Jump to content

Dual gauge: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Change wikilink to new name
m Dual-gauge railways by nation: Typo fixing, replaced: Bangladseh → Bangladesh
 
(41 intermediate revisions by 23 users not shown)
Line 1: Line 1:
{{Short description|Railway track with more than two rails }}
{{Short description|Railway track with more than two rails }}
{{distinguish|Third rail|Guard rail (rail transport)}}
{{Use dmy dates|date=November 2022}}
{{Use dmy dates|date=November 2022}}
{{Use Australian English|date=November 2022}}
{{Use Australian English|date=November 2022}}
{{distinguish|Third rail|Guard rail (rail transport)}}
{{train topics}}
{{train topics}}


Line 8: Line 8:


==Background==
==Background==
{{quote box|align=right | width=25% | quote= A comprehensive list of rail gauges around the world is in the article about [[Track gauge]]. <span style="color: #FFFFF0"></span>}}
{{Hatnote|A comprehensive list of rail gauges around the world is in the article about [[Track gauge]].}}


The rail gauge is the most fundamental specification of a railway. [[Rail tracks]] and [[Wheelset (rail transport)|wheelsets]] are built within [[engineering tolerance]]s that allow optimum lateral movement of the wheelsets between the rails. Pairs of rails that become too wide or narrow in gauge will cause derailments, especially if in excess of normal gauge-widening on curves.<ref>{{cite book |last=Tratman |first=E.E. Russell |date=1908 |url= https://archive.org/details/railwaytracktrac01trat/page/n9/mode/2up |title=Railway track and track work |publisher=The Engineering News Publishing Co. |edition=3 |location=New York|access-date=8 November 2022 |page=402}}</ref>{{refn|group=note|Two-rail track on curves is re-gauged when the gauge is 20 mm over (16 mm on narrow gauge). It is sometimes done by relocating the low (inner) rail to save "spike-killing" the sleeper at the outer end, where lateral loads are greater. In other cases, the sleeper may be slid through by about 70 mm to provide "new" timber for spiking.<ref>{{cite book |date=1988 |title=Track Maintenance Guide |publisher=Australian National Railways Commission |location=Adelaide |page=section 12.2}}</ref> On dual-gauge turnouts, tolerances are small: only {{convert|8|mm|in|abbr=off}} over gauge and {{convert|2|mm|in|abbr=off}} under.<ref>{{cite web |url=https://extranet.artc.com.au/docs/eng/track-civil/workinstruct/pc/ETN-03-01.pdf |title=50kg dual gauge turnouts and gauge separations – construction and maintenance manual |author=<!--Not stated-->|date=2008 |website=Australian Rail Track Corporation |access-date=7 November 2022 }}</ref>}}
The rail gauge is the most fundamental specification of a railway. [[Rail tracks]] and [[Wheelset (rail transport)|wheelsets]] are built within [[engineering tolerance]]s that allow optimum lateral movement of the wheelsets between the rails. Pairs of rails that become too wide or narrow in gauge will cause derailments, especially if in excess of normal gauge-widening on curves.<ref name=Tratman>{{cite book |last=Tratman |first=E.E. Russell |date=1908 |url= https://archive.org/details/railwaytracktrac01trat/page/n9/mode/2up |title=Railway track and track work |publisher=The Engineering News Publishing Co. |edition=3 |location=New York|access-date=8 November 2022 |page=402}}</ref>{{refn|group=note|Two-rail track on curves is re-gauged when the gauge is 20 mm over (16 mm on narrow gauge). It is sometimes done by relocating the low (inner) rail to save "spike-killing" the sleeper at the outer end, where lateral loads are greater. In other cases, the sleeper may be slid through by about 70 mm to provide "new" timber for spiking.<ref>{{cite book |date=1988 |title=Track Maintenance Guide |publisher=Australian National Railways Commission |location=Adelaide |page=section 12.2}}</ref> On dual-gauge turnouts, tolerances are small: only {{convert|8|mm|in|abbr=off}} over gauge and {{convert|2|mm|in|abbr=off}} under.<ref>{{cite web |url=https://extranet.artc.com.au/docs/eng/track-civil/workinstruct/pc/ETN-03-01.pdf |title=50kg dual gauge turnouts and gauge separations – construction and maintenance manual |author=<!--Not stated-->|date=2008 |website=Australian Rail Track Corporation |access-date=7 November 2022 }}</ref>}}


Given the requirement for gauge to be within very tight limits, when the designed distance between the pair of wheels on a wheelset differs even slightly from that of others on a railway, track must be built to two specific gauges. That is achieved in a variety of ways: most commonly by adding a third rail, more rarely by adding another pair of rails; and rarer still, when three gauges are present, by four rails.
Given the requirement for gauge to be within very tight limits, when the designed distance between the pair of wheels on a wheelset differs even slightly from that of others on a railway, track must be built to two specific gauges. That is achieved in a variety of ways: most commonly by adding a third rail, more rarely by adding another pair of rails; and rarer still, when three gauges are present, by four rails.


==Configurations==
==Configurations==
[[File:Rail baseplate on dual gauge (1435 and 1600 mm) track, South Australian Railways.jpg|thumb|200px|[[Rail fastening system#Tieplates|Baseplate]] on dual-gauge track showing the minimum practicable gap between the bases of two rails – about 40&nbsp;mm (1<span style="vertical-align:super;font-size:x-small">1</span>/<span style="vertical-align:sub;font-size:x-small">2</span>&nbsp;in) – which determines the minimum difference in gauges possible in a three-rail configuration.]]
[[File:Rail baseplate on dual gauge (1435 and 1600 mm) track, South Australian Railways.jpg|thumb|200px|[[Rail fastening system#Tieplates|Baseplate]] on dual-gauge track showing the minimum practicable gap between the bases of two rails – about 40&nbsp;mm (1<span style="vertical-align:super;font-size:x-small">1</span>/<span style="vertical-align:sub;font-size:x-small">2</span>&nbsp;in) – which determines the minimum difference in gauges possible in a three-rail configuration]]

{{Quote box
|title = Interactive 3D view
|quote = {{Show||
{{big|An interactive 3D view of&nbsp;dual-gauge&nbsp;track&nbsp;components is<br />[https://inlandrail.com.au/what-is-dual-gauge-track/ here]}}
}}
|align = left
|width = 270px
}}


Dual-gauge track can consist of three rails, sharing one "common" rail; or four rails, with the rails of the narrower gauge lying between those of the broader gauge. In the three-rail configuration, wear and tear of the common rail is greater than with the two other outer rails. In dual gauge lines, turnouts ([[railroad switch]]es) are more complex than in single-gauge track, and trains must be safely signalled on both of the gauges. [[Track circuit]]s and mechanical interlocking must also operate on both gauges.<ref>{{cite book|title=Farewell narrow gauge |last=Rogers |first=K.C. |date=1969 |location=Adelaide |publisher=Australian Railway Historical Society (SA Division Inc.) |pages=19–22 }}</ref>
Dual-gauge track can consist of three rails, sharing one "common" rail; or four rails, with the rails of the narrower gauge lying between those of the broader gauge. In the three-rail configuration, wear and tear of the common rail is greater than with the two other outer rails. In dual gauge lines, turnouts ([[railroad switch]]es) are more complex than in single-gauge track, and trains must be safely signalled on both of the gauges. [[Track circuit]]s and mechanical interlocking must also operate on both gauges.<ref>{{cite book|title=Farewell narrow gauge |last=Rogers |first=K.C. |date=1969 |location=Adelaide |publisher=Australian Railway Historical Society (SA Division Inc.) |pages=19–22 }}</ref>


Multi-gauge track is very often associated with a break-of-gauge station, where rail vehicles or vehicle contents are transferred from one gauge to another. A break of gauge causes delay and increases congestion, especially on single-track lines. Essentially, two trains are required to do what a single train would normally accomplish. When traffic passes mainly in one direction, full wagons taken to the border have to be returned as empties, and a train of empty wagons has to be brought to the break of gauge from the other side to fetch the cargo. Congestion is also caused by unloading and reloading.<ref>{{cite book |last=Pratt |first=Edwin A. |date=1912 |title=The state railway muddle in Australia |publisher=John Murray |location=London |via=Internet Archive |page=68 |url=https://archive.org/details/staterailwaymudd00pratrich/page/68/mode/1up |access-date=2022-11-28}}</ref><ref name=haul>{{cite book |authors=Donovan, Peter & O'Neil, Bernard; revised edition Jay, Christopher |date=1991 |title=The long haul: Australian National 1978–1988 |edition=Revised |publisher= Australian National Railways Commission |location=Adelaide |isbn=1875359087}}</ref>{{rp|74–75}} The problem is worsened when there is a disparity between the capacity of locomotives and vehicles on the two gauges: typically, one broad-gauge trainload needs three narrow-gauge trains to carry.<ref>{{cite journal |last=Chambers |first=T.F. |date=February 1971 |title=The railways and Terowie – their early history and change of pattern over nearly a century |journal=[[Australian Railway History|Australian Railway Historical Society Bulletin]] |volume=XXII |issue=400 |page=34 |issn=0005-0105 }}</ref>
Multi-gauge track is very often associated with a break-of-gauge station, where rail vehicles or vehicle contents are transferred from one gauge to another. A break of gauge causes delay and increases congestion, especially on single-track lines. Essentially, two trains are required to do what a single train would normally accomplish. When traffic passes mainly in one direction, full wagons taken to the border have to be returned as empties, and a train of empty wagons has to be brought to the break of gauge from the other side to fetch the cargo. Congestion is also caused by unloading and reloading.<ref>{{cite book |last=Pratt |first=Edwin A. |date=1912 |title=The state railway muddle in Australia |publisher=John Murray |location=London |via=Internet Archive |page=68 |url=https://archive.org/details/staterailwaymudd00pratrich/page/68/mode/1up |access-date=2022-11-28}}</ref><ref name=haul>{{cite book |last1=Donovan|first1=Peter Francis|last2=O'Neil|first2=Bernard|last3=Jay|first3=Christopher|date=1991 |title=The long haul: Australian National 1978–1988 |edition=Revised |publisher= Australian National Railways Commission |location=Adelaide |isbn=1875359087}}</ref>{{rp|74–75}} The problem is worsened when there is a disparity between the capacity of locomotives and vehicles on the two gauges: typically, one broad-gauge trainload needs three narrow-gauge trains to carry.<ref>{{cite journal |last=Chambers |first=T.F. |date=February 1971 |title=The railways and Terowie – their early history and change of pattern over nearly a century |journal=[[Australian Railway History|Australian Railway Historical Society Bulletin]] |volume=XXII |issue=400 |page=34 |issn=0005-0105 }}</ref>


==Dual gauge (three rails)==
===Three rails===
[[File:Cross-section of Australian dual-gauge railway track.tif|thumb|left|Configuration of dual-gauge (1600 mm and 1435 mm) track]]
[[File:Cross-section of Australian dual-gauge railway track.tif|thumb|left|Configuration of dual-gauge (1600 mm and 1435 mm) track.]]


Constructing dual-gauge track with three rails is possible when the two adjacent rails can be separated at the base by at least the space required by rail fastening hardware such as spikes and or rail clips – typically {{convert|40|mm|in|abbr=off|comma=off}}. If the two gauges are closer than that, four rails must be used. Depending on the rail fasteners used and the weight of rails (heavy rails are bigger), the practicable difference between the two gauges is in the range {{convert|145|mm|in|abbr=off|comma=off}} to {{convert|200|mm|in|abbr=off|comma=off}}.<ref>{{cite book |date=1988 |title=Track Maintenance Guide |publisher=Australian National Railways Commission |location=Adelaide |page=section 9.1}}</ref>
Constructing dual-gauge track with three rails is possible when the two adjacent rails can be separated at the base by at least the space required by rail fastening hardware such as spikes and or rail clips – typically {{convert|40|mm|in|abbr=off|comma=off}}. If the two gauges are closer than that, four rails must be used. Depending on the rail fasteners used and the weight of rails (heavy rails are bigger), the practicable difference between the two gauges is in the range {{convert|145|mm|in|abbr=off|comma=off}} to {{convert|200|mm|in|abbr=off|comma=off}}.<ref>{{cite book |date=1988 |title=Track Maintenance Guide |publisher=Australian National Railways Commission |location=Adelaide |page=section 9.1}}</ref>


{| class="wikitable floatleft mw-collapsible mw-collapsed" border= "1" style= "width:60%; font-size: 86%; float:left; margin-left:2em; margin-right:2em; margin-bottom:2em"
{| class="wikitable floatleft mw-collapsible mw-collapsed" border= "1" style= "width:60%; font-size: 86%; float:left; margin-left:2em; margin-right:2em; margin-bottom:2em"
Line 47: Line 56:
{{clear}}
{{clear}}


==Dual gauge (four rails)==
===Four rails===
[[File: Cross-section of 4-rail dual-gauge track (standard and metre gauge).png |thumb|left|Four-rail arrangement of standard and metre gauge on the [[Chemin de Fer de la Baie de Somme]]. A 435&nbsp;mm difference in gauge can also be accommodated in a three-rail configuration.]]
[[File: Cross-section of 4-rail dual-gauge track (standard and metre gauge).png |thumb|left|Four-rail arrangement of standard and metre gauge on the [[Chemin de Fer de la Baie de Somme]]. A 435&nbsp;mm difference in gauge can also be accommodated in a three-rail configuration.]]


There are many places where gauge dimensions of two different railway systems are too close to allow a three-rail configuration, including:
In some places, the dimensions of two gauges needing to be collocated are too close to allow a three-rail configuration – for example:
* {{Track gauge|1000mm|lk=on|comma=off}} and {{Track gauge|1067mm|lk=on|comma=off}} (common in Africa, a legacy respectively of French/Belgian and British railway practice)
* {{Track gauge|1000mm|lk=on|comma=off}} and {{Track gauge|1067mm|lk=on|comma=off}} (common in Africa, a legacy respectively of French/Belgian and British railway practice)
* {{Track gauge|1000mm|lk=on|comma=off}} and {{Track gauge|914mm|lk=on|comma=off}} (common in South America)
* {{Track gauge|1000mm|lk=on|comma=off}} and {{Track gauge|914mm|lk=on|comma=off}} (common in South America)
* {{Track gauge|1435mm|lk=on|comma=off}} and {{Track gauge|1524mm|lk=on|comma=off}} (common where broad-gauge railways of former [[satellite states]] of the [[Soviet Union]] meet European or Chinese standard gauge).
* {{Track gauge|1435mm|lk=on|comma=off}} and {{Track gauge|1524mm|lk=on|comma=off}} (common where broad-gauge railways of former [[satellite states]] of the [[Soviet Union]] meet European or Chinese standard gauge).
In such cases, four rails are needed to provide the dual gauge.
In such cases, four rails are needed for dual gauge. In addition, four rails may result from an engineering preference when three rails would suffice: an example is on the [[Chemin de Fer de la Baie de Somme]] (Somme Bay railway), which combines standard and metre gauge – {{convert|435|mm|in|abbr=off|comma=off}} different, well within the parameters for three rails.


Four rails might also be installed because of other engineering or operational factors, even though three rails would suffice: an example is on the [[Chemin de Fer de la Baie de Somme]] (Somme Bay railway), which combines standard and metre gauge – {{convert|435|mm|in|abbr=off|comma=off}} different, well within the parameters for three rails.
Four rails can also be deployed where it is essential to have the centre-line of all rail vehicles aligned with the centre-line of the track. Examples are:

* in constricted tunnels
Four rails are necessary where the centre-line of rail vehicles on both tracks must be closely aligned with the centre-line of the track in tunnels or other constricted locations. Such configurations, when they revert back to standard parallel lines as soon as room is available, are termed "[[Gauntlet track|gauntlet track" (US: "gantlet track")]].<ref>{{cite web|url=https://www.trains.com/trn/train-basics/ask-trains/gantlet-gauntlet/ |title=Gantlet vs. gauntlet |author=<!--Not stated--> |date=1 February 2011 |website=[[Trains (magazine)|Trains]] |publisher=[[Kalmbach Media]]|access-date=1 September 2023 }}</ref><ref name=Tratman/>
* passenger platforms, where for reasons of safety and comfort the step taken by the passenger must be within uniform limits

* on [[Railway turntable|turntables]], which must present identical positioning of rails at both ends, requiring all four rails to be aligned to the central axis.{{Citation needed|date=November 2022}}
Four rails must be placed identically on either side of the central axis of dual-gauge [[Railway turntable|turntables]] (and six rails on triple-gauge turntables) so that they match the configuration of the fixed rails leading to and from the turntable, regardless of the direction in which the turntable is facing.


{|class="wikitable floatleft mw-collapsible mw-collapsed" border= "1" style= "width:60%; font-size: 86%; float:left; margin-left:2em; margin-right:2em; margin-bottom:2em"
{|class="wikitable floatleft mw-collapsible mw-collapsed" border= "1" style= "width:60%; font-size: 86%; float:left; margin-left:2em; margin-right:2em; margin-bottom:2em"
Line 74: Line 84:
|<br />[[Image: Haparanda-Tornio rail bridge across the Torne River, looking towards Sweden, 2008.jpg |border|400x130px|none]]
|<br />[[Image: Haparanda-Tornio rail bridge across the Torne River, looking towards Sweden, 2008.jpg |border|400x130px|none]]
|-align="left" vertical-align="top"
|-align="left" vertical-align="top"
|style="vertical-align: top; width=100"|1524&nbsp;/ 1435&nbsp;mm<br />(5&nbsp;ft 0&nbsp;/ 4&nbsp;ft 8<span style="vertical-align:super;font-size:x-small">1</span>/<span style="vertical-align:sub;font-size:x-small">2</span>&nbsp;in).<br />A line comprising European standard gauge and "Russian" gauge, a legacy of the former [[satellite state]]s of the [[Soviet Union]]. The 89 mm difference between the two gauges is too small for a three-rail configuration.{{hair space}}{{efn-la|Torne River rail bridge between Tornio (Finland) and Haparanda (Sweden, ahead), 2008.}}
|style="vertical-align: top; width=100"|1524&nbsp;/ 1435&nbsp;mm<br />(5&nbsp;ft 0&nbsp;/ 4&nbsp;ft 8<span style="vertical-align:super;font-size:x-small">1</span>/<span style="vertical-align:sub;font-size:x-small">2</span>&nbsp;in).<br />A line comprising European standard gauge and "Russian" gauge, a legacy of the former [[satellite state]]s of the [[Soviet Union]]. The 89&nbsp;mm difference between the two gauges is too small to allow a three-rail configuration.{{hair space}}{{efn-la|Torne River rail bridge between Tornio (Finland) and Haparanda (Sweden, ahead), 2008.}}
|-align="center"
|-align="center"
|}
|}
{{clear}}
{{clear}}


==Triple gauge==
===Triple gauge===
[[File:Cross-section of Australian triple-gauge track.png|thumb|left|Cross-section of triple-gauge track at [[Gladstone railway station, South Australia|Gladstone]] and [[Peterborough railway station, South Australia|Peterborough]], [[South Australia]], before [[Sydney–Perth rail corridor|gauge standardisation]]. The three gauges require the respective gaps between the outer and inner rails to be different, unlike four-rail dual gauge.]]
[[File:Cross-section of Australian triple-gauge track.png|thumb|left|Cross-section of triple-gauge track at [[Gladstone railway station, South Australia|Gladstone]] and [[Peterborough railway station, South Australia|Peterborough]], [[South Australia]], before [[Sydney–Perth rail corridor|gauge standardisation]]. The three gauges require the respective gaps between the outer and inner rails to be different, unlike four-rail dual gauge.]]


Line 120: Line 130:
! Notes
! Notes
|-
|-
| [[Volos#Railway|Volos]], Greece
| [[Gladstone railway station, South Australia|Gladstone, South Australia]]{{refn|group=note|[[Port Pirie Junction railway station|Port Pirie Junction]] was a triple-gauge station from 1937 to 1983 but, unlike Gladstone, did not have any triple-gauge track. For the most part the gauges were separate; dual-gauge tracks served a few trans-shipment sidings and another [[Port Pirie railway station (Ellen Street)| passenger station]] in the town's main street.<ref>{{cite journal |last1=Bakewell |first1=Guy |last2=Wilson |first2=John |date=September 1968 |title=Farewell to Ellen Street |journal=[[Australian Railway History|Australian Railway Historical Society Bulletin]] |volume=XIX |issue=371 |page=211 |issn=0005-0105}}</ref><ref>{{webarchive |url=https://web.archive.org/web/20160228020700/http://natrailmuseum.org.au/downloads/documents/Multi_Gauge_Muddle.compressed.pdf |title=South Australia's mixed gauge muddle }}</ref>}}
| rowspan="2" | {{Track gauge|1067mm|comma=off}} || rowspan="4" | {{Track gauge|1435mm|comma=off}} || rowspan="2" | {{Track gauge|1600mm|comma=off}}
| {{Track gauge|600mm}} || rowspan="4" | {{Track gauge|1000mm|comma=off}} || rowspan="5" | {{Track gauge|1435mm|comma=off}}
| {{Track gauge|600mm}} gauge closed in the 1970s, {{Track gauge|1000mm|comma=off}} gauge closed in 1998
| 1968–1983<br />(Some has been reconstructed at the [[National Railway Museum, Port Adelaide]].)<ref>{{cite magazine|title=NRM report |author=<!--Not stated-->|date= January 2022 |magazine=[[Catch Point (periodical)|Catch Point Magazine]] |location=Port Adelaide |publisher=National Railway Museum |page=45 }}</ref>
|-
|-
| [[Jenbach]], Austria
| [[Peterborough railway station, South Australia|Peterborough, South Australia]]
| {{Track gauge|760mm}}
| 1968–1983. (Some has been preserved at the [[Steamtown Heritage Rail Centre]] in Peterborough.)<ref>{{cite web |url=https://www.steamtown.com.au/gallery-links/ |title=About Steamtown |author=<!--Not stated-->|date=2022 |website=Steamtown Peterborough |publisher=Steamtown Heritage Rail Centre |access-date=5 November 2022 }}</ref>
| rowspan="2" | Still in use{{When|date=November 2022}}
|-
|-
| [[Latour-de-Carol]], France
| [[Montreux]], Switzerland
| rowspan="2" | {{Track gauge|1000mm|comma=off}} || rowspan="2" | {{Track gauge|1668mm|comma=off}}
| rowspan="2" | {{Track gauge|800mm}}
| rowspan="2" |Still in use{{When|date=November 2022}}
|-
|-
| [[Hendaye]], France
| [[Capolago]], Switzerland
| Metre gauge line closed in 1950
|-
| [[Vynohradiv]], Ukraine
| {{Track gauge|750mm}} || {{Track gauge|1520mm|comma=off}} || rowspan="6" | {{Track gauge|1435mm|comma=off}}
| Standard and broad gauge track is track plait{{Ambiguous|reason= Term is not understood|date=October 2022}} between [[Halmeu]], Romania and [[Čierna nad Tisou railway station|Čierna nad Tisou]], [[Slovakia]], near Ukraine. The narrow-gauge track belongs to Borzhava narrow-gauge railway.{{Ambiguous|reason= Is ng part of triple gauge or separate? Distances?|date=October 2022}} All still in use.{{When|date=November 2022}}
|-
|-
| [[Växjö]], Sweden
| [[Växjö]], Sweden
Line 141: Line 148:
| Until 1974 or later<ref>[http://www.vmjs.se/ Triple gauge at Växjö, ''click on Treskensspår at the left'']</ref>
| Until 1974 or later<ref>[http://www.vmjs.se/ Triple gauge at Växjö, ''click on Treskensspår at the left'']</ref>
|-
|-
| [[Montreux]], Switzerland
| [[Latour-de-Carol]], France
| {{Track gauge|800mm}} || rowspan="4" | {{Track gauge|1000mm|comma=off}}
| rowspan="3" | {{Track gauge|1000mm|comma=off}} || rowspan="6" | {{Track gauge|1435mm|comma=off}} || rowspan="3" | {{Track gauge|1668mm|comma=off}}
| Three gauges since 1928; still in use in 2024.
| rowspan="2" | Still in use{{When|date=November 2022}}
|-
|-
| [[Jenbach]], Austria
| [[Hendaye]], France
| Still in use
| {{Track gauge|760mm}}
|-
|-
| [[Capolago]], Switzerland
| [[Barcelona]], Spain
| Approach to [[Port of Barcelona]], still in use as of September 2024
| {{Track gauge|800mm}}
| Metre gauge line closed in 1950
|-
|-
| [[Gladstone railway station, South Australia|Gladstone, South Australia]]{{refn|group=note|[[Port Pirie Junction railway station|Port Pirie Junction]] was a triple-gauge station from 1937 to 1983 but, unlike Gladstone, did not have any triple-gauge track. For the most part the gauges were separate; dual-gauge tracks served a few trans-shipment sidings and another [[Port Pirie railway station (Ellen Street)|passenger station]] in the town's main street.<ref>{{cite journal |last1=Bakewell |first1=Guy |last2=Wilson |first2=John |date=September 1968 |title=Farewell to Ellen Street |journal=[[Australian Railway History|Australian Railway Historical Society Bulletin]] |volume=XIX |issue=371 |page=211 |issn=0005-0105}}</ref><ref>{{Cite web |url=http://natrailmuseum.org.au/downloads/documents/Multi_Gauge_Muddle.compressed.pdf |title=South Australia's mixed gauge muddle |access-date=8 November 2022 |archive-date=28 February 2016 |archive-url=https://web.archive.org/web/20160228020700/http://natrailmuseum.org.au/downloads/documents/Multi_Gauge_Muddle.compressed.pdf |url-status=dead }}</ref>}}
| [[Volos#Railway|Volos]], Greece
| rowspan="3" | {{Track gauge|1067mm|comma=off}} || rowspan="2" | {{Track gauge|1600mm|comma=off}}
| {{Track gauge|600mm}}
| 1968–1983<br />(Some has been reconstructed at the [[National Railway Museum, Port Adelaide]].)<ref>{{cite magazine|title=NRM report |author=<!--Not stated-->|date= January 2022 |magazine=[[Catch Point (periodical)|Catch Point Magazine]] |location=Port Adelaide |publisher=National Railway Museum |page=45 }}</ref>
| {{Track gauge|600mm}} gauge closed in the 1970s, {{Track gauge|1000mm|comma=off}} gauge closed in 1998
|-
| [[Peterborough railway station, South Australia|Peterborough, South Australia]]
| 1968–1983. (Some has been preserved at the [[Steamtown Heritage Rail Centre]] in Peterborough.)<ref>{{cite web |url=https://www.steamtown.com.au/gallery-links/ |title=About Steamtown |author=<!--Not stated-->|date=2022 |website=Steamtown Peterborough |publisher=Steamtown Heritage Rail Centre |access-date=5 November 2022 }}</ref>
|-
|-
| [[Toronto]], Canada
| [[Toronto]], Canada
| {{Track gauge|1067mm|comma=off}} || {{Track gauge|1435mm|comma=off}} || {{Track gauge|1676mm|comma=off}}
|| {{Track gauge|1676mm|comma=off}}
| Reported as impending in 1872.<ref>{{cite news |title=The railway gauges |newspaper=[[The Mercury (Hobart)]] |url=https://trove.nla.gov.au/newspaper/article/8920889# |volume= XXI |issue=3577 |location=(Original, Hobart. Digital reproduction, Canberra|publisher=National Library of Australia – [[Trove]] digital newspaper archive) |date= 14 June 1872 |page=3 |accessdate=31 October 2022}}</ref> Subsequently [[Track gauge conversion|converted]] to {{Track gauge|1435mm|comma=off}} gauge.
| Reported as impending in 1872.<ref>{{cite news |title=The railway gauges |newspaper=[[The Mercury (Hobart)]] |url=https://trove.nla.gov.au/newspaper/article/8920889# |volume= XXI |issue=3577 |location=(Original, Hobart. Digital reproduction, Canberra|publisher=National Library of Australia – [[Trove]] digital newspaper archive) |date= 14 June 1872 |page=3 |accessdate=31 October 2022}}</ref> Subsequently [[Track gauge conversion|converted]] to {{Track gauge|1435mm|comma=off}} gauge.
|}
|}
Line 178: Line 187:
{{clear}}
{{clear}}


==More than three gauges==
===More than three gauges===
[[File: Beyer, Peacock and Co Gorton Foundry in 1870.jpg|thumb|The Gorton Foundry of [[Beyer, Peacock and Company]] was typical of locomotive and rolling stock manufacturers that exported to many countries. This track of four gauges traversed two turntables, requiring the rails to be centralised.]]
[[File: Beyer, Peacock and Co Gorton Foundry in 1870.jpg|thumb|The Gorton Foundry of [[Beyer, Peacock & Company]] was typical of locomotive and rolling stock manufacturers that exported to many countries. This track of four gauges traversed two turntables, requiring the rails to be centralised.]]


Three gauges are the maximum found on operating railway lines and in railway yards, but some rolling stock manufacturers collocate more than three lines in their works, depending on the particular gauges of their customers.
Three gauges are the maximum found on operating railway lines and in railway yards, but some rolling stock manufacturers collocate more than three lines in their works, depending on the particular gauges of their customers.


==Alternatives to dual-gauge track==
==Alternatives==
[[File:Schema rollbocks trucks.PNG|thumb|[[Rollbock]]s compared to [[transporter wagon]]s]]
[[File:Schema rollbocks trucks.PNG|thumb|[[Rollbock]]s compared to [[transporter wagon]]s]]


[[File: Australian National Railways 5-pack freight cars and container loader, Islington freight terminal, 1985.jpg |thumb|250px|Standardised [[Intermodal container|containers]] have revolutionised rail, road and sea [[freight transport]]. Although mechanisation has speeded up handling, moving containers from one train to another because of different rail gauges is costly and inefficient.]]
[[File: Australian National Railways 5-pack freight cars and container loader, Islington freight terminal, 1985.jpg |thumb|250px|Standardised [[Intermodal container|containers]] have revolutionised rail, road and sea [[freight transport]]. Although mechanisation has sped up handling, moving containers from one train to another because of different rail gauges is costly and inefficient.]]


Transfer of freight and passengers between different gauges does not necessarily involve dual-gauge track: there may simply be two tracks that approach either side of a platform without overlapping. In Australia, 13 break-of-gauge stations existed by 1945 as a result of longstanding interstate rivalries: three different gauges had persisted since the 1850s and the five mainland state capitals were not linked by standard gauge until 1995.<ref>{{cite book|title=Australian Railwayman: from cadet engineer to railways commissioner |last=Fitch |first=Ronald J. |date=2006 |location=Dural, New South Wales |publisher=Rosenberg Publishing Pty Ltd |page=168 |isbn=1877058483 }}</ref> Huge costs and long delays were imposed by [[Transshipment|Trans-shipment]] of freight at break-of-gauge stations, whether manually, by gantry crane or by wheelset or bogie exchange.<ref name=haul/>{{rp|67}}</ref> During [[World War II]], breaks of gauge in Australia added immense difficulty to the war effort by needing extra locomotives and rolling stock, and more than 1600 service personnel and a large pool of civilians, at transfer points for an annual average transfer of about 1.8&nbsp;million tonnes of freight.<ref>{{cite book |last=Laird |first=Philip |date=2001 |title=Back on track: re-thinking transport policy in Australia and New Zealand |publisher=University of New South Wales Press |location=Sydney |isbn=086840411X |page=187}}</ref>
Transfer of freight and passengers between different gauges does not necessarily involve dual-gauge track: there may simply be two tracks that approach either side of a platform without overlapping. In Australia, 13 break-of-gauge stations existed by 1945 as a result of longstanding interstate rivalries: three different gauges had persisted since the 1850s and the five mainland state capitals were not linked by standard gauge until 1995.<ref>{{cite book|title=Australian Railwayman: from cadet engineer to railways commissioner |last=Fitch |first=Ronald J. |date=2006 |location=Dural, New South Wales |publisher=Rosenberg Publishing Pty Ltd |page=168 |isbn=1877058483 }}</ref> Huge costs and long delays were imposed by [[Transshipment|trans-shipment]] of freight at break-of-gauge stations, whether manually, by gantry crane or by wheelset or bogie exchange.<ref name=haul/>{{rp|67}} During [[World War II]], breaks of gauge in Australia added immense difficulty to the war effort by needing extra locomotives and rolling stock, and more than 1600 service personnel and a large pool of civilians, at transfer points for an annual average transfer of about 1.8&nbsp;million tonnes of freight.<ref>{{cite book |last=Laird |first=Philip |date=2001 |title=Back on track: re-thinking transport policy in Australia and New Zealand |publisher=University of New South Wales Press |location=Sydney |isbn=086840411X |page=187}}</ref>


To cost and inefficiency was added, in the case of passengers, considerable inconvenience. In 1896, at [[Albury railway station|Albury station]] on the [[Sydney–Melbourne railway]], famed American writer Samuel Clemens ([[Mark Twain]]) had to change trains in the middle of a "biting-cold" night in 1896 and there formed his pungent view of "the paralysis of intellect that gave that idea birth".<ref>{{cite web |url= http://www.online-literature.com/twain/following-the-equator/14/ |title= Following the Equator |first= Mark |last= Twain |date= 2020 |website= The Literature Network|access-date= 27 May 2020 }}</ref>
To cost and inefficiency was added, in the case of passengers, considerable inconvenience. In 1896, at [[Albury railway station|Albury station]] on the [[Sydney–Melbourne railway]], famed American writer Samuel Clemens ([[Mark Twain]]) had to change trains in the middle of a "biting-cold" night in 1896 and there formed his pungent view of "the paralysis of intellect that gave that idea birth".<ref>{{cite web |url= http://www.online-literature.com/twain/following-the-equator/14/ |title= Following the Equator |first= Mark |last= Twain |date= 2020 |website= The Literature Network|access-date= 27 May 2020 }}</ref>


In some locations, an alternative to building long lengths of dual-gauge track has been to change the wheels on [[railroad car|rolling stock]], either by dropping and changing wheelsets from [[Train wheel|four-wheeled]] vehicles or exchanging bogies (US: trucks) under eight-wheeled vehicles. With this arrangement, a short length of dual-gauge track is only needed within the facility. A benefit is that the contents of fully loaded cars are not disturbed. The scheme was first adopted on the French–Spanish border and in Poland. It introduces delay into transit times compared with dual-gauge operation, but is much quicker than trans-shipping: when introduced in 1962 in Melbourne, Australia, on the route between Sydney and Adelaide, the freight handling time per train dropped from five days to less than two. The process involved disconnecting the [[Railway brake|brake rigging]] and [[bogie]] [[List of railroad truck parts#Center pin|centre pins]] have to be disconnected before the vehicle is lifted and new bogies are wheeled underneath.<ref name=buckland>{{cite journal | last=Buckland |first=J.L. |date=October 1962 |title=Bogie changing extends the benefits of standard-gauge |journal=[[Australian Railway History|Australian Railway Historical Society Bulletin]] |volume=XIII |issue=300 |pages=161–162 |issn=0005-0105 }}</ref>{{refn|group=note|At that time, each transfer took 20 minutes; inspection and marshalling took up the remaining time.<ref name=buckland/> In 1982, each of two shifts of 18 men exchanged an average of 66 bogies per day; in comparison, 100 men would have been needed to transfer the same amount of freight wagon to wagon.<ref>{{cite book |author=Lee, Robert |title=The Railways of Victoria 1854-2004 |publisher=Melbourne University Publishing Ltd |year=2007 |isbn= 978-0-522-85134-2 |page=224}}</ref>}}
In some locations, an alternative to building long lengths of dual-gauge track has been to change the wheels on [[railroad car|rolling stock]], either by dropping and changing wheelsets from [[Train wheel|four-wheeled]] vehicles or exchanging bogies (US: trucks) under eight-wheeled vehicles. With this arrangement, a short length of dual-gauge track is only needed within the facility. A benefit is that the contents of fully loaded cars are not disturbed. The scheme was first adopted on the French–Spanish border and in Poland. It introduces delay into transit times compared with dual-gauge operation, but is much quicker than trans-shipping: when introduced in 1962 in Melbourne, Australia, on the route between Sydney and Adelaide, the freight handling time per train dropped from five days to less than two. The process involved disconnecting the [[Railway brake|brake rigging]] and [[bogie]] [[List of railroad truck parts#Center pin|centre pins]] have to be disconnected before the vehicle is lifted and new bogies are wheeled underneath.<ref name=buckland>{{cite journal | last=Buckland |first=J.L. |date=October 1962 |title=Bogie changing extends the benefits of standard-gauge |journal=[[Australian Railway History|Australian Railway Historical Society Bulletin]] |volume=XIII |issue=300 |pages=161–162 |issn=0005-0105 }}</ref>{{refn|group=note|At that time, each transfer took 20 minutes; inspection and marshalling took up the remaining time.<ref name=buckland/> In 1982, each of two shifts of 18 men exchanged an average of 66 bogies per day; in comparison, 100 men would have been needed to transfer the same amount of freight wagon to wagon.<ref>{{cite book |author=Lee, Robert |title=The Railways of Victoria 1854–2004 |publisher=Melbourne University Publishing Ltd |year=2007 |isbn= 978-0-522-85134-2 |page=224}}</ref>}}


In Europe, a similar principle embodies low-profile, small-wheeled [[transporter wagon]]s, which carry vehicles built for one gauge on a line with a different gauge. A variant is the [[rollbock]] (Rollböcke in German), used under two-axle standard-gauge vehicles: each wheelset is carried on a small four-wheeled narrow-gauge trolley.<ref>{{cite AV media|date=2015 |title=Harzquerbahn 2015 - Güterverkehr zwischen Unterberg und Nordhausen |trans-title=Freight traffic between Unterberg and Nordhausen |language=|url=https://www.youtube.com/watch?v=6CBdZdcGpmI |access-date=3 November 2022 |publisher=Schmalspurbahn-Fans }}</ref> The entire train is converted in minutes at a slow walking pace, each rollbock being automatically matched to its wheelset from underneath.{{refn|group=note|The [[Ramsey car-transfer apparatus|principle]] of attaching narrow-gauge bogies from underneath in this manner had been patented by Robert Henry Ramsey in 1872, in the United States.<ref>{{cite web|url=https://www.midcontinent.org/rollingstock/builders/ramseys_cartruck.htm |title=Ramsey's car truck shifting apparatus |author=<!--Not stated-->|date=2007 |website=Mid-Continent Railway Museum |access-date=3 November 2022}}</ref>}}
In Europe, a similar principle embodies low-profile, small-wheeled [[transporter wagon]]s, which carry vehicles built for one gauge on a line with a different gauge. A variant is the [[rollbock]] (Rollböcke in German), used under two-axle standard-gauge vehicles: each wheelset is carried on a small four-wheeled narrow-gauge trolley.<ref>{{cite AV media|date=2015 |title=Harzquerbahn 2015 Güterverkehr zwischen Unterberg und Nordhausen |trans-title=Freight traffic between Unterberg and Nordhausen |language=|url=https://www.youtube.com/watch?v=6CBdZdcGpmI |access-date=3 November 2022 |publisher=Schmalspurbahn-Fans }}</ref> The entire train is converted in minutes at a slow walking pace, each rollbock being automatically matched to its wheelset from underneath.{{refn|group=note|The [[Ramsey car-transfer apparatus|principle]] of attaching narrow-gauge bogies from underneath in this manner had been patented by Robert Henry Ramsey in 1872, in the United States.<ref>{{cite web|url=https://www.midcontinent.org/rollingstock/builders/ramseys_cartruck.htm |title=Ramsey's car truck shifting apparatus |author=<!--Not stated-->|date=2007 |website=Mid-Continent Railway Museum |access-date=3 November 2022}}</ref>}}


A further variant is "[[Train on Train |train on train]]", in which an entire narrow-gauge train is carried on standard-gauge [[flatcar]]s on which continuous rail has been fitted.<ref>{{cite book| title=Uniform railway gauge| first=Eric| last=Harding| publisher=Lothian Publishing| year=1958| page=14}}</ref><ref>{{cite book| title=Tales from a Railway Odyssey| authorlink=Keith Smith (engineer)| first=Keith A.| last=Smith| page=114}}</ref><ref>{{cite journal |last=Buckland |first=J.L. |date=December 1955 |title=The "pick-a-back" train |journal=[[Australian Railway History|Australian Railway Historical Society Bulletin]] |volume=VI |issue=218 |pages=157–162 |issn=0005-0105 }}</ref>
A further variant is "[[Train on Train|train on train]]", in which an entire narrow-gauge train is carried on standard-gauge [[flatcar]]s on which continuous rail has been fitted.<ref>{{cite book| title=Uniform railway gauge| first=Eric| last=Harding| publisher=Lothian Publishing| year=1958| page=14}}</ref><ref>{{cite book| title=Tales from a Railway Odyssey| authorlink=Keith Smith (engineer)| first=Keith A.| last=Smith| page=114}}</ref><ref>{{cite journal |last=Buckland |first=J.L. |date=December 1955 |title=The "pick-a-back" train |journal=[[Australian Railway History|Australian Railway Historical Society Bulletin]] |volume=VI |issue=218 |pages=157–162 |issn=0005-0105 }}</ref>


Differences in gauge are also accommodated by [[variable gauge|gauge-adjustable wheelsets]], which {{As of|2022|lc=yes}} were installed under some passenger vehicles on international links between Spain and France, Sweden and Finland, Poland and Lithuania, and Poland and Ukraine. In Spain, change-over facilities are extensive, since although {{convert|1668|mm|in|abbr=off|comma=off}} track predominates, and high-speed lines are laid to {{Track gauge|1435mm|lk=on|comma=off}} standard gauge, there are many lines with narrower gauges ({{convert|1000|mm|in|abbr=off|comma=off}} and others).<ref>{{cite book|url=https://www.vialibre-ffe.com/pdf/Track_gauge_changeover.pdf|title=Automatic track gauge changeover for trains in Spain|first=Alberto García|last=Álvarez|publisher=Fundación de los Ferrocarriles Españoles|edition=4|date=2010|isbn=978-84-89649-56-9|page=7}}</ref>
Differences in gauge are also accommodated by [[variable gauge|gauge-adjustable wheelsets]], which {{As of|2022|lc=yes}} were installed under some passenger vehicles on international links between Spain and France, Sweden and Finland, Poland and Lithuania, and Poland and Ukraine. In Spain, change-over facilities are extensive, since although {{convert|1668|mm|in|abbr=off|comma=off}} track predominates, and high-speed lines are laid to {{Track gauge|1435mm|lk=on|comma=off}} standard gauge, there are many lines with narrower gauges ({{convert|1000|mm|in|abbr=off|comma=off}} and others).<ref>{{cite book|url=https://www.vialibre-ffe.com/pdf/Track_gauge_changeover.pdf|title=Automatic track gauge changeover for trains in Spain|first=Alberto García|last=Álvarez|publisher=Fundación de los Ferrocarriles Españoles|edition=4|date=2010|isbn=978-84-89649-56-9|page=7}}</ref>


==Dual-gauge railways by nation==
==Dual-gauge railways by nation==
{{More citations needed section|date=November 2022}}
{{More citations needed section|date=November 2022}}
;Australia
;Australia{{anchor|Australia}}
{{flagicon|AUS}} In [[Victoria (Australia)|Victoria]], there are sections of {{Track gauge|1600mm|lk=on|comma=off}} and {{Track gauge|1435mm|lk=on|comma=off}} dual-gauge track between [[Southern Cross railway station|Southern Cross station]] and [[West Footscray railway station|West Footscray]], [[Sunshine railway station, Melbourne|Sunshine]] and [[Newport railway station, Melbourne|Newport]], [[Albion railway station, Melbourne|Albion]] and [[Jacana railway station|Jacana]], [[North Geelong railway station|North Geelong]] and [[Gheringhap, Victoria|Gheringhap]], [[Maryborough railway station, Victoria|Maryborough]] and [[Dunolly railway station|Dunolly]], and in various goods yards and industrial sidings. Until 2008, there was a dual-gauge line between [[Wodonga railway station|Wodonga]] and [[Bandiana railway station|Bandiana]].
{{flagicon|AUS}} In [[Victoria (Australia)|Victoria]], there are sections of {{Track gauge|1600mm|lk=on|comma=off}} and {{Track gauge|1435mm|lk=on|comma=off}} dual-gauge track between [[Southern Cross railway station|Southern Cross station]] and [[West Footscray railway station|West Footscray]], [[Sunshine railway station, Melbourne|Sunshine]] and [[Newport railway station, Melbourne|Newport]], [[Albion railway station, Melbourne|Albion]] and [[Jacana railway station|Jacana]], [[North Geelong railway station|North Geelong]] and [[Gheringhap, Victoria|Gheringhap]], [[Maryborough railway station, Victoria|Maryborough]] and [[Dunolly railway station|Dunolly]], and in various goods yards and industrial sidings. Until 2008, there was a dual-gauge line between [[Wodonga railway station|Wodonga]] and [[Bandiana railway station|Bandiana]].


At [[Albury railway station]], [[New South Wales]], a {{Track gauge|1600mm |comma=off}} and {{Track gauge|1435mm |comma=off}} dual-gauge line was in place until 2011. A dual-gauge line was within [[Tocumwal railway station]] until 1988, when the standard gauge component was put out of use.
At [[Albury railway station]], [[New South Wales]], a {{Track gauge|1600mm |comma=off}} and {{Track gauge|1435mm |comma=off}} dual-gauge line was in place until 2011. A dual-gauge line was within [[Tocumwal railway station]] until 1988, when the standard gauge component was put out of use.


In 1900, in [[South Australia]], a three-rail dual-gauge system was proposed in order to avoid a break of gauge. However, designing turnouts was considered to be difficult due to the difference of only {{convert|165|mm|in|abbr=off}} between the {{Track gauge|1435mm |comma=off}} and the {{Track gauge|1600mm |comma=off}} broad gauge. After twenty years of discord, the proposal was abandoned.<ref>{{cite news |url=http://nla.gov.au/nla.news-article45890361 |title=Personal. |newspaper=[[The Barrier Miner]] |location=Broken Hill, NSW |date=3 July 1924 |access-date=1 September 2012 |page=2 |publisher=National Library of Australia}}</ref><ref>{{cite news |url=http://nla.gov.au/nla.news-article3739201 |title=Great Western Railway. |newspaper=[[The Argus (Melbourne)|The Argus]] |location=Melbourne |date=11 March 1926 |access-date=27 August 2011 |page=7 |publisher=National Library of Australia}}</ref><ref>{{cite news |url=http://nla.gov.au/nla.news-article14617972 |title=Unification of gauges. |newspaper=[[The Sydney Morning Herald]] |date=6 May 1904 |access-date=10 March 2014 |page=5 |publisher=National Library of Australia}}</ref> Much later, the [[South Australian Railways]] successfully adopted [[Railroad switch#Dual gauge switches|dual-gauge turnouts]].<ref>[http://extranet.artc.com.au/docs/eng/track-civil/workinstruct/pc/ETN-03-01.pdf Civil track engineering] ARTC pdf.</ref>
In 1900, in [[South Australia]], a three-rail dual-gauge system was proposed in order to avoid a break of gauge. However, designing turnouts was considered to be difficult due to the difference of only {{convert|165|mm|in|abbr=off}} between the {{Track gauge|1435mm |comma=off}} and the {{Track gauge|1600mm |comma=off}} broad gauge. After twenty years, the proposal was abandoned.<ref>{{cite news |url=http://nla.gov.au/nla.news-article45890361 |title=Personal. |newspaper=[[The Barrier Miner]] |location=Broken Hill, NSW |date=3 July 1924 |access-date=1 September 2012 |page=2 |publisher=National Library of Australia}}</ref><ref>{{cite news |url=http://nla.gov.au/nla.news-article3739201 |title=Great Western Railway. |newspaper=[[The Argus (Melbourne)|The Argus]] |location=Melbourne |date=11 March 1926 |access-date=27 August 2011 |page=7 |publisher=National Library of Australia}}</ref><ref>{{cite news |url=http://nla.gov.au/nla.news-article14617972 |title=Unification of gauges. |newspaper=[[The Sydney Morning Herald]] |date=6 May 1904 |access-date=10 March 2014 |page=5 |publisher=National Library of Australia}}</ref> Much later, the [[South Australian Railways]] successfully adopted [[Railroad switch#Dual gauge switches|dual-gauge turnouts]].<ref>[http://extranet.artc.com.au/docs/eng/track-civil/workinstruct/pc/ETN-03-01.pdf Civil track engineering] ARTC pdf.</ref>


In [[Western Australia]], {{Track gauge|1067mm|lk=on|comma=off}} and {{Track gauge|1435mm |comma=off}} of double-track dual-gauge extends for {{Convert|120|km|mi|abbr=on}} of the [[Eastern Railway (Western Australia)#Third Route|main line]] from [[East Perth railway station|East Perth]] to [[Northam railway station, Western Australia|Northam]]. Dual-gauge track is also used from the triangle at [[Woodbridge, Western Australia|Woodbridge]] to [[Cockburn, Western Australia|Cockburn Junction]], then to [[Kwinana Beach|Kwinana]] on one branch and [[North Fremantle]] on the other. The signalling system detects the gauge of the approaching train and puts the signals to stop if the route is set for the wrong gauge.
In [[Western Australia]], {{Track gauge|1067mm|lk=on|comma=off}} and {{Track gauge|1435mm |comma=off}} of double-track dual-gauge extends for {{Convert|120|km|mi|abbr=on}} of the [[Eastern Railway (Western Australia)#Third Route|main line]] from [[East Perth railway station|East Perth]] to [[Northam railway station, Western Australia|Northam]]. Dual-gauge track is also used from the triangle at [[Woodbridge, Western Australia|Woodbridge]] to [[Cockburn, Western Australia|Cockburn Junction]], then to [[Kwinana Beach|Kwinana]] on one branch and [[North Fremantle]] on the other. The signalling system detects the gauge of the approaching train and puts the signals to stop if the route is set for the wrong gauge.


In [[Queensland]], there is a section of {{Track gauge|1067mm |comma=off}} and {{Track gauge|1435mm |comma=off}} dual-gauge track between the rail freight [[Classification yard|yards]] at [[Acacia Ridge]] and [[Park Road railway station|Park Road station]], which is utilised by both passenger and freight trains. Freight trains to the Port of Brisbane utilise the dual gauge [[Fisherman Islands railway line|Fisherman Islands line]] that runs parallel to the [[Cleveland railway line]] from Park Road to [[Lindum railway station|Lindum]]. Passenger trains use the dual-gauge section of the [[Beenleigh railway line]] running parallel to the electric suburban narrow gauge of the Queensland Rail city network over the [[Merivale Bridge]] into platforms 2 and 3 at [[Roma Street railway station|Roma Street Station]]. This is used by standard gauge interstate [[NSW TrainLink|New South Wales TrainLink]] [[New South Wales XPT|XPT]] services to [[Central railway station, Sydney|Sydney]]. In 2012, a dual-gauge line was installed between Acacia Ridge and [[Bromelton, Queensland|Bromelton]] to serve a new freight hub at Bromelton.
In [[Queensland]], there is a section of {{Track gauge|1067mm |comma=off}} and {{Track gauge|1435mm |comma=off}} dual-gauge track between the rail freight [[Classification yard|yards]] at [[Acacia Ridge]] and [[Park Road railway station|Park Road station]], which is utilised by both passenger and freight trains. Freight trains to the Port of Brisbane utilise the dual gauge [[Fisherman Islands railway line|Fisherman Islands line]] that runs parallel to the [[Cleveland railway line]] from Park Road to [[Lindum railway station|Lindum]]. Passenger trains use the dual-gauge section of the [[Beenleigh railway line]] running parallel to the electric suburban narrow gauge of the Queensland Rail city network over the [[Merivale Bridge]] into platforms 2 and 3 at [[Roma Street railway station|Roma Street Station]]. This is used by standard gauge interstate [[NSW TrainLink|New South Wales TrainLink]] [[New South Wales XPT|XPT]] services to [[Central railway station, Sydney|Sydney]]. In 2012, a dual-gauge line was installed between Acacia Ridge and [[Bromelton, Queensland|Bromelton]] to serve a new freight hub at Bromelton.
Line 216: Line 225:


;Bangladesh
;Bangladesh
{{flagicon|BAN}} The [[Bangladesh Railway]] uses three rails to avoid breaks of gauge between its broad-gauge and metre-gauge lines. The [[Jamuna Bridge]] and [[Padma Bridge]], which link the east–west and north–south rail systems respectively, have [[#Dual gauge (four rails)|four-rail]] dual-gauge tracks. Of the {{convert|2875|km|mi}} Bangladseh Railway system, about {{convert|1600|km|mi}} has [[#Dual gauge (four rails)|four-rail]] dual-gauge.{{Citation needed|date=March 2023}}{{Dubious|date=March 2023}}
{{flagicon|BAN}} The [[Bangladesh Railway]] uses three rails to avoid breaks of gauge between its broad-gauge and metre-gauge lines. The [[Jamuna Bridge]] and [[Padma Bridge]], which link the east–west and north–south rail systems respectively, have [[#Dual gauge (four rails)|four-rail]] dual-gauge tracks. Of the {{convert|2875|km|mi}} Bangladesh Railway system, about {{convert|1600|km|mi}} has [[#Dual gauge (four rails)|four-rail]] dual-gauge.{{Citation needed|date=March 2023}}{{Dubious|date=March 2023}}


;Belgium
;Belgium
Line 236: Line 245:
{{flagicon|DEU}} In the 1970s, the [[Stuttgarter Straßenbahnen]] tram lines underwent a gauge conversion from {{Track gauge|1000mm |comma=off}} gauge to standard gauge. This was part of an upgrade to the [[Stuttgart Stadtbahn]]. In 1981, {{Track gauge|1435mm |comma=off}} and {{Track gauge|1000mm |comma=off}} dual-gauge track was constructed so that new DT-8 Stadtbahn cars and old trams could share the network. In 2008, a further gauge conversion was completed. The Stuttgart Straßenbahn Museum operates {{Track gauge|1000mm |comma=off}} gauge trams on weekends and special occasions.
{{flagicon|DEU}} In the 1970s, the [[Stuttgarter Straßenbahnen]] tram lines underwent a gauge conversion from {{Track gauge|1000mm |comma=off}} gauge to standard gauge. This was part of an upgrade to the [[Stuttgart Stadtbahn]]. In 1981, {{Track gauge|1435mm |comma=off}} and {{Track gauge|1000mm |comma=off}} dual-gauge track was constructed so that new DT-8 Stadtbahn cars and old trams could share the network. In 2008, a further gauge conversion was completed. The Stuttgart Straßenbahn Museum operates {{Track gauge|1000mm |comma=off}} gauge trams on weekends and special occasions.


In [[Krefeld]] on Ostwall, Germany, tram lines are dual gauge so that standard {{Track gauge|1435mm |comma=off}} [[Rheinbahn]] U76 [[Stadtbahn]] cars and {{Track gauge|1000mm |comma=off}} gauge trams may share the lines. At the north end of the route, at the junction with Rheinstraße, the trams reverse. There, the standard gauge line ends, while the metre gauge lines continue. At the Hauptbahnhof, on Oppumer Straße, dual gauge track continues. At the ends of Oppumer Straße, the two tracks diverge.
In [[Krefeld]] on Ostwall, tram lines are dual gauge so that standard {{Track gauge|1435mm |comma=off}} [[Rheinbahn]] U76 [[Stadtbahn]] cars and {{Track gauge|1000mm |comma=off}} gauge trams may share the lines. At the north end of the route, at the junction with Rheinstraße, the trams reverse. There, the standard gauge line ends, while the metre gauge lines continue. At the Hauptbahnhof, on Oppumer Straße, dual gauge track continues. At the ends of Oppumer Straße, the two tracks diverge.


In [[Mülheim]] there is a similar situation. The [[Trams in Duisburg|Duisburg tram line 901]] meets the [[Trams in Mülheim/Oberhausen|local line 102]]. The tram system in Duisburg uses {{Track gauge|1435mm |comma=off}} gauge track while the tram route from [[Witten]] to [[Mülheim]] uses {{Track gauge|1000mm |comma=off}} gauge tracks. Two lines share a tunnel section between the [[Mülheim (Ruhr) Hauptbahnhof]] and Schloss Broich then diverge at street level.
In [[Mülheim]] there is a similar situation. The [[Trams in Duisburg|Duisburg tram line 901]] meets the [[Trams in Mülheim/Oberhausen|local line 102]]. The tram system in Duisburg uses {{Track gauge|1435mm |comma=off}} gauge track while the tram route from [[Witten]] to Mülheim uses {{Track gauge|1000mm |comma=off}} gauge tracks. Two lines share a tunnel section between the [[Mülheim (Ruhr) Hauptbahnhof]] and Schloss Broich then diverge at street level.


The tram network between [[Werne]] to [[Bad Honnef]] is large with various operators and gauges. The trams in [[Wuppertal]] used {{Track gauge|1435mm |comma=off}} gauge track on east{{ndash}}west lines and {{Track gauge|1000mm |comma=off}} gauge track on north{{ndash}}south lines. [[Trams in Duisburg]] used {{Track gauge|1435mm |comma=off}} gauge track on lines south of the [[Ruhr]] and {{Track gauge|1000mm |comma=off}} gauge tracks on lines north of the Ruhr. The north lines closed in the 1960s and 1970s. Duisburg's three routes were converted to {{Track gauge|1435mm |comma=off}} gauge track.
The tram network between [[Werne]] to [[Bad Honnef]] is large with various operators and gauges. The trams in [[Wuppertal]] used {{Track gauge|1435mm |comma=off}} gauge track on east{{ndash}}west lines and {{Track gauge|1000mm |comma=off}} gauge track on north{{ndash}}south lines. [[Trams in Duisburg]] used {{Track gauge|1435mm |comma=off}} gauge track on lines south of the [[Ruhr]] and {{Track gauge|1000mm |comma=off}} gauge tracks on lines north of the Ruhr. The north lines closed in the 1960s and 1970s. Duisburg's three routes were converted to {{Track gauge|1435mm |comma=off}} gauge track.
Line 251: Line 260:
{{flagicon|INA}} In 1899, in the [[Dutch East Indies]], dual gauge track was installed between [[Yogyakarta (city)|Yogyakarta]] and [[Surakarta|Solo]]. The track was owned by the [[Nederlandsch-Indische Spoorweg Maatschappij]], a private company, which in 1867 had built the {{Track gauge|1435mm |comma=off}} gauge line. The third rail was installed to allow passengers and goods travelling over the {{Track gauge|1067mm|comma=off}} gauge ''Staatsspoorweg'' (state railway) a direct connection. At a later date, the government constructed new tracks to allow greater capacity and higher speeds. In 1940, a third rail was installed between Solo and Gundih on the line to [[Semarang]], allowing {{Track gauge|1067mm|comma=off}} gauge trains to travel between Semarang, Solo and Yogyakarta via Gambringan, on the line to [[Surabaya]] instead of on the original line via Kedungjati.
{{flagicon|INA}} In 1899, in the [[Dutch East Indies]], dual gauge track was installed between [[Yogyakarta (city)|Yogyakarta]] and [[Surakarta|Solo]]. The track was owned by the [[Nederlandsch-Indische Spoorweg Maatschappij]], a private company, which in 1867 had built the {{Track gauge|1435mm |comma=off}} gauge line. The third rail was installed to allow passengers and goods travelling over the {{Track gauge|1067mm|comma=off}} gauge ''Staatsspoorweg'' (state railway) a direct connection. At a later date, the government constructed new tracks to allow greater capacity and higher speeds. In 1940, a third rail was installed between Solo and Gundih on the line to [[Semarang]], allowing {{Track gauge|1067mm|comma=off}} gauge trains to travel between Semarang, Solo and Yogyakarta via Gambringan, on the line to [[Surabaya]] instead of on the original line via Kedungjati.


In 1942 and 1943 in [[Java]], under [[Japan|Japanese military occupation]], conversion from took place {{Track gauge|ussg}} to {{Track gauge|1067mm |comma=off}} on the [[Rail transport in Indonesia|Brumbung]]{{ndash}}Kedungjati{{ndash}}Gundih main line and the Kedungjati{{ndash}}[[Ambarawa]] branch line.
In 1942 and 1943 in [[Java]], under [[Japan|Japanese military occupation]], conversion took place from {{Track gauge|ussg}} to {{Track gauge|1067mm |comma=off}} on the [[Rail transport in Indonesia|Brumbung]]{{ndash}}Kedungjati{{ndash}}Gundih main line and the Kedungjati{{ndash}}[[Ambarawa]] branch line.


Until the 1970s, a short section of dual gauge {{Track gauge|1067mm| comma=off}} and {{Track gauge|750mm}} line existed in [[North Sumatra]] on a joint line of the [[Deli Railway]] and the [[Atjeh Tram]].
Until the 1970s, a short section of dual gauge {{Track gauge|1067mm| comma=off}} and {{Track gauge|750mm}} line existed in [[North Sumatra]] on a joint line of the [[Deli Railway]] and the [[Atjeh Tram]].
Line 270: Line 279:


;Netherlands
;Netherlands
{{flagicon|Netherlands}} The first railway lines in the [[Netherlands]] were constructed with a track gauge of {{Track gauge|1945mm|lk=on|comma=off}}. For the [[1939]] centennial celebration, an exact replica of the country's first locomotive [[De Arend (locomotive)|"De Arend"]] was built using the original blueprints. Since 1953, the locomotive is housed at the Dutch [[Railway Museum (Netherlands)|National Railway Museum]], where in recent years, a dual-gauge track has been constructed in the rail yard, allowing for the locomotive to drive back and forth on special occasions.<ref>{{cite web |url=https://www.spoorwegmuseum.nl/ontdek/nu-in-het-museum/arend-onder-stoom/ |title=Arend onder Stoom - Het Spoorwegmuseum |website=www.spoorwegmuseum.nl |url-status=dead |archive-url=https://web.archive.org/web/20200926190317/https://www.spoorwegmuseum.nl/ontdek/nu-in-het-museum/arend-onder-stoom/ |archive-date=2020-09-26}} </ref>
{{flagicon|Netherlands}} The first railway lines in the [[Netherlands]] were constructed with a track gauge of {{Track gauge|1945mm|lk=on|comma=off}}. For the 1939 centennial celebration, an exact replica of the country's first locomotive [[De Arend (locomotive)|"De Arend"]] was built using the original blueprints. Since 1953, the locomotive is housed at the Dutch [[Railway Museum (Netherlands)|National Railway Museum]], where in recent years, a dual-gauge track has been constructed in the rail yard, allowing for the locomotive to drive back and forth on special occasions.<ref>{{cite web |url=https://www.spoorwegmuseum.nl/ontdek/nu-in-het-museum/arend-onder-stoom/ |title=Arend onder Stoom Het Spoorwegmuseum |website=www.spoorwegmuseum.nl |url-status=dead |archive-url=https://web.archive.org/web/20200926190317/https://www.spoorwegmuseum.nl/ontdek/nu-in-het-museum/arend-onder-stoom/ |archive-date=2020-09-26}}</ref>


;Poland
;Poland
Line 277: Line 286:
;Russia
;Russia
{{flagicon|RUS}} Between 2008 and 2012, a {{convert|2|km|mi|abbr=on}} dual-gauge cross-border track was rebuilt between [[Khasan (urban-type settlement)|Khasan]], Russia, and [[Rajin-guyok|Rajin]], North Korea; its gauges were the Russian {{Track gauge|1520mm|lk=on|comma=off}} and Korean {{Track gauge|1435mm|comma=off}}.<ref>[http://eng.rzd.ru/newse/public/rzdeng?STRUCTURE_ID=15&layer_id=4839&id=105789 Russian Railways : Demonstration train makes run between Rajin and Khasan] RZD news</ref>
{{flagicon|RUS}} Between 2008 and 2012, a {{convert|2|km|mi|abbr=on}} dual-gauge cross-border track was rebuilt between [[Khasan (urban-type settlement)|Khasan]], Russia, and [[Rajin-guyok|Rajin]], North Korea; its gauges were the Russian {{Track gauge|1520mm|lk=on|comma=off}} and Korean {{Track gauge|1435mm|comma=off}}.<ref>[http://eng.rzd.ru/newse/public/rzdeng?STRUCTURE_ID=15&layer_id=4839&id=105789 Russian Railways : Demonstration train makes run between Rajin and Khasan] RZD news</ref>
Similar arrangements exist on the approach to [[Kaliningrad]], where {{Track gauge|1435mm |comma=off}} track extends from the Polish border with some sections of dual gauge.


;Spain
;Spain
{{flagicon|Spain}} In Spain, there is {{Convert|21.7|km|abbr=on}} of dual gauge in the [[AVE]] line from [[Zaragoza]] to [[Huesca]], usable for both {{Track gauge|1435mm |comma=off}} standard-gauge high-speed trains and {{Track gauge|1668mm|lk=on|comma=off}} Spanish network trains. Some dual-gauge sidings are at Port Bou on the French border. In 2009, [[Administrador de Infraestructuras Ferroviarias|Adif]] called for tenders for the installation of a third rail for standard-gauge trains on the {{convert|22|km|abbr=on}} between [[Castellbisbal]] and the Can Tunis freight terminal in [[Barcelona]].<ref>{{cite news | url=http://www.railwaygazette.com/nc/news/single-view/view/world-infrastructure-market-march-2009.html | title=World infrastructure market March 2009 | date=14 March 2009| work=[[Railway Gazette International]]}}</ref>
{{flagicon|Spain}} In Spain, there is {{Convert|21.7|km|abbr=on}} of dual gauge in the [[AVE]] line from [[Zaragoza]] to [[Huesca]], usable for both {{Track gauge|1435mm |comma=off}} standard-gauge high-speed trains and {{Track gauge|1668mm|lk=on|comma=off}} Spanish network trains. Some dual-gauge sidings are at Port Bou on the French border. In 2009, [[Administrador de Infraestructuras Ferroviarias|Adif]] called for tenders for the installation of a third rail for standard-gauge trains on the {{convert|22|km|abbr=on}} between [[Castellbisbal]] and the Can Tunis freight terminal in [[Barcelona]].<ref>{{cite news | url=http://www.railwaygazette.com/nc/news/single-view/view/world-infrastructure-market-march-2009.html | title=World infrastructure market March 2009 | date=14 March 2009 | work=[[Railway Gazette International]] }}{{Dead link|date=February 2024 |bot=InternetArchiveBot |fix-attempted=yes }}</ref>


;Sweden
;Sweden
{{flagicon|Sweden}} The bridges at the borders of [[Rail transport in Sweden|Sweden]] and [[Rail transport in Finland|Finland]], between [[Haparanda]] and [[Tornio]] have {{convert|2|km|mi|abbr=on}} of dual gauge, {{Track gauge|1435mm |comma=off}} and {{Track gauge|1524mm |comma=off}} track. At each end of the dual-gauge section are yards with standard and Finnish gauge areas to allow for [[transshipment|trans-shipment]]. [[#Dual gauge (four rails)|Four rails]] are used because the gauges are close and the [[Structure gauge|bridge structure]] is wider than normal to allow for the offset from the centreline of each gauge. A Rafil [[variable gauge|gauge changer]] is at the Tornio yard. Similar arrangements exist on the approach to [[Kaliningrad]], where {{Track gauge|1435mm |comma=off}} track extends from the Polish border with some sections of dual gauge.
{{flagicon|Sweden}} The bridges at the borders of [[Rail transport in Sweden|Sweden]] and [[Rail transport in Finland|Finland]], between [[Haparanda]] and [[Tornio]] have {{convert|2|km|mi|abbr=on}} of dual gauge, {{Track gauge|1435mm |comma=off}} and {{Track gauge|1524mm |comma=off}} track. At each end of the dual-gauge section are yards with standard and Finnish gauge areas to allow for [[transshipment|trans-shipment]]. [[#Dual gauge (four rails)|Four rails]] are used because the gauges are close and the [[Structure gauge|bridge structure]] is wider than normal to allow for the offset from the centreline of each gauge. A Rafil [[variable gauge|gauge changer]] is at the Tornio yard.

Between [[Västervik]] and [[:sv:Jenny, Västervik|Jenny]], Sweden, there is a {{Track gauge|891mm}} and {{Track gauge|1435mm |comma=off}} dual-gauge line and dual-gauge track in the Västervik station area.
Between [[Västervik]] and [[:sv:Jenny, Västervik|Jenny]], Sweden, there is a {{Track gauge|891mm}} and {{Track gauge|1435mm |comma=off}} dual-gauge line and dual-gauge track in the Västervik station area.


;Switzerland
;Switzerland
{{flagicon|Switzerland}} In Switzerland, dual-gauge {{Track gauge|1435mm |comma=off}} track and {{Track gauge|1000mm |comma=off}} track exists between [[Lucerne]] and [[Horw]] of the [[Zentralbahn]], between [[Niederbipp]] and [[Oberbipp]] of the [[Oberaargau-Jura Railways]] and between [[Chur]] and [[Domat/Ems]] of [[RhB]]. All three allow narrow-gauge passenger trains and standard-gauge freight trains to operate. A ″non-stop″ scheme (albeit with a pause to change locomotives) on the [[Montreux]]-[[Interlaken]] route was inaugurated in December 2022.<ref>{{cite magazine|last=Fender|first=Keith|title=Swiss introduce gauge-changing train on Montreaux Interlaken route|date=April 2023|magazine=[[Trains]]|publisher=[[Kalmbach]]|pages=41-42}}</ref> The former [[Zollikofen]]-[[Worblaufen]]-[[Stettlen|Deisswil]] dual gauge was cut back to Papiermühle when the factory in Deisswil closed.{{when|date=November 2022}}
{{flagicon|Switzerland}} In Switzerland, dual-gauge {{Track gauge|1435mm |comma=off}} track and {{Track gauge|1000mm |comma=off}} track exists between [[Lucerne]] and [[Horw]] of the [[Zentralbahn]], between [[Niederbipp]] and [[Oberbipp]] of the [[Oberaargau-Jura Railways]] and between [[Chur]] and [[Domat/Ems]] of [[RhB]]. All three allow narrow-gauge passenger trains and standard-gauge freight trains to operate. A ″non-stop″ scheme (albeit with a pause to change locomotives) on the [[Montreux]]-[[Interlaken]] route was inaugurated in December 2022.<ref>{{cite magazine|last=Fender|first=Keith|title=Swiss introduce gauge-changing train on Montreaux Interlaken route|date=April 2023|magazine=[[Trains (magazine)|Trains]]|publisher=[[Kalmbach Media]]|pages=41–42}}</ref> The former [[Zollikofen]]-[[Worblaufen]]-[[Stettlen|Deisswil]] dual gauge was cut back to Papiermühle when the factory in Deisswil closed.{{when|date=November 2022}}

;Ukraine
{{flagicon|Ukraine}} The railway tracks between the border with [[Slovakia]] at [[Solomonovo]] and the border with [[Romania]] at [[Nevetlenfolu]] are dual-gauge, {{Track gauge|1520mm|lk=on|comma=off}} and {{Track gauge|1435mm|lk=on|comma=off}}. This is in part due to the Austro-Hungarian heritage of the [[Zakarpattia Oblast]], but also has military and political importance, as it allows standard-gauge trains to run between Romania and Slovakia by bypassing [[Hungary]], otherwise impossible due to the break-of -gauge between the Russian-gauge network of Ukraine and standard-gauge networks of Romania and Slovakia.


;United Kingdom
;United Kingdom
{{flagicon|United Kingdom}} The [[Great Western Railway]] in Britain was originally built to a broad gauge of 2134 mm (7 ft 0 in), subsequently widened to 2140 mm (7 ft 0{{frac|1|2}} in). After a [[Great Western Railway#Brunel's 7-foot gauge and the "gauge war"|"gauge war"]], the gauge was [[track gauge conversion|converted]] to {{Track gauge|1435mm |comma=off}}. A dual-gauge system was easily installed as the gauges were well separated and the line had wooden [[railroad tie|sleepers]]. A short section of broad and standard gauge is at the [[Great Western Society]] site at [[Didcot]].
{{flagicon|United Kingdom}} The [[Great Western Railway]] in Britain was originally built to a broad gauge of 2134&nbsp;mm (7&nbsp;ft 0 in), subsequently widened to 2140&nbsp;mm (7&nbsp;ft 0{{frac|1|2}} in). After a [[Great Western Railway#Brunel's 7-foot gauge and the "gauge war"|"gauge war"]], the gauge was [[track gauge conversion|converted]] to {{Track gauge|1435mm |comma=off}}. A dual-gauge system was easily installed as the gauges were well separated and the line had wooden [[railroad tie|sleepers]]. A short section of broad and standard gauge is at the [[Great Western Society]] site at [[Didcot]].


The port authority in [[Derry]], [[Northern Ireland]] used a dual-gauge line in a street-level network to transfer freight. Two of the city's stations were on a narrow {{Track gauge|914mm|lk=on|comma=off}} gauge. The other two city stations were on broad {{Track gauge|1600mm|lk=on|comma=off}} gauge.
The port authority in [[Derry]], [[Northern Ireland]], used a dual-gauge line in a street-level network to transfer freight. Two of the city's stations were on a narrow {{Track gauge|914mm|lk=on|comma=off}} gauge. The other two city stations were on broad {{Track gauge|1600mm|lk=on|comma=off}} gauge.


The [[Fairbourne Railway]] in [[Gwynedd]], [[Wales]], has a section of dual gauge track from Fairbourne station to Car Park crossing installed in the late 2010s to allow visiting {{Track gauge|15in|lk=on}} gauge trains to run on part of the line, which was converted to {{Track gauge|12.25in|lk=on}} gauge in 1986, usually as part of special events.
;United States
;United States
{{flagicon|United States}} In Los Angeles, the {{Track gauge|1067mm|lk=on|comma=off}} [[Los Angeles Railway]] and {{Track gauge|1435mm |comma=off}} [[Pacific Electric Railway]] ran on dual gauge track on some [[Downtown Los Angeles|downtown]] streets.{{when|date=November 2022}}
{{flagicon|United States}} In Los Angeles, the {{Track gauge|1067mm|lk=on|comma=off}} [[Los Angeles Railway]] and {{Track gauge|1435mm |comma=off}} [[Pacific Electric Railway]] ran on dual gauge track on some [[Downtown Los Angeles|downtown]] streets.{{when|date=November 2022}}


From 1880 to 1902, the [[Burlington, Cedar Rapids and Northern Railway]] (standard gauge) and the [[Burlington and Northwestern Railway]] (narrow gauge) shared a dual-gauge mainline from [[Burlington, Iowa]] to [[Mediapolis, Iowa|Mediapolis]], {{convert|23|km|mi|abbr=off}} to the north.
From 1880 to 1902, the [[Burlington, Cedar Rapids and Northern Railway]] (standard gauge) and the [[Burlington and Northwestern Railway]] (narrow gauge) shared a dual-gauge mainline from [[Burlington, Iowa]], to [[Mediapolis, Iowa|Mediapolis]], {{convert|23|km|mi|abbr=off}} to the north.


The early operational years of the [[State Belt Railroad]] in [[San Francisco]] featured dual-gauge tracks to accommodate regional railroads of the time, which [[Ferries of San Francisco Bay|interchanged via ferry]].
The early operational years of the [[State Belt Railroad]] in [[San Francisco]] featured dual-gauge tracks to accommodate regional railroads of the time, which [[Ferries of San Francisco Bay|interchanged via ferry]].
Line 303: Line 316:
Until 1941, the [[Colorado and Southern Railway]] used both standard-gauge and narrow-gauge tracks, and had a dual-gauge line between [[Denver]] and [[Golden, Colorado]].
Until 1941, the [[Colorado and Southern Railway]] used both standard-gauge and narrow-gauge tracks, and had a dual-gauge line between [[Denver]] and [[Golden, Colorado]].


Until the 1960s, the [[Denver and Rio Grande Western Railroad]]'s [[Alamosa–Durango Line]] from [[Alamosa, Colorado]] to [[Antonito, Colorado|Antonito]] was dual-gauge.
Until the 1960s, the [[Denver and Rio Grande Western Railroad]]'s [[Alamosa–Durango Line]] from [[Alamosa, Colorado]], to [[Antonito, Colorado|Antonito]] was dual-gauge ({{Track gauge|914mm }} and {{Track gauge|1435mm |comma=off}}).


Previously, in its [[Mount Union, Pennsylvania]] yard, the [[East Broad Top Railroad and Coal Company]] used dual-gauge tracks.
Previously, in its yard at [[Mount Union, Pennsylvania]], the [[East Broad Top Railroad and Coal Company]] used dual-gauge tracks.

Apart from the Los Angeles Railway and the Pacific Electric Railway, the examples were {{Track gauge|914mm }} and {{Track gauge|1435mm |comma=off}}.


;Vietnam
;Vietnam
Line 330: Line 341:
{{Reflist|group=note}}
{{Reflist|group=note}}
==Notes to gallery photos==
===Notes to gallery photos===
{{notelist-la}}
{{notelist-la}}


Line 337: Line 348:


==Further reading==
==Further reading==
* {{cite book |last=Fairlie |first=Robert F. |date=1872 |title=Railways or no railways: narrow gauge v broad gauge |publisher=Effingham Wilson |location=Royal Exchange, London}}
* {{cite book |last=Fairlie |first=Robert F. |date=1872 |title=Railways or no railways: narrow gauge v broad gauge |publisher=Effingham Wilson |location=Royal Exchange, London}}

* {{cite book |last=Tratman |first=E.E. Russell |date=1908 |url= https://archive.org/details/railwaytracktrac01trat/page/n9/mode/2up |title=Railway track and track work |publisher=The Engineering News Publishing Co. |edition=3rd |location=New York|access-date=8 November 2022}}
* {{cite book |last=Tratman |first=E.E. Russell |date=1908 |url= https://archive.org/details/railwaytracktrac01trat/page/n9/mode/2up |title=Railway track and track work |publisher=The Engineering News Publishing Co. |edition=3rd |location=New York|access-date=8 November 2022}}


==External links==
==External links==
* [https://inlandrail.com.au/what-is-dual-gauge-track/ Interactive 3D model of dual-gauge track]
* [https://web.archive.org/web/20061205185702/http://jwr.janes.com/public/jwr/index.shtml Jane's World Railways] (hard copy)
* [https://web.archive.org/web/20061205185702/http://jwr.janes.com/public/jwr/index.shtml Jane's World Railways] (hard copy)
* [http://www.jhmd.cz/ Jindřichův Hradec Local Railways]
* [http://www.columbusrailroads.com/track%20gauge.htm Dual-gauge streetcar track]
* [http://nla.gov.au/nla.news-article100575593 Diagram of mixed gauge turnouts]<ref>{{cite news |url=http://nla.gov.au/nla.news-article100575593 |title=Diagram of mixed gauge turnouts |newspaper=The Globe and Sunday Times War Pictorial |issue=272 |location=New South Wales, Australia |date=17 June 1916 |page=19 |via=National Library of Australia}}</ref>
* [http://web.quick.cz/rails/jhradec/ Jindřichohradecké úzké] mainly in Czech
* [http://www.infrastructure.sa.gov.au/RR South Australia – Rail Revitalisation Project] [[File:Lock-gray-alt-2.svg|9px|link=|alt=Free registration required|Free registration required]] <code>registration</code>: a free registration is required to access the source.
* [http://www.columbusrailroads.com/track%20gauge.htm Columbus' streetcar track gauge]
* {{cite news |url=http://nla.gov.au/nla.news-article100575593 |title=Diagram of mixed gauge turnouts |newspaper=The Globe And Sunday Times War Pictorial |issue=272 |location=New South Wales, Australia |date=17 June 1916 |page=19 |via=National Library of Australia}}


{{Navbox track gauge}}
{{Navbox track gauge}}

Latest revision as of 14:38, 18 October 2024

In railway engineering, "gauge" is the transverse distance between the inner surfaces of the heads of two rails, which for the vast majority of railway lines is the number of rails in place. However, it is sometimes necessary for track to carry railway vehicles with wheels matched to two different gauges. Such track is described as dual gauge – achieved either by addition of a third rail, if it will fit, or by two additional rails. Dual-gauge tracks are more expensive to configure with signals and sidings, and to maintain, than two separate single-gauge tracks. It is therefore usual to build dual-gauge or other multi-gauge tracks only when necessitated by lack of space or when tracks of two different gauges meet in marshalling yards or passenger stations. Dual-gauge tracks are by far the most common configuration, but triple-gauge tracks have been built in some situations.

Background

[edit]

The rail gauge is the most fundamental specification of a railway. Rail tracks and wheelsets are built within engineering tolerances that allow optimum lateral movement of the wheelsets between the rails. Pairs of rails that become too wide or narrow in gauge will cause derailments, especially if in excess of normal gauge-widening on curves.[1][note 1]

Given the requirement for gauge to be within very tight limits, when the designed distance between the pair of wheels on a wheelset differs even slightly from that of others on a railway, track must be built to two specific gauges. That is achieved in a variety of ways: most commonly by adding a third rail, more rarely by adding another pair of rails; and rarer still, when three gauges are present, by four rails.

Configurations

[edit]
Baseplate on dual-gauge track showing the minimum practicable gap between the bases of two rails – about 40 mm (11/2 in) – which determines the minimum difference in gauges possible in a three-rail configuration
Interactive 3D view
An interactive 3D view of dual-gauge track components is
here

Dual-gauge track can consist of three rails, sharing one "common" rail; or four rails, with the rails of the narrower gauge lying between those of the broader gauge. In the three-rail configuration, wear and tear of the common rail is greater than with the two other outer rails. In dual gauge lines, turnouts (railroad switches) are more complex than in single-gauge track, and trains must be safely signalled on both of the gauges. Track circuits and mechanical interlocking must also operate on both gauges.[4]

Multi-gauge track is very often associated with a break-of-gauge station, where rail vehicles or vehicle contents are transferred from one gauge to another. A break of gauge causes delay and increases congestion, especially on single-track lines. Essentially, two trains are required to do what a single train would normally accomplish. When traffic passes mainly in one direction, full wagons taken to the border have to be returned as empties, and a train of empty wagons has to be brought to the break of gauge from the other side to fetch the cargo. Congestion is also caused by unloading and reloading.[5][6]: 74–75  The problem is worsened when there is a disparity between the capacity of locomotives and vehicles on the two gauges: typically, one broad-gauge trainload needs three narrow-gauge trains to carry.[7]

Three rails

[edit]
Configuration of dual-gauge (1600 mm and 1435 mm) track.

Constructing dual-gauge track with three rails is possible when the two adjacent rails can be separated at the base by at least the space required by rail fastening hardware such as spikes and or rail clips – typically 40 millimetres (1.6 inches). If the two gauges are closer than that, four rails must be used. Depending on the rail fasteners used and the weight of rails (heavy rails are bigger), the practicable difference between the two gauges is in the range 145 millimetres (5.7 inches) to 200 millimetres (7.9 inches).[8]

Gallery: Dual gauge (3 rails)


1600 / 1000 mm
(5 ft 3 / 3 ft 33/8 in)
[a]
1600 / 1435 mm
(5 ft 3 / 4 ft 81/2 in).
[b]


1435 / 891 mm
(4 ft 81/2 / 2 ft 113/32 in)
[c]
1435 / 1000 mm
(4 ft 81/2 / 3 ft 33/8 in)
[d]

1435 / 1067 mm
(4 ft 81/2 / 3 ft 6 in)
[e]

Four rails

[edit]
Four-rail arrangement of standard and metre gauge on the Chemin de Fer de la Baie de Somme. A 435 mm difference in gauge can also be accommodated in a three-rail configuration.

In some places, the dimensions of two gauges needing to be collocated are too close to allow a three-rail configuration – for example:

  • 1000 mm (3 ft 3+38 in) and 1067 mm (3 ft 6 in) (common in Africa, a legacy respectively of French/Belgian and British railway practice)
  • 1000 mm (3 ft 3+38 in) and 914 mm (3 ft) (common in South America)
  • 1435 mm (4 ft 8+12 in) and 1524 mm (5 ft) (common where broad-gauge railways of former satellite states of the Soviet Union meet European or Chinese standard gauge).

In such cases, four rails are needed to provide the dual gauge.

Four rails might also be installed because of other engineering or operational factors, even though three rails would suffice: an example is on the Chemin de Fer de la Baie de Somme (Somme Bay railway), which combines standard and metre gauge – 435 millimetres (17.1 inches) different, well within the parameters for three rails.

Four rails are necessary where the centre-line of rail vehicles on both tracks must be closely aligned with the centre-line of the track in tunnels or other constricted locations. Such configurations, when they revert back to standard parallel lines as soon as room is available, are termed "gauntlet track" (US: "gantlet track").[9][1]

Four rails must be placed identically on either side of the central axis of dual-gauge turntables (and six rails on triple-gauge turntables) so that they match the configuration of the fixed rails leading to and from the turntable, regardless of the direction in which the turntable is facing.

Gallery: Dual gauge (4 rails)


1435 / 1000 mm
(4 ft 81/2 / 3 ft 338 in).
In the foreground, the narrow gauge diverges via a fixed-rail configuration. [f]
1520 / 1435 mm
(4 ft 1127/32 / 4 ft 81/2 in).
The gauges of this track are as follows (numbering the rails from left to right). 1520 mm gauge: rails 1 and 3; 1435 mm gauge: rails 2 and 4. [g]

1524 / 1435 mm
(5 ft 0 / 4 ft 81/2 in).
A line comprising European standard gauge and "Russian" gauge, a legacy of the former satellite states of the Soviet Union. The 89 mm difference between the two gauges is too small to allow a three-rail configuration. [h]

Triple gauge

[edit]
Cross-section of triple-gauge track at Gladstone and Peterborough, South Australia, before gauge standardisation. The three gauges require the respective gaps between the outer and inner rails to be different, unlike four-rail dual gauge.

In rare situations, three different gauges may converge on to a rail yard and triple-gauge track is needed to meet the operational needs of the break-of-gauge station – most commonly where there is insufficient space to do otherwise. Construction and operation of triple-gauge track and its signalling, however, involves immense cost and disruption, and is undertaken when no other alternative is available.[10]

Gallery: Triple gauge (4 rails)


1600 / 1435 / 1067 mm
(5 ft 3 / 4 ft 81/2 / 3 ft 6 in).
Turnout, 4-rail triple-gauge both ways, from the points end. [i]
1600 / 1435 / 1067 mm
(5 ft 3 / 4 ft 81/2 / 3 ft 6 in).
Turnout, 4-rail triple-gauge both ways, from the crossing end. [j]


1600 / 1435 / 1067 mm
(5 ft 3 / 4 ft 81/2 / 3 ft 6 in). Three-rail dual-gauge track is joined by four-rail triple-gauge. [k]
1600 / 1435 / 1067mm
(5 ft 3 / 4 ft 81/2 in / 3 ft 6 in).
Standard-gauge car on 4-rail triple-gauge track. Narrow gauge track is two central rails; broad gauge is far left rail and second from right. [l]


1600 / 1435 / 1067 mm
(5 ft 3 / 4 ft 81/2 / 3 ft 6 in).
A six-rail triple-gauge turntable. It must always present the same positioning of rails at both ends, so all four rails must be symmetrical to the central axis. This is made possible only by reducing the profile of the middle rail on either side. [m]
1600 / 1435 / 1067 mm
(5 ft 3 / 4 ft 81/2 / 3 ft 6 in).
When the Sydney–Perth rail corridor was converted to standard gauge in the late 1960s, dual-gauge track in the Gladstone yard had to be replaced by all-new triple-gauge track. The result was an inordinately complex marshalling yard. [n]

The following table shows localities where triple gauge has been necessary.

