Pennsylvania Turnpike/Interstate 95 Interchange Project: Difference between revisions
GreenC bot (talk | contribs) Rescued 4 archive links; reformat 6 links. Wayback Medic 2.5 per WP:USURPURL and JUDI batch #20 |
|||
(409 intermediate revisions by more than 100 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Highway construction project}} |
|||
{{Expand|date=January 2007}} |
|||
{{Use mdy dates|date=July 2020}} |
|||
{{Future road}} |
|||
{{Infobox road |
{{Infobox road junction |
||
|marker_image=[[Image:Pennsylvania Turnpike logo.svg|70px]][[Image:I-95.svg|70px]][[Image:I-276.svg|84px]][[Image:I-195.svg|84px]] |
|||
|state=PA |
|state=PA |
||
|road_type=I |
|||
|highway_name=Pennsylvania Turnpike/Interstate 95 Interchange Project |
|||
| |
|name=Pennsylvania Turnpike/Interstate 95 Interchange Project |
||
|image=2017-09-03 10 35 55 View south along the ramps which will carry I-95 between the Delaware Expressway and the Pennsylvania Turnpike during construction of the I-95-Pennsylvania Turnpike Interchange near Durham Road in Bristol Township, Pennsylvania.jpg |
|||
|map= |
|||
|image_caption=Ramps for Interstate 95 under construction in 2017 |
|||
|system= |
|||
|other_names= |
|||
|commons= |
|||
|location= [[Bristol Township, Bucks County, Pennsylvania]] |
|||
|coord={{coord|40.127292|-74.886546|region:US_type:landmark|display=inline,title|name=Pennsylvania Turnpike/Interstate 95 Interchange Project}} |
|||
|map_notes=Map of project area showing completed components of the interchange |
|||
|roads= {{plainlist|1= |
|||
*{{jct|state=PA|I-Toll|276|PATP}} |
|||
*{{jct|state=PA|I|95}} |
|||
*{{jct|state=PA|I|295}} }} |
|||
|type=Interchange |
|||
|spans= |
|||
|lanes= |
|||
|const= {{plainlist| |
|||
* '''Stage 1''': 2010–present |
|||
* '''Stages 2 & 3''': planned |
|||
}} |
}} |
||
|contractor= {{plainlist| |
|||
* '''Design''': A. D. Marble & Company, [[Jacobs Engineering Group]], [[HNTB]] |
|||
* '''Management''': Portfolio Associates, Urban Engineers |
|||
* '''Inspection''': [[AECOM]], [[WSP Global|WSP]], L.R. Kimball, Temple Group Incorporated |
|||
}}<ref name="Team">{{cite web |author = Pennsylvania Turnpike Commission |author-link = Pennsylvania Turnpike Commission |title = Contact Us: Project Team |url = https://www.patpconstruction.com/paturnpikei95/team.aspx |archive-url = https://web.archive.org/web/20151117162911/https://www.patpconstruction.com/paturnpikei95/team.aspx |url-status = usurped |archive-date = November 17, 2015 |website = PA Turnpike / I-95 Interchange Project |publisher = Pennsylvania Turnpike Commission |access-date = January 20, 2020 }}</ref> |
|||
|opened= {{start date|2018|09|22}} (mainline movements of I-95)<ref name=sofield>{{cite news |first = Tom |last = Sofield |date = September 22, 2018 |title = Decades in the Making, I-95, Turnpike Connector Opens to Motorists |url = http://levittownnow.com/2018/09/22/decades-in-the-making-i-95-turnpike-connector-opens-to-motorists/ |journal = Levittown Now |access-date = September 22, 2018 }}</ref> |
|||
|height= |
|||
|width= |
|||
|maint= [[Pennsylvania Turnpike Commission]] |
|||
|tolls= |
|||
|map= |
|||
|map_alt= |
|||
}}The '''Pennsylvania Turnpike/Interstate 95 Interchange Project''' is an ongoing [[road construction]] project to build an [[Interchange (road)|interchange]] between [[Interstate 95 in Pennsylvania|Interstate 95]] (I-95) and the [[Pennsylvania Turnpike]] in [[Bristol Township, Bucks County, Pennsylvania|Bristol Township]], [[Bucks County, Pennsylvania|Bucks County]], [[Pennsylvania]], in the United States. The $553 million first stage<ref name="spending">{{cite web |author=Pennsylvania Turnpike Commission |title=Background: Construction Spending |url=https://www.patpconstruction.com/paturnpikei95/construction-spending.aspx |archive-url=https://web.archive.org/web/20180822014732/https://www.patpconstruction.com/paturnpikei95/construction-spending.aspx |url-status=usurped |archive-date=August 22, 2018 |access-date=August 21, 2018 |publisher=Pennsylvania Turnpike Commission}}</ref> is complete: a pair of flyover ramps–one connecting I-95 northbound with the eastbound turnpike and the other connecting the westbound turnpike with I-95 southbound—that opened in 2018,<ref name="sofield" /> with some cleanups to connecting roads completed in 2021.<ref>{{Cite web |title=I-95 Interchange Design & Construction Details |url=https://www.paturnpike.com/traveling/construction/site/i-95-interchange-project/design-construction-details |access-date=2023-02-02 |website=PTC Construction Sites |language=en}}</ref> Construction of the remaining ramps is expected to begin when funding is available. |
|||
The project filled a gap in I-95 left by the cancellation of the [[Somerset Freeway]] in [[New Jersey]]. It completes the highway from [[Miami]] to the [[Houlton–Woodstock Border Crossing]] in [[Maine]], and makes it a continuous route between [[Philadelphia]] and [[New York City]]. After the first two ramps opened, I-95 was redirected eastward along the Pennsylvania Turnpike to the [[New Jersey Turnpike]]. [[Interstate 295 (Delaware–Pennsylvania)|I-295]] was extended from its former northern terminus at [[U.S. Route 1 in New Jersey|U.S. Route 1]] (US 1) in [[Lawrence Township, Mercer County, New Jersey|Lawrence Township, New Jersey]], west and south across the [[Scudder Falls Bridge]] along the former section of I-95 to the Pennsylvania Turnpike. |
|||
The '''Pennsylvania Turnpike/Interstate 95 Interchange Project''' is a project to build an [[interchange (road)|interchange]] where [[Interstate 95 in Pennsylvania|Interstate 95]] crosses the [[Pennsylvania Turnpike]] in [[Bristol Township, Pennsylvania]]. This will fill the gap that exists on I-95 through [[New Jersey]] due to the cancellation of the [[Somerset Freeway]]. The project also includes widening the Turnpike east of [[U.S. Route 1 (Pennsylvania)|U.S. Route 1]] and rebuilding the [[Delaware River-Turnpike Toll Bridge]], which connects [[Bristol Township, Pennsylvania]] and [[Burlington Township, New Jersey]]. |
