West Cliff Railway: Difference between revisions
mNo edit summary |
Rescuing 1 sources and tagging 0 as dead.) #IABot (v2.0.9.3) (Eastmain - 13671 |
||
(27 intermediate revisions by 22 users not shown) | |||
Line 1: | Line 1: | ||
{{Use dmy dates|date=March 2017}} |
|||
⚫ | |||
{{Use British English|date=March 2017}} |
|||
⚫ | |||
⚫ | |||
⚫ | |||
{{Infobox rail line |
|||
[[Image:Bournemouth West Cliff Railway 1.jpg|thumb|right|The line and beach. In December the beach is deserted and the line closed for the winter.]] |
|||
| box_width = |
|||
⚫ | The '''West Cliff Railway''', or '''West Cliff Lift''', is a [[funicular|funicular railway]] located in the [[England|English]] [[seaside resort]] of [[Bournemouth]]. The line serves to link the seaside promenade and beach with the cliff top and the town behind.<ref name=tht>{{cite web | title = Bournemouth's Cliff Railways | publisher = The Heritage Trail | url = http://www.theheritagetrail.co.uk/cliff_trams/bournemouth_railways.htm | accessdate = 2009-05-15}}</ref> |
||
| name = West Cliff Railway |
|||
| color = |
|||
| logo = |
|||
| logo_width = |
|||
| logo_alt = |
|||
| image = Bournemouth West Cliff Railway 2.jpg |
|||
| image_width = |
|||
| image_alt = |
|||
| caption = The beach, cliff railway and cliff-top hotels viewed from the Pier |
|||
| type = [[Funicular]] |
|||
| system = |
|||
| status = in use |
|||
| locale = [[West Cliff, Bournemouth|West Cliff]], [[Bournemouth]], [[England]], [[United Kingdom]] |
|||
| start = |
|||
| end = |
|||
| stations = |
|||
| routes = |
|||
| daily_ridership = |
|||
| ridership2 = |
|||
| open = {{Start date|1935}} |
|||
| close = |
|||
| owner = |
|||
| operator = [[Bournemouth, Christchurch and Poole Council]] |
|||
| character = |
|||
| depot = |
|||
| stock = |
|||
| linelength_km = |
|||
| linelength_mi = |
|||
| linelength = {{convert|145|ft}} |
|||
| tracklength_km = |
|||
| tracklength_mi = |
|||
| tracklength = |
|||
| tracks = [[Double track]] |
|||
| gauge = {{RailGauge|5ft6in|lk=on}} |
|||
| old_gauge = |
|||
| load_gauge = |
|||
| minradius = |
|||
| racksystem = |
|||
| routenumber = |
|||
| linenumber = |
|||
| electrification = |
|||
| speed_km/h = |
|||
| speed_mph = |
|||
| speed = |
|||
| elevation_m = |
|||
| elevation_ft = |
|||
| elevation = |
|||
| website = |
|||
| map = |
|||
| map_state = collapsed |
|||
| maxincline = 70.4% |
|||
}} |
|||
⚫ | |||
⚫ | |||
⚫ | The '''West Cliff Railway''', or '''West Cliff Lift''', is a [[funicular|funicular railway]] located on [[West Cliff, Bournemouth|West Cliff]] in the [[England|English]] [[seaside resort]] of [[Bournemouth]]. The line serves to link the seaside promenade and beach with the cliff top and the town behind.<ref name=tht>{{cite web | title = Bournemouth's Cliff Railways | publisher = The Heritage Trail | url = http://www.theheritagetrail.co.uk/cliff_trams/bournemouth_railways.htm | accessdate = 2009-05-15 | archive-date = 7 June 2009 | archive-url = https://web.archive.org/web/20090607133030/http://www.theheritagetrail.co.uk/cliff_trams/bournemouth_railways.htm | url-status = dead }}</ref> |
||
== Overview == |
|||
The line is owned and operated by [[Bournemouth |
The line is owned and operated by [[Bournemouth, Christchurch and Poole Council]] and has the following technical parameters:<ref name=tht/><ref name=funnet>{{cite web | url = http://www.funiculars.net/line.php?id=24 | title = West Cliff, Bournemouth | publisher = Funiculars.net | accessdate = 2009-05-15}}</ref> |
||
=== Technical Parameters === |
|||
*Length: ''{{convert|145|ft}}'' |
*Length: ''{{convert|145|ft}}'' |
||
*Gradient: ''70 |
*Gradient: ''70.4%'' |
||
*Cars: ''2'' |
*Cars: ''2'' |
||
*Capacity: ''12 passengers per car'' |
*Capacity: ''12 passengers per car'' |
||
*Configuration: ''Double track'' |
*Configuration: ''[[Double track]]'' |
||
*Gauge: ''{{ |
*Gauge: ''{{RailGauge|5ft6in}}'' |
||
*Traction: ''Electricity'' |
*Traction: ''Electricity'' |
||
== History == |
|||
The West Cliff Railway was opened in 1908 by Bournemouth Corporation, some four months after the opening of the nearby [[East Cliff Railway]]. Like the East Cliff Railway, it was electrically operated from the start, with winding gear situated at the upper station driven by a {{convert|25|hp}} winding motor. The line was controlled by a driver at the upper station, assisted by an attendant at the lower station. Wooden-bodied cars were used.<ref name=tht/> |
The West Cliff Railway was opened in 1908 by Bournemouth Corporation, some four months after the opening of the nearby [[East Cliff Railway]]. Like the East Cliff Railway, it was electrically operated from the start, with winding gear situated at the upper station driven by a {{convert|25|hp}} winding motor. The line was controlled by a driver at the upper station, assisted by an attendant at the lower station. Wooden-bodied cars were used.<ref name=tht/> |
||
