Stockholm City Line: Difference between revisions
Hemphopade (talk | contribs) No edit summary |
No edit summary |
||
(15 intermediate revisions by 10 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Railway tunnel in Stockholm, Sweden}} |
|||
{{Expand Swedish| |
{{Expand Swedish|topic=transp|date=February 2020}} |
||
{{More citations needed|date=October 2008}} |
{{More citations needed|date=October 2008}} |
||
{{Infobox rail line |
{{Infobox rail line |
||
Line 36: | Line 37: | ||
| event3 = |
| event3 = |
||
| owner = [[Swedish Transport Administration]] |
| owner = [[Swedish Transport Administration]] |
||
| operator = [[ |
| operator = [[SJ AB]] & [[Storstockholms Lokaltrafik]] |
||
| character = |
| character = |
||
| depot = |
| depot = |
||
Line 68: | Line 69: | ||
[[File:Centralbron pendeltåg 2009.jpg|thumb|The new tunnel will divert Stockholm's commuter traffic from the busy main line through the city.]] |
[[File:Centralbron pendeltåg 2009.jpg|thumb|The new tunnel will divert Stockholm's commuter traffic from the busy main line through the city.]] |
||
The '''Stockholm City Line''' ({{ |
The '''Stockholm City Line''' ({{langx|sv|Citybanan}}) is a commuter [[rail transport|railway]] [[tunnel]] beneath central [[Stockholm]] in [[Sweden]] which is used by the [[Stockholm Commuter Rail]]. The line is {{convert|7.4|km}} long, [[double track]] and [[railway electrification system|electrified]]. It has two stations: [[Stockholm City Station]] is located directly below [[T-Centralen]], the central station of the [[Stockholm Metro]]. The [[Odenplan station]] is the other station, and is also served by the Green Line of the Metro. The line opened on 10 July 2017.<ref>{{Cite web|url = http://www.trafikverket.se/en/startpage/Projects/Railway-construction-projects1/The-Stockholm-City-Line/|title = The Stockholm City Line|date = 2014-08-21|access-date = 2015-04-02|website = Trafikverket|url-status = dead|archive-url = https://web.archive.org/web/20150402164159/http://www.trafikverket.se/en/startpage/Projects/Railway-construction-projects1/The-Stockholm-City-Line/|archive-date = 2015-04-02}}</ref><ref>Stockholm's Citybanan Opens ''[[Today's Railways Europe]]'' issue 261 September 2017 pages 34-38</ref> |
||
==Route== |
==Route== |
||
Line 75: | Line 76: | ||
Placing the commuter rail traffic into a tunnel of its own thus allows increased capacity for other national rail traffic through Central Station via [[Centralbron]]. The entire system for long-distance passenger railways in Sweden suffers from this bottleneck, since 80% of train rides in Sweden start or stop in Stockholm [http://www.banverket.se/sv/Amnen/Aktuella-projekt/Projekt/1867/Citybanan-i-Stockholm/Nyheter/2008/Avtal-mellan-staten-och-regionerna-sakrar-Citybanans-finansiering.aspx]. As a result, there is no room to increase the frequency of commuter, regional, and long-distance trains despite their heavy usage. |
Placing the commuter rail traffic into a tunnel of its own thus allows increased capacity for other national rail traffic through Central Station via [[Centralbron]]. The entire system for long-distance passenger railways in Sweden suffers from this bottleneck, since 80% of train rides in Sweden start or stop in Stockholm [http://www.banverket.se/sv/Amnen/Aktuella-projekt/Projekt/1867/Citybanan-i-Stockholm/Nyheter/2008/Avtal-mellan-staten-och-regionerna-sakrar-Citybanans-finansiering.aspx]. As a result, there is no room to increase the frequency of commuter, regional, and long-distance trains despite their heavy usage. |
||
Seen from south to north, the route of the Citybanan tunnel branches off the |
Seen from south to north, the route of the Citybanan tunnel branches off the {{ill|Stockholm Connection Line|sv|Sammanbindningsbanan (järnväg)|lt=Connection Line}} after [[Stockholm South Station]] on [[Södermalm]], and continues beneath the bay bottom of [[Riddarfjärden]] at [[Söderström (Stockholm)|Söderström]], beneath the islet of [[Riddarholmen]], beneath Riddarfjärden at [[Norrström]], to the new City Station. From there, it continues beneath [[Norrmalm]] to Odenplan Station, then beneath [[Vasastaden, Stockholm|Vasastaden]] to join with the [[East Coast Line (Sweden)|East Coast Line]] at [[Tomteboda]]. |
