Jump to content

Nanning Metro: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Tags: Mobile edit Mobile web edit
 
(48 intermediate revisions by 29 users not shown)
Line 1: Line 1:
{{short description|Rapid transit system in Nanning, China}}
{{short description|Rapid transit system in Nanning, China}}
{{cleanup HTML|date=February 2019}}
{{Infobox public transit
{{Infobox public transit
| name = Nanning Metro
| name = Nanning Metro
| image =
| image =
| imagesize =
| imagesize =
| image2 = Nanning Rail Transit.png
| image2 =
| imagesize2 = 100px
| imagesize2 =
| caption =
| caption =
| owner =
| owner =
| locale = [[Nanning]], [[Guangxi]], [[People's Republic of China|China]]
| locale = [[Nanning]], [[Guangxi]], [[China]]
| transit_type = [[Rapid Transit]]
| transit_type = [[Rapid Transit]]
| lines = 3
| lines = 5
| stations = 66
| stations = 101
| ridership = 0.5852 million (2018 daily avg.)<ref>http://3g.nnwb.com/html/2019-08/25/content_370171.htm</ref>
| ridership = 791,100 (2021 daily avg.)<ref name = ridership/>
1.4326 million (31 December 2020 record)<ref>{{cite web | url=http://www.nnnews.net/yaowen/p/3065226.html | title=南宁地铁客流量连续两日创新高 1月1日客运量达143.26万人次_南宁新闻网 }}</ref>
1.1657 million (30 September 2019 record)<ref>http://baijiahao.baidu.com/s?id=1646820805805390200&wfr=spider&for=pc</ref>
| chief_executive =
| chief_executive =
| headquarters =
| headquarters =
Line 24: Line 23:
| train_length =
| train_length =
| headway =
| headway =
| system_length = {{convert|81.0|km|mi|1|abbr=on}}
| system_length = {{convert|128.2|km|mi|1|abbr=on}}
| track_gauge = 1,435 mm (4 ft 8 1⁄2 in)
| track_gauge = 1,435 mm (4 ft 8 1⁄2 in)
| ogauge =
| ogauge =
Line 32: Line 31:
| top_speed = <!-- {{convert|0|mph|km/h|abbr=on}} -->
| top_speed = <!-- {{convert|0|mph|km/h|abbr=on}} -->
| osm_id =
| osm_id =
| map = [[File:Nanning Rail Transit Linemap.svg|250px]]
| map = [[File:Nanning Rail Transit Diagram.png|250px]]
| map_name =
| map_name =
| map_state = <!-- show or collapsed -->
| map_state = <!-- show or collapsed -->
Line 40: Line 39:
| start =
| start =
| end =
| end =
| annual_ridership = 289 million (2021)<ref name = ridership>{{cite web|url=https://mp.weixin.qq.com/s/V6Bnx1J8u3emUAAdEx0TTg|title=运送乘客237.1亿人次,新增运营里程1168公里…2021年城市轨道交通运营成绩单|date= 2022-01-13|access-date=19 July 2022}}</ref>
| annual_ridership = 0.214 billion (2018)
| character =
| character =
}}<br />{{Chinese
}}{{Chinese
|title=Nanning Rail Transit
|title=Nanning Rail Transit
|s=南宁轨道交通
|s=南宁轨道交通
Line 53: Line 52:
|order=st
|order=st
}}
}}
'''Nanning Metro''' or '''Nanning Rail Transit (NNRT)''' is a [[rapid transit]] system in [[Nanning]], the capital of [[Guangxi|Guangxi Zhuang Autonomous Region]] in [[China]].
'''Nanning Metro''' or '''Nanning Nanning Rail Transit (NNRT)''' is a [[rapid transit]] system in [[Nanning]], the capital of [[Guangxi|Guangxi Zhuang Autonomous Region]]. Line 1 officially started construction on December 29, 2011.<ref name="开工"/> The first 11.2&nbsp;km section, from Nanhu to Nanning East railway station, began operation June 28, 2016.<ref>http://www.urbanrail.net/as/cn/nanning/nanning.htm</ref> The line opened fully on December 28, 2016. It is 32.1&nbsp;km long, with 25 stations.<ref name="开工"/><ref>{{Cite web|url=http://www.gxnews.com.cn/staticpages/20161228/newgx5863ca6c-15822979.shtml|title=南宁轨道交通1号线全线开通试运营-广西新闻网|website=www.gxnews.com.cn|access-date=2016-12-28}}</ref> Line 2 started construction in 2012 and was completed on December 28, 2017.<ref>http://gx.people.com.cn/n/2013/0118/c179430-18043536.html</ref><ref name=":0">{{Cite web|url=http://www.chinanews.com/sh/2017/12-28/8411562.shtml|title=南宁地铁2号线开通试运营 轨道交通建成"十字网"-中新网|last=chinanews|website=www.chinanews.com|access-date=2017-12-29}}</ref> Currently, Lines 3, 4, 5 and an extension of Line 2 are under construction. It is planned that by 2021 there will be four vertical and four horizontal lines totaling 252&nbsp;km of subway. The system is projected to carry over 5 million passengers per day.<ref name="开工">{{cite news|language=zh|author=罗宁|url=http://unn.people.com.cn/GB/22220/120172/16754009.html|title=南宁轨道交通一号线工程全线开工|work=南宁新闻网|publisher=人民网|date=2011-12-29|access-date=2012-01-01}}</ref><ref>{{Cite web|url=http://gx.people.com.cn/n2/2017/1228/c179430-31081979.html|title=2021年南宁将开通5条地铁线路 轨道交连线成网--广西频道--人民网|last=L_103847|website=gx.people.com.cn|access-date=2017-12-29}}</ref>


