Jump to content

D3 motorway (Czech Republic): Difference between revisions

Coordinates: 49°22′47.29″N 14°43′27.32″E / 49.3798028°N 14.7242556°E / 49.3798028; 14.7242556
From Wikipedia, the free encyclopedia
Content deleted Content added
Unfinished sections: already not unfinished
 
(44 intermediate revisions by 20 users not shown)
Line 1: Line 1:
{{Short description|Motorway in the Czech Republic}}
{{unreferenced|date=August 2008}}
{{Expand Czech|topic=transp}}
{{infobox road
{{Infobox road
|country=CZE
| country = CZE
|type=D
| type = D
|route=3
| route = 3
|map=Motorway D3-CZ map.svg
| map = {{MapframeForObjects|frame=yes|plain=yes|type=line|frame-align=center|frame-width=290|stroke-width=3}}
|e-road=[[File:CZ traffic sign IS17 - E55.svg|40px|European route E55]]
| map_custom = yes
|length_km=50
| e-road = [[File:CZ traffic sign IS17 - E55.svg|40px|European route E55]]
|length_notes=Planned: {{convert|172|km|mi|abbr=on}}
| length_km = 100.5
|terminus_a= [[File:CZ traffic sign IS16a - D0.svg|20px]] [[D0 motorway (Czech Republic)|D0]] in [[Prague]]
| length_notes = Planned: {{convert|172|km|mi|abbr=on}}
|junction=
|terminus_b=[[File:S10-AT.svg|20px]] [[Mühlviertler Schnellstraße|S10]] border with [[Austria]] near [[Dolní Dvořiště]]
| terminus_a = [[File:CZ traffic sign IS16a - D0.svg|20px]] [[D0 motorway (Czech Republic)|D0]] in [[Prague]]
| junction =
|regions=[[Central Bohemian Region|Central Bohemian]], [[South Bohemian Region|South Bohemian]]
| terminus_b = [[File:S10-AT.svg|20px]] [[Mühlviertler Schnellstraße|S10]] border with [[Austria]] near [[Dolní Dvořiště]]
|cities=[[Tábor]], [[České Budějovice]]
| regions = [[Central Bohemian Region|Central Bohemian]], [[South Bohemian Region|South Bohemian]]
| cities = [[Tábor]], [[České Budějovice]]
| photo = Motorway D3-CZ-11 12 2019.png
}}
}}
The '''D3 motorway''' ({{langx|cs|'''Dálnice D3'''}}) is a [[highway]] in the [[Czech Republic]]. Currently only the middle segment of the route is in operation; when complete, it will run from [[Prague]] via [[Tábor]] and [[České Budějovice]] to the Czech-[[Austria]]n border at [[Dolní Dvořiště]]. It is part of the [[European route E55]].


The D3 motorway in the [[South Bohemian Region]] towards the Austrian border should be completed by 2026.<ref>{{cite news |title=ŘSD může dostavět padesát metrů dálnice D3, vyvlastnění pozemku platí |url=https://www.idnes.cz/ceske-budejovice/zpravy/rsd-dalnice-d3-borek-sevetin-vyvlastneni-pozemek-majitel.A190204_130953_budejovice-zpravy_khr |work=iDNES.cz |date=4 February 2019}}</ref> Completion of D3 in the [[Central Bohemian Region]] is planned by 2028, however its designed course through the Lower [[Sázava (river)|Sázava]] landscape is still objected and opposed by environmental and citizens associations.
The '''D3 motorway''' ({{lang-cs|'''Dálnice D3'''}}) is a [[highway]] in the [[Czech Republic]]. Currently only some segments of the route are in operation; when complete, it will run from [[Prague]] through [[Tábor]] and [[České Budějovice]] to the Czech-[[Austria]]n border at [[Dolní Dvořiště]]. It is part of the [[European route E55]].