||
==History== |
==History== |
||
[[File:Citybanan 2009-03d.jpg|thumb|Citybanan in March 2009. The sign reads, "We're building a tunnel under Söderström [the southern channel around [[Gamla stan]]] as part of the Stockholm City Line."]] |
[[File:Citybanan 2009-03d.jpg|thumb|Citybanan in March 2009. The sign reads, "We're building a tunnel under Söderström [the southern channel around [[Gamla stan]]] as part of the Stockholm City Line."]] |
||
The project was proposed by the [[Swedish State Railways]] in 1988 and, after initially being disregarded as too expensive, |
The project was proposed by the [[Swedish State Railways]] in 1988 and, after initially being disregarded as too expensive, was seriously considered again from 2002. In 2006, the [[Swedish Rail Administration]] agreed with the city and [[Storstockholms Lokaltrafik]] on the financing of the project, and the last step in the planning process was scheduled for 2006–2007. The cost of the tunnel and stations was estimated at 16.3 billion [[Swedish kronor]]. |
||
After the general elections of 2006, the new [[Alliance for Sweden|Alliance government]] called the project into question. Representatives of the government announced on October 1 of that year that they were scrapping Citybanan in favor of building a third railway track through the city.<ref>{{Cite news|url = http://www.svd.se/nyheter/inrikes/alliansen-vill-skrota-citybanan_357708.svd|title = Alliansen vill skrota Citybanan|date = 2006-10-02|access-date = 2015-04-02|newspaper = Svenska Dagbladet|language = sv}}</ref> In December 2006, however, the government's appointed expert, recommended building the tunnel following a renewed assessment of the project. In May 2007 the government finally decided to build the tunnel. In September 2014 the tunnel reached its full length.<ref>{{Cite web|url = http://www.trafikverket.se/Privat/Projekt/Stockholm/Citybanan/Nyhetsarkiv-start/2014-09/Oppen-tunnel-fran-norr-till-soder/|title = Fritt fram i hela tunneln|date = 2014-09-25|access-date = 2015-05-23|website = Trafikverket}}</ref> |
After the general elections of 2006, the new [[Alliance for Sweden|Alliance government]] called the project into question. Representatives of the government announced on October 1 of that year that they were scrapping Citybanan in favor of building a third railway track through the city.<ref>{{Cite news|url = http://www.svd.se/nyheter/inrikes/alliansen-vill-skrota-citybanan_357708.svd|title = Alliansen vill skrota Citybanan|date = 2006-10-02|access-date = 2015-04-02|newspaper = Svenska Dagbladet|language = sv}}</ref> In December 2006, however, the government's appointed expert, recommended building the tunnel following a renewed assessment of the project. In May 2007 the government finally decided to build the tunnel. In September 2014 the tunnel reached its full length.<ref>{{Cite web|url = http://www.trafikverket.se/Privat/Projekt/Stockholm/Citybanan/Nyhetsarkiv-start/2014-09/Oppen-tunnel-fran-norr-till-soder/|title = Fritt fram i hela tunneln|date = 2014-09-25|access-date = 2015-05-23|website = Trafikverket}}</ref> |
||
Line 96: | Line 97: | ||
*[http://www.dn.se/sthlm/citybanan-borjar-byggas-i-sommar Dagens Nyheter – Citybanan börjar byggas i sommar] {{in lang|sv}} |
*[http://www.dn.se/sthlm/citybanan-borjar-byggas-i-sommar Dagens Nyheter – Citybanan börjar byggas i sommar] {{in lang|sv}} |
||
⚫ | |||
[[Category:Railway lines in Sweden]] |
[[Category:Railway lines in Sweden]] |
||
[[Category:Railway lines opened in 2017]] |
[[Category:Railway lines opened in 2017]] |
||
[[Category: |
[[Category:Rail transport in Stockholm]] |
||
⚫ | |||
[[Category:Transport in Stockholm]] |
|||
[[Category:Underground commuter rail]] |
[[Category:Underground commuter rail]] |
||
[[Category:2017 establishments in Sweden]] |
[[Category:2017 establishments in Sweden]] |
Latest revision as of 08:20, 11 November 2024
You can help expand this article with text translated from the corresponding article in Swedish. (February 2020) Click [show] for important translation instructions.