==Lines in operation==
==Lines in operation==
[[File:Nanning Rail Transit Linemap.svg|center|750px]]
[[File:Nanning Rail Transit Diagram.png|center|750px]]
{|class="wikitable sortable" style="cell-padding:1.5; font-size:96%; text-align:center;"
{|class="wikitable sortable" style="cell-padding:1.5; font-size:96%; text-align:center;"
! data-sort-type="text"style="width:120px;"|Line
! data-sort-type="text"style="width:120px;"|Line
Line 66: Line 65:
|-
|-
|style="text-align:center; line-height:1.05" | {{rint|nanning|1}}
|style="text-align:center; line-height:1.05" | {{rint|nanning|1}}
|style="text-align:center; width:225px; line-height:1.05"| '''[[Shibu Station|Shibu]]'''<br>([[Xixiangtang District|Xixiangtang]])
|style="text-align:center; width:225px; line-height:1.05"| '''{{stl|Nanning Metro|Shibu}}'''<br>([[Xixiangtang District|Xixiangtang]])
|style="text-align:center; width:225px; line-height:1.05"| '''[[Nanning East railway station]]'''<br>([[Qingxiu District|Qingxiu]])
|style="text-align:center; width:225px; line-height:1.05"| '''[[Nanning East railway station]]'''<br>([[Qingxiu District|Qingxiu]])
|style="text-align:center; line-height:1.05" | 2016
|style="text-align:center; line-height:1.05" | 2016
Line 74: Line 73:
|-
|-
|style="text-align:center; line-height:1.05" | {{rint|nanning|2}}
|style="text-align:center; line-height:1.05" | {{rint|nanning|2}}
|style="text-align:center; width:225px; line-height:1.05"| '''[[Xijin Station|Xijin]]'''<br>([[Xixiangtang District|Xixiangtang]])
|style="text-align:center; width:225px; line-height:1.05"| '''{{stl|Nanning Metro|Xijin}}'''<br>([[Xixiangtang District|Xixiangtang]])
|style="text-align:center; width:225px; line-height:1.05"| '''[[Tanze Station (Nanning)|Tanze]]'''<br>([[Liangqing District|Liangqing]])
|style="text-align:center; width:225px; line-height:1.05"| '''{{stl|Nanning Metro|Tanze}}'''<br>([[Liangqing District|Liangqing]])
|style="text-align:center; line-height:1.05" | 2017
|style="text-align:center; line-height:1.05" | 2017
|style="text-align:center; line-height:1.05" | 2020
|style="text-align:center; line-height:1.05" | 2020
Line 82: Line 81:
|-
|-
|style="text-align:center; line-height:1.05" | {{rint|nanning|3}}
|style="text-align:center; line-height:1.05" | {{rint|nanning|3}}
|style="text-align:center; width:225px; line-height:1.05"| '''[[Keyuan Dadao Station|Keyuan Dadao]]'''<br>([[Xixiangtang District|Xixiangtang]])
|style="text-align:center; width:225px; line-height:1.05"| '''{{stl|Nanning Metro|Keyuan Dadao}}'''<br>([[Xixiangtang District|Xixiangtang]])
|style="text-align:center; width:225px; line-height:1.05"| '''[['Pingliang Overpass Station|Pingliang Overpass]]'''<br>([[Liangqing District|Liangqing]])
|style="text-align:center; width:225px; line-height:1.05"| '''{{stl|Nanning Metro|Pingliang Overpass}}'''<br>([[Liangqing District|Liangqing]])
|style="text-align:center; line-height:1.05" | 2019
|style="text-align:center; line-height:1.05" | 2019
|style="text-align:center; line-height:1.05" | —
|style="text-align:center; line-height:1.05" | —
Line 90: Line 89:
|-
|-
|{{rint|nanning|4}}
|{{rint|nanning|4}}
|'''Hongyun Lu'''
|'''{{stl|Nanning Metro|Hongyun Lu}}'''
|'''{{stl|Nanning Metro|Lengtangcun}}'''
|'''Lentangcun'''
|2020
|2020
|
|
|20.7
|20.7
|16
|16
|-
|{{rint|nanning|5}}
|'''{{stl|Nanning Metro|Guokai Dadao}}'''
|'''{{stl|Nanning Metro|Jinqiao Coach Station}}'''
|2021
|
|20.2<ref name=":1"/>
|17
|- class="sortbottom"
|- class="sortbottom"
| colspan="5" style="text-align:center; line-height:1.05" |'''Total'''
| colspan="5" style="text-align:center; line-height:1.05" |'''Total'''
| style="text-align:center; line-height:1.05" |'''108.0'''
| style="text-align:center; line-height:1.05" |'''128.2'''
| style="text-align:center; line-height:1.05" |'''84'''
| style="text-align:center; line-height:1.05" |'''101'''
|}
|}


