Building the A plant of the [[Hanasaari Power Plant]] started in 1957 and it was completed in 1960. The A plant was in use until 2000 and since that as a backup plant. A decision to dismantle the A plant was made in 2006.<ref>[https://web.archive.org/web/20070927004357/http://www.helsinginenergia.fi/media/t06/1214_hanasaari.html Hanasaaren A-voimalaitos puretaan ja Hanasaaren B-voimalaitoksen läheisyyteen rakennetaan kivihiilen varastointia varten puskurisiilot – Helsingin Energia käynnistää Hanasaari-projektin 14.12.2006.] Helsingin Energia. Accessed on 29 July 2007.</ref> Planning the B plant started in 1962, and it started operating in 1974. There have been plans for residential building in the area, which will require cleansing the soil, as [[cyanide]] was found in the soil near the red-brick B plant in 2006. Cleansing the [[groundwater]] in the area is expensive and difficult, and can take decades to fully complete.<ref>Huhtanen, Jarmo: [https://www.hs.fi/kaupunki/art-2000004434641.html Helsingin Hanasaaresta löytyi suuria pitoisuuksia myrkyllistä syanidia], ''[[Helsingin Sanomat]]'' 22 October 2006. Accessed on 29 July 2007.</ref><ref>[https://www.ts.fi/uutiset |
Building the A plant of the [[Hanasaari Power Plant]] started in 1957 and it was completed in 1960. The A plant was in use until 2000 and since that as a backup plant. A decision to dismantle the A plant was made in 2006.<ref>[https://web.archive.org/web/20070927004357/http://www.helsinginenergia.fi/media/t06/1214_hanasaari.html Hanasaaren A-voimalaitos puretaan ja Hanasaaren B-voimalaitoksen läheisyyteen rakennetaan kivihiilen varastointia varten puskurisiilot – Helsingin Energia käynnistää Hanasaari-projektin 14.12.2006.] Helsingin Energia. Accessed on 29 July 2007.</ref> Planning the B plant started in 1962, and it started operating in 1974. There have been plans for residential building in the area, which will require cleansing the soil, as [[cyanide]] was found in the soil near the red-brick B plant in 2006. Cleansing the [[groundwater]] in the area is expensive and difficult, and can take decades to fully complete.<ref>Huhtanen, Jarmo: [https://www.hs.fi/kaupunki/art-2000004434641.html Helsingin Hanasaaresta löytyi suuria pitoisuuksia myrkyllistä syanidia], ''[[Helsingin Sanomat]]'' 22 October 2006. Accessed on 29 July 2007.</ref><ref>[https://www.ts.fi/uutiset/1074155641 HS: Hanasaaresta löytyi myrkyllistä syanidia], ''[[Turun Sanomat]]'' 22 October 2006. Accessed on 27 November 2020.</ref> |
||
==As a residential area== |
==As a residential area== |
Latest revision as of 19:12, 5 August 2024
Hanasaari (Swedish: Hanaholmen) is a neighbourhood in the district of Sörnäinen in Helsinki, Finland, between the neighbourhoods of Vilhonvuori, Kalasatama and Sompasaari near Merihaka. The name comes from an island that was lost under reclaimed land. Hanasaari has primarily been a power plant area, although the plant has already been shut down. The first power plant was built next to Hanasaari in Suvilahti.
History
[edit]Etymology
[edit]The name of the island first appeared in a 1639 map of Helsinki as Haneholmen, where the word hane meant rooster. The name came from the smaller island named Hönan ("the hen"), thus the names of the two islands formed a pair, which is typical in island names. In 1909 the Swedish and Finnish names Hanaholmen - Hanaholma were in use. The current name Hanasaari was made official in 1928, but it had already been in use since the 1880s.[1]
Power plant
[edit]Building the A plant of the Hanasaari Power Plant started in 1957 and it was completed in 1960. The A plant was in use until 2000 and since that as a backup plant. A decision to dismantle the A plant was made in 2006.[2] Planning the B plant started in 1962, and it started operating in 1974. There have been plans for residential building in the area, which will require cleansing the soil, as cyanide was found in the soil near the red-brick B plant in 2006. Cleansing the groundwater in the area is expensive and difficult, and can take decades to fully complete.[3][4]
As a residential area
[edit]The plant was shut down on April 1, 2023, after the Helsinki City Council had voted for its closing back in 2015.[5] There will be a new residential area in Hanasaari in the 2030s.[6]
References
[edit]- ^ Olavi Terho et al. (ed.): Helsingin kadunnimet, p. 98. Helsingin kaupungin julkaisuja 24, 1970, Helsinki.
- ^ Hanasaaren A-voimalaitos puretaan ja Hanasaaren B-voimalaitoksen läheisyyteen rakennetaan kivihiilen varastointia varten puskurisiilot – Helsingin Energia käynnistää Hanasaari-projektin 14.12.2006. Helsingin Energia. Accessed on 29 July 2007.
- ^ Huhtanen, Jarmo: Helsingin Hanasaaresta löytyi suuria pitoisuuksia myrkyllistä syanidia, Helsingin Sanomat 22 October 2006. Accessed on 29 July 2007.
- ^ HS: Hanasaaresta löytyi myrkyllistä syanidia, Turun Sanomat 22 October 2006. Accessed on 27 November 2020.
- ^ "Helsinki's coal-fired district heating plant shuts down on Saturday". Yle. 2023-03-31. Retrieved 2024-04-11.
- ^ Näin Kalasatamaa rakennetaan, Uutta Helsinkiä, city of Helsinki. Accessed on 7 July 2021.
External links
[edit]- Media related to Hanasaari at Wikimedia Commons
- Hanasaari Power Plant Archived 2023-04-02 at the Wayback Machine, Helen. Accessed on 27 November 2020.
- Pelasta Hanasaari. Accessed on 20 May 2007.
- "Hanasaari A: Ruma on kaunista". Voima 8 May 2007. Accessed on 27 November 2020.