|||
The project also includes plans to rebuild nearby interchanges and overpasses and widen the turnpike from [[U.S. Route 1 in Pennsylvania|US 1]] in [[Bensalem Township, Pennsylvania|Bensalem Township]] eastward to the Delaware River; some of these components have been completed, while the others are contingent on funding. The interchange project initially had approval and funding to double the capacity of the nearby [[Delaware River–Turnpike Toll Bridge]] between Bristol Township and [[Burlington Township, New Jersey]], by building an identical second span. But after cracks were discovered in the bridge, officials decided to replace it with a new structure that {{As of|2023|lc=y|pre=early}}, has not yet been designed.<ref>{{cite web |title=Proposed 2020 Capital Improvement Program |url=https://www.njta.com/media/5179/proposed-2020-capital-improvement-program.pdf |access-date=March 14, 2022 |publisher=New Jersey Turnpike Authority}}</ref> |
|||
Construction is expected to start in early 2008 and will cost approximately 650 million dollars. When completed, this will allow I-95 to be a continuous route between [[Philadelphia, Pennsylvania|Philadelphia]] and [[New York City]] and finally complete the highway from [[Maine]] to [[Florida]]. |
|||
The Pennsylvania Turnpike/Interstate 95 Interchange Project is the last project to be financed under the [[Federal Aid Highway Act of 1956]], which established the [[Interstate Highway System]].<ref>{{cite web |author = Federal Highway Administration |author-link = Federal Highway Administration |url = https://highways.dot.gov/highway-history/interstate-system/50th-anniversary/interstate-frequently-asked-questions |title = Interstate Frequently Asked Questions |publisher = Federal Highway Administration |access-date = February 25, 2008 }}</ref> It is also the first transportation project in Pennsylvania to be funded through the [[EB-5 visa]] program; its success may lead the [[Pennsylvania Turnpike Commission]] to apply the program to the unfinished [[Mon–Fayette Expressway]] and [[Pennsylvania Route 576|Southern Beltway]] projects near [[Pittsburgh]].<ref>{{cite news |first = Bobby |last = Kerlik |url = http://triblive.com/news/allegheny/7286651-74/investors-program-china#axzz3MK1GEaTH |title = Investors Eager to Trade Cash for Green Cards in Immigration Program |newspaper = [[Pittsburgh Tribune-Review]] |date = December 13, 2014 |access-date = December 19, 2014 }}</ref> |
|||
==Background== |
|||
The [[Somerset Freeway]] was planned to run from existing I-95 north of [[Trenton, New Jersey|Trenton]] northeast to [[Interstate 287]] west of [[Perth Amboy, New Jersey|Perth Amboy]], and was to carry I-95 towards the [[New Jersey Turnpike]]. Due to local opposition, it was cancelled in 1982, and I-95 was later rerouted south on the Turnpike and its Pennsylvania Extension to end at the state line. The section of I-95 north of the interchange (extended several miles in 1995) will become an extension of [[Interstate 195 (New Jersey)|Interstate 195]] when the interchange is completed,<ref>[http://www.paturnpikei95.com/pdf/DACMeeting050914.pdf Pennsylvania Turnpike Commission I-95/I-276 Interchange Project Meeting Design Management Summary - DRAFT: Design Advisory Committee Meeting #2]</ref> and the part of [[Interstate 276]] east of the interchange will become part of Interstate 95. |
|||
==History== |
|||
At the formation of the [[Interstate Highway System]], [[Interstate 95|I-95]] was planned as a Florida-to-Maine superhighway passing through the [[Northeast megalopolis|Northeast Megalopolis]]. However, decades of disputes among local and regional governments and private landowners prevented or delayed the design and construction of this highway from the [[Trenton, New Jersey|Trenton]]–[[Philadelphia]] area to northern New Jersey in the [[New Brunswick, New Jersey|New Brunswick]]–[[Piscataway Township, New Jersey|Piscataway]] area. Until 2018, I-95 was incomplete because of the gap in this area. If drivers wished to proceed northbound from [[Newark, Delaware]], to [[New York City]] without encountering a traffic signal, the most direct route was (and still is today) to exit I-95 onto [[Interstate 295 (Delaware–Pennsylvania)|I-295]] just south of [[Wilmington, Delaware|Wilmington]], enter New Jersey via the [[Delaware Memorial Bridge]], and continue north on the [[New Jersey Turnpike]]. Alternatively, drivers who stayed on I-95 northbound passed through [[Delaware County, Pennsylvania]], the city of Philadelphia, and [[Bucks County, Pennsylvania]], and then over the [[Delaware River]] on the [[Scudder Falls Bridge]] into [[Mercer County, New Jersey]], northwest of Trenton on what is now I-295. Before 2018, from this point, I-95 abruptly ended at the interchange with [[U.S. Route 1 in New Jersey|US 1]] in [[Lawrence Township, Mercer County, New Jersey|Lawrence Township]] and became I-295 southbound. Motorists then entered [[Interstate 195 (New Jersey)|I-195]] eastbound from I-295 exit 60A, and then took I-195 to the New Jersey Turnpike northbound (where I-95 continues). According to the [[New Jersey Turnpike Authority]], the turnpike was signed as I-95 north of exit 7A (for I-195) in the area of [[Robbinsville Township, New Jersey|Robbinsville Township]]. However, the [[New Jersey Department of Transportation]] (NJDOT) stated that I-95 started from the [[Delaware River–Turnpike Toll Bridge]] and followed the New Jersey Turnpike Extension to the northbound lanes of the mainline of the turnpike. |
|||
===Early proposed Interstate 95 routings=== |
|||