{{notelist}}
{{notelist}}


==History==
==Future Expansion==
Line 1 officially started construction on December 29, 2011.<ref name="开工"/> The first 11.2&nbsp;km section, from Nanhu to Nanning East railway station, began operation June 28, 2016.<ref>{{Cite web|url=http://www.urbanrail.net/as/cn/nanning/nanning.htm|title = UrbanRail.Net > Asia > China > Nanning Metro}}</ref> The line opened fully on December 28, 2016. It is 32.1&nbsp;km long, with 25 stations.<ref name="开工"/><ref>{{Cite web|url=http://www.gxnews.com.cn/staticpages/20161228/newgx5863ca6c-15822979.shtml|title=南宁轨道交通1号线全线开通试运营-广西新闻网|website=www.gxnews.com.cn|access-date=2016-12-28}}</ref> Line 2 started construction in 2012 and was completed on December 28, 2017.<ref>{{cite news|url=http://gx.people.com.cn/n/2013/0118/c179430-18043536.html|archive-url=https://archive.today/20130801162102/http://gx.people.com.cn/n/2013/0118/c179430-18043536.html|title=南宁轨道交通2号线预计年底开工2017年建成 连接玉洞西津|url-status=dead|date=2013-01-18|archive-date=2013-08-01|work=[[People's Daily]]|access-date=2013-08-01}}</ref><ref name=":0">{{Cite web|url=http://www.chinanews.com/sh/2017/12-28/8411562.shtml|title=南宁地铁2号线开通试运营 轨道交通建成"十字网"-中新网|last=chinanews|website=www.chinanews.com|access-date=2017-12-29}}</ref> Line 3 opened in June 2019. Line 4 opened in November 2020. Line 5 opened on December 16, 2021.<ref name=":1">{{cite web|url=https://www.sohu.com/a/508217651_120711264|title=12月16日!南宁地铁5号线时间定了!|website=[[Sohu]]}}</ref>
[[File:Nanning Rail Transit System Map Plan2022 2018.png|center|800px]]

{| class="wikitable sortable"
With the opening of Line 5, Nanning became the seventh city in China, and the first in Southern China to open and operate a fully automated subway line.<ref>{{cite news|language=zh|url=https://www.163.com/dy/article/GRCC9LI80514R9NP.html|title=南宁地铁5号线开通运营 成为华南地区首条全自动运行地铁线路|work=163 News|date=2021-12-16}}</ref>
!Planned opening date

!Route
==Future expansion==
!Name

! colspan="2" |Terminals
The final 3.9&nbsp;km of Phase 1 of Line 4, an extension from Lengtangcun to Longgang adding 3 stations, started construction in August 2022.<ref>{{cite news |title=Guangxi Nanning Metro Line 4 Continuation Project Starts |work=Seetao |url=https://www.seetao.com/details/177515.html} |access-date=2022-08-22}}</ref>
!Length (km)

!Stations
Line 6 Phase 1 started construction on December 26, 2023. Line 6 Phase 1 is an east-west crosstown line that is 27.9 km long with 21 stations.<ref>{{Cite web |title=重磅!南宁地铁6号线一期工程开工_建设_早报_南国 |url=https://www.sohu.com/a/www.sohu.com/a/747248430_120711264 |access-date=2024-06-26 |website=www.sohu.com}}</ref>
!Status

|-
It is planned that there will be four vertical and four horizontal lines totaling 252&nbsp;km of subway. The system is projected to carry over 5 million passengers per day.<ref name="开工">{{cite news|language=zh|author=罗宁|url=http://unn.people.com.cn/GB/22220/120172/16754009.html|title=南宁轨道交通一号线工程全线开工|work=南宁新闻网|publisher=人民网|date=2011-12-29|access-date=2012-01-01}}</ref><ref>{{cite news|url=http://gx.people.com.cn/n2/2017/1228/c179430-31081979.html|archive-url=https://web.archive.org/web/20171229112623/http://gx.people.com.cn/n2/2017/1228/c179430-31081979.html|title=2021年南宁将开通5条地铁线路 轨道交通连线成网|url-status=dead|date=2017-12-28|archive-date=2017-12-29|work=[[People's Daily]]}}</ref>
|2020
|{{rint|nanning|4}}
|Phase I
|Hongyun Lu
|Longgang
|24.6&nbsp;km
|19
|<ref>{{Cite web|url=http://www.nngdjt.com/html/4061/6835.html|title=地铁4号线一期开建 全线串起五象各组团-南宁轨道交通集团有限责任公司|website=www.nngdjt.com|access-date=2019-01-13}}</ref>
|-
| rowspan="2" |2021
|{{rint|nanning|2}}
|East Extension
|Yudong
|Tanze
|6.3&nbsp;km
|5
|<ref>{{Cite web|url=http://www.nngdjt.com/html/4061/8671.html|title=南宁地铁2号线东延工程开工建设-南宁轨道交通集团有限责任公司|website=www.nngdjt.com|access-date=2019-01-13}}</ref><ref>{{Cite web|url=http://www.gxnews.com.cn/staticpages/20170527/newgx5928bcd0-16225680.shtml|title=南宁地铁2号线东延工程开建 设5站全长约6.3公里||access-date=2019-01-13|archive-url=https://web.archive.org/web/20170530011322/http://www.gxnews.com.cn/staticpages/20170527/newgx5928bcd0-16225680.shtml|archive-date=2017-05-30|url-status=live|work=www.gxnews.com.cn}}</ref>
|-
|{{rint|nanning|5}}
|Phase I
|Guokai Dadao
|Jinqiao Coach Station
|20.38&nbsp;km
|17
|<ref>{{Cite web|url=http://www.crfsdi.com.cn/sysWeb/upfiles/hpgs/201610081855002.pdf|archive-url=https://web.archive.org/web/20161012151615/http://www.crfsdi.com.cn/sysWeb/upfiles/hpgs/201610081855002.pdf|url-status=dead|archive-date=2016-10-12|date=2016-10-12|access-date=2019-01-13|work=www.crfsdi.com.cn|title=南宁市城市轨道交通 5 号线一期工程(那洪~金桥客运站)环境影响评价公众参与第二次公示}}</ref>}


== Network Map ==
==Network map==
{{Rapid transit OSM map
{{Rapid transit OSM map
| system_qid = Q10907375
|system_qid = Q10907375
| frame-lat = 22.8
|frame-lat = 22.81
| frame-long = 108.3
|frame-long = 108.30
| frame-width = 750
|frame-height = 400
| frame-height = 470
|frame-width = 600
| zoom = 11
|zoom = 11
| length = yes
}}
}}


==See also==
==See also==
*[[Nanning Railway Bureau]]
*[[Nanning railway station]]
*[[List of metro systems]]
*[[List of metro systems]]


Line 162: Line 142:
{{Guangxi transit}}
{{Guangxi transit}}
{{Rapid transit in the People's Republic of China}}
{{Rapid transit in the People's Republic of China}}
{{Rapid transit in Asia}}


[[Category:Nanning Metro| ]]
[[Category:Nanning Metro| ]]
Line 167: Line 148:
[[Category:Rail transport in Guangxi]]
[[Category:Rail transport in Guangxi]]
[[Category:2016 establishments in China]]
[[Category:2016 establishments in China]]
[[Category:Railway lines opened in 2016]]