Occurrences of triple gauge
Place Narrowest
gauge
Middle
gauge
Broadest
gauge
Notes
Volos, Greece 600 mm (1 ft 11+58 in) 1000 mm (3 ft 3+38 in) 1435 mm (4 ft 8+12 in) 600 mm (1 ft 11+58 in) gauge closed in the 1970s, 1000 mm (3 ft 3+38 in) gauge closed in 1998
Jenbach, Austria 760 mm (2 ft 5+1516 in) Still in use[when?]
Montreux, Switzerland 800 mm (2 ft 7+12 in)
Capolago, Switzerland Metre gauge line closed in 1950
Växjö, Sweden 891 mm (2 ft 11+332 in) 1067 mm (3 ft 6 in) Until 1974 or later[11]
Latour-de-Carol, France 1000 mm (3 ft 3+38 in) 1435 mm (4 ft 8+12 in) 1668 mm (5 ft 5+2132 in) Three gauges since 1928; still in use in 2024.
Hendaye, France Still in use
Barcelona, Spain Approach to Port of Barcelona, still in use as of September 2024
Gladstone, South Australia[note 2] 1067 mm (3 ft 6 in) 1600 mm (5 ft 3 in) 1968–1983
(Some has been reconstructed at the National Railway Museum, Port Adelaide.)[14]
Peterborough, South Australia 1968–1983. (Some has been preserved at the Steamtown Heritage Rail Centre in Peterborough.)[15]
Toronto, Canada 1676 mm (5 ft 6 in) Reported as impending in 1872.[16] Subsequently converted to 1435 mm (4 ft 8+12 in) gauge.
Gallery: Multi-gauge devices


1600 / 1067 mm
(5 ft 3 / 3 ft 6 in).
A dual-gauge centraliser that directs narrow-gauge livestock cars to the centre of the broad gauge so that they can be shunted without snagging the platforms. [o]
1600 / 1435 mm
(5 ft 3 / 4 ft 81/2 in).
A simple dual-gauge common-rail change-over device. It directs standard-gauge rolling stock from the common rail in the left foreground to the right-hand rail in readiness for the turnout in the distance. [p]


1600 / 1435 / 1067 mm
(5 ft 3 / 4 ft 81/2 / 3 ft 6 in).
Triple-gauge common-rail change-over device: from one common rail (right foreground) to narrow gauge in the middle (in the distance). [q]
1600 / 1435 / 1067 mm
(5 ft 3 / 4 ft 81/2 / 3 ft 6 in).
A four-rail triple-gauge track that joins a three-rail dual-gauge track. The change-over device in the foreground directs standard-gauge rolling stock into a four-rail configuration. [r]

More than three gauges

[edit]
The Gorton Foundry of Beyer, Peacock & Company was typical of locomotive and rolling stock manufacturers that exported to many countries. This track of four gauges traversed two turntables, requiring the rails to be centralised.

Three gauges are the maximum found on operating railway lines and in railway yards, but some rolling stock manufacturers collocate more than three lines in their works, depending on the particular gauges of their customers.

Alternatives

[edit]
Rollbocks compared to transporter wagons
Standardised containers have revolutionised rail, road and sea freight transport. Although mechanisation has sped up handling, moving containers from one train to another because of different rail gauges is costly and inefficient.

Transfer of freight and passengers between different gauges does not necessarily involve dual-gauge track: there may simply be two tracks that approach either side of a platform without overlapping. In Australia, 13 break-of-gauge stations existed by 1945 as a result of longstanding interstate rivalries: three different gauges had persisted since the 1850s and the five mainland state capitals were not linked by standard gauge until 1995.[17] Huge costs and long delays were imposed by trans-shipment of freight at break-of-gauge stations, whether manually, by gantry crane or by wheelset or bogie exchange.[6]: 67  During World War II, breaks of gauge in Australia added immense difficulty to the war effort by needing extra locomotives and rolling stock, and more than 1600 service personnel and a large pool of civilians, at transfer points for an annual average transfer of about 1.8 million tonnes of freight.[18]

To cost and inefficiency was added, in the case of passengers, considerable inconvenience. In 1896, at Albury station on the Sydney–Melbourne railway, famed American writer Samuel Clemens (Mark Twain) had to change trains in the middle of a "biting-cold" night in 1896 and there formed his pungent view of "the paralysis of intellect that gave that idea birth".[19]

In some locations, an alternative to building long lengths of dual-gauge track has been to change the wheels on rolling stock, either by dropping and changing wheelsets from four-wheeled vehicles or exchanging bogies (US: trucks) under eight-wheeled vehicles. With this arrangement, a short length of dual-gauge track is only needed within the facility. A benefit is that the contents of fully loaded cars are not disturbed. The scheme was first adopted on the French–Spanish border and in Poland. It introduces delay into transit times compared with dual-gauge operation, but is much quicker than trans-shipping: when introduced in 1962 in Melbourne, Australia, on the route between Sydney and Adelaide, the freight handling time per train dropped from five days to less than two. The process involved disconnecting the brake rigging and bogie centre pins have to be disconnected before the vehicle is lifted and new bogies are wheeled underneath.[20][note 3]

In Europe, a similar principle embodies low-profile, small-wheeled transporter wagons, which carry vehicles built for one gauge on a line with a different gauge. A variant is the rollbock (Rollböcke in German), used under two-axle standard-gauge vehicles: each wheelset is carried on a small four-wheeled narrow-gauge trolley.[22] The entire train is converted in minutes at a slow walking pace, each rollbock being automatically matched to its wheelset from underneath.[note 4]

A further variant is "train on train", in which an entire narrow-gauge train is carried on standard-gauge flatcars on which continuous rail has been fitted.[24][25][26]

Differences in gauge are also accommodated by gauge-adjustable wheelsets, which as of 2022 were installed under some passenger vehicles on international links between Spain and France, Sweden and Finland, Poland and Lithuania, and Poland and Ukraine. In Spain, change-over facilities are extensive, since although 1668 millimetres (65.7 inches) track predominates, and high-speed lines are laid to 1435 mm (4 ft 8+12 in) standard gauge, there are many lines with narrower gauges (1000 millimetres (39 inches) and others).[27]

Dual-gauge railways by nation

[edit]
Australia

Australia In Victoria, there are sections of 1600 mm (5 ft 3 in) and 1435 mm (4 ft 8+12 in) dual-gauge track between Southern Cross station and West Footscray, Sunshine and Newport, Albion and Jacana, North Geelong and Gheringhap, Maryborough and Dunolly, and in various goods yards and industrial sidings. Until 2008, there was a dual-gauge line between Wodonga and Bandiana.

At Albury railway station, New South Wales, a 1600 mm (5 ft 3 in) and 1435 mm (4 ft 8+12 in) dual-gauge line was in place until 2011. A dual-gauge line was within Tocumwal railway station until 1988, when the standard gauge component was put out of use.

In 1900, in South Australia, a three-rail dual-gauge system was proposed in order to avoid a break of gauge. However, designing turnouts was considered to be difficult due to the difference of only 165 millimetres (6.5 inches) between the 1435 mm (4 ft 8+12 in) and the 1600 mm (5 ft 3 in) broad gauge. After twenty years, the proposal was abandoned.[28][29][30] Much later, the South Australian Railways successfully adopted dual-gauge turnouts.[31]

In Western Australia, 1067 mm (3 ft 6 in) and 1435 mm (4 ft 8+12 in) of double-track dual-gauge extends for 120 km (75 mi) of the main line from East Perth to Northam. Dual-gauge track is also used from the triangle at Woodbridge to Cockburn Junction, then to Kwinana on one branch and North Fremantle on the other. The signalling system detects the gauge of the approaching train and puts the signals to stop if the route is set for the wrong gauge.

In Queensland, there is a section of 1067 mm (3 ft 6 in) and 1435 mm (4 ft 8+12 in) dual-gauge track between the rail freight yards at Acacia Ridge and Park Road station, which is utilised by both passenger and freight trains. Freight trains to the Port of Brisbane utilise the dual gauge Fisherman Islands line that runs parallel to the Cleveland railway line from Park Road to Lindum. Passenger trains use the dual-gauge section of the Beenleigh railway line running parallel to the electric suburban narrow gauge of the Queensland Rail city network over the Merivale Bridge into platforms 2 and 3 at Roma Street Station. This is used by standard gauge interstate New South Wales TrainLink XPT services to Sydney. In 2012, a dual-gauge line was installed between Acacia Ridge and Bromelton to serve a new freight hub at Bromelton.

The 1700 kilometres (1100 miles) long Inland Railway, under construction in 2022, will have about 300 kilometres (190 miles) of dual gauge.

Bangladesh

Bangladesh The Bangladesh Railway uses three rails to avoid breaks of gauge between its broad-gauge and metre-gauge lines. The Jamuna Bridge and Padma Bridge, which link the east–west and north–south rail systems respectively, have four-rail dual-gauge tracks. Of the 2,875 kilometres (1,786 mi) Bangladesh Railway system, about 1,600 kilometres (990 mi) has four-rail dual-gauge.[citation needed][dubiousdiscuss]

Belgium

Belgium Tram tracks in Brussels once combined 1000 mm (3 ft 3+38 in) metre gauge lines for inter-urban trams and 1435 mm (4 ft 8+12 in) lines for urban trams in a three-rail layout. In 1991, the interurban trams went out of service and then the network used only standard-gauge track.

Bulgaria

Bulgaria The Sofia tramway uses a mixture of narrow and standard gauge. A 2.6 km (1.6 mi) section of track between Krasna polyana depot and Pirotska street is dual-gauge shared by 1435 mm (4 ft 8+12 in) route 22 and 1009 mm (3 ft 3+2332 in) route 11.

Cameroon

Cameroon The new port of Kribi may serve 1000mm gauge bauxite traffic as well as 1435mm gauge iron ore traffic.

Czech Republic

Czech Republic In the Czech Republic, there is 2 km of dual gauge 1435 mm (4 ft 8+12 in) and 760 mm (2 ft 5+1516 in) track near Jindřichův Hradec. In 1985, its original four rails were converted to three rails. In 2004, in Jindřichův Hradec at a switch where a dual gauge railway bifurcates, a Junák express from Plzeň to Brno derailed due to a signalling error. The standard gauge train had been switched on to the narrow gauge track.

France

France The Chemin de Fer de la Baie de Somme in France is dual gauge between Noyelles-sur-Mer and Saint-Valery-sur-Somme. The line has four rails with metre gauge laid within standard gauge. There are some dual-gauge (standard and Iberian) sidings at Cerbère on the Spanish border.

Germany

Germany In the 1970s, the Stuttgarter Straßenbahnen tram lines underwent a gauge conversion from 1000 mm (3 ft 3+38 in) gauge to standard gauge. This was part of an upgrade to the Stuttgart Stadtbahn. In 1981, 1435 mm (4 ft 8+12 in) and 1000 mm (3 ft 3+38 in) dual-gauge track was constructed so that new DT-8 Stadtbahn cars and old trams could share the network. In 2008, a further gauge conversion was completed. The Stuttgart Straßenbahn Museum operates 1000 mm (3 ft 3+38 in) gauge trams on weekends and special occasions.

In Krefeld on Ostwall, tram lines are dual gauge so that standard 1435 mm (4 ft 8+12 in) Rheinbahn U76 Stadtbahn cars and 1000 mm (3 ft 3+38 in) gauge trams may share the lines. At the north end of the route, at the junction with Rheinstraße, the trams reverse. There, the standard gauge line ends, while the metre gauge lines continue. At the Hauptbahnhof, on Oppumer Straße, dual gauge track continues. At the ends of Oppumer Straße, the two tracks diverge.

In Mülheim there is a similar situation. The Duisburg tram line 901 meets the local line 102. The tram system in Duisburg uses 1435 mm (4 ft 8+12 in) gauge track while the tram route from Witten to Mülheim uses 1000 mm (3 ft 3+38 in) gauge tracks. Two lines share a tunnel section between the Mülheim (Ruhr) Hauptbahnhof and Schloss Broich then diverge at street level.

The tram network between Werne to Bad Honnef is large with various operators and gauges. The trams in Wuppertal used 1435 mm (4 ft 8+12 in) gauge track on east–west lines and 1000 mm (3 ft 3+38 in) gauge track on north–south lines. Trams in Duisburg used 1435 mm (4 ft 8+12 in) gauge track on lines south of the Ruhr and 1000 mm (3 ft 3+38 in) gauge tracks on lines north of the Ruhr. The north lines closed in the 1960s and 1970s. Duisburg's three routes were converted to 1435 mm (4 ft 8+12 in) gauge track.

Ghana

Ghana Ghana is converting its narrow gauge to standard gauge, and is installing dual-gauge sleepers as an intermediate stage.

Greece

Greece In Greece, the line between Athens and Elefsis (now closed) was dual gauge in order to allow the 1000 mm (3 ft 3+38 in) gauge trains of the Peloponnese rail network to pass. It also allowed standard gauge trains to reach the Elefsis shipyards. In Volos, a short section of track between the main station and the harbour used an unusual triple gauge, to accommodate standard gauge trains from Larissa, metre gauge trains from Kalambaka, and the 600 mm (1 ft 11+58 in) gauge trains of the Pelion railway.

Indonesia

Indonesia In 1899, in the Dutch East Indies, dual gauge track was installed between Yogyakarta and Solo. The track was owned by the Nederlandsch-Indische Spoorweg Maatschappij, a private company, which in 1867 had built the 1435 mm (4 ft 8+12 in) gauge line. The third rail was installed to allow passengers and goods travelling over the 1067 mm (3 ft 6 in) gauge Staatsspoorweg (state railway) a direct connection. At a later date, the government constructed new tracks to allow greater capacity and higher speeds. In 1940, a third rail was installed between Solo and Gundih on the line to Semarang, allowing 1067 mm (3 ft 6 in) gauge trains to travel between Semarang, Solo and Yogyakarta via Gambringan, on the line to Surabaya instead of on the original line via Kedungjati.

In 1942 and 1943 in Java, under Japanese military occupation, conversion took place from 4 ft 8+12 in (1,435 mm) to 1067 mm (3 ft 6 in) on the Brumbung–Kedungjati–Gundih main line and the Kedungjati–Ambarawa branch line.

Until the 1970s, a short section of dual gauge 1067 mm (3 ft 6 in) and 750 mm (2 ft 5+12 in) line existed in North Sumatra on a joint line of the Deli Railway and the Atjeh Tram.

Some sugar mill railways in Java have dual-gauge sections.

Ireland

Republic of Ireland Ireland's Ulster Railway underwent a gauge conversion from 1880mm to the new Irish standard of 1600 mm (5 ft 3 in). The Dublin & Drogheda Railway underwent a gauge conversion because the gauges were too close to allow a dual-gauge line.

Italy

Italy The Potenza – Avigliano Lucania line in Italy is a dual gauge rail with 1435 mm (4 ft 8+12 in) and 950 mm (3 ft 1+38 in) tracks.

Japan

Japan In Japan, the national standard is 1067 mm (3 ft 6 in) narrow gauge. Dual gauge is used where the 1435 mm (4 ft 8+12 in) Shinkansen (bullet train) lines join the main network. For example, part of the Ōu Main Line became part of the Akita Shinkansen and was converted to dual gauge in a limited section. The longest (82.1 km (51.0 mi)) dual gauge section in Japan is near, and in, the Seikan Tunnel. Sections of the Hakone Tozan Line are among a number of other dual-gauge lines.

Mexico

Mexico Mexico previously had 1435 mm (4 ft 8+12 in) and 914 mm (3 ft) dual gauge track.

