Jump to content

Gokō Station: Difference between revisions

Coordinates: 35°47′50″N 139°57′58″E / 35.7972°N 139.9660°E / 35.7972; 139.9660
From Wikipedia, the free encyclopedia
Content deleted Content added
PrimeBOT (talk | contribs)
m Task 24: template update following a TFD
 
(8 intermediate revisions by 7 users not shown)
Line 1: Line 1:
{{short description|Railway station in Matsudo, Chiba Prefecture, Japan}}
{{short description|Railway station in Matsudo, Chiba Prefecture, Japan}}
{{Infobox station
{{Infobox station
| name = Gokō Station
| name = [[File:SL-07 station number.png|50px]]<br /> Gokō Station
| native_name = 五香駅
| native_name = 五香駅
| native_name_lang = ja
| native_name_lang = ja
| type =
| type =
| image = Shin-keisei-railway-Goko-station-east-entrance-20100101.jpg
| image = Gokō Station West Exit.jpg
| alt =
| alt =
| caption = East entrance Gokō Station
| caption = West entrance in December 2022
| other_name =
| other_name =
| address = 408-8 Kanegasaku, [[Matsudo, Chiba|Matsudo]], [[Chiba Prefecture|Chiba]]<br />{{Nihongo2|(千葉県松戸市金ヶ作408番8号)}}
| address = 408-8 Kanegasaku, Matsudo-shi, Chiba-ken 270-2251
| country = Japan
| country = Japan
| coordinates = {{Coord|35.7972|N|139.9660|E|type:railwaystation_region:JP|display=inline, title}}
| coordinates =
| operator = [[Shin-Keisei Electric Railway]]
| operator = {{ric|Shin-Keisei|name=y}}
| line = [[Shin-Keisei Line]]
| line = {{KSLS|SL}} [[Shin-Keisei Line]]
| distance = {{cvt|7.4|km}} from {{STN|Matsudo|x}}
| platforms =
| platforms = 1 [[island platform]]
| tracks = 2
| connections =
| connections =
| structure =
| structure = At grade
| code = '''{{Color|#EF59A1|○}}SL07'''
| code = '''{{Color|#EF59A1|○}}SL07'''
| website = {{Official website|1=https://www.shinkeisei.co.jp/station/navi_goko/}}
| opened = 1955
| opened ={{start date and age|1955|04|21|df=y}}
| closed =
| closed =
| former =
| former =
| passengers = 31,604 daily
| passengers = 30,037 daily
| pass_year = 2009
| pass_year = 2018
| map_type = Japan Chiba Prefecture#Japan
| services =
| map_dot_label = Gokō Station
| services = {{Adjacent stations|system=Shin-Keisei|line=Shin-Keisei|left=Tokiwadaira|right=Motoyama|note-left={{KSSN|SL|06|30}}|note-right={{KSSN|SL|08|30}}}}
}}
}}


{{nihongo|'''Gokō Station'''|五香駅|Gokō-eki}} is a [[railway station]] operated by [[Shin-Keisei Electric Railway]]'s [[Shin-Keisei Line]] located in [[Matsudo, Chiba|Matsudo]], [[Chiba Prefecture]], [[Japan]]. It is 7.4 kilometers from the terminus of the Shin-Keisei Line at [[Matsudo Station]].
{{nihongo|'''Gokō Station'''|五香駅|Gokō-eki}} is a passenger [[railway station]] located in the city of [[Matsudo, Chiba|Matsudo]], [[Chiba Prefecture]], [[Japan]], operated by the private railway operator [[Shin-Keisei Electric Railway]].


==History==
==Lines==
Gokō Station is served by the [[Shin-Keisei Line]], and is located 7.4 kilometers from the terminus of the line at [[Matsudo Station]].
Gokō Station was opened on April 21, 1955.

== Lines ==
*[[Shin-Keisei Electric Railway]]
**[[Shin-Keisei Line]]


== Layout ==
== Layout ==
Gokō Station has a single [[island platform]], with an elevated station building.
The station consists of a single [[island platform]], with an elevated station building.


