Jump to content

Euro Quebec Hydro Hydrogen Project: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Rescuing 0 sources and tagging 1 as dead.) #IABot (v2.0.9.5) (Eastmain - 18002
 
Line 1: Line 1:
{{short description|Former Canadian hydropower project}}
{{short description|Former Canadian hydropower project}}
<!-- Please do not remove or change this AfD message until the discussion has been closed. -->
{{Article for deletion/dated|page=Euro Quebec Hydro Hydrogen Project|timestamp=20240305071944|year=2024|month=March|day=5|substed=yes|help=off}}
<!-- Once discussion is closed, please place on talk page: {{Old AfD multi|page=Euro Quebec Hydro Hydrogen Project|date=5 March 2024|result='''keep'''}} -->
<!-- End of AfD message, feel free to edit beyond this point -->
{{Refimprove|date=August 2011}}
{{Refimprove|date=August 2011}}



Latest revision as of 06:23, 26 March 2024

The Euro Quebec Hydro Hydrogen Project or EQHHP (also known as Euro Quebec Hydro Hydrogen Pilot Project or EQHHPP) was a 100 MW pilot project to study the shipping of Canadian hydropower converted via electrolysis into hydrogen and the shipping of the hydrogen to Hamburg, Germany.[1][2] The time frame of phase B was 1992 to 1997.[3]

The method of transport is a hydrogen tanker that carries smaller highly insulated hydrogen tanks filled with liquid hydrogen.

See also

[edit]

References

[edit]
[edit]