Jump to content

SkyTrain (Vancouver): Difference between revisions

Route map:
From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
Tags: Mobile edit Mobile web edit
Citation bot (talk | contribs)
Added work. | Use this bot. Report bugs. | Suggested by Dominic3203 | Category:Wikipedia articles in need of updating from November 2010 | #UCB_Category 208/552
 
(764 intermediate revisions by more than 100 users not shown)
Line 1: Line 1:
{{Short description|Automated rapid transit system in Metro Vancouver, Canada}}
{{Infobox Public transit
{{Use Canadian English|date=April 2024}}
|name = SkyTrain
{{Use mdy dates|date=April 2024}}
|image = Skytrain.svg
{{Infobox public transit
|imagesize =
| name = SkyTrain
|image2 = Skytrain_composite.png
| image = Skytrain.svg
|imagesize2 = 300px
| imagesize =
|owner = [[TransLink (British Columbia)|TransLink]]
| image2 = Skytrain composite.png
|locale = [[Greater Vancouver]], British Columbia, Canada
| imagesize2 =
|transit_type = [[Rapid transit]]
| owner = Province of [[British Columbia]]
|lines = 3 operational (1 extension under construction)
| locale = [[Metro Vancouver]], British Columbia
|stations = 47 ([[List of Vancouver SkyTrain stations|List of stations]]) <br>6 under construction
| transit_type = [[Medium-capacity rail system|Medium-capacity rapid transit system]]
|ridership = 390,600 (Q4 2014)<ref name="APTA-Q4-2014" />
| lines = 3
|annual_ridership = 117.7 million (2014)<ref name="APTA-Q4-2014" />
| stations = 54 (13 under construction) ([[List of Vancouver SkyTrain stations|List of stations]])
|website = {{url|www.translink.ca|TransLink}}
| daily_ridership = {{American transit ridership|BC Vancouver AG daily}} ({{American transit ridership|dailydate}}){{American transit ridership|dailycitation}}
|operator = British Columbia Rapid Transit Company<br /><small>''(Expo and Millennium Line)''</small><br />Protrans BC <small>''(Canada Line)''</small>
| annual_ridership = {{American transit ridership|BC Vancouver AG annual}} ({{American transit ridership|annualdate}}){{American transit ridership|annualcitation}}
|began_operation = {{Start date and age|1985|12|11}} <ref name="SkyTrain-opening">{{cite web | title = The Buzzer - 2011-01-14 | publisher = TransLink | url = http://www.translink.ca/~/media/Documents/rider_guide/Buzzer%20Vault/2010s/2011/Buzzer_2011_01_14.ashx | date = January 14, 2011 | accessdate = July 23, 2013}}</ref>
| website = {{url|www.translink.ca|TransLink}}
|character = Subway and Elevated, fully grade-separated, 3rd Rail
| operator = [[TransLink (British Columbia)|TransLink]]
|vehicles = 298
| began_operation = {{Start date and age|1985|12|11}}<ref name="SkyTrain-opening">{{cite web |title=The Buzzer – 2011-01-14 |publisher=TransLink |url=http://www.translink.ca/~/media/Documents/rider_guide/Buzzer%20Vault/2010s/2011/Buzzer_2011_01_14.ashx |date=January 14, 2011 |access-date=July 23, 2013 |archive-url=https://web.archive.org/web/20131012005254/http://www.translink.ca/~/media/Documents/rider_guide/Buzzer%20Vault/2010s/2011/Buzzer_2011_01_14.ashx |archive-date=October 12, 2013 |url-status=live}}</ref>
|train_length = 2, 4 or 6 car trainsets
| character = Elevated, underground, and at-grade
|headway = 2.7–20 minutes
| vehicles = 298
|system_length = {{convert|68.6|km|mi|1|abbr=on}}<ref>{{cite news|url=http://buzzer.translink.ca/2013/03/state-of-good-repair/|title=TransLink 101: keeping our system in a state of good repair|date=March 12, 2013|work=The Buzzer Blog}}</ref>
| train_length = 2-, 4- or 6-car trainsets
{{convert|10.9|km|mi|1|abbr=on}} (under construction)
| headway = {{plainlist|
|track_gauge = {{RailGauge|sg}} <br />([[standard gauge]])
* 2–10 minutes (Expo and Millennium Lines)
|minimum_radius_of_curvature =
* 3–20 minutes (Canada Line)
|el = [[Third rail]]<br/>(650 V DC for Expo and Millennium Lines)<br/>(750 V DC for Canada Line)<br />([[linear induction motor|Linear induction]] or [[Electric motor]])
}}
|average_speed = {{convert|45|km/h|mph|abbr=on}}
| system_length = {{plainlist|
|top_speed = {{convert|90|km/h|mph|abbr=on}}<small> (Expo and Millennium Lines)</small>{{citation needed|date=April 2012}}<br /> {{convert|80|km/h|mph|abbr=on}} <small>(Canada Line)</small>
