ETS Line: Difference between revisions
Appearance
Content deleted Content added
AeronPeryton (talk | contribs) Reverted to revision 377106636 by AeronPeryton; Reference not cited, seems promotional. (TW) |
m Bot: Fixing double redirect to KTM ETS |
||
(34 intermediate revisions by 22 users not shown) | |||
Line 1: | Line 1: | ||
#REDIRECT [[KTM ETS]] |
|||
{{Uncategorised|date=August 2010}} |
|||
{{Unreferenced|date=May 2010}} |
|||
{{ETS Express Line}} |
|||
New express service between Ipoh - Seremban will introduce soon after KTMB has received the first of 5 ordered Electrical Train Set (ETS) from Rotem. |
|||
==ETS technical specifications== |
|||
Maximum operation speed: 140 km/h |
|||
Maximum design speed: 160 km/h |
|||
Passenger capacity: 350 |
|||
Length: 138m (6 car train) |
|||
Weight: 231.8 tons |
|||
==Carriage dimensions== |
|||
*Length: 22.95m |
|||
*Width: 2.75m |
|||
*Height: 4m |
|||
==See also== |
|||
*[[Rail transport in Malaysia]] |
|||
*[[Public transport in Kuala Lumpur]] |
|||
==References== |
|||
{{Reflist}} |
|||
{{Rail transport in Klang Valley}} |
Latest revision as of 09:01, 1 March 2015
Redirect to: