European Rail Traffic Management System: Difference between revisions
m Sounds like cheapo publicity |
VulcanSphere (talk | contribs) m Changing short description from "World-class train signalling, communications and loading paradigm" to "Standards for railway signalling" |
||
(14 intermediate revisions by 12 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Standards for railway signalling}} |
|||
{{EngvarB|date=May 2013}} |
{{EngvarB|date=May 2013}} |
||
{{Use dmy dates|date=October 2018}} |
{{Use dmy dates|date=October 2018}} |
||
Line 43: | Line 44: | ||
The main target of ERTMS is to promote the [[interoperability]] of trains in the EU. It aims to greatly enhance safety, increase efficiency of train transports and enhance cross-border interoperability of [[rail transport in Europe]]. This is done by replacing former national [[Railway signal|signalling]] equipment and operational procedures with a single new Europe-wide standard for train control and command systems. |
The main target of ERTMS is to promote the [[interoperability]] of trains in the EU. It aims to greatly enhance safety, increase efficiency of train transports and enhance cross-border interoperability of [[rail transport in Europe]]. This is done by replacing former national [[Railway signal|signalling]] equipment and operational procedures with a single new Europe-wide standard for train control and command systems. |
||
The development process was started with the technical foundations for communication (GSM-R) and signalling (ETCS). Both are well established and in advanced public implementation worldwide{ |
The development process was started with the technical foundations for communication (GSM-R) and signalling (ETCS). Both are well established and in advanced public implementation worldwide{{citation needed|date=December 2021}}. Now{{when|date=December 2021}} it begins to start attention for the 3rd part of ETML i.e. for fleet management or passenger information. |
||
== History == |
== History == |
||
In the mid |
In the mid-1980s, the [[International Union of Railways]] (UIC) and the [[European Rail Research Institute]] (ERRI) began the search for a common European operation management for railways, titled ERTMS.<ref>{{Cite journal|last=Schmied|first=Peter|date=2000|title=ETCS-System auf der Strecke Wien – Budapest erfolgreich getestet.|journal=[[Eisenbahn-Revue International]]|language=de|volume=01/2000|pages=32}}</ref> Today the development of ERTMS is steered by the ERA and driven by the [[Union des Industries Ferroviaires Européennes|Association of the European Rail Industry]] (UNIFE, Union des Industries Ferroviaires Européennes). |
||
Until this effort began, there were (for historical reasons in each national railway system) in Europe: |
Until this effort began, there were (for historical reasons in each national railway system) in Europe: |
||
* More than 20 different [[train protection system]]s, |
* More than 20 different [[train protection system]]s, |
||
* Different, conflicting [[rail operating rule]]s, |
* Different, conflicting [[rail operating rule]]s, |
||
* Different national [[homologation]] rules, |
* Different national [[homologation]] rules for vehicles, |
||
* Different [[Professional certification|accreditation]] rules for [[Driver's license|drivers]], |
* Different [[Professional certification|accreditation]] rules for [[Driver's license|drivers]], |
||
* Five different [[railway electrification system]]s, |
* Five different [[railway electrification system]]s, |
||
Line 70: | Line 71: | ||
* Market enhancement for control- and management systems; with better choices for customers, lower prices in [[Economies of scale|mass production]] and [[export]] possibilities for worldwide application, |
* Market enhancement for control- and management systems; with better choices for customers, lower prices in [[Economies of scale|mass production]] and [[export]] possibilities for worldwide application, |
||
* Generation of equal security levels in train operation with comparable rules. |
* Generation of equal security levels in train operation with comparable rules. |
||
In 1995 a development plan first mentioned the creation of the ''European Rail Traffic Management System''.<ref name="nielson">{{cite web|url=http://irse.org.au/index.php/en/component/docman/doc_download/54-the-core-of-atp-data-engineering?Itemid=71|title=The Core of ATP – Data Engineering|date=14 March 2008|publisher=IRSE Technical Meeting "All About ATP" Sydney|author=Warren Kaiser, Stein Nielson|access-date=5 June 2017|archive-url=https://web.archive.org/web/20130429142912/http://irse.org.au/index.php/en/component/docman/doc_download/54-the-core-of-atp-data-engineering?Itemid=71|archive-date=29 April 2013|url-status=dead|df=dmy-all}}|</ref> In 1996 the first specification for ETCS followed in response to [[Directive 96/48/EC|EU Council Directive 96/48/EC99]]<ref name="interop">{{cite EU directive|serial=96/48/EC99 |
In 1995 a development plan first mentioned the creation of the ''European Rail Traffic Management System''.<ref name="nielson">{{cite web|url=http://irse.org.au/index.php/en/component/docman/doc_download/54-the-core-of-atp-data-engineering?Itemid=71|title=The Core of ATP – Data Engineering|date=14 March 2008|publisher=IRSE Technical Meeting "All About ATP" Sydney|author=Warren Kaiser, Stein Nielson|access-date=5 June 2017|archive-url=https://web.archive.org/web/20130429142912/http://irse.org.au/index.php/en/component/docman/doc_download/54-the-core-of-atp-data-engineering?Itemid=71|archive-date=29 April 2013|url-status=dead|df=dmy-all}}|</ref> In 1996 the first specification for ETCS followed in response to [[Directive 96/48/EC|EU Council Directive 96/48/EC99]]<ref name="interop">{{cite EU directive|serial=96/48/EC99|date=23 July 1996|description=amending Council Directive 96/48/EC on the interoperability of the trans-European high-speed rail system|eurlextag=31996L0048}} and {{CELEX|32001L0016|text=Directive 2001/16/EC of the European Parliament and of the Council on the interoperability of the trans-European conventional rail system}}</ref> on interoperability of the trans-European [[Trans-European high-speed rail network|high-speed rail system]]. |
||
The [[functional specification]] of ETCS was announced In April 2000 as guidelines for implementation in [[Madrid]].'''<ref name="eri-2000-275">Meldung ''ERTMS-Spezifikation festgelegt''. In: [[Eisenbahn-Revue International]], Heft 6/2000, {{ISSN|1421-2811}}, S. 275.</ref>''' In autumn 2000 the member states of EU voted for publication of this specifications as decision of the European Commission to get a preliminary security in law and planning. This was to give the foundation for testing applications in six member railways of the [[ERTMS Users Group]].<ref name="eri-2002-186">''DB AG startet Versuche mit ETCS-Level 2''. In: [[Eisenbahn-Revue International]], Heft 4/2002, {{ISSN|1421-2811}}, S. 186–189.</ref> |
The [[functional specification]] of ETCS was announced In April 2000 as guidelines for implementation in [[Madrid]].'''<ref name="eri-2000-275">Meldung ''ERTMS-Spezifikation festgelegt''. In: [[Eisenbahn-Revue International]], Heft 6/2000, {{ISSN|1421-2811}}, S. 275.</ref>''' In autumn 2000 the member states of EU voted for publication of this specifications as decision of the European Commission to get a preliminary security in law and planning. This was to give the foundation for testing applications in six member railways of the [[ERTMS Users Group]].<ref name="eri-2002-186">''DB AG startet Versuche mit ETCS-Level 2''. In: [[Eisenbahn-Revue International]], Heft 4/2002, {{ISSN|1421-2811}}, S. 186–189.</ref> |
||
Line 76: | Line 77: | ||
In 2002 the [[Union of Signalling Industry]] (UNISIG) published the SUBSET-026 defining the current implementation of ETCS signalling equipment together with GSM–R – this ''Class 1'' ''SRS 2.2.2'' (now called [[European Train Control System#Baseline 2|ETCS Baseline 2]]) was accepted by the European Commission in decision 2002/731/EEC as mandatory for high-speed rail and in decision 2004/50/EEC as mandatory for conventional rail. |
In 2002 the [[Union of Signalling Industry]] (UNISIG) published the SUBSET-026 defining the current implementation of ETCS signalling equipment together with GSM–R – this ''Class 1'' ''SRS 2.2.2'' (now called [[European Train Control System#Baseline 2|ETCS Baseline 2]]) was accepted by the European Commission in decision 2002/731/EEC as mandatory for high-speed rail and in decision 2004/50/EEC as mandatory for conventional rail. |
||
In 2004 further development stalled |
In 2004 further development stalled. While some countries ([[Austria]], [[Spain]], [[Switzerland]]) switched to ETCS with some benefit, [[Deutsche Bahn|German]] and [[SNCF|French]] railway operators had already introduced proven and modern types of domestic [[train protection system]]s for high speed traffic, so they would gain no benefit. Furthermore, the introduction of ETCS Level 1 (such as in Spain) proved to be expensive and nearly all implementations are delayed. The defined standards were comprehensive by political nature, but not exact in technical means. National rail authorities often had certain features or constraints in their existing system they did not want to lose, and since every authority was still required to approve the systems, dialects of ERTMS emerged. Some active players were willing to overcome the situation with a new Baseline definition, not suited for immediate action. |
||
This situation |
This situation shifted the focus more onto the technical parts of ETCS and GSM-R as universal technical foundations of ERTMS. To master this situation, [[Karel Vinck]] was appointed in July 2005 as EU coordinator. |
||
In 2005 |
In 2005 a [[Memorandum of Understanding]] on ERTMS was published by members of the European Commission, national railways and supplying industries in [[Brussels]]. According to this declaration ETCS was to be introduced in 10 to 12 years on a named part of the [[Trans-European Networks]].<ref name="eri-2005-235">Meldung ''Absichtserklärung zu ERTMS''. In: [[Eisenbahn-Revue International]], Heft 5/2005, {{ISSN|1421-2811}}, S. 235.</ref> Following this a conference was held in April 2006 in [[Budapest]] for the introduction of ERTMS, attended by 700 people.<ref name="eri-2006-284">Peter Winter: ''UIC-Konferenz zur Einführung des European Rail Traffic Management Systems in Budapest''. In: [[Eisenbahn-Revue International]]. Heft 6/2006, {{ISSN|1421-2811}}, S. 284–285.</ref> |
||
In July 2009, the [[European Commission]] announced that ETCS is now mandatory for all EU funded projects which include new or upgraded signalling and GSM-R is required when radio communications are upgraded.<ref>{{cite news | title=EC sets out ERTMS deployment deadlines | url=http://www.railwaygazette.com/news/single-view/view//ec-sets-out-ertms-deployment-deadlines.html | publisher=[[Railway Gazette International]] |date=31 July 2009 }}</ref> |
In July 2009, the [[European Commission]] announced that ETCS is now mandatory for all EU funded projects which include new or upgraded signalling and GSM-R is required when radio communications are upgraded.<ref>{{cite news | title=EC sets out ERTMS deployment deadlines | url=http://www.railwaygazette.com/news/single-view/view//ec-sets-out-ertms-deployment-deadlines.html | publisher=[[Railway Gazette International]] |date=31 July 2009 }}</ref> |
||
Line 86: | Line 87: | ||
In April 2012 at the UIC ''ERTMS World Conference'' in Stockholm, Sweden, the executive director of the [[Community of European Railway and Infrastructure Companies]] (CER) called for an accelerated implementation of ERTMS in Europe.<ref name="irj20120425">{{cite news | url=http://www.railjournal.com/newsflash/now-or-never-for-ertms-in-europe-says-lochman-1627.html | title=Now or never for ERTMS in Europe, says Lochman | date=25 April 2012 | publisher=[[International Railway Journal]] | access-date=6 May 2012 | archive-url=https://web.archive.org/web/20120521094131/http://www.railjournal.com/newsflash/now-or-never-for-ertms-in-europe-says-lochman-1627.html | archive-date=21 May 2012 | url-status=dead | df=dmy-all }}</ref> |
In April 2012 at the UIC ''ERTMS World Conference'' in Stockholm, Sweden, the executive director of the [[Community of European Railway and Infrastructure Companies]] (CER) called for an accelerated implementation of ERTMS in Europe.<ref name="irj20120425">{{cite news | url=http://www.railjournal.com/newsflash/now-or-never-for-ertms-in-europe-says-lochman-1627.html | title=Now or never for ERTMS in Europe, says Lochman | date=25 April 2012 | publisher=[[International Railway Journal]] | access-date=6 May 2012 | archive-url=https://web.archive.org/web/20120521094131/http://www.railjournal.com/newsflash/now-or-never-for-ertms-in-europe-says-lochman-1627.html | archive-date=21 May 2012 | url-status=dead | df=dmy-all }}</ref> |
||
After definition of [[European Train Control System#Baseline 3|ETCS Baseline 3]] in about 2010 and starting of implementation in multiple countries with ''Baseline 3 Release 2'' in summer 2016, it is again possible to direct attention to operational management requirements of [[payload]]s. |
After definition of [[European Train Control System#Baseline 3|ETCS Baseline 3]] in about 2010 and starting of implementation in multiple countries with ''Baseline 3 Release 2'' in summer 2016, it is again possible to direct attention to operational management requirements of [[payload]]s. Logistics companies like [[DB Cargo]] have the need to develop functional capabilities in the target scope of ETML,<ref>{{cite web|title=Neues Digital Lab "ampulse" im "House of Logistics & Mobility" eingeweiht.|website=dbcargo.com|publisher=DB Cargo AG|url=https://www.dbcargo.com/rail-deutschland-de/news_media/press/press_releases/13273898/2017-02-08-Digital_Lab_ampulse.html|url-status=dead|access-date=9 February 2017|archive-url=https://web.archive.org/web/20170211155431/https://www.dbcargo.com/rail-deutschland-de/news_media/press/press_releases/13273898/2017-02-08-Digital_Lab_ampulse.html|archive-date=11 February 2017|date=8 February 2017|language=de|df=dmy-all}}</ref> which should be welcome for standardisation. |
||
== ERTMS implementation strategies == |
== ERTMS implementation strategies == |
||
Line 107: | Line 108: | ||
'''Operational principle of ETCS in mixed operation: NTC and ETCS Level 2''' |
'''Operational principle of ETCS in mixed operation: NTC and ETCS Level 2''' |
||
The principle of mixed level signalling is based on simple principles using bi-directional data exchange between the [[radio block centre|Radio Block Centre]] (RBC) and the [[interlocking]] systems. The operator sets a route and does not need to know if the route will be used for a Level NTC (former LSTM) only or a Level 2-equipped train. A route is locked based on the national principles by the interlocking system and the RBC is informed about the routes set. The RBC checks whether it is possible to allocate a train to the route and then informs the interlocking system that a train is allocated to the route. The interlocking system |
The principle of mixed level signalling is based on simple principles using bi-directional data exchange between the [[radio block centre|Radio Block Centre]] (RBC) and the [[interlocking]] systems. The operator sets a route and does not need to know if the route will be used for a Level NTC (former LSTM) only or a Level 2-equipped train. A route is locked based on the national principles by the interlocking system and the RBC is informed about the routes set. The RBC checks whether it is possible to allocate a train to the route and then informs the interlocking system that a train is allocated to the route. The interlocking system may show the ETCS white bar aspect to signals at the ETCS Border or along the ERTMS-route. Depending on the implementation, NTC systems along the route may or may not be active.<blockquote>Movement Authority (MA) is the permission for a train to move to a specific location within the constraints of the infrastructure and with supervision of speed.<ref name=":0">{{Cite book|url=https://www.era.europa.eu/node/641/210_en|title=Subset-023. "ERTMS/ETCS-Glossary of Terms and Abbreviations"|publisher=ERTMS USERS GROUP|year=2014|access-date=21 December 2018|archive-date=21 December 2018|archive-url=https://web.archive.org/web/20181221134721/https://www.era.europa.eu/node/641/210_en|url-status=dead}}</ref> End of movement Authority (EoA) is the location to which the train is permitted to proceed and where target speed is equal to zero. End of movement Authority is the location to which the train is permitted to proceed according to a MA. When transmitting a MA, it is the end of the last section given in the MA.<ref name=":0" /></blockquote>The RBC sends a ''Movement Authority (MA)'' to the train if a Level 2 train is allocated to the route. Otherwise the signal shows the optical proceed aspect and the related ''NTC'' code is sent to the track. As soon as a Level 2 train reports itself in rear of a route currently assigned for optical authorisation (e.g. after ''Start Of Mission (SOM)'' procedure or when the driver changes level from Level NTC to Level 2), the optical authorisation is automatically upgraded to a Level 2 movement authority. Consequently, a Level 2 movement authority is downgraded to an optical authorisation after a predefined time-out if the driver closes the cab or a fault is detected that restricts the movement authority (e.g. if the [[GSM-R]] radio coverage is unavailable.) |
||
== See also == |
== See also == |
||
Line 115: | Line 116: | ||
* [[LOCOPROL]] |
* [[LOCOPROL]] |
||
* [[UNIFE]] |
* [[UNIFE]] |
||
⚫ | |||
⚫ | |||
== External links == |
== External links == |
||
* [https://ec.europa.eu/transport/modes/rail/ertms/ertms_deployment_en ERTMS deployment plan] with [https://ec.europa.eu/transport/sites/transport/files/ertms_0/annexes_en.pdf Annexes] |
* [https://ec.europa.eu/transport/modes/rail/ertms/ertms_deployment_en ERTMS deployment plan] with [https://ec.europa.eu/transport/sites/transport/files/ertms_0/annexes_en.pdf Annexes] |
||
* [http://www.unife.org/topics/3.html Website of UNIFE] |
* [http://www.unife.org/topics/3.html Website of UNIFE] {{Webarchive|url=https://web.archive.org/web/20160321033657/http://unife.org/topics/3.html |date=21 March 2016 }} |
||
* [http://www.era.europa.eu/Core-Activities/ERTMS/Pages/home.aspx Website of ERA] |
* [http://www.era.europa.eu/Core-Activities/ERTMS/Pages/home.aspx Website of ERA] |
||
* [http://uic.org/ertms Website of UIC] |
* [http://uic.org/ertms Website of UIC] {{Webarchive|url=https://web.archive.org/web/20171027204433/http://uic.org/ertms |date=27 October 2017 }} |
||
* [http://www.ertms.be/ ERTMS Users Group] |
* [http://www.ertms.be/ ERTMS Users Group] |
||
* ''[https://www.gov.uk/government/publications/implementation-plans-for-technical-specifications-for-interoperability Great Britain's National implementation plan]'' |
* ''[https://www.gov.uk/government/publications/implementation-plans-for-technical-specifications-for-interoperability Great Britain's National implementation plan]'' |
||
⚫ | |||
⚫ | |||
{{Authority control}} |
{{Authority control}} |
Latest revision as of 05:13, 25 July 2024
Formation | 1998/1999 |
---|---|
Website | http://www.ertms.net/ |
The European Rail Traffic Management System (ERTMS) is the system of standards for management and interoperation of signalling for railways by the European Union (EU). It is conducted by the European Union Agency for Railways (ERA) and is the organisational umbrella for the separately managed parts of
- GSM–R (communication),
- European Train Control System (ETCS, signalling),
- European Train Management Layer (ETML, payload management)
The main target of ERTMS is to promote the interoperability of trains in the EU. It aims to greatly enhance safety, increase efficiency of train transports and enhance cross-border interoperability of rail transport in Europe. This is done by replacing former national signalling equipment and operational procedures with a single new Europe-wide standard for train control and command systems.
The development process was started with the technical foundations for communication (GSM-R) and signalling (ETCS). Both are well established and in advanced public implementation worldwide[citation needed]. Now[when?] it begins to start attention for the 3rd part of ETML i.e. for fleet management or passenger information.
History
[edit]In the mid-1980s, the International Union of Railways (UIC) and the European Rail Research Institute (ERRI) began the search for a common European operation management for railways, titled ERTMS.[1] Today the development of ERTMS is steered by the ERA and driven by the Association of the European Rail Industry (UNIFE, Union des Industries Ferroviaires Européennes).
Until this effort began, there were (for historical reasons in each national railway system) in Europe:
- More than 20 different train protection systems,
- Different, conflicting rail operating rules,
- Different national homologation rules for vehicles,
- Different accreditation rules for drivers,
- Five different railway electrification systems,
- Missing, different or inoperable communication systems to driver cabs,
- Different national languages,
- Different measuring systems (Metric System, Imperial units),
- Right- and left-hand traffic organisation,
- Rail gauge differences on main lines in peripheral countries (Iberian Peninsula, Ireland, Russian broad gauge),
- Different railway coupling mechanisms by countries or rolling stock type,
all influencing train communication in parts.
To illustrate this, long running trains like Eurostar or Thalys must have 6 to 8 different train protection systems.[2]
Technical targets of ERTMS are:[2]
- Creation of an unified, standardised European train protection system to enhance interoperability and to quickly replace outdated systems,
- Unifying and enhancement of driver cab signalling,
- Market enhancement for control- and management systems; with better choices for customers, lower prices in mass production and export possibilities for worldwide application,
- Generation of equal security levels in train operation with comparable rules.
In 1995 a development plan first mentioned the creation of the European Rail Traffic Management System.[3] In 1996 the first specification for ETCS followed in response to EU Council Directive 96/48/EC99[4] on interoperability of the trans-European high-speed rail system.
The functional specification of ETCS was announced In April 2000 as guidelines for implementation in Madrid.[5] In autumn 2000 the member states of EU voted for publication of this specifications as decision of the European Commission to get a preliminary security in law and planning. This was to give the foundation for testing applications in six member railways of the ERTMS Users Group.[6]
In 2002 the Union of Signalling Industry (UNISIG) published the SUBSET-026 defining the current implementation of ETCS signalling equipment together with GSM–R – this Class 1 SRS 2.2.2 (now called ETCS Baseline 2) was accepted by the European Commission in decision 2002/731/EEC as mandatory for high-speed rail and in decision 2004/50/EEC as mandatory for conventional rail.
In 2004 further development stalled. While some countries (Austria, Spain, Switzerland) switched to ETCS with some benefit, German and French railway operators had already introduced proven and modern types of domestic train protection systems for high speed traffic, so they would gain no benefit. Furthermore, the introduction of ETCS Level 1 (such as in Spain) proved to be expensive and nearly all implementations are delayed. The defined standards were comprehensive by political nature, but not exact in technical means. National rail authorities often had certain features or constraints in their existing system they did not want to lose, and since every authority was still required to approve the systems, dialects of ERTMS emerged. Some active players were willing to overcome the situation with a new Baseline definition, not suited for immediate action.
This situation shifted the focus more onto the technical parts of ETCS and GSM-R as universal technical foundations of ERTMS. To master this situation, Karel Vinck was appointed in July 2005 as EU coordinator.
In 2005 a Memorandum of Understanding on ERTMS was published by members of the European Commission, national railways and supplying industries in Brussels. According to this declaration ETCS was to be introduced in 10 to 12 years on a named part of the Trans-European Networks.[7] Following this a conference was held in April 2006 in Budapest for the introduction of ERTMS, attended by 700 people.[8]
In July 2009, the European Commission announced that ETCS is now mandatory for all EU funded projects which include new or upgraded signalling and GSM-R is required when radio communications are upgraded.[9]
In April 2012 at the UIC ERTMS World Conference in Stockholm, Sweden, the executive director of the Community of European Railway and Infrastructure Companies (CER) called for an accelerated implementation of ERTMS in Europe.[10]
After definition of ETCS Baseline 3 in about 2010 and starting of implementation in multiple countries with Baseline 3 Release 2 in summer 2016, it is again possible to direct attention to operational management requirements of payloads. Logistics companies like DB Cargo have the need to develop functional capabilities in the target scope of ETML,[11] which should be welcome for standardisation.
ERTMS implementation strategies
[edit]This section needs additional citations for verification. (October 2018) |
The deployment of the European Rail Traffic Management System means the installation of ETCS components on the lineside of the railways and the train borne equipment. Both parts are connected by GSM-R as the communication part. Various railway roll out strategies can be used. With the introduction of ETCS the infrastructure manager has to decide whether a line will be equipped only with ETCS or if there is a demand for a mixed signalling system with support for National Train Control (NTC). Currently, both 'clean' and mixed systems are being deployed in Europe and around the world.[12]
'Clean' ETCS operation
[edit]Many new ETCS lines in Europe are being created and then it may often be preferred to implement ETCS Level 1 or Level 2 only. With this implementation strategy the wayside signalling cost is kept to a minimum, but the vehicle fleet that operates on these lines will need to all be equipped with ETCS on board to allow operation. This is more suitable for new high-speed passenger lines, where new vehicles will be bought, less suitable if long-distance freight trains shall use it. Examples of 'clean' ETCS operation include HSL-Zuid in the Netherlands, TP Ferro international stretch (Sección Internacional / Section Internationale) Figueres [ES] – Perpignan [FR], Erfurt–Halle/Leipzig in Germany, among others. Also all ETCS railways in Sweden and Norway, since the ETCS and ATC balise frequencies are too close so that older trains would get faults when passing Eurobalises.
Mixed operation
[edit]Mixed operation is a strategy where the wayside signalling is equipped with both ETCS and a conventional Class B system. Often the conventional system is the legacy system used during the signalling upgrade program. The main purposes of introducing a mixed operation (mixed signalling system) are:
- For financial and operational reasons, it is impossible to install ETCS for the complete network in a short period.
- Not every train is equipped to run on ETCS lines and ETCS-equipped trains cannot run only on new lines.
- Having a fall-back solution minimises the risk to the operation.
With mixed operation it is possible to run a line with both conventional and ETCS trains and to use the advantages of ETCS technology for the trains so equipped (e.g. higher speed or more trains on the line) but with the benefit that it is not necessary to equip the whole train fleet with ETCS simultaneously. Examples of ETCS in mixed operation include HSL 3 in Belgium where ETCS is mixed with national ATP system TBL or High-Speed Line Cordoba-Malaga in Spain[13] where ETCS is mixed with NTC of ASFA and LZB.
Operational principle of ETCS in mixed operation: NTC and ETCS Level 2
The principle of mixed level signalling is based on simple principles using bi-directional data exchange between the Radio Block Centre (RBC) and the interlocking systems. The operator sets a route and does not need to know if the route will be used for a Level NTC (former LSTM) only or a Level 2-equipped train. A route is locked based on the national principles by the interlocking system and the RBC is informed about the routes set. The RBC checks whether it is possible to allocate a train to the route and then informs the interlocking system that a train is allocated to the route. The interlocking system may show the ETCS white bar aspect to signals at the ETCS Border or along the ERTMS-route. Depending on the implementation, NTC systems along the route may or may not be active.
Movement Authority (MA) is the permission for a train to move to a specific location within the constraints of the infrastructure and with supervision of speed.[14] End of movement Authority (EoA) is the location to which the train is permitted to proceed and where target speed is equal to zero. End of movement Authority is the location to which the train is permitted to proceed according to a MA. When transmitting a MA, it is the end of the last section given in the MA.[14]
The RBC sends a Movement Authority (MA) to the train if a Level 2 train is allocated to the route. Otherwise the signal shows the optical proceed aspect and the related NTC code is sent to the track. As soon as a Level 2 train reports itself in rear of a route currently assigned for optical authorisation (e.g. after Start Of Mission (SOM) procedure or when the driver changes level from Level NTC to Level 2), the optical authorisation is automatically upgraded to a Level 2 movement authority. Consequently, a Level 2 movement authority is downgraded to an optical authorisation after a predefined time-out if the driver closes the cab or a fault is detected that restricts the movement authority (e.g. if the GSM-R radio coverage is unavailable.)
See also
[edit]- European Rail Traffic Management System in Great Britain
- European Union Agency for Railways (formerly ERA)
- Positive Train Control
- LOCOPROL
- UNIFE
References
[edit]- ^ Schmied, Peter (2000). "ETCS-System auf der Strecke Wien – Budapest erfolgreich getestet". Eisenbahn-Revue International (in German). 01/2000: 32.
- ^ a b Jacques Poré (2007), "ERTMS/ETCS – Erfahrungen und Ausblicke", Signal + Draht (in German), vol. 99, no. 10, pp. 34–40, ISSN 0037-4997
- ^ Warren Kaiser, Stein Nielson (14 March 2008). "The Core of ATP – Data Engineering". IRSE Technical Meeting "All About ATP" Sydney. Archived from the original on 29 April 2013. Retrieved 5 June 2017.|
- ^ Directive 96/48/EC99 of 23 July 1996 of the European Parliament and of the Council amending Council Directive 96/48/EC on the interoperability of the trans-European high-speed rail system and Directive 2001/16/EC of the European Parliament and of the Council on the interoperability of the trans-European conventional rail system
- ^ Meldung ERTMS-Spezifikation festgelegt. In: Eisenbahn-Revue International, Heft 6/2000, ISSN 1421-2811, S. 275.
- ^ DB AG startet Versuche mit ETCS-Level 2. In: Eisenbahn-Revue International, Heft 4/2002, ISSN 1421-2811, S. 186–189.
- ^ Meldung Absichtserklärung zu ERTMS. In: Eisenbahn-Revue International, Heft 5/2005, ISSN 1421-2811, S. 235.
- ^ Peter Winter: UIC-Konferenz zur Einführung des European Rail Traffic Management Systems in Budapest. In: Eisenbahn-Revue International. Heft 6/2006, ISSN 1421-2811, S. 284–285.
- ^ "EC sets out ERTMS deployment deadlines". Railway Gazette International. 31 July 2009.
- ^ "Now or never for ERTMS in Europe, says Lochman". International Railway Journal. 25 April 2012. Archived from the original on 21 May 2012. Retrieved 6 May 2012.
- ^ "Neues Digital Lab "ampulse" im "House of Logistics & Mobility" eingeweiht". dbcargo.com (in German). DB Cargo AG. 8 February 2017. Archived from the original on 11 February 2017. Retrieved 9 February 2017.
- ^ ERTMS deployment map Archived 16 January 2012 at the Wayback Machine. UNIFE, Retrieved 11 November 2011
- ^ ERTMS Online Newsletter Archived 19 September 2011 at the Wayback Machine. European Communities, March 2008, Retrieved 29 December 2011
- ^ a b Subset-023. "ERTMS/ETCS-Glossary of Terms and Abbreviations". ERTMS USERS GROUP. 2014. Archived from the original on 21 December 2018. Retrieved 21 December 2018.
External links
[edit]- ERTMS deployment plan with Annexes
- Website of UNIFE Archived 21 March 2016 at the Wayback Machine
- Website of ERA
- Website of UIC Archived 27 October 2017 at the Wayback Machine
- ERTMS Users Group
- Great Britain's National implementation plan