Latest revision as of 11:00, 27 December 2024

Nanning Metro
Overview
LocaleNanning, Guangxi, China
Transit typeRapid Transit
Number of lines5
Number of stations101
Daily ridership791,100 (2021 daily avg.)[1] 1.4326 million (31 December 2020 record)[2]
Annual ridership289 million (2021)[1]
Websitehttp://www.nngdjt.com/
Operation
Began operationJune 28, 2016; 8 years ago (2016-06-28)
Operator(s)Nanning Rail Transport Limited
Number of vehicles66 (2019)
Technical
System length128.2 km (79.7 mi)
Track gauge1,435 mm (4 ft 8 1⁄2 in)
System map

Nanning Rail Transit
Chinese name
Simplified Chinese南宁轨道交通
Traditional Chinese南寧軌道交通
Transcriptions
Standard Mandarin
Hanyu PinyinNánníng Guǐdào Jiāotōng
Alternative Chinese name
Simplified Chinese南宁地铁
Traditional Chinese南寧地鐵
Transcriptions
Standard Mandarin
Hanyu PinyinNánníng Dìtiě
Zhuang name
ZhuangNanzningz Didez

Nanning Metro or Nanning Rail Transit (NNRT) is a rapid transit system in Nanning, the capital of Guangxi Zhuang Autonomous Region in China.

Lines in operation

[edit]
Line Terminals
(District)
Commencement Newest
Extension
Length
km
Stations
 1  Shibu
(Xixiangtang)
Nanning East railway station
(Qingxiu)
2016 2016 32.1 25
 2  Xijin
(Xixiangtang)
Tanze
(Liangqing)
2017 2020 27.3 23
 3  Keyuan Dadao
(Xixiangtang)
Pingliang Overpass
(Liangqing)
2019 27.9 23
 4  Hongyun Lu Lengtangcun 2020 20.7 16
 5  Guokai Dadao Jinqiao Coach Station 2021 20.2[3] 17
Total 128.2 101

History

[edit]

Line 1 officially started construction on December 29, 2011.[4] The first 11.2 km section, from Nanhu to Nanning East railway station, began operation June 28, 2016.[5] The line opened fully on December 28, 2016. It is 32.1 km long, with 25 stations.[4][6] Line 2 started construction in 2012 and was completed on December 28, 2017.[7][8] Line 3 opened in June 2019. Line 4 opened in November 2020. Line 5 opened on December 16, 2021.[3]

With the opening of Line 5, Nanning became the seventh city in China, and the first in Southern China to open and operate a fully automated subway line.[9]

Future expansion

[edit]

The final 3.9 km of Phase 1 of Line 4, an extension from Lengtangcun to Longgang adding 3 stations, started construction in August 2022.[10]

Line 6 Phase 1 started construction on December 26, 2023. Line 6 Phase 1 is an east-west crosstown line that is 27.9 km long with 21 stations.[11]

It is planned that there will be four vertical and four horizontal lines totaling 252 km of subway. The system is projected to carry over 5 million passengers per day.[4][12]

Network map

[edit]

Map


See also

[edit]

References

[edit]
  1. ^ a b "运送乘客237.1亿人次,新增运营里程1168公里…2021年城市轨道交通运营成绩单". 2022-01-13. Retrieved 19 July 2022.
  2. ^ "南宁地铁客流量连续两日创新高 1月1日客运量达143.26万人次_南宁新闻网".
  3. ^ a b "12月16日!南宁地铁5号线开通时间定了!". Sohu.
  4. ^ a b c 罗宁 (2011-12-29). "南宁轨道交通一号线工程全线开工". 南宁新闻网 (in Chinese). 人民网. Retrieved 2012-01-01.
  5. ^ "UrbanRail.Net > Asia > China > Nanning Metro".
  6. ^ "南宁轨道交通1号线全线开通试运营-广西新闻网". www.gxnews.com.cn. Retrieved 2016-12-28.
  7. ^ "南宁轨道交通2号线预计年底开工2017年建成 连接玉洞西津". People's Daily. 2013-01-18. Archived from the original on 2013-08-01. Retrieved 2013-08-01.
  8. ^ chinanews. "南宁地铁2号线开通试运营 轨道交通建成"十字网"-中新网". www.chinanews.com. Retrieved 2017-12-29.
  9. ^ "南宁地铁5号线开通运营 成为华南地区首条全自动运行地铁线路". 163 News (in Chinese). 2021-12-16.
  10. ^ "Guangxi Nanning Metro Line 4 Continuation Project Starts". Seetao. Retrieved 2022-08-22.
  11. ^ "重磅!南宁地铁6号线一期工程开工_建设_早报_南国". www.sohu.com. Retrieved 2024-06-26.
  12. ^ "2021年南宁将开通5条地铁线路 轨道交通连线成网". People's Daily. 2017-12-28. Archived from the original on 2017-12-29.