D3 motorway (Czech Republic): Difference between revisions
M97uzivatel (talk | contribs) →Unfinished sections: updated |
M97uzivatel (talk | contribs) →Unfinished sections: already not unfinished |
||
(13 intermediate revisions by 6 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Motorway in the Czech Republic}} |
|||
{{Expand Czech|topic=transp}} |
{{Expand Czech|topic=transp}} |
||
{{Infobox road |
{{Infobox road |
||
Line 7: | Line 8: | ||
| map_custom = yes |
| map_custom = yes |
||
| e-road = [[File:CZ traffic sign IS17 - E55.svg|40px|European route E55]] |
| e-road = [[File:CZ traffic sign IS17 - E55.svg|40px|European route E55]] |
||
| length_km = |
| length_km = 100.5 |
||
| length_notes = Planned: {{convert|172|km|mi|abbr=on}} |
| length_notes = Planned: {{convert|172|km|mi|abbr=on}} |
||
| terminus_a = [[File:CZ traffic sign IS16a - D0.svg|20px]] [[D0 motorway (Czech Republic)|D0]] in [[Prague]] |
| terminus_a = [[File:CZ traffic sign IS16a - D0.svg|20px]] [[D0 motorway (Czech Republic)|D0]] in [[Prague]] |
||
Line 16: | Line 17: | ||
| photo = Motorway D3-CZ-11 12 2019.png |
| photo = Motorway D3-CZ-11 12 2019.png |
||
}} |
}} |
||
The '''D3 motorway''' ({{ |
The '''D3 motorway''' ({{langx|cs|'''Dálnice D3'''}}) is a [[highway]] in the [[Czech Republic]]. Currently only the middle segment of the route is in operation; when complete, it will run from [[Prague]] via [[Tábor]] and [[České Budějovice]] to the Czech-[[Austria]]n border at [[Dolní Dvořiště]]. It is part of the [[European route E55]]. |
||
The D3 motorway in the [[South Bohemian Region]] towards the Austrian border should be completed by 2026.<ref>{{cite news |title=ŘSD může dostavět padesát metrů dálnice D3, vyvlastnění pozemku platí |url=https://www.idnes.cz/ceske-budejovice/zpravy/rsd-dalnice-d3-borek-sevetin-vyvlastneni-pozemek-majitel.A190204_130953_budejovice-zpravy_khr |work=iDNES.cz |date=4 February 2019}}</ref> Completion of D3 in the [[Central Bohemian Region]] is planned by 2028, however its designed course through the Lower [[Sázava (river)|Sázava]] landscape is still objected and opposed by environmental and citizens associations. |
The D3 motorway in the [[South Bohemian Region]] towards the Austrian border should be completed by 2026.<ref>{{cite news |title=ŘSD může dostavět padesát metrů dálnice D3, vyvlastnění pozemku platí |url=https://www.idnes.cz/ceske-budejovice/zpravy/rsd-dalnice-d3-borek-sevetin-vyvlastneni-pozemek-majitel.A190204_130953_budejovice-zpravy_khr |work=iDNES.cz |date=4 February 2019}}</ref> Completion of D3 in the [[Central Bohemian Region]] is planned by 2028, however its designed course through the Lower [[Sázava (river)|Sázava]] landscape is still objected and opposed by environmental and citizens associations. |
||
== Course == |
== Course == |
||
Once completed, the {{convert|172|km|mi|adj=mid|-long}} highway will connect the Czech capital Prague with the Austrian ''[[Mühlviertler Schnellstraße|Mühlviertel Expressway]]'' (S10) to [[Linz]]. As of December |
Once completed, the {{convert|172|km|mi|adj=mid|-long}} highway will connect the Czech capital Prague with the Austrian ''[[Mühlviertler Schnellstraße|Mühlviertel Expressway]]'' (S10) to [[Linz]]. As of December 2024 {{convert|100.5|km|mi|abbr=on}} of the highway are in operation, a section from [[Mezno]] to [[Kaplice]]-nádraží, while a further {{convert|15.3|km|mi|abbr=on}} from Kaplice-nádraží to Czechia-Austria border are currently under construction.<ref>{{cite news |last1=Skálová |first1=Klára |last2=Otta |first2=Edwin |last3=Hříbal |first3=Antonín |title=K hranicím bezpečněji a bez kolon. Otevřeli nové úseky D3 i obchvat Budějovic |url=https://taborsky.denik.cz/z_regionu/ceske-budejovice-dalnice-otevira.html |access-date=21 December 2024 |agency=Denik |publisher=Vltava Labe media |language=cs}}</ref> The most controversial and disputed section is the planned segment in the [[Central Bohemian Region]]. |
||
A {{convert|24.0|km|mi|adj=mid|-long}} section from [[Dolní Třebonín]] to the border with [[Austria]] on the other side of the future S10 expressway was initially planned to be built as an expressway ({{ |
A {{convert|24.0|km|mi|adj=mid|-long}} section from [[Dolní Třebonín]] to the border with [[Austria]] on the other side of the future S10 expressway was initially planned to be built as an expressway ({{langx|cs|rychlostní silnice}}) as well, however on 1 January 2016, the category of expressways (R) was abolished in Czechia, so it is counted as part of the D3 motorway. |
||
== Unfinished sections == |
== Unfinished sections == |
||
Line 34: | Line 35: | ||
|[[Prague|Praha]] – [[Jílové u Prahy]] |
|[[Prague|Praha]] – [[Jílové u Prahy]] |
||
|9,51 km |
|9,51 km |
||
| rowspan="5" |planned |
| rowspan="5" |planned 2027 |
||
| rowspan="5" |planned |
| rowspan="5" |planned 2031 |
||