===Platforms===
===Platforms===
{{ja-rail-line|pfn=1|first=2|name= Shin-Keisei Line |linecol=#EF59A1|dir=For {{STN| Shin-Kamagaya }}, {{STN|Shin-Tsudanuma}}, {{STN|Keisei Tsudanuma||Keisei-Tsudanuma}}}}
{{ja-rail-line|pfn=1|first=2|name= Shin-Keisei Line |linecol=#{{rcr|Shin-Keisei|Shin-Keisei}}|dir=For {{STN| Shin-Kamagaya |x}}, {{STN|Shin-Tsudanuma|x}}, {{STN|Keisei Tsudanuma|x||Keisei-Tsudanuma}}}}
{{ja-rail-line|pfn=2|first-3|name= Shin-Keisei Line |linecol=#EF59A1|dir=For {{STN|Yabashira}}, {{STN|Matsudo}}}}
{{ja-rail-line|pfn=2|first=3|nidx= Shin-Keisei Line |linecol=#{{rcr|Shin-Keisei|Shin-Keisei}}|dir=For {{STN|Yabashira|x}}, {{STN|Matsudo|x}}}}
{{end box}}


==History==
== Adjacent stations ==
Gokō Station was opened on 21 April 1955.
{{J-railservice start}}
{{J-route|route=Shin-Keisei Line (SL07)|col=#EF59A1|f=w}}
{{J-rserv|service=-|previous={{STN|Tokiwadaira}} (SL06)|next={{STN|Motoyama|Chiba}} (SL08)}}
{{S-end}}


=== Future plans ===
{{Commons category}}
Effective April 2025, the station is to come under the aegis of [[Keisei Electric Railway]] as the result of the buyout of the Shin-Keisei Railway.<ref>{{Cite web |date=31 October 2023 |title=京成電鉄、新京成電鉄を吸収合併へ2025年4月 現在の路線・駅は維持する方針 |trans-title=Keisei Electric Railway will absorb the Shin-Keisei Electric Railway in April 2025; Plans made to maintain current routes and stations |url=https://www.chibanippo.co.jp/news/economics/1124565 |url-status=live |archive-url=https://web.archive.org/web/20231031125424/https://www.chibanippo.co.jp/news/economics/1124565 |archive-date=31 October 2023 |access-date=31 October 2023 |website=Chiba Nippo |language=ja}}</ref><ref>{{Cite web |date=31 October 2023 |title=新京成電鉄、解散・消滅へ - 京成電鉄が吸収合併、2025年実施予定 |trans-title=Shin-Keisei Electric Railway to dissolve and disappear - Keisei Electric Railway will absorb the railway in the merger, scheduled to take place in 2025 |url=https://news.mynavi.jp/article/20231031-2807582/ |url-status=live |archive-url=https://web.archive.org/web/20231031115818/https://news.mynavi.jp/article/20231031-2807582/ |archive-date=31 October 2023 |access-date=31 October 2023 |website=MyNavi Corporation |language=ja}}</ref>

==Passenger statistics==
In fiscal 2018, the station was used by an average of 30,037 passengers daily.<ref name="chiba2018stats">{{cite web|url= http://www.pref.chiba.lg.jp/toukei/toukeidata/nenkan/nenkan-h31/index.html#a11|script-title= ja:千葉県統計年鑑(平成31年)|trans-title= Chiba Prefecture Statistics (Fiscal 2018)|year= 2019|publisher= Chiba Prefecture|location= Japan|language= Japanese|archiveurl= |archivedate= |accessdate= 11 August 2020}}{{Dead link|date=June 2024 |bot=InternetArchiveBot |fix-attempted=yes }}</ref>

==Surrounding area==
*Chiba Prefectural Matsudo International High School
*Matsudo City Daiyon Junior High School
*Kashiwa City Southern Junior High School
* Matsudo City Takagi Daini Elementary School

==See also==
* [[List of railway stations in Japan]]

==References==
{{Reflist}}


==External links==
==External links==
{{Commons category-inline}}
* {{in lang|ja}} [http://www.shinkeisei.co.jp/train/railmap/goko.html Shin Keisei Railway Station information]
* [https://www.shinkeisei.co.jp/station/navi_goko/ Shin Keisei Railway Station information]{{in lang|ja}}