During the mid-1950s, while I-95 was still in its infancy, a proposal was made to route it through the city of Trenton by way of the [[Trenton–Morrisville Toll Bridge]] (now in use and designated as [[U.S. Route 1|US 1]]).<ref>{{cite web |last = Anderson |first = Steve |url = http://www.nycroads.com/roads/I-95_NJ/ |title = Interstate 95: New Jersey (Trenton Section) |website = Eastern Roads |access-date = February 1, 2012 }}{{sps|certain=yes|date=June 2020}}</ref> New Jersey opposed this routing due to the limited capacity of the bridge. A proposal to bypass and loop around Trenton was formally proposed and agreed upon by both states in the late 1950s. What was eventually called the Scudder Falls Bridge was constructed in 1959. Completed soon afterward was a section of I-95 north of Trenton. Plans then began in the mid-1960s to join this segment to [[Interstate 287|I-287]] in northern New Jersey. This controversial section of I-95 became known as the Somerset Freeway, but by 1978, doubts were expressed if I-95 would ever be completed.<ref>{{cite news |author-link = Martin Waldron |last = Waldron |first = Martin |title = Caution! Some Roads Lead Nowhere |newspaper = [[The New York Times]] |date = March 19, 1978 |page = E8 |url = https://www.nytimes.com/1978/03/19/archives/interstate-highways-are-still-unfinished-caution-some-roads-lead.html }}</ref> |
|||
===Somerset Freeway=== |
|||
{{main article|Interstate 95 in New Jersey#Routing through Central New Jersey: Somerset Freeway}} |
|||
The Somerset Freeway was to run from existing I-95 (present-day I-295) in [[Hopewell Township, Mercer County, New Jersey|Hopewell Township]] northeast to [[I-287]] in [[Piscataway Township]], where I-95 would have followed I-287 east to the New Jersey Turnpike. The project was cancelled in 1982, primarily for two reasons. First, residents along the Princeton corridor feared increased congestion and a drop in property values. Second, the state of New Jersey feared a drop in state revenues by diverting traffic from the New Jersey Turnpike. A 1980 article in ''[[The New York Times]]'' stated: <blockquote>Killing I-95 means that the entire length of the turnpike almost surely will become the official I-95 artery through the state, thus assuring it a continued source of toll revenue. At present, only that segment of the turnpike north of exit 10 in Middlesex County is designated as I-95.<ref>{{cite news |last = Sullivan |first = Ronald |title = The Killing of I-95: Too Much Too Late |newspaper = The New York Times |date = May 4, 1980 |page = NJ22 }}</ref></blockquote> This did not come fully to pass, as the Commonwealth of Pennsylvania objected to having Interstate 95 removed from within its boundaries. Instead, I-95 was rerouted south on the New Jersey Turnpike to exit 6, and onto its Pennsylvania Extension to end at the state line, pending the construction of an interchange where the Pennsylvania Turnpike crossed existing I-95 in Pennsylvania. This route was legislated in the [[Surface Transportation Assistance Act]] of 1982.<ref>{{USPL|97|424|}} "Notwithstanding any other provision of law, the Secretary of Transportation is authorized and directed, pursuant to section 103 of such title, to designate as part of the Interstate Highway System the New Jersey Turnpike from exit 10 to the interchange with the Pennsylvania Turnpike and the Pennsylvania Turnpike from such interchange to and including the proposed interchange with Interstate Route 95 in Bucks County, Pennsylvania."</ref> I-95 was originally built without an interchange with the Pennsylvania Turnpike because federal laws at the time, since repealed, prohibited federal funds from being used to build interchanges with [[toll road]]s.<ref>{{cite news |last1 = McGinnis |first1 = James |title = I-95 and PA Turnpike linked, more construction coming |url = https://www.burlingtoncountytimes.com/news/20180921/i-95-and-pa-turnpike-linked-more-construction-coming |access-date = September 2, 2019 |newspaper = Burlington County Times |date = September 21, 2018 }}</ref> |
|||
===Finalization of plans=== |
|||
Although this project was legislated in 1982, an impact study was not started by the Pennsylvania Turnpike Commission until 1992, which was not completed until 2003. Details were hashed out during the design sessions that took place from 2004 to 2006. One of the last uncertainties was the question of what would become of the existing section of I-95 north of the interchange. The Design Advisory Committee determined that in order to avoid confusion, that segment would become an extension of I-195 when the interchange is completed,<ref>{{cite book |author = Edwards and Kelsey |url = http://www.paturnpikei95.com/pdf/DACMeeting050914.pdf |title = Pennsylvania Turnpike Commission I-95/I-276 Interchange Project Meeting Design Management Summary Draft: Design Advisory Committee Meeting #2 |publisher = Edwards and Kelsey |date = September 14, 2005 |access-date = February 1, 2012 |archive-url = https://web.archive.org/web/20111105195453/http://www.paturnpikei95.com/pdf/DACMeeting050914.pdf |archive-date = November 5, 2011 }}</ref> and the part of [[Interstate 276|I-276]] east of the interchange would become part of I-95. On May 20, 2015, it was decided to extend I-295 instead of I-195 along the former section of I-95 into Pennsylvania south to the new interchange.<ref name=aashto2015>{{cite letter |last = Nadeau |first = Gregory G. |date = May 20, 2015 |title = FHWA to AASHTO I-95 Designation |recipient = Bud Wright |location = Washington, DC |publisher = Federal Highway Administration |url = http://route.transportation.org/Documents/05%2014%202015%20Cheyenne%2c%20WY%20Report/FHWA%20to%20AASHTO%20I-95.Designation.pdf |format = PDF |access-date = June 8, 2015 |url-status = dead |archive-url = https://web.archive.org/web/20150609165553/http://route.transportation.org/Documents/05%2014%202015%20Cheyenne%2C%20WY%20Report/FHWA%20to%20AASHTO%20I-95.Designation.pdf |archive-date = June 9, 2015 }}</ref> |
|||
Financing on the project was partially provided to the heavily indebted Pennsylvania Turnpike Commission by a group of foreign investors who invested $200 million through a transaction put together by the Delaware Valley Regional Center (DVRC). The turnpike commission will pay a 2% annual interest rate, saving $35 million over the period of the loan. The DVRC managing director, Joseph P. Manheim, said the regional center will receive commissions and fees. The remainder of the funding of the project will come from U.S. government turnpike funds.<ref>{{cite news |last1 = Nussbaum |first1 = Paul |title = Chinese investors sign up to fund I-95-Pa. Turnpike link |url = https://www.inquirer.com/philly/business/20141130_Chinese_investors_sign_up_to_fund_I-95-Pa__Turnpike_link.html |newspaper = Philadelphia Inquirer |date = November 30, 2014 |access-date = June 11, 2019 }}</ref> |