|- style="vertical-align: top; background-color: #e999c3" |
|- style="vertical-align: top; background-color: #e999c3" |
||
|Jílové u Prahy – Hostěradice |
|Jílové u Prahy – Hostěradice |
||
Line 49: | Line 50: | ||
|16,45 km |
|16,45 km |
||
|- style="vertical-align: top; background-color: #ffcc96" |
|- style="vertical-align: top; background-color: #ffcc96" |
||
|[[Úsilné]] – Hodějovice |
|||
|7,2 km |
|||
⚫ | |||
|2024<ref name="rsd-0310-I" /> |
|||
|- style="vertical-align: top; background-color: #ffcc96" |
|||
|Hodějovice – Dolní Třebonín |
|||
|12,5 km |
|||
|03/2019<ref name=":0">{{Cite web|last=|first=|date=|title=Directorate of roads and highways|url=https://mapapp.rsd.cz/Upload/Stavby/40/infoletak_d3-hodejovice-trebonin.pdf|url-status=live|archive-url=https://web.archive.org/web/20190113003937/https://mapapp.rsd.cz/Upload/Stavby/40/infoletak_d3-hodejovice-trebonin.pdf |archive-date=2019-01-13 |access-date=|website=}}</ref> |
|||
|6/2024<ref>https://apdos.roadmedia.cz/Upload/Stavby/40/infoletak_d3-hodejovice-trebonin.pdf?t=2024-01-04%2017:52:01.863</ref> |
|||
|- style="vertical-align: top; background-color: #ffcc96" |
|||
|Dolní Třebonín – Kaplice-nádraží |
|||
|8,5 km |
|||
|02/2022<ref name="rsd0311">https://mapapp.rsd.cz/Upload/Stavby/48/infoletak_d3-trebonin-kaplice.pdf {{Bare URL PDF|date=March 2022}}</ref> |
|||
|planned 2024<ref name="rsd0311" /> |
|||
|- style="vertical-align: top; background-color: #e999c3" |
|||
|Kaplice-nádraží – Nažidla |
|Kaplice-nádraží – Nažidla |
||
|12,0 km |
|12,0 km |
||
|2024 |
|06/2024 |
||
|planned 2026 |
|planned 2026 |
||
|- style="vertical-align: top; background-color: # |
|- style="vertical-align: top; background-color: #ffcc96" |
||
|Nažidla – border with [[Austria]] |
|Nažidla – border with [[Austria]] |
||
|3,5 km |
|3,5 km |
||
⚫ | |||
|2024 |
|||
|planned 2026 |
|planned 2026 |
||
|} |
|} |
Latest revision as of 17:26, 26 December 2024
You can help expand this article with text translated from the corresponding article in Czech. Click [show] for important translation instructions.
|
D3 Motorway | |
---|---|
Dálnice D3 | |
Route information | |
Part of | |
Length | 100.5 km (62.4 mi) Planned: 172 km (107 mi) |
Major junctions | |
From | D0 in Prague |
To | S10 border with Austria near Dolní Dvořiště |
Location | |
Country | Czech Republic |
Regions | Central Bohemian, South Bohemian |
Major cities | Tábor, České Budějovice |
Highway system | |
The D3 motorway (Czech: Dálnice D3) is a highway in the Czech Republic. Currently only the middle segment of the route is in operation; when complete, it will run from Prague via Tábor and České Budějovice to the Czech-Austrian border at Dolní Dvořiště. It is part of the European route E55.
The D3 motorway in the South Bohemian Region towards the Austrian border should be completed by 2026.[1] Completion of D3 in the Central Bohemian Region is planned by 2028, however its designed course through the Lower Sázava landscape is still objected and opposed by environmental and citizens associations.
Course
[edit]Once completed, the 172-kilometre-long (107 mi) highway will connect the Czech capital Prague with the Austrian Mühlviertel Expressway (S10) to Linz. As of December 2024 100.5 km (62.4 mi) of the highway are in operation, a section from Mezno to Kaplice-nádraží, while a further 15.3 km (9.5 mi) from Kaplice-nádraží to Czechia-Austria border are currently under construction.[2] The most controversial and disputed section is the planned segment in the Central Bohemian Region.
A 24.0-kilometre-long (14.9 mi) section from Dolní Třebonín to the border with Austria on the other side of the future S10 expressway was initially planned to be built as an expressway (Czech: rychlostní silnice) as well, however on 1 January 2016, the category of expressways (R) was abolished in Czechia, so it is counted as part of the D3 motorway.
Unfinished sections
[edit]Section | Length | Start of construction | Completion |
---|---|---|---|
Praha – Jílové u Prahy | 9,51 km | planned 2027 | planned 2031 |
Jílové u Prahy – Hostěradice | 4,49 km | ||
Hostěradice – Václavice | 11,29 km | ||
Václavice – Voračice | 16,70 km | ||
Voračice – Nová Hospoda | 16,45 km | ||
Kaplice-nádraží – Nažidla | 12,0 km | 06/2024 | planned 2026 |
Nažidla – border with Austria | 3,5 km | 01/2024[3] | planned 2026 |
Images
[edit]-
D3 motorway near Planá nad Lužnicí.
-
D3 motorway near České Budějovice.
References
[edit]- ^ "ŘSD může dostavět padesát metrů dálnice D3, vyvlastnění pozemku platí". iDNES.cz. 4 February 2019.
- ^ Skálová, Klára; Otta, Edwin; Hříbal, Antonín. "K hranicím bezpečněji a bez kolon. Otevřeli nové úseky D3 i obchvat Budějovic" (in Czech). Vltava Labe media. Denik. Retrieved 21 December 2024.
- ^ https://apdos.roadmedia.cz/Upload/Stavby/46/infoletak_d3-nazidla-dolni-dvoriste.pdf?t=2024-01-09%2012:13:38.877 [bare URL]