* {{convert|79.6|km|mi|1|abbr=on}}<ref name="evergreenextensionopens" />
|map = [[File:Vancouver Skytrain Network Map.png|300px|center]]
* {{convert|5.7|km|mi|1|abbr=on}} under construction<ref>{{Cite web|title=Broadway Subway Project – Government of British Columbia|url=https://www.broadwaysubway.ca/|access-date=July 8, 2021|language=en-US}}</ref>
|map_state =
}}
| track_gauge = {{Track gauge|sg|allk=on}}
| minimum_radius_of_curvature =
| el = 650 V DC [[Railway electrification system#Three rail system|third rail]] [[linear induction motor|linear induction]] (Expo and Millennium Lines)<br />750 V DC [[third rail]] conventional [[traction motor]]s (Canada Line)
| average_speed = {{Plainlist|
* {{convert|40|km/h|mph|abbr=on}} (Expo and Millennium Lines)<ref name="speeds">{{cite web |url=https://www.translink.ca/-/media/translink/documents/plans-and-projects/managing-the-transit-network/tspr/csv-data/2022/tspr2022_rail_keycharacteristics_line.csv |title= Rail: Key Characteristics by line |date=2022 |access-date=December 7, 2023 |publisher=TransLink |archive-url=https://web.archive.org/web/20231128043947/https://www.translink.ca/-/media/translink/documents/plans-and-projects/managing-the-transit-network/tspr/csv-data/2022/tspr2022_rail_keycharacteristics_line.csv |archive-date=November 28, 2023}}</ref>
* {{convert|32|km/h|mph|abbr=on}} (Canada Line)<ref name="speeds" />
}}
| top_speed = {{convert|80|km/h|mph|abbr=on}}<ref>{{Cite web |url=https://www.translink.ca/About-Us/Corporate-Overview/Operating-Companies/BCRTC/Quick-Facts.aspx |title=Quick Facts |access-date=November 27, 2016 |archive-url=https://web.archive.org/web/20190806152324/https://www.translink.ca/About-Us/Corporate-Overview/Operating-Companies/BCRTC/Quick-Facts.aspx |archive-date=August 6, 2019 |url-status=dead}}</ref><ref>{{cite web |url=http://vancouver.ca/engsvcs/transport/rto/canadaline/documents/20071214UpdatedFactSheetNo.1CanadaLineVehicle.pdf |title=Canada Line Fact Sheet The Canada Line Vehicle |publisher=canadaline.ca (TransLink) |date=December 14, 2007 |access-date=June 16, 2015 |page=2 |archive-url=https://web.archive.org/web/20090326090147/http://vancouver.ca/engsvcs/transport/rto/canadaline/documents/20071214UpdatedFactSheetNo.1CanadaLineVehicle.pdf |archive-date=March 26, 2009}}</ref>
| map = {{switcher
| {{maplink-road|from=SkyTrain (Vancouver).map}}
| Show interactive map
| [[File:Vancouver Skytrain and Seabus Map.svg|275px]]
| Show static map
| {{SkyTrain (Vancouver)|inline=yes}}
| Show route diagram
}}
}}
}}
'''SkyTrain''' is the [[rapid transit]] metropolitan rail system of [[Greater Vancouver]], [[British Columbia]], Canada.<ref>{{cite web|title=SkyTrain|url=http://tripplanning.translink.ca/hiwire?.a=iScheduleLookupSearch&LineName=999&LineAbbr=999|publisher=Translink|date=November 2011}}</ref> SkyTrain has {{convert|68.7|km|mi|1|abbr=on}} of track<ref>"Dubai Green Line Opens." ''Railway Gazette International'' 167.10 (2011 Oct.): 12. ''Associates Programs Source Plus.'' Web. 15 Dec. 2011.</ref> and uses [[Automated guideway transit|fully automated trains on grade-separated tracks]] running on underground and elevated guideways, allowing SkyTrain to hold consistently high on-time reliability.<ref>{{cite web|title=Expo Line Upgrades Improve Communications|url=http://www.translink.ca/en/About-Us/Media/2011/October/Expo-Line-Upgrades-Improve-Communications.aspx|publisher=Translink|date=October 11, 2011}}</ref> The name, SkyTrain, was coined for the system during [[Expo 86]] because the first line (Expo) principally runs on elevated guideway outside of [[Downtown Vancouver]], treating passengers to panoramic views of the metropolitan area. SkyTrain has the world's longest cable-supported transit-only bridge, known as [[Skybridge (TransLink)|SkyBridge]], to cross the [[Fraser River]] in the suburbs.<ref>{{cite web|title=Skytrain Bridge |url=http://www.b-t.com/projects/skytrain.htm |publisher=Buckland & Taylor Ltd. |accessdate=August 22, 2009 |deadurl=yes |archiveurl=https://web.archive.org/20080706163505/http://www.b-t.com/projects/skytrain.htm |archivedate=July 6, 2008 }}</ref>


