Binalood Wind Farm: Difference between revisions
Appearance
Content deleted Content added
m Moving Category:Buildings and structures in Razavi Khorasan Province to Category:Buildings and structures in Razavi Khorasan province per Wikipedia:Categories for discussion/Speedy |
|||
(30 intermediate revisions by 20 users not shown) | |||
Line 1: | Line 1: | ||
{{Infobox power station |
|||
⚫ | '''Binalood wind farm''' is a [[wind farm]] situated in [[Razavi Khorasan Province]] of [[Iran]] near the city of [[Nishapur]]. It currently uses 43 turbines with generating capacity of 660 |
||
| name = Binalood wind farm |
|||
⚫ | |||
| image = The Road of 44 - East of Iran - Nishapur to Mashhad - Dizbad wind farm 3.JPG |
|||
| image_size = |
|||
| image_caption = |
|||
| image_alt = |
|||
| location_map_size = |
|||
| location_map_caption = |
|||
| coordinates = {{coord|35|59|31|N|59|23|18|E|type:landmark|display=inline,title}} |
|||
| country = [[Iran]] |
|||
| location = [[Nishapur]], [[Razavi Khorasan Province]] |
|||
| status = Active |
|||
| construction_began = |
|||
| commissioned = 2008 |
|||
| decommissioned = |
|||
| cost = |
|||
| owner = |
|||
| operator = |
|||
| ps_units_operational = 43 X 0.66 MW |
|||
| ps_units_manu_model = |
|||
| wind_hub_height = |
|||
| wind_rotor_diameter = |
|||
| wind_rated_speed = |
|||
| wind_farm_type = Onshore |
|||
| wind_site_elevation = |
|||
| wind_site_usage = {{convert|700|ha|acre|0|abbr=on}} |
|||
| wind_site_area = |
|||
| ps_electrical_capacity = 28.2 MW<br />Planned: 61.2 MW |
|||
| ps_electrical_cap_fac = |
|||
| website = https://binaloodwf.com/?lang=en |
|||
| extra = |
|||
}} |
|||
⚫ | '''Binalood wind farm''' is a [[wind farm]] situated in [[Razavi Khorasan Province]] of [[Iran]] near the city of [[Nishapur]]. It currently uses 43 turbines with a generating capacity of 660 kW to produce 28.2 MW of electricity using [[wind power]]. The area of the farm is over {{convert|700|ha}}. The project was initiated in 2002 and the farm came online in 2008. The plant was built by [[Renewable energy organization of Iran]]. The plant is currently being expanded by adding 50 more turbines, each with a capacity of 660 kW, increasing its total capacity to 61.2 MW.<ref>{{cite web|url=http://www.iranwindenergy.com/armoodli.pdf |title=Archived copy |accessdate=2010-04-22 |url-status=dead |archiveurl=https://web.archive.org/web/20110713054349/http://www.iranwindenergy.com/armoodli.pdf |archivedate=2011-07-13 }}</ref><ref>{{Cite web |url=http://www.sabaniroo.co.ir/eng/index.asp?page=5&id=138 |title=.:: Wind Turbine & Power Plant :: |access-date=2010-04-19 |archive-date=2010-01-09 |archive-url=https://web.archive.org/web/20100109043907/http://www.sabaniroo.co.ir/eng/index.asp?page=5&id=138 |url-status=dead }}</ref><ref>{{cite web |url=http://www.suna.org.ir/projectdetail-fa-67.html |title=Archived copy |accessdate=2010-04-19 |url-status=dead |archiveurl=https://web.archive.org/web/20100730211511/http://www.suna.org.ir/projectdetail-fa-67.html |archivedate=2010-07-30 }}</ref> |
||
==See also== |
==See also== |
||
{{Portal |
{{Portal|Iran|Energy|Weather|Renewable energy}} |
||
*[[Wind power in Iran]] |
*[[Wind power in Iran]] |
||
*[[Manjil and Rudbar Wind Farm]] |
*[[Manjil and Rudbar Wind Farm]] |
||
Line 12: | Line 45: | ||
==External links== |
==External links== |
||
*[ |
*[https://web.archive.org/web/20101130060723/http://suna.org.ir/home-en.html Renewable energy organization of Iran] |
||
{{Renewable energy by country}} |
{{Renewable energy by country}} |
||
{{coord missing|Iran}} |
|||
{{DEFAULTSORT:Binalood Wind Farm}} |
|||
[[Category:Wind power in Iran]] |
|||
[[Category:Wind farms in Iran]] |
[[Category:Wind farms in Iran]] |
||
[[Category:Razavi Khorasan |
[[Category:Buildings and structures in Razavi Khorasan province]] |
||
[[Category:Nishapur]] |
[[Category:Buildings and structures in Nishapur]] |
||
{{Iran-powerstation-stub}} |
{{Iran-powerstation-stub}} |
||
{{Wind-farm-stub}} |
|||
⚫ |
Latest revision as of 21:44, 13 June 2024
Binalood wind farm | |
---|---|
Official name | نیروگاه بادی بینالود |
Country | Iran |
Location | Nishapur, Razavi Khorasan Province |
Coordinates | 35°59′31″N 59°23′18″E / 35.99194°N 59.38833°E |
Status | Active |
Commission date | 2008 |
Wind farm | |
Type | Onshore |
Power generation | |
Units operational | 43 X 0.66 MW |
Nameplate capacity | 28.2 MW Planned: 61.2 MW |
External links | |
Website | https://binaloodwf.com/?lang=en |
Binalood wind farm is a wind farm situated in Razavi Khorasan Province of Iran near the city of Nishapur. It currently uses 43 turbines with a generating capacity of 660 kW to produce 28.2 MW of electricity using wind power. The area of the farm is over 700 hectares (1,700 acres). The project was initiated in 2002 and the farm came online in 2008. The plant was built by Renewable energy organization of Iran. The plant is currently being expanded by adding 50 more turbines, each with a capacity of 660 kW, increasing its total capacity to 61.2 MW.[1][2][3]
See also
[edit]- Wind power in Iran
- Manjil and Rudbar Wind Farm
- Iran–Armenia Wind Farm
- List of power stations in Iran
References
[edit]- ^ "Archived copy" (PDF). Archived from the original (PDF) on 2011-07-13. Retrieved 2010-04-22.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ ".:: Wind Turbine & Power Plant ::". Archived from the original on 2010-01-09. Retrieved 2010-04-19.
- ^ "Archived copy". Archived from the original on 2010-07-30. Retrieved 2010-04-19.
{{cite web}}
: CS1 maint: archived copy as title (link)
External links
[edit]