Netherlands

Netherlands The first railway lines in the Netherlands were constructed with a track gauge of 1945 mm (6 ft 4+916 in). For the 1939 centennial celebration, an exact replica of the country's first locomotive "De Arend" was built using the original blueprints. Since 1953, the locomotive is housed at the Dutch National Railway Museum, where in recent years, a dual-gauge track has been constructed in the rail yard, allowing for the locomotive to drive back and forth on special occasions.[32]

Poland

Poland In Poland, there is 3 kilometres (1.9 miles) of 1435 mm (4 ft 8+12 in) and 750 mm (2 ft 5+12 in) dual-gauge track in the Greater Poland Voivodeship, linking Pleszew with a nearby mainline station. It is served by narrow-gauge passenger trains and standard-gauge freight trains.

Russia

Russia Between 2008 and 2012, a 2 km (1.2 mi) dual-gauge cross-border track was rebuilt between Khasan, Russia, and Rajin, North Korea; its gauges were the Russian 1520 mm (4 ft 11+2732 in) and Korean 1435 mm (4 ft 8+12 in).[33] Similar arrangements exist on the approach to Kaliningrad, where 1435 mm (4 ft 8+12 in) track extends from the Polish border with some sections of dual gauge.

Spain

Spain In Spain, there is 21.7 km (13.5 mi) of dual gauge in the AVE line from Zaragoza to Huesca, usable for both 1435 mm (4 ft 8+12 in) standard-gauge high-speed trains and 1668 mm (5 ft 5+2132 in) Spanish network trains. Some dual-gauge sidings are at Port Bou on the French border. In 2009, Adif called for tenders for the installation of a third rail for standard-gauge trains on the 22 km (14 mi) between Castellbisbal and the Can Tunis freight terminal in Barcelona.[34]

Sweden

Sweden The bridges at the borders of Sweden and Finland, between Haparanda and Tornio have 2 km (1.2 mi) of dual gauge, 1435 mm (4 ft 8+12 in) and 1524 mm (5 ft) track. At each end of the dual-gauge section are yards with standard and Finnish gauge areas to allow for trans-shipment. Four rails are used because the gauges are close and the bridge structure is wider than normal to allow for the offset from the centreline of each gauge. A Rafil gauge changer is at the Tornio yard. Between Västervik and Jenny, Sweden, there is a 891 mm (2 ft 11+332 in) and 1435 mm (4 ft 8+12 in) dual-gauge line and dual-gauge track in the Västervik station area.

Switzerland

Switzerland In Switzerland, dual-gauge 1435 mm (4 ft 8+12 in) track and 1000 mm (3 ft 3+38 in) track exists between Lucerne and Horw of the Zentralbahn, between Niederbipp and Oberbipp of the Oberaargau-Jura Railways and between Chur and Domat/Ems of RhB. All three allow narrow-gauge passenger trains and standard-gauge freight trains to operate. A ″non-stop″ scheme (albeit with a pause to change locomotives) on the Montreux-Interlaken route was inaugurated in December 2022.[35] The former Zollikofen-Worblaufen-Deisswil dual gauge was cut back to Papiermühle when the factory in Deisswil closed.[when?]

Ukraine

Ukraine The railway tracks between the border with Slovakia at Solomonovo and the border with Romania at Nevetlenfolu are dual-gauge, 1520 mm (4 ft 11+2732 in) and 1435 mm (4 ft 8+12 in). This is in part due to the Austro-Hungarian heritage of the Zakarpattia Oblast, but also has military and political importance, as it allows standard-gauge trains to run between Romania and Slovakia by bypassing Hungary, otherwise impossible due to the break-of -gauge between the Russian-gauge network of Ukraine and standard-gauge networks of Romania and Slovakia.

United Kingdom

United Kingdom The Great Western Railway in Britain was originally built to a broad gauge of 2134 mm (7 ft 0 in), subsequently widened to 2140 mm (7 ft 012 in). After a "gauge war", the gauge was converted to 1435 mm (4 ft 8+12 in). A dual-gauge system was easily installed as the gauges were well separated and the line had wooden sleepers. A short section of broad and standard gauge is at the Great Western Society site at Didcot.

The port authority in Derry, Northern Ireland, used a dual-gauge line in a street-level network to transfer freight. Two of the city's stations were on a narrow 914 mm (3 ft) gauge. The other two city stations were on broad 1600 mm (5 ft 3 in) gauge.

The Fairbourne Railway in Gwynedd, Wales, has a section of dual gauge track from Fairbourne station to Car Park crossing installed in the late 2010s to allow visiting 15 in (381 mm) gauge trains to run on part of the line, which was converted to 12+14 in (311 mm) gauge in 1986, usually as part of special events.

United States

United States In Los Angeles, the 1067 mm (3 ft 6 in) Los Angeles Railway and 1435 mm (4 ft 8+12 in) Pacific Electric Railway ran on dual gauge track on some downtown streets.[when?]

From 1880 to 1902, the Burlington, Cedar Rapids and Northern Railway (standard gauge) and the Burlington and Northwestern Railway (narrow gauge) shared a dual-gauge mainline from Burlington, Iowa, to Mediapolis, 23 kilometres (14 miles) to the north.

The early operational years of the State Belt Railroad in San Francisco featured dual-gauge tracks to accommodate regional railroads of the time, which interchanged via ferry.

Until 1941, the Colorado and Southern Railway used both standard-gauge and narrow-gauge tracks, and had a dual-gauge line between Denver and Golden, Colorado.

Until the 1960s, the Denver and Rio Grande Western Railroad's Alamosa–Durango Line from Alamosa, Colorado, to Antonito was dual-gauge (914 mm (3 ft) and 1435 mm (4 ft 8+12 in)).

Previously, in its yard at Mount Union, Pennsylvania, the East Broad Top Railroad and Coal Company used dual-gauge tracks.

Vietnam

Vietnam In Vietnam, near the border with China, there is 1000 mm (3 ft 3+38 in) and 1435 mm (4 ft 8+12 in) dual-gauge track between Hanoi and Đồng Đăng. Other smaller dual-gauge sections exist elsewhere in the north-east of the country.[36]

See also

[edit]

Notes

[edit]
  1. ^ Two-rail track on curves is re-gauged when the gauge is 20 mm over (16 mm on narrow gauge). It is sometimes done by relocating the low (inner) rail to save "spike-killing" the sleeper at the outer end, where lateral loads are greater. In other cases, the sleeper may be slid through by about 70 mm to provide "new" timber for spiking.[2] On dual-gauge turnouts, tolerances are small: only 8 millimetres (0.31 inches) over gauge and 2 millimetres (0.079 inches) under.[3]
  2. ^ Port Pirie Junction was a triple-gauge station from 1937 to 1983 but, unlike Gladstone, did not have any triple-gauge track. For the most part the gauges were separate; dual-gauge tracks served a few trans-shipment sidings and another passenger station in the town's main street.[12][13]
  3. ^ At that time, each transfer took 20 minutes; inspection and marshalling took up the remaining time.[20] In 1982, each of two shifts of 18 men exchanged an average of 66 bogies per day; in comparison, 100 men would have been needed to transfer the same amount of freight wagon to wagon.[21]
  4. ^ The principle of attaching narrow-gauge bogies from underneath in this manner had been patented by Robert Henry Ramsey in 1872, in the United States.[23]
[edit]
  1. ^ Commuter lines near Estação Central, City of Belo Horizonte, Brazil, 2007.
  2. ^ Secondary main line, Wallaroo, South Australia, 2008. Such close spacing of two rails is at the limit of possibilities for three-rail dual gauge; if closer, a four-rail configuration must be built.
  3. ^ Jenny, Sweden, 2006.
  4. ^ Street tramway track in Liberec, Czech Republic, 2007.
  5. ^ Odawara on the Hakone Tozan Railway, Japan, 2005.
  6. ^ Chemin de Fer de la Baie de Somme, France, 2007.
  7. ^ Newly laid track between Mockava and Šeštokai, Lithuania, 2013 or earlier.
  8. ^ Torne River rail bridge between Tornio (Finland) and Haparanda (Sweden, ahead), 2008.
  9. ^ Gladstone, South Australia, early 1970s.
  10. ^ Gladstone, South Australia, early 1970s.
  11. ^ Gladstone, South Australia, early 1970s.
  12. ^ Gladstone, South Australia, early 1970s.
  13. ^ Locomotive depot, Peterborough, South Australia, 2010 (turntable was made triple-gauge in 1969 to accommodate new standard gauge).
  14. ^ Gladstone railway station, 1976.
  15. ^ Gladstone, South Australia, 1970s.
  16. ^ Southern Cross station, Melbourne, Australia, 2010.
  17. ^ National Railway Museum, Port Adelaide, 2022. Rebuilt with components from Gladstone.
  18. ^ Gladstone station, South Australia, 1976. The four rails in the foreground include one rail that is common to all three gauges (the rail on the right) and the gauges are as follows (numbering rails from left to right): broad gauge, 1 and 4; standard gauge, 2 and 4; narrow gauge, 3 and 4.

References

[edit]
  1. ^ a b Tratman, E.E. Russell (1908). Railway track and track work (3 ed.). New York: The Engineering News Publishing Co. p. 402. Retrieved 8 November 2022.
  2. ^ Track Maintenance Guide. Adelaide: Australian National Railways Commission. 1988. p. section 12.2.
  3. ^ "50kg dual gauge turnouts and gauge separations – construction and maintenance manual" (PDF). Australian Rail Track Corporation. 2008. Retrieved 7 November 2022.
  4. ^ Rogers, K.C. (1969). Farewell narrow gauge. Adelaide: Australian Railway Historical Society (SA Division Inc.). pp. 19–22.
  5. ^ Pratt, Edwin A. (1912). The state railway muddle in Australia. London: John Murray. p. 68. Retrieved 28 November 2022 – via Internet Archive.
  6. ^ a b Donovan, Peter Francis; O'Neil, Bernard; Jay, Christopher (1991). The long haul: Australian National 1978–1988 (Revised ed.). Adelaide: Australian National Railways Commission. ISBN 1875359087.
  7. ^ Chambers, T.F. (February 1971). "The railways and Terowie – their early history and change of pattern over nearly a century". Australian Railway Historical Society Bulletin. XXII (400): 34. ISSN 0005-0105.
  8. ^ Track Maintenance Guide. Adelaide: Australian National Railways Commission. 1988. p. section 9.1.
  9. ^ "Gantlet vs. gauntlet". Trains. Kalmbach Media. 1 February 2011. Retrieved 1 September 2023.
  10. ^ Fitch, Ronald J. (1989). Making tracks: 46 years in Australian railways. Kenthurst NSW: Kangaroo Press. p. 141. ISBN 0864172702.
  11. ^ Triple gauge at Växjö, click on Treskensspår at the left
  12. ^ Bakewell, Guy; Wilson, John (September 1968). "Farewell to Ellen Street". Australian Railway Historical Society Bulletin. XIX (371): 211. ISSN 0005-0105.
  13. ^ "South Australia's mixed gauge muddle" (PDF). Archived from the original (PDF) on 28 February 2016. Retrieved 8 November 2022.
  14. ^ "NRM report". Catch Point Magazine. Port Adelaide: National Railway Museum. January 2022. p. 45.
  15. ^ "About Steamtown". Steamtown Peterborough. Steamtown Heritage Rail Centre. 2022. Retrieved 5 November 2022.
  16. ^ "The railway gauges". The Mercury (Hobart). Vol. XXI, no. 3577. (Original, Hobart. Digital reproduction, Canberra: National Library of Australia – Trove digital newspaper archive). 14 June 1872. p. 3. Retrieved 31 October 2022.
  17. ^ Fitch, Ronald J. (2006). Australian Railwayman: from cadet engineer to railways commissioner. Dural, New South Wales: Rosenberg Publishing Pty Ltd. p. 168. ISBN 1877058483.
  18. ^ Laird, Philip (2001). Back on track: re-thinking transport policy in Australia and New Zealand. Sydney: University of New South Wales Press. p. 187. ISBN 086840411X.
  19. ^ Twain, Mark (2020). "Following the Equator". The Literature Network. Retrieved 27 May 2020.
  20. ^ a b Buckland, J.L. (October 1962). "Bogie changing extends the benefits of standard-gauge". Australian Railway Historical Society Bulletin. XIII (300): 161–162. ISSN 0005-0105.
  21. ^ Lee, Robert (2007). The Railways of Victoria 1854–2004. Melbourne University Publishing Ltd. p. 224. ISBN 978-0-522-85134-2.
  22. ^ Harzquerbahn 2015 – Güterverkehr zwischen Unterberg und Nordhausen [Freight traffic between Unterberg and Nordhausen]. Schmalspurbahn-Fans. 2015. Retrieved 3 November 2022.
  23. ^ "Ramsey's car truck shifting apparatus". Mid-Continent Railway Museum. 2007. Retrieved 3 November 2022.
  24. ^ Harding, Eric (1958). Uniform railway gauge. Lothian Publishing. p. 14.
  25. ^ Smith, Keith A. Tales from a Railway Odyssey. p. 114.
  26. ^ Buckland, J.L. (December 1955). "The "pick-a-back" train". Australian Railway Historical Society Bulletin. VI (218): 157–162. ISSN 0005-0105.
  27. ^ Álvarez, Alberto García (2010). Automatic track gauge changeover for trains in Spain (PDF) (4 ed.). Fundación de los Ferrocarriles Españoles. p. 7. ISBN 978-84-89649-56-9.
  28. ^ "Personal". The Barrier Miner. Broken Hill, NSW: National Library of Australia. 3 July 1924. p. 2. Retrieved 1 September 2012.
  29. ^ "Great Western Railway". The Argus. Melbourne: National Library of Australia. 11 March 1926. p. 7. Retrieved 27 August 2011.
  30. ^ "Unification of gauges". The Sydney Morning Herald. National Library of Australia. 6 May 1904. p. 5. Retrieved 10 March 2014.
  31. ^ Civil track engineering ARTC pdf.
  32. ^ "Arend onder Stoom – Het Spoorwegmuseum". www.spoorwegmuseum.nl. Archived from the original on 26 September 2020.
  33. ^ Russian Railways : Demonstration train makes run between Rajin and Khasan RZD news
  34. ^ "World infrastructure market March 2009". Railway Gazette International. 14 March 2009.[permanent dead link]
  35. ^ Fender, Keith (April 2023). "Swiss introduce gauge-changing train on Montreaux Interlaken route". Trains. Kalmbach Media. pp. 41–42.
  36. ^ The length of Vietnam railway network Archived September 10, 2006, at the Wayback Machine

Further reading

[edit]
  • Fairlie, Robert F. (1872). Railways or no railways: narrow gauge v broad gauge. Royal Exchange, London: Effingham Wilson.
  • Tratman, E.E. Russell (1908). Railway track and track work (3rd ed.). New York: The Engineering News Publishing Co. Retrieved 8 November 2022.
[edit]
  1. ^ "Diagram of mixed gauge turnouts". The Globe and Sunday Times War Pictorial. No. 272. New South Wales, Australia. 17 June 1916. p. 19 – via National Library of Australia.