Cenisio (Milan Metro): Difference between revisions
Appearance
Content deleted Content added
m + short description |
m fixed/removed deprecated parameters from Template:Infobox station (via WP:JWB) |
||
(13 intermediate revisions by 8 users not shown) | |||
Line 18: | Line 18: | ||
| bicycle = |
| bicycle = |
||
| baggage_check = |
| baggage_check = |
||
| opened = {{Start date|2015|06|20|df=y}} |
| opened = {{Start date and age|2015|06|20|df=y}} |
||
| closed = |
| closed = |
||
| rebuilt = |
| rebuilt = |
||
| electrified = |
| electrified = |
||
| |
| accessible = yes |
||
| code = |
| code = |
||
| owned = [[Azienda Trasporti Milanesi]] |
| owned = [[Azienda Trasporti Milanesi]] |
||
| zone = [[Sistema Tariffario Integrato del Bacino di Mobilità|STIBM]]: Mi1<ref>{{cite web |title=Rete metropolitana di Milano |url=https://giromilano.atm.it/images/schema_rete_metro.jpg |publisher=[[Azienda Trasporti Milanesi]] |access-date=13 January 2022 |archive-date=9 July 2021 |archive-url=https://web.archive.org/web/20210709183803/https://giromilano.atm.it/images/schema_rete_metro.jpg |url-status=dead }}</ref> |
|||
| zone = Urban |
|||
| smartcardname = |
| smartcardname = |
||
| smartcardstatus = |
| smartcardstatus = |
||
Line 34: | Line 34: | ||
| pass_system = |
| pass_system = |
||
| mpassengers = |
| mpassengers = |
||
| services = {{ |
| services = {{Adjacent stations |system= Milan Metro |line= Line 5 |left=Monumentale|right=Gerusalemme}} |
||
{{s-line |system= Milan Metro |line= Line 5 |previous=Monumentale|next=Gerusalemme}} |
|||
| map_locator = |
| map_locator = |
||
| web = |
| web = |
||
}} |
}} |
||
'''Cenisio''' is a station on |
'''Cenisio''' is a station on [[Milan Metro Line 5|Line 5]] of the [[Milan Metro]]. |
||
== History == |
== History == |
||
The works for the construction of the station began in July 2011,<ref>[http://www.comune.milano.it/dseserver/webcity/comunicati.nsf/weball/EB5B4C072DB945ABC12578C50052B08C] Sito Comune di Milano</ref> as part of the second section of the line, from [[Garibaldi FS (Milan Metro)|Garibaldi FS]] to [[San Siro Stadio (Milan Metro)|San Siro Stadio]]. It was opened to the public on 20 June 2015, nearly two months after the opening of this section of the line, and five months earlier than scheduled<ref>[http://www.milanotoday.it/eventi/inaugurazione-fermata-cenisio-programma-circo-20-giugno-2015.html MilanoToday]</ref> |
The works for the construction of the station began in July 2011,<ref>[http://www.comune.milano.it/dseserver/webcity/comunicati.nsf/weball/EB5B4C072DB945ABC12578C50052B08C] Sito Comune di Milano</ref> as part of the second section of the line, from [[Garibaldi FS (Milan Metro)|Garibaldi FS]] to [[San Siro Stadio (Milan Metro)|San Siro Stadio]]. It was opened to the public on 20 June 2015, nearly two months after the opening of this section of the line, and five months earlier than scheduled.<ref>[http://www.milanotoday.it/eventi/inaugurazione-fermata-cenisio-programma-circo-20-giugno-2015.html MilanoToday]</ref> |
||
== Station structure == |
== Station structure == |
||
Cenisio is an underground station with two tracks served by one island platform and, like all the other stations on |
Cenisio is an underground station with two tracks served by one island platform and, like all the other stations on Line 5, is wheelchair accessible. |
||
== Interchanges == |
== Interchanges == |
||
Line 56: | Line 55: | ||
{{Milan Metro Line 5 navbox}} |
{{Milan Metro Line 5 navbox}} |
||
[[Category:Milan Metro stations]] |
[[Category:Line 5 (Milan Metro) stations]] |
||
[[Category:Railway stations opened in 2015]] |
[[Category:Railway stations in Italy opened in 2015]] |
||
[[Category:2015 establishments in Italy]] |
|||
Latest revision as of 00:27, 29 July 2024
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Coordinates | 45°17′29″N 9°06′08″E / 45.291409°N 9.102231°E | ||||||||||
Owned by | Azienda Trasporti Milanesi | ||||||||||
Platforms | 1 | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Fare zone | STIBM: Mi1[1] | ||||||||||
History | |||||||||||
Opened | 20 June 2015 | ||||||||||
Services | |||||||||||
|
Cenisio is a station on Line 5 of the Milan Metro.
History
[edit]The works for the construction of the station began in July 2011,[2] as part of the second section of the line, from Garibaldi FS to San Siro Stadio. It was opened to the public on 20 June 2015, nearly two months after the opening of this section of the line, and five months earlier than scheduled.[3]
Station structure
[edit]Cenisio is an underground station with two tracks served by one island platform and, like all the other stations on Line 5, is wheelchair accessible.
Interchanges
[edit]Near this station are located:
- Tram stops (lines 12 and 14)
References
[edit]- ^ "Rete metropolitana di Milano". Azienda Trasporti Milanesi. Archived from the original on 9 July 2021. Retrieved 13 January 2022.
- ^ [1] Sito Comune di Milano
- ^ MilanoToday