== Course ==
== Course ==
Once completed, the {{convert|172|km|mi|adj=mid|-long}} highway will connect the Czech capital Prague with the Austrian ''[[Mühlviertler Schnellstraße]]'' (S10) highway to [[Linz]]. As of March 2019 only {{convert|50.7|km|mi|abbr=on}} of the highway are in operation, a section from [[Mezno]] to [[Veselí nad Lužnicí]] {{convert|47.5|km|mi|abbr=on}} and from [[Borek (České Budějovice District)|Borek]] to [[Úsilné]] {{convert|3.2|km|mi|abbr=on}} while a further {{convert|18.8|km|mi|abbr=on}} from Veselí through [[Ševětín]] to Borek and {{convert|19.7|km|mi|abbr=on}} from Úsilne to Dolní Třebonín are currently under construction. The most controversial and disputed section is the planned segment in the [[Central Bohemian Region]].
Once completed, the {{convert|172|km|mi|adj=mid|-long}} highway will connect the Czech capital Prague with the Austrian ''[[Mühlviertler Schnellstraße|Mühlviertel Expressway]]'' (S10) to [[Linz]]. As of December 2024 {{convert|100.5|km|mi|abbr=on}} of the highway are in operation, a section from [[Mezno]] to [[Kaplice]]-nádraží, while a further {{convert|15.3|km|mi|abbr=on}} from Kaplice-nádraží to Czechia-Austria border are currently under construction.<ref>{{cite news |last1=Skálová |first1=Klára |last2=Otta |first2=Edwin |last3=Hříbal |first3=Antonín |title=K hranicím bezpečněji a bez kolon. Otevřeli nové úseky D3 i obchvat Budějovic |url=https://taborsky.denik.cz/z_regionu/ceske-budejovice-dalnice-otevira.html |access-date=21 December 2024 |agency=Denik |publisher=Vltava Labe media |language=cs}}</ref> The most controversial and disputed section is the planned segment in the [[Central Bohemian Region]].


A {{convert|24.0|km|mi|adj=mid|-long}} section from [[Dolní Třebonín]] to the border with Austria on the other side of the future ''Mühlviertler Schnellstraße'' (S10) was initially planned to be built as an expressway ({{lang-cs|rychlostní silnice}}), however on 1 January 2016, the category of expressways was abolished, and it is counted as part of the D3 motorway.
A {{convert|24.0|km|mi|adj=mid|-long}} section from [[Dolní Třebonín]] to the border with [[Austria]] on the other side of the future S10 expressway was initially planned to be built as an expressway ({{langx|cs|rychlostní silnice}}) as well, however on 1 January 2016, the category of expressways (R) was abolished in Czechia, so it is counted as part of the D3 motorway.

== Unfinished sections ==
{| class="wikitable"
!Section
!Length
!Start of construction
!Completion
|- style="vertical-align: top; background-color: #e999c3"
|[[Prague|Praha]] – [[Jílové u Prahy]]
|9,51&nbsp;km
| rowspan="5" |planned 2027
| rowspan="5" |planned 2031
|- style="vertical-align: top; background-color: #e999c3"
|Jílové u Prahy – Hostěradice
|4,49&nbsp;km
|- style="vertical-align: top; background-color: #e999c3"
|Hostěradice – Václavice
|11,29&nbsp;km
|- style="vertical-align: top; background-color: #e999c3"
|Václavice – Voračice
|16,70&nbsp;km
|- style="vertical-align: top; background-color: #e999c3"
|Voračice – Nová Hospoda
|16,45&nbsp;km
|- style="vertical-align: top; background-color: #ffcc96"
|Kaplice-nádraží – Nažidla
|12,0&nbsp;km
|06/2024
|planned 2026
|- style="vertical-align: top; background-color: #ffcc96"
|Nažidla – border with [[Austria]]
|3,5&nbsp;km
|01/2024<ref>https://apdos.roadmedia.cz/Upload/Stavby/46/infoletak_d3-nazidla-dolni-dvoriste.pdf?t=2024-01-09%2012:13:38.877 {{Bare URL inline|date=August 2024}}</ref>
|planned 2026
|}