|||
==Design and construction== |
==Design and construction== |
||
{{Multiple image |
|||
The approved design calls for a multi-phased construction. The first two phases, scheduled to begin in the first half of 2008 and end some time in 2014, consists of the development of a single-loop interchange at the point where the PA Turnpike (I-276) and I-95 meet in Bristol Township. In order to accommodate the projected high traffic volume, a new [[Toll road|tollbooth]] will be built approximately 2 miles west of the interchange, terminating the toll ticket part of the turnpike system. The current tollbooth at the Delaware River bridge will still exist, but its purpose will be to collect a flat-rate toll for westbound traffic only. This phase also calls for the widening of the Turnpike between Exits 351 (U.S. Route 1) and 358 ([[U.S. Route 13]]) from 4 lanes to 6. |
|||
| width=200 |
|||
The third and final phase will consist of the building of a second bridge across the [[Delaware River]], adjacent to the current one, that will allow eastbound and westbound traffic to solely utilize separate bridge spans. In this respect, the design is similar to that of the [[Delaware Memorial Bridge]]. |
|||
| image1 = 2020-07-07 14 51 26 View north along Interstate 95 (Delaware Expressway) at Exit 40 (Interstate 295 EAST, Trenton) in Bristol Township, Bucks County, Pennsylvania.jpg |
|||
| image2 = 2020-07-12 09 45 32 View south along Interstate 95 (Pennsylvania Turnpike Delaware River Extension) at Exit 40 (Interstate 276 WEST-Pennsylvania Turnpike, Harrisburg) in Bristol Township, Bucks County, Pennsylvania.jpg |
|||
| footer = Signage at the first components of the interchange from both directions of I-95 |
|||
}} |
|||
The multi-phased construction began in late 2010, and the approved design called for Stage 1 to tentatively end in 2020.<ref name=":0"/> Groundbreaking for the interchange took place on July 30, 2013, with Governor [[Tom Corbett]] in attendance.<ref name=wcau73013>{{cite news |last = Chang |first = David |title = New Project Links Pa. Turnpike to I-95 |publisher = [[WCAU-TV]] |location = Philadelphia |date = July 30, 2013 |access-date = July 30, 2013 |url = http://www.nbcphiladelphia.com/news/local/New-Project-Links-Pa-Turnpike-to-I-95-217680301.html }}</ref> Construction of the first stage of the interchange, supplying the mainline movements of [[Interstate 95 in Pennsylvania|I-95]], began in late 2014.<ref name=inq81414>{{cite news |last = Nussbaum |first = Paul |title = Work to begin on connecting Pa. Turnpike and I-95 |newspaper = The Philadelphia Inquirer |date = August 14, 2014 |url = http://articles.philly.com/2014-08-14/business/52772901_1_toll-gantry-pennsylvania-turnpike-commission-new-jersey-turnpike |archive-url = https://web.archive.org/web/20140820193652/http://articles.philly.com/2014-08-14/business/52772901_1_toll-gantry-pennsylvania-turnpike-commission-new-jersey-turnpike |url-status = dead |archive-date = August 20, 2014 |access-date = December 2, 2014 }}</ref> In order to accommodate the projected high traffic volume, a new [[Toll road|toll plaza]], completed in January 2016, was constructed about {{convert|2|mi|km|spell=in}} west of the interchange, terminating the [[ticket system]] on the Pennsylvania Turnpike. The former toll plaza at the Delaware River bridge was converted to an [[Open road tolling|electronic toll gantry]] which collects a flat-rate toll for west/southbound traffic only.<ref name=":0">{{cite web |author = Pennsylvania Turnpike Commission |url = https://www.patpconstruction.com/paturnpikei95/faq.aspx |archive-url = https://web.archive.org/web/20151117095616/https://www.patpconstruction.com/paturnpikei95/faq.aspx |url-status = usurped |archive-date = November 17, 2015 |title = FAQ |publisher = Pennsylvania Turnpike Commission |access-date = August 21, 2018 }}</ref> In March 2018, I-95 was renumbered to [[Interstate 295 (Delaware–Pennsylvania)|I-295]] between US 1 in Lawrence Township, New Jersey and Taylorsville Road in Lower Makefield Township, Pennsylvania. In July 2018, I-295 was extended southward to the future Pennsylvania Turnpike interchange, switching cardinal directions at Taylorsville Road, with northbound becoming westbound, even though the road actually goes south from that point.<ref>{{cite web |title = Schedule |website = I95Link.com |url = http://i95link.com/schedule/ |access-date = April 13, 2018 }}</ref><ref name="6abc Philadelphia 2018">{{cite news |title = Explainer: Why parts of I-95 are becoming I-295 |publisher = [[WPVI-TV]] |location = Philadelphia |date = June 14, 2018 |url = https://6abc.com/3601666/ |access-date = August 20, 2018 }}</ref> The two flyover ramps that officially bridge the I-95 gap opened on September 22, 2018, before the completion of Stage 1.<ref>{{cite web |author = Pennsylvania Turnpike Commission |url = https://www.patpconstruction.com/paturnpikei95/ |title = PA Turnpike / I-95 Interchange Project |publisher = Pennsylvania Turnpike Commission |archive-url = https://web.archive.org/web/20170630141120/https://www.patpconstruction.com/paturnpikei95/ |archive-date = June 30, 2017 |url-status = usurped |access-date = July 13, 2017 }}</ref> This stage also called for the widening of the turnpike between exits 351 ([[U.S. Route 1 in Pennsylvania|US 1]]) and 42 ([[U.S. Route 13 in Pennsylvania|US 13]]) from four lanes to six, and reconstruction of the turnpike's interchange with US 13. |
|||
Stage 2 of the project involves the construction of ramps supplying the remaining six movements between I-276, I-95, and I-295, the replacement of three overpasses along the turnpike, reconstruction of the Bensalem Interchange with US 1, and further widening of the turnpike. This stage will begin when funding is available.<ref name=":0"/> |