|
This article needs additional citations for verification. (October 2008) |
Stockholm City Line | |
---|---|
Overview | |
Native name | Citybanan |
Owner | Swedish Transport Administration |
Termini |
|
Stations | 3 |
Service | |
System | Stockholm commuter rail |
Operator(s) | SJ AB & Storstockholms Lokaltrafik |
Rolling stock | X60/X60B |
History | |
Opened | 10 July 2017 |
Technical | |
Line length | 7.4 km (4.6 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 15 kV 16.7 Hz AC |
Operating speed | 90 km/h (56 mph) |
Signalling | ATC-2 |
The Stockholm City Line (Swedish: Citybanan) is a commuter railway tunnel beneath central Stockholm in Sweden which is used by the Stockholm Commuter Rail. The line is 7.4 kilometres (4.6 mi) long, double track and electrified. It has two stations: Stockholm City Station is located directly below T-Centralen, the central station of the Stockholm Metro. The Odenplan station is the other station, and is also served by the Green Line of the Metro. The line opened on 10 July 2017.[1][2]
Route
[edit]The tunnel significantly improves the traffic throughput to and from south of Stockholm as there are only two tracks in that direction from Stockholm Central Station, the same number that were in place in 1871 when the railway was originally built. It has 24 scheduled trains per hour in each direction. The commuter trains pass Stockholm with up to 16 trains per hour per direction. The other eight are regional and long-distance trains. The tunnel takes all commuter trains, allowing more regional and intercity trains to operate along the old line.
Placing the commuter rail traffic into a tunnel of its own thus allows increased capacity for other national rail traffic through Central Station via Centralbron. The entire system for long-distance passenger railways in Sweden suffers from this bottleneck, since 80% of train rides in Sweden start or stop in Stockholm [1]. As a result, there is no room to increase the frequency of commuter, regional, and long-distance trains despite their heavy usage.
Seen from south to north, the route of the Citybanan tunnel branches off the Connection Line after Stockholm South Station on Södermalm, and continues beneath the bay bottom of Riddarfjärden at Söderström, beneath the islet of Riddarholmen, beneath Riddarfjärden at Norrström, to the new City Station. From there, it continues beneath Norrmalm to Odenplan Station, then beneath Vasastaden to join with the East Coast Line at Tomteboda.
History
[edit]The project was proposed by the Swedish State Railways in 1988 and, after initially being disregarded as too expensive, was seriously considered again from 2002. In 2006, the Swedish Rail Administration agreed with the city and Storstockholms Lokaltrafik on the financing of the project, and the last step in the planning process was scheduled for 2006–2007. The cost of the tunnel and stations was estimated at 16.3 billion Swedish kronor.
After the general elections of 2006, the new Alliance government called the project into question. Representatives of the government announced on October 1 of that year that they were scrapping Citybanan in favor of building a third railway track through the city.[3] In December 2006, however, the government's appointed expert, recommended building the tunnel following a renewed assessment of the project. In May 2007 the government finally decided to build the tunnel. In September 2014 the tunnel reached its full length.[4]
Coordinates:
- Southern tunnel entrance: 59°18′54″N 18°04′04″E / 59.315052°N 18.067773°E
- Northern tunnel entrance: 59°20′57″N 18°01′09″E / 59.349252°N 18.019209°E
References
[edit]- ^ "The Stockholm City Line". Trafikverket. 2014-08-21. Archived from the original on 2015-04-02. Retrieved 2015-04-02.
- ^ Stockholm's Citybanan Opens Today's Railways Europe issue 261 September 2017 pages 34-38
- ^ "Alliansen vill skrota Citybanan". Svenska Dagbladet (in Swedish). 2006-10-02. Retrieved 2015-04-02.
- ^ "Fritt fram i hela tunneln". Trafikverket. 2014-09-25. Retrieved 2015-05-23.