==Images==
==Images==
<gallery>
<gallery>
File: Planá nad Lužnicí, zatáčka.jpg | D3 Highway near [[Planá nad Lužnicí]].
File:Planá nad Lužnicí, zatáčka.jpg|D3 motorway near [[Planá nad Lužnicí]].
File:Dálnice D3 u Českých Budějovic.jpg|D3 motorway near [[České Budějovice]].
</gallery>
</gallery>

== References ==
{{Reflist}}


{{CzechHighways}}
{{CzechHighways}}


{{coord|49|22|47.29|N|14|43|27.32|E|region:CZ|display=title}}
{{coord|49|22|47.29|N|14|43|27.32|E|region:CZ|display=title}}
{{Authority control}}


[[Category:Motorways in the Czech Republic|D03]]
[[Category:Motorways in the Czech Republic|D03]]

Latest revision as of 17:26, 26 December 2024

D3 Motorway shield}}
D3 Motorway
Dálnice D3
Map
Motorway D3-CZ-11 12 2019.png
Route information
Part of European route E55
Length100.5 km (62.4 mi)
Planned: 172 km (107 mi)
Major junctions
From D0 in Prague
To S10 border with Austria near Dolní Dvořiště
Location
CountryCzech Republic
RegionsCentral Bohemian, South Bohemian
Major citiesTábor, České Budějovice
Highway system

The D3 motorway (Czech: Dálnice D3) is a highway in the Czech Republic. Currently only the middle segment of the route is in operation; when complete, it will run from Prague via Tábor and České Budějovice to the Czech-Austrian border at Dolní Dvořiště. It is part of the European route E55.

The D3 motorway in the South Bohemian Region towards the Austrian border should be completed by 2026.[1] Completion of D3 in the Central Bohemian Region is planned by 2028, however its designed course through the Lower Sázava landscape is still objected and opposed by environmental and citizens associations.

Course

[edit]

Once completed, the 172-kilometre-long (107 mi) highway will connect the Czech capital Prague with the Austrian Mühlviertel Expressway (S10) to Linz. As of December 2024 100.5 km (62.4 mi) of the highway are in operation, a section from Mezno to Kaplice-nádraží, while a further 15.3 km (9.5 mi) from Kaplice-nádraží to Czechia-Austria border are currently under construction.[2] The most controversial and disputed section is the planned segment in the Central Bohemian Region.

A 24.0-kilometre-long (14.9 mi) section from Dolní Třebonín to the border with Austria on the other side of the future S10 expressway was initially planned to be built as an expressway (Czech: rychlostní silnice) as well, however on 1 January 2016, the category of expressways (R) was abolished in Czechia, so it is counted as part of the D3 motorway.

Unfinished sections

[edit]
Section Length Start of construction Completion
PrahaJílové u Prahy 9,51 km planned 2027 planned 2031
Jílové u Prahy – Hostěradice 4,49 km
Hostěradice – Václavice 11,29 km
Václavice – Voračice 16,70 km
Voračice – Nová Hospoda 16,45 km
Kaplice-nádraží – Nažidla 12,0 km 06/2024 planned 2026
Nažidla – border with Austria 3,5 km 01/2024[3] planned 2026

Images

[edit]

References

[edit]
  1. ^ "ŘSD může dostavět padesát metrů dálnice D3, vyvlastnění pozemku platí". iDNES.cz. 4 February 2019.
  2. ^ Skálová, Klára; Otta, Edwin; Hříbal, Antonín. "K hranicím bezpečněji a bez kolon. Otevřeli nové úseky D3 i obchvat Budějovic" (in Czech). Vltava Labe media. Denik. Retrieved 21 December 2024.
  3. ^ https://apdos.roadmedia.cz/Upload/Stavby/46/infoletak_d3-nazidla-dolni-dvoriste.pdf?t=2024-01-09%2012:13:38.877 [bare URL]

49°22′47.29″N 14°43′27.32″E / 49.3798028°N 14.7242556°E / 49.3798028; 14.7242556