|||
The third and final stage was supposed to consist of the construction of a second eastbound/northbound span of the [[Delaware River–Turnpike Toll Bridge]] across the [[Delaware River]], adjacent to the current one, which would have allowed each direction of traffic to utilize separate bridge spans.<ref name=":0"/> However, in 2017, a fracture was discovered in the existing structure, causing the Commission and Authority to change their plans for the project. Currently, PTC and NJTA plan to replace the bridge in its entirety. Construction is expected to begin no earlier than 2025.<ref>{{Cite web|title=Design - Planned Design|url=https://www.patpconstruction.com/paturnpikei95/delaware-river-bridge.aspx|archive-url=https://web.archive.org/web/20200724210710/https://www.patpconstruction.com/paturnpikei95/delaware-river-bridge.aspx|url-status=usurped|archive-date=July 24, 2020|access-date=2020-07-24|website=www.patpconstruction.com}}</ref> |
|||
The first stage of the project, which includes the new toll plaza, widening, and the flyover ramps between I-95 and the turnpike, is projected to cost about $553 million.<ref name="spending" /> The flyover ramps are expected to cost $142.9 million, with $100 million coming from federal funds and the remainder from the turnpike commission. The Pennsylvania Turnpike Commission is borrowing money from foreign investors in order to provide funding for the project. The remaining stages of the project are unfunded, with a projected total cost of $1.1 billion for the entire project.<ref name="inq81414"/> |
|||
The I-95 project, funded by an amalgam of federal and state entities, created over 5,000 jobs.<ref>{{cite journal |url = https://transportationtodaynews.com/news/14305-successful-pa-turnpike-i-95-interchange-project-drives-numerous-local-state-regional-benefits/ |title = Successful PA Turnpike/I-95 interchange project drives numerous local, state, regional benefits |last1 = Riley |first1 = Kim |date = June 30, 2019 |website = Transportation Today |location = Washington DC }}</ref><ref>{{cite news |url = https://www.theatlantic.com/technology/archive/2018/01/after-61-years-americas-busiest-highway-is-almost-complete/550982/ |title = After 61 Years, America's Busiest Highway Is Almost Complete |last1 = Meyer |first1 = Robinson |date = January 20, 2018 |magazine = [[The Atlantic]] }}</ref> |
|||
==Cashless tolling== |
|||
While the eastern terminus of the [[Ticket system|toll ticket system]] on the Pennsylvania Turnpike was moved from the Delaware River Bridge to a spot {{convert|2|mi|km|spell=in}} west of the interchange, the previous tollbooth at the bridge was replaced by a new [[Open road tolling|cashless toll system]]—a first for Pennsylvania.<ref>{{cite magazine |first = Dan |last = McQuade |title = PA Turnpike Introduces Cashless Tolling at Delaware River Bridge |url = https://www.phillymag.com/news/2016/01/06/pa-turnpike-cashless-toll/ |date = January 6, 2016 |magazine = [[Philadelphia (magazine)|Philadelphia]] |access-date = July 4, 2020 }}</ref> This toll system was instituted on January 3, 2016, for west/southbound drivers only. The toll can be paid with [[E-ZPass]] or [[toll-by-plate]]. As vehicles without an E-ZPass transponder pass through the toll gantry, a camera takes a picture of the vehicle's license plate and the owner of the vehicle is mailed an invoice for the toll. In March 2020, cashless tolling was expanded to the entire Pennsylvania Turnpike system.<ref>{{cite news|last=Tierney|first=Jacob|title=Pennsylvania Turnpike to lay off 500 employees, make cashless tolling permanent|publisher=TribLive|date=June 2, 2020|url=https://triblive.com/news/pennsylvania/pennsylvania-turnpike-to-lay-off-500-employees-make-cashless-tolling-permanent/|accessdate=June 2, 2020}}</ref> |
|||
==Changes in route designation== |
==Changes in route designation== |
||
Signage was changed for affected highways throughout 2018.<ref name="new295">{{cite press release |first = Steve |last = Schapiro |url = http://news.transportation.org/Pages/StateDotNewsDetail.aspx?MessageId=55519 |title = I-95 to be redesignated as I-295 in Mercer County starting in 2018 |date = December 21, 2017 |access-date = December 21, 2017 |publisher = New Jersey Department of Transportation |archive-url = https://web.archive.org/web/20171222104909/http://news.transportation.org/Pages/StateDotNewsDetail.aspx?MessageId=55519 |archive-date = December 22, 2017 }}</ref> |
|||
Once construction is completed, signage will be changed for impacted highways. The changes are outlined as follows: |
|||
{| class="wikitable" |
{| class="wikitable" |
||
|- |
|- |
||
! Highway |
!scope="col" | Highway section |
||
!scope="col" | Former designation |
|||
! Current Designation |
|||
!scope="col" | Current designation |
|||
! Proposed Designation |
|||
|- |
|- |
||
| Highway from the [[Pennsylvania Turnpike|PA Turnpike]] in [[Bristol Township, Bucks County, Pennsylvania|Bristol Township]] to [[U.S. Route 1 in New Jersey|US 1]] in [[Lawrence Township, Mercer County, New Jersey|Lawrence Township]] |
|||
| I-95 from PA Turnpike, across the [[Scudder Falls Bridge]] into [[Mercer County, NJ]], and continuing to Exit 67 in Lawrenceville |
|||
| I-95 |
| I-95 |
||
| I- |
| I-295 |
||
|- |
|- |
||
| PA Turnpike from the new interchange in Bristol Township to the [[Delaware River–Turnpike Toll Bridge|Delaware River Turnpike Bridge]] |
|||
| I-295 from Exit 67 in Lawrenceville to Exit 60 east of Trenton |
|||
| I-295 |
|||
| I-195 |
|||
|- |
|||
| PA Turnpike from new interchange in Bristol Township to the [[Delaware_River-Turnpike_Toll_Bridge|Delaware River Turnpike Bridge]] |
|||
| I-276 |
| I-276 |
||
| I-95 |
| I-95 |
||
|- |
|- |
||
| [[NJ Turnpike |
| [[New Jersey Turnpike#Extensions|NJ Turnpike Pennsylvania Extension (Pearl Harbor Memorial Turnpike Extension)]] from the Delaware River Turnpike Bridge to the [[New Jersey Turnpike|mainline NJ Turnpike]] |