{{Shin-Keisei Line}}
{{Shin-Keisei Line}}

{{Coord|35.7972|N|139.9660|E|type:railwaystation_region:JP|display=title}}


{{DEFAULTSORT:Goko Station}}
{{DEFAULTSORT:Goko Station}}
[[Category:Railway stations in Japan opened in 1955]]
[[Category:Railway stations in Japan opened in 1955]]
[[Category:Railway stations in Chiba Prefecture]]
[[Category:Railway stations in Chiba Prefecture]]
[[Category:Matsudo]]


{{Chiba-railstation-stub}}

Latest revision as of 02:13, 6 January 2025


Gokō Station

五香駅
West entrance in December 2022
General information
Location408-8 Kanegasaku, Matsudo-shi, Chiba-ken 270-2251
Japan
Coordinates35°47′50″N 139°57′58″E / 35.7972°N 139.9660°E / 35.7972; 139.9660
Operated by Shin-Keisei
Line(s)SL Shin-Keisei Line
Distance7.4 km (4.6 mi) from Matsudo
Platforms1 island platform
Tracks2
Construction
Structure typeAt grade
Other information
Station codeSL07
WebsiteOfficial website
History
Opened21 April 1955; 69 years ago (1955-04-21)
Passengers
201830,037 daily
Services
Preceding station Shin-Keisei Following station
Tokiwadaira
SL06
towards Matsudo
Shin-Keisei Line Motoyama
SL08
Location
Gokō Station is located in Chiba Prefecture
Gokō Station
Gokō Station
Location within Chiba Prefecture
Gokō Station is located in Japan
Gokō Station
Gokō Station
Gokō Station (Japan)

Gokō Station (五香駅, Gokō-eki) is a passenger railway station located in the city of Matsudo, Chiba Prefecture, Japan, operated by the private railway operator Shin-Keisei Electric Railway.

Lines

[edit]

Gokō Station is served by the Shin-Keisei Line, and is located 7.4 kilometers from the terminus of the line at Matsudo Station.

Layout

[edit]

The station consists of a single island platform, with an elevated station building.

Platforms

[edit]
1  Shin-Keisei Line For Shin-Kamagaya , Shin-Tsudanuma, Keisei-Tsudanuma
2  Shin-Keisei Line For Yabashira, Matsudo

History

[edit]

Gokō Station was opened on 21 April 1955.

Future plans

[edit]

Effective April 2025, the station is to come under the aegis of Keisei Electric Railway as the result of the buyout of the Shin-Keisei Railway.[1][2]

Passenger statistics

[edit]

In fiscal 2018, the station was used by an average of 30,037 passengers daily.[3]

Surrounding area

[edit]
  • Chiba Prefectural Matsudo International High School
  • Matsudo City Daiyon Junior High School
  • Kashiwa City Southern Junior High School
  • Matsudo City Takagi Daini Elementary School

See also

[edit]

References

[edit]
  1. ^ "京成電鉄、新京成電鉄を吸収合併へ2025年4月 現在の路線・駅は維持する方針" [Keisei Electric Railway will absorb the Shin-Keisei Electric Railway in April 2025; Plans made to maintain current routes and stations]. Chiba Nippo (in Japanese). 31 October 2023. Archived from the original on 31 October 2023. Retrieved 31 October 2023.
  2. ^ "新京成電鉄、解散・消滅へ - 京成電鉄が吸収合併、2025年実施予定" [Shin-Keisei Electric Railway to dissolve and disappear - Keisei Electric Railway will absorb the railway in the merger, scheduled to take place in 2025]. MyNavi Corporation (in Japanese). 31 October 2023. Archived from the original on 31 October 2023. Retrieved 31 October 2023.
  3. ^ 千葉県統計年鑑(平成31年) [Chiba Prefecture Statistics (Fiscal 2018)] (in Japanese). Japan: Chiba Prefecture. 2019. Retrieved 11 August 2020.[permanent dead link]
[edit]

Media related to Gokō Station at Wikimedia Commons