'''SkyTrain''' is the [[Medium-capacity rail system|medium-capacity rapid transit]] system serving the [[Metro Vancouver Regional District|Metro Vancouver region]] in British Columbia, Canada.<ref>{{cite web |title=SkyTrain |url=http://tripplanning.translink.ca/hiwire?.a=iScheduleLookupSearch&LineName=999&LineAbbr=999 |publisher=TransLink |date=November 17, 2011 |access-date=August 22, 2009 |archive-url=https://web.archive.org/web/20160715011013/http://tripplanning.translink.ca/hiwire?.a=iScheduleLookupSearch&LineName=999&LineAbbr=999 |archive-date=July 15, 2016 |url-status=live}}</ref> SkyTrain has {{convert|79.6|km|mi|1|abbr=on}} of track and uses [[Automated guideway transit|fully automated trains on grade-separated tracks]] running on underground and elevated guideways, allowing SkyTrain to hold consistently high on-time reliability.<ref name="evergreenextensionopens">{{Cite news |date=December 2, 2016 |title=Evergreen Extension opening today |work=NEWS 1130 |url=http://www.news1130.com/2016/12/02/evergreen-extension-opening-today/ |url-status=live |access-date=May 16, 2017 |archive-url=https://web.archive.org/web/20170831172740/http://www.news1130.com/2016/12/02/evergreen-extension-opening-today/ |archive-date=August 31, 2017}}</ref><ref>{{cite web |title=Expo Line Upgrades Improve Communications |url=http://www.translink.ca/en/About-Us/Media/2011/October/Expo-Line-Upgrades-Improve-Communications.aspx |publisher=TransLink |date=October 11, 2011 |access-date=November 17, 2011 |archive-url=https://web.archive.org/web/20111212232337/http://www.translink.ca/en/About-Us/Media/2011/October/Expo-Line-Upgrades-Improve-Communications.aspx |archive-date=December 12, 2011}}</ref> In {{American transit ridership|annualdate}}, the system had a ridership of {{American transit ridership|BC Vancouver AG annual}}, or about {{American transit ridership|BC Vancouver AG daily}} per weekday as of {{American transit ridership|dailydateasof}}.
SkyTrain has a total of 47 stations on three lines: Expo, Millennium, and Canada Lines. The Expo Line and Millennium Line are operated by British Columbia Rapid Transit Company under contract from [[TransLink (British Columbia)|TransLink]] (originally BC Transit), a regional government transportation agency. The [[Canada Line]] is operated on the same principles by the private concessionaire ProTrans BC under contract to TransLink, and is an integrated part of the regional transport system. The Evergreen Extension, an extension to the Millennium Line, is currently under construction in the north east suburbs and is anticipated to open for service in 2017.