||
| I-276 (signage)<br> I-95 (designation) |
|||
| [[NJ 700]]-P |
|||
| I-95 |
| I-95 (signed) |
||
|- |
|||
| Mainline NJ Turnpike from the NJ Turnpike Pennsylvania Extension (Pearl Harbor Memorial Turnpike Extension) in [[Mansfield Township, Burlington County, New Jersey|Mansfield Township]] to [[Interstate 195 (New Jersey)|I-195]] in [[Robbinsville Township, New Jersey|Robbinsville Township]] |
|||
| I-95 (unsigned) |
|||
| I-95 (signed) |
|||
|} |
|} |
||
==See also== |
==See also== |
||
*[[ |
* [[List of gaps in Interstate Highways]] |
||
*{{portal-inline|Pennsylvania}} |
|||
*{{portal-inline|U.S. Roads}} |
|||
==References== |
==References== |
||
{{Reflist}} |
|||
<div class="references-small"> |
|||
<references/> |
|||
</div> |
|||
==External |
==External links== |
||
{{commons category}} |
|||
*[http://www.paturnpikei95.com/home.htm PA Turnpike/I-95 Interchange] |
|||
*[https://www.paturnpike.com/traveling/construction/site/i-95-interchange-project PA Turnpike/I-95 Interchange project home page] |
|||
{{Pennsylvania Turnpike Commission}} |
|||
{{DEFAULTSORT:Pennsylvania Turnpike Interstate 95 Interchange Project}} |
|||
[[Category:Transportation in Pennsylvania]] |
|||
[[Category: |
[[Category:Transportation in Bucks County, Pennsylvania]] |
||
[[Category:Interstate 95]] |
[[Category:Interstate 95]] |
||
[[Category:Proposed transportation infrastructure in the United States]] |
|||
[[Category:Pennsylvania Turnpike Commission]] |
|||
[[Category:Road interchanges in the United States]] |
Latest revision as of 05:15, 21 December 2024
Pennsylvania Turnpike/Interstate 95 Interchange Project | |
---|---|
Location | |
Bristol Township, Bucks County, Pennsylvania | |
Coordinates | 40°07′38″N 74°53′12″W / 40.127292°N 74.886546°W |
Roads at junction | |
Construction | |
Type | Interchange |
Constructed |
|
Opened | September 22, 2018[2] | (mainline movements of I-95)
Maintained by | Pennsylvania Turnpike Commission |
The Pennsylvania Turnpike/Interstate 95 Interchange Project is an ongoing road construction project to build an interchange between Interstate 95 (I-95) and the Pennsylvania Turnpike in Bristol Township, Bucks County, Pennsylvania, in the United States. The $553 million first stage[3] is complete: a pair of flyover ramps–one connecting I-95 northbound with the eastbound turnpike and the other connecting the westbound turnpike with I-95 southbound—that opened in 2018,[2] with some cleanups to connecting roads completed in 2021.[4] Construction of the remaining ramps is expected to begin when funding is available.
The project filled a gap in I-95 left by the cancellation of the Somerset Freeway in New Jersey. It completes the highway from Miami to the Houlton–Woodstock Border Crossing in Maine, and makes it a continuous route between Philadelphia and New York City. After the first two ramps opened, I-95 was redirected eastward along the Pennsylvania Turnpike to the New Jersey Turnpike. I-295 was extended from its former northern terminus at U.S. Route 1 (US 1) in Lawrence Township, New Jersey, west and south across the Scudder Falls Bridge along the former section of I-95 to the Pennsylvania Turnpike.
The project also includes plans to rebuild nearby interchanges and overpasses and widen the turnpike from US 1 in Bensalem Township eastward to the Delaware River; some of these components have been completed, while the others are contingent on funding. The interchange project initially had approval and funding to double the capacity of the nearby Delaware River–Turnpike Toll Bridge between Bristol Township and Burlington Township, New Jersey, by building an identical second span. But after cracks were discovered in the bridge, officials decided to replace it with a new structure that as of early 2023[update], has not yet been designed.[5]
The Pennsylvania Turnpike/Interstate 95 Interchange Project is the last project to be financed under the Federal Aid Highway Act of 1956, which established the Interstate Highway System.[6] It is also the first transportation project in Pennsylvania to be funded through the EB-5 visa program; its success may lead the Pennsylvania Turnpike Commission to apply the program to the unfinished Mon–Fayette Expressway and Southern Beltway projects near Pittsburgh.[7]
History
[edit]At the formation of the Interstate Highway System, I-95 was planned as a Florida-to-Maine superhighway passing through the Northeast Megalopolis. However, decades of disputes among local and regional governments and private landowners prevented or delayed the design and construction of this highway from the Trenton–Philadelphia area to northern New Jersey in the New Brunswick–Piscataway area. Until 2018, I-95 was incomplete because of the gap in this area. If drivers wished to proceed northbound from Newark, Delaware, to New York City without encountering a traffic signal, the most direct route was (and still is today) to exit I-95 onto I-295 just south of Wilmington, enter New Jersey via the Delaware Memorial Bridge, and continue north on the New Jersey Turnpike. Alternatively, drivers who stayed on I-95 northbound passed through Delaware County, Pennsylvania, the city of Philadelphia, and Bucks County, Pennsylvania, and then over the Delaware River on the Scudder Falls Bridge into Mercer County, New Jersey, northwest of Trenton on what is now I-295. Before 2018, from this point, I-95 abruptly ended at the interchange with US 1 in Lawrence Township and became I-295 southbound. Motorists then entered I-195 eastbound from I-295 exit 60A, and then took I-195 to the New Jersey Turnpike northbound (where I-95 continues). According to the New Jersey Turnpike Authority, the turnpike was signed as I-95 north of exit 7A (for I-195) in the area of Robbinsville Township. However, the New Jersey Department of Transportation (NJDOT) stated that I-95 started from the Delaware River–Turnpike Toll Bridge and followed the New Jersey Turnpike Extension to the northbound lanes of the mainline of the turnpike.
