Kaladipet metro station: Difference between revisions
Appearance
Content deleted Content added
Santosh4118 (talk | contribs) m Modified look of wikipage |
Santosh4118 (talk | contribs) |
||
(4 intermediate revisions by 4 users not shown) | |||
Line 26: | Line 26: | ||
| rebuilt = |
| rebuilt = |
||
| electrified = Single-phase 25 kV, 50 Hz AC through [[overhead catenary]] |
| electrified = Single-phase 25 kV, 50 Hz AC through [[overhead catenary]] |
||
| |
| accessible = Yes {{access icon}}{{citation needed|date=February 2021}} |
||
| code = |
| code = SKP |
||
| owned = [[Chennai Metro]] |
| owned = [[Chennai Metro]] |
||
| operator = Chennai Metro Rail Limited (CMRL) |
| operator = Chennai Metro Rail Limited (CMRL) |
||
Line 70: | Line 70: | ||
| collapsible = no |
| collapsible = no |
||
| map = vCONTgfa |
| map = vCONTgfa |
||
cPLT\vSTR\cPLT ~~ ~~ ~~ to [[Tiruvottriyur Theradi metro station|Tiruvottriyur Theradi]] |
|||
*'''P2'''\ |
*'''P2'''\cPLT\vSTR\cPLT\*'''P1''' |
||
cPLT\vSTR\cPLT ~~ ~~ ~~ to [[Tollgate metro station|Toll Gate]] |
|||
vCONTgfe |
vCONTgfe |
||
| bottom = <div style="width:23.5em;text-align:center">Station with two tracks and two side platforms</div> |
| bottom = <div style="width:23.5em;text-align:center">Station with two tracks and two side platforms</div> |
||
Line 89: | Line 89: | ||
|- |
|- |
||
| style="border-bottom:solid 1px gray;" width="100" |<span style="color:#{{rail color|Chennai Metro|Blue}}">'''Platform 1'''<br />'''Southbound'''</span> |
| style="border-bottom:solid 1px gray;" width="100" |<span style="color:#{{rail color|Chennai Metro|Blue}}">'''Platform 1'''<br />'''Southbound'''</span> |
||
| style="border-bottom:solid 1px gray;" width="500" |Towards → [[Chennai International Airport metro station|Chennai International Airport]] |
| style="border-bottom:solid 1px gray;" width="500" |Towards → [[Chennai International Airport metro station|Chennai International Airport]]<br><small>'''Next Station:''' [[Tollgate metro station|Toll Gate]]<br>''(to be further extended to [[Kilambakkam metro station|Kilambakkam]] in the future)''</small> |
||
|- |
|- |
||
|<span style="color:#{{rail color|Chennai Metro|Blue}}">'''Platform 2'''<br />'''Northbound'''</span> |
|<span style="color:#{{rail color|Chennai Metro|Blue}}">'''Platform 2'''<br />'''Northbound'''</span> |
||
|<span style="color:white"></span>Towards ← [[Wimco Nagar Depot metro station|Wimco Nagar Depot]] |
|<span style="color:white"></span>Towards ← [[Wimco Nagar Depot metro station|Wimco Nagar Depot]]<br><small>'''Next Station:''' [[Tiruvottriyur Theradi metro station|Tiruvottriyur Theradi]]</small> |
||
|- |
|- |
||
| colspan="2" style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;text-align:center;" |<small>[[Side platform]]<nowiki> | Doors will open on the left </nowiki>{{access icon}}</small> |
| colspan="2" style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;text-align:center;" |<small>[[Side platform]]<nowiki> | Doors will open on the left </nowiki>{{access icon}}</small> |
||
Line 119: | Line 119: | ||
{{Chennai topics}} |
{{Chennai topics}} |
||
{{Chennai Metro}} |
{{Chennai Metro|blue line=yes}} |
||
{{Transport in Chennai}} |
{{Transport in Chennai}} |
||
Latest revision as of 14:13, 16 August 2024
Kaladipet (formerly known as Thangal Metro station)[1] is an elevated metro station on the North-South Corridor of the Line 1 Extension of the Blue Line of Chennai Metro in Chennai, India. This station will serve the neighbourhoods of Kaladipet and other northern suburbs of Chennai.
History
[edit]The station was inaugurated on 14 February 2021, with the inauguration of the northern extension of Blue line of Phase I.[2]
Station layout
[edit]Kaladipet track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
|
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 1 Southbound |
Towards → Chennai International Airport Next Station: Toll Gate (to be further extended to Kilambakkam in the future) | |
Platform 2 Northbound |
Towards ← Wimco Nagar Depot Next Station: Tiruvottriyur Theradi | |
Side platform | Doors will open on the left | ||
L2 |
See also
[edit]References
[edit]- ^ C, Shivakumar (24 October 2020). "Phase-1 Metro extension trial next month". Express News Service. Retrieved 24 October 2020.
- ^ Cuenca, Oliver (16 February 2021). "Chennai Metro inaugurates Blue Line extension". International Railway Journal. IRJ. Retrieved 18 February 2021.
External links
[edit]Wikimedia Commons has media related to Chennai Metro.
Wikivoyage has a travel guide for Chennai.
- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.