The winding motor was replaced in the 1960s by a {{convert|28|hp}} [[three-phase]] motor. The cars were also replaced in the 1960s by [[aluminium]]-bodied cars intended to be interchangeable across all three of Bournemouth's surviving cliff railways. In 1987 the track was re-laid, and during the 1990s the line was further upgraded with the installation of an electronic control system.<ref name=tht/> |
The winding motor was replaced in the 1960s by a {{convert|28|hp}} [[three-phase]] motor. The cars were also replaced in the 1960s by [[aluminium]]-bodied cars intended to be interchangeable across all three of Bournemouth's surviving cliff railways. In 1987 the track was re-laid, and during the 1990s the line was further upgraded with the installation of an electronic control system.<ref name=tht/> |
||
== Further nearby Funiculars == |
|||
The West Cliff Railway is one of three such cliff railways in Bournemouth, the other two being the [[East Cliff Railway]] and the [[Fisherman's Walk Cliff Railway]]. All three operate between April and October.<ref name=tht/> |
The West Cliff Railway is one of three such cliff railways in Bournemouth, the other two being the [[East Cliff Railway]] (closed since 2016) and the [[Fisherman's Walk Cliff Railway]]. All three operate between April and October.<ref name=tht/> |
||
== See also == |
|||
* [[List of funicular railways]] |
|||
== References == |
== References == |
||
Line 25: | Line 87: | ||
== External links == |
== External links == |
||
{{ |
{{Commons category|West Cliff Railway}} |
||
* [https://www.bcpcouncil.gov.uk/Leisure-culture-and-local-heritage/Beaches-and-quays/Bournemouth-cliff-lifts-and-land-trains.aspx The official council page for the lifts, including prices] |
|||
* [http://www.theheritagetrail.co.uk/cliff_trams/bournemouth_railways.htm Article on Bournemouth's Cliff Railways from ''The Heritage Trail'' web site] |
* [http://www.theheritagetrail.co.uk/cliff_trams/bournemouth_railways.htm Article on Bournemouth's Cliff Railways from ''The Heritage Trail'' web site] {{Webarchive|url=https://web.archive.org/web/20090607133030/http://www.theheritagetrail.co.uk/cliff_trams/bournemouth_railways.htm |date=7 June 2009 }} |
||
* [http://www.hows.org.uk/personal/rail/bour.htm Article on Bournemouth's Cliff Railways from the ''Funicular Railways of the UK'' web site] |
* [http://www.hows.org.uk/personal/rail/bour.htm Article on Bournemouth's Cliff Railways from the ''Funicular Railways of the UK'' web site] |
||
⚫ | |||
<BR> |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
{{Dorset-geo-stub}} |
|||
⚫ | |||
{{UK-rail-stub}} |
|||
⚫ | |||
[[Category:5 ft 6 in gauge railways in England]] |
Latest revision as of 08:48, 8 May 2023
West Cliff Railway | |
---|---|
Overview | |
Status | in use |
Locale | West Cliff, Bournemouth, England, United Kingdom |
Service | |
Type | Funicular |
Operator(s) | Bournemouth, Christchurch and Poole Council |
History | |
Opened | 1935 |
Technical | |
Line length | 145 feet (44 m) |
Number of tracks | Double track |
Track gauge | 5 ft 6 in (1,676 mm) |
Maximum incline | 70.4% |
The West Cliff Railway, or West Cliff Lift, is a funicular railway located on West Cliff in the English seaside resort of Bournemouth. The line serves to link the seaside promenade and beach with the cliff top and the town behind.[1]
Overview
[edit]The line is owned and operated by Bournemouth, Christchurch and Poole Council and has the following technical parameters:[1][2]
Technical Parameters
[edit]- Length: 145 feet (44 m)
- Gradient: 70.4%
- Cars: 2
- Capacity: 12 passengers per car
- Configuration: Double track
- Gauge: 5 ft 6 in (1,676 mm)
- Traction: Electricity
History
[edit]The West Cliff Railway was opened in 1908 by Bournemouth Corporation, some four months after the opening of the nearby East Cliff Railway. Like the East Cliff Railway, it was electrically operated from the start, with winding gear situated at the upper station driven by a 25 horsepower (19 kW) winding motor. The line was controlled by a driver at the upper station, assisted by an attendant at the lower station. Wooden-bodied cars were used.[1]
The winding motor was replaced in the 1960s by a 28 horsepower (21 kW) three-phase motor. The cars were also replaced in the 1960s by aluminium-bodied cars intended to be interchangeable across all three of Bournemouth's surviving cliff railways. In 1987 the track was re-laid, and during the 1990s the line was further upgraded with the installation of an electronic control system.[1]
Further nearby Funiculars
[edit]The West Cliff Railway is one of three such cliff railways in Bournemouth, the other two being the East Cliff Railway (closed since 2016) and the Fisherman's Walk Cliff Railway. All three operate between April and October.[1]
See also
[edit]References
[edit]- ^ a b c d e "Bournemouth's Cliff Railways". The Heritage Trail. Archived from the original on 7 June 2009. Retrieved 15 May 2009.
- ^ "West Cliff, Bournemouth". Funiculars.net. Retrieved 15 May 2009.