Early proposed Interstate 95 routings
[edit]During the mid-1950s, while I-95 was still in its infancy, a proposal was made to route it through the city of Trenton by way of the Trenton–Morrisville Toll Bridge (now in use and designated as US 1).[8] New Jersey opposed this routing due to the limited capacity of the bridge. A proposal to bypass and loop around Trenton was formally proposed and agreed upon by both states in the late 1950s. What was eventually called the Scudder Falls Bridge was constructed in 1959. Completed soon afterward was a section of I-95 north of Trenton. Plans then began in the mid-1960s to join this segment to I-287 in northern New Jersey. This controversial section of I-95 became known as the Somerset Freeway, but by 1978, doubts were expressed if I-95 would ever be completed.[9]
Somerset Freeway
[edit]The Somerset Freeway was to run from existing I-95 (present-day I-295) in Hopewell Township northeast to I-287 in Piscataway Township, where I-95 would have followed I-287 east to the New Jersey Turnpike. The project was cancelled in 1982, primarily for two reasons. First, residents along the Princeton corridor feared increased congestion and a drop in property values. Second, the state of New Jersey feared a drop in state revenues by diverting traffic from the New Jersey Turnpike. A 1980 article in The New York Times stated:
Killing I-95 means that the entire length of the turnpike almost surely will become the official I-95 artery through the state, thus assuring it a continued source of toll revenue. At present, only that segment of the turnpike north of exit 10 in Middlesex County is designated as I-95.[10]
This did not come fully to pass, as the Commonwealth of Pennsylvania objected to having Interstate 95 removed from within its boundaries. Instead, I-95 was rerouted south on the New Jersey Turnpike to exit 6, and onto its Pennsylvania Extension to end at the state line, pending the construction of an interchange where the Pennsylvania Turnpike crossed existing I-95 in Pennsylvania. This route was legislated in the Surface Transportation Assistance Act of 1982.[11] I-95 was originally built without an interchange with the Pennsylvania Turnpike because federal laws at the time, since repealed, prohibited federal funds from being used to build interchanges with toll roads.[12]
Finalization of plans
[edit]Although this project was legislated in 1982, an impact study was not started by the Pennsylvania Turnpike Commission until 1992, which was not completed until 2003. Details were hashed out during the design sessions that took place from 2004 to 2006. One of the last uncertainties was the question of what would become of the existing section of I-95 north of the interchange. The Design Advisory Committee determined that in order to avoid confusion, that segment would become an extension of I-195 when the interchange is completed,[13] and the part of I-276 east of the interchange would become part of I-95. On May 20, 2015, it was decided to extend I-295 instead of I-195 along the former section of I-95 into Pennsylvania south to the new interchange.[14]
Financing on the project was partially provided to the heavily indebted Pennsylvania Turnpike Commission by a group of foreign investors who invested $200 million through a transaction put together by the Delaware Valley Regional Center (DVRC). The turnpike commission will pay a 2% annual interest rate, saving $35 million over the period of the loan. The DVRC managing director, Joseph P. Manheim, said the regional center will receive commissions and fees. The remainder of the funding of the project will come from U.S. government turnpike funds.[15]
Design and construction
[edit]The multi-phased construction began in late 2010, and the approved design called for Stage 1 to tentatively end in 2020.[16] Groundbreaking for the interchange took place on July 30, 2013, with Governor Tom Corbett in attendance.[17] Construction of the first stage of the interchange, supplying the mainline movements of I-95, began in late 2014.[18] In order to accommodate the projected high traffic volume, a new toll plaza, completed in January 2016, was constructed about two miles (3.2 km) west of the interchange, terminating the ticket system on the Pennsylvania Turnpike. The former toll plaza at the Delaware River bridge was converted to an electronic toll gantry which collects a flat-rate toll for west/southbound traffic only.[16] In March 2018, I-95 was renumbered to I-295 between US 1 in Lawrence Township, New Jersey and Taylorsville Road in Lower Makefield Township, Pennsylvania. In July 2018, I-295 was extended southward to the future Pennsylvania Turnpike interchange, switching cardinal directions at Taylorsville Road, with northbound becoming westbound, even though the road actually goes south from that point.[19][20] The two flyover ramps that officially bridge the I-95 gap opened on September 22, 2018, before the completion of Stage 1.[21] This stage also called for the widening of the turnpike between exits 351 (US 1) and 42 (US 13) from four lanes to six, and reconstruction of the turnpike's interchange with US 13.
Stage 2 of the project involves the construction of ramps supplying the remaining six movements between I-276, I-95, and I-295, the replacement of three overpasses along the turnpike, reconstruction of the Bensalem Interchange with US 1, and further widening of the turnpike. This stage will begin when funding is available.[16]
The third and final stage was supposed to consist of the construction of a second eastbound/northbound span of the Delaware River–Turnpike Toll Bridge across the Delaware River, adjacent to the current one, which would have allowed each direction of traffic to utilize separate bridge spans.[16] However, in 2017, a fracture was discovered in the existing structure, causing the Commission and Authority to change their plans for the project. Currently, PTC and NJTA plan to replace the bridge in its entirety. Construction is expected to begin no earlier than 2025.[22]
The first stage of the project, which includes the new toll plaza, widening, and the flyover ramps between I-95 and the turnpike, is projected to cost about $553 million.[3] The flyover ramps are expected to cost $142.9 million, with $100 million coming from federal funds and the remainder from the turnpike commission. The Pennsylvania Turnpike Commission is borrowing money from foreign investors in order to provide funding for the project. The remaining stages of the project are unfunded, with a projected total cost of $1.1 billion for the entire project.[18]
The I-95 project, funded by an amalgam of federal and state entities, created over 5,000 jobs.[23][24]
Cashless tolling
[edit]While the eastern terminus of the toll ticket system on the Pennsylvania Turnpike was moved from the Delaware River Bridge to a spot two miles (3.2 km) west of the interchange, the previous tollbooth at the bridge was replaced by a new cashless toll system—a first for Pennsylvania.[25] This toll system was instituted on January 3, 2016, for west/southbound drivers only. The toll can be paid with E-ZPass or toll-by-plate. As vehicles without an E-ZPass transponder pass through the toll gantry, a camera takes a picture of the vehicle's license plate and the owner of the vehicle is mailed an invoice for the toll. In March 2020, cashless tolling was expanded to the entire Pennsylvania Turnpike system.[26]
Changes in route designation
[edit]Signage was changed for affected highways throughout 2018.[27]
Highway section | Former designation | Current designation |
---|---|---|
Highway from the PA Turnpike in Bristol Township to US 1 in Lawrence Township | I-95 | I-295 |
PA Turnpike from the new interchange in Bristol Township to the Delaware River Turnpike Bridge | I-276 | I-95 |
NJ Turnpike Pennsylvania Extension (Pearl Harbor Memorial Turnpike Extension) from the Delaware River Turnpike Bridge to the mainline NJ Turnpike | I-276 (signage) I-95 (designation) |
I-95 (signed) |
Mainline NJ Turnpike from the NJ Turnpike Pennsylvania Extension (Pearl Harbor Memorial Turnpike Extension) in Mansfield Township to I-195 in Robbinsville Township | I-95 (unsigned) | I-95 (signed) |
See also
[edit]References
[edit]- ^ Pennsylvania Turnpike Commission. "Contact Us: Project Team". PA Turnpike / I-95 Interchange Project. Pennsylvania Turnpike Commission. Archived from the original on November 17, 2015. Retrieved January 20, 2020.
{{cite web}}
: CS1 maint: unfit URL (link) - ^ a b Sofield, Tom (September 22, 2018). "Decades in the Making, I-95, Turnpike Connector Opens to Motorists". Levittown Now. Retrieved September 22, 2018.
- ^ a b Pennsylvania Turnpike Commission. "Background: Construction Spending". Pennsylvania Turnpike Commission. Archived from the original on August 22, 2018. Retrieved August 21, 2018.
{{cite web}}
: CS1 maint: unfit URL (link) - ^ "I-95 Interchange Design & Construction Details". PTC Construction Sites. Retrieved February 2, 2023.
- ^ "Proposed 2020 Capital Improvement Program" (PDF). New Jersey Turnpike Authority. Retrieved March 14, 2022.
- ^ Federal Highway Administration. "Interstate Frequently Asked Questions". Federal Highway Administration. Retrieved February 25, 2008.
- ^ Kerlik, Bobby (December 13, 2014). "Investors Eager to Trade Cash for Green Cards in Immigration Program". Pittsburgh Tribune-Review. Retrieved December 19, 2014.
- ^ Anderson, Steve. "Interstate 95: New Jersey (Trenton Section)". Eastern Roads. Retrieved February 1, 2012.[self-published source]
- ^ Waldron, Martin (March 19, 1978). "Caution! Some Roads Lead Nowhere". The New York Times. p. E8.
- ^ Sullivan, Ronald (May 4, 1980). "The Killing of I-95: Too Much Too Late". The New York Times. p. NJ22.
- ^ Pub. L. 97–424 "Notwithstanding any other provision of law, the Secretary of Transportation is authorized and directed, pursuant to section 103 of such title, to designate as part of the Interstate Highway System the New Jersey Turnpike from exit 10 to the interchange with the Pennsylvania Turnpike and the Pennsylvania Turnpike from such interchange to and including the proposed interchange with Interstate Route 95 in Bucks County, Pennsylvania."
- ^ McGinnis, James (September 21, 2018). "I-95 and PA Turnpike linked, more construction coming". Burlington County Times. Retrieved September 2, 2019.
- ^ Edwards and Kelsey (September 14, 2005). Pennsylvania Turnpike Commission I-95/I-276 Interchange Project Meeting Design Management Summary Draft: Design Advisory Committee Meeting #2 (PDF). Edwards and Kelsey. Archived from the original (PDF) on November 5, 2011. Retrieved February 1, 2012.
- ^ Nadeau, Gregory G. (May 20, 2015). "FHWA to AASHTO I-95 Designation" (PDF). Letter to Bud Wright. Washington, DC: Federal Highway Administration. Archived from the original (PDF) on June 9, 2015. Retrieved June 8, 2015.
- ^ Nussbaum, Paul (November 30, 2014). "Chinese investors sign up to fund I-95-Pa. Turnpike link". Philadelphia Inquirer. Retrieved June 11, 2019.
- ^ a b c d Pennsylvania Turnpike Commission. "FAQ". Pennsylvania Turnpike Commission. Archived from the original on November 17, 2015. Retrieved August 21, 2018.
{{cite web}}
: CS1 maint: unfit URL (link) - ^ Chang, David (July 30, 2013). "New Project Links Pa. Turnpike to I-95". Philadelphia: WCAU-TV. Retrieved July 30, 2013.
- ^ a b Nussbaum, Paul (August 14, 2014). "Work to begin on connecting Pa. Turnpike and I-95". The Philadelphia Inquirer. Archived from the original on August 20, 2014. Retrieved December 2, 2014.
- ^ "Schedule". I95Link.com. Retrieved April 13, 2018.
- ^ "Explainer: Why parts of I-95 are becoming I-295". Philadelphia: WPVI-TV. June 14, 2018. Retrieved August 20, 2018.
- ^ Pennsylvania Turnpike Commission. "PA Turnpike / I-95 Interchange Project". Pennsylvania Turnpike Commission. Archived from the original on June 30, 2017. Retrieved July 13, 2017.
{{cite web}}
: CS1 maint: unfit URL (link) - ^ "Design - Planned Design". www.patpconstruction.com. Archived from the original on July 24, 2020. Retrieved July 24, 2020.
{{cite web}}
: CS1 maint: unfit URL (link) - ^ Riley, Kim (June 30, 2019). "Successful PA Turnpike/I-95 interchange project drives numerous local, state, regional benefits". Transportation Today. Washington DC.
- ^ Meyer, Robinson (January 20, 2018). "After 61 Years, America's Busiest Highway Is Almost Complete". The Atlantic.
- ^ McQuade, Dan (January 6, 2016). "PA Turnpike Introduces Cashless Tolling at Delaware River Bridge". Philadelphia. Retrieved July 4, 2020.
- ^ Tierney, Jacob (June 2, 2020). "Pennsylvania Turnpike to lay off 500 employees, make cashless tolling permanent". TribLive. Retrieved June 2, 2020.
- ^ Schapiro, Steve (December 21, 2017). "I-95 to be redesignated as I-295 in Mercer County starting in 2018" (Press release). New Jersey Department of Transportation. Archived from the original on December 22, 2017. Retrieved December 21, 2017.