The name "SkyTrain" was coined for the system during [[Expo 86]] because the first line (Expo) principally runs on elevated guideway outside of [[Downtown Vancouver]], providing panoramic views of the metropolitan area. SkyTrain uses the world's third-longest cable-supported transit-only bridge, known as [[Skybridge (TransLink)|SkyBridge]], to cross the [[Fraser River]].<ref>{{cite web |title=Skytrain Bridge |url=http://www.b-t.com/projects/skytrain.htm |publisher=Buckland & Taylor Ltd. |access-date=August 22, 2009 |archive-url=https://web.archive.org/web/20080706163505/http://www.b-t.com/projects/skytrain.htm |archive-date=July 6, 2008}}</ref>
SkyTrain uses a fare system shared with other local transit services, and is policed by the [[South Coast British Columbia Transportation Authority Police Service]]. SkyTrain Attendants (STAs) are present to provide first aid, directions and customer service, inspect fares, monitor train faults, and operate the trains manually if necessary.

With the opening of the [[Evergreen Extension]] on December 2, 2016, SkyTrain became the longest [[Rapid transit|rapid transit system]] in Canada and the longest fully automated driverless system in the world.<ref name="open-date">{{cite news|last1=Slattery|first1=Jill|date=December 1, 2016|title=Evergreen SkyTrain Line launched|work=Global News|url=http://globalnews.ca/news/3101723/new-evergreen-skytrain-line-launches-friday/|url-status=live|access-date=December 2, 2016|archive-url=https://web.archive.org/web/20161203061553/http://globalnews.ca/news/3101723/new-evergreen-skytrain-line-launches-friday/|archive-date=December 3, 2016}}</ref> The total lengths of the automated lines of the [[Shanghai Metro]],<ref>{{Cite web|date=December 31, 2021|title=Shanghai opens two new lines on longest metro in world|url=https://www.independent.co.uk/asia/china/shanghai-metro-longest-world-china-b1984870.html|access-date=February 16, 2022|website=The Independent|language=en}}</ref> [[Mass Rapid Transit (Singapore)|Singapore MRT]], [[Kuala Lumpur]] [[Rapid KL]] and [[Dubai Metro]] have since surpassed those of SkyTrain.<ref>{{Cite news |url=http://www.railjournal.com/index.php/metros/uitp-forecasts-2200km-of-automated-metros-by-2025.html |title=Automated metros set to reach 2200&nbsp;km by 2025 |last=Briginshaw |first=David |access-date=May 16, 2018 |date=July 20, 2016 |archive-url=https://web.archive.org/web/20180415174521/http://www.railjournal.com/index.php/metros/uitp-forecasts-2200km-of-automated-metros-by-2025.html |archive-date=April 15, 2018 |url-status=live}}</ref>

SkyTrain has [[List of Vancouver SkyTrain stations|54 stations]] served by three lines: the [[Expo Line (SkyTrain)|Expo Line]], the [[Millennium Line]], and the [[Canada Line]]. The Expo and Millennium Lines are operated by British Columbia Rapid Transit Company under contract from [[TransLink (British Columbia)|TransLink]] (originally BC Transit), a regional government transportation agency. The Canada Line is operated on the same principles by the private concessionaire ProTrans BC under contract to TransLink and is an integrated part of the regional transport system. SkyTrain uses a fare system shared with other local transit services and is policed by the [[Metro Vancouver Transit Police]]. SkyTrain attendants (STAs) provide first aid, emergency response, directions and customer service, inspect fares, monitor train faults, and operate the trains manually if necessary.

{{TOC limit|3}}


== Network ==
== Network ==


=== Expo Line ===
=== Expo Line ===
{{Main|Expo Line (TransLink)}}
{{Main|Expo Line (SkyTrain)}}
The Expo Line connects [[Waterfront Station (Vancouver)|Waterfront Station]] in Vancouver to [[King George Station]] in Surrey, principally along a route established by the Westminster and Vancouver Tramway Company as an interurban line in 1890.<ref>{{Cite journal |title=Your Ride Guide 2006 (Vancouver Sun, with TransLink and Bombardier) |last1=Heckenast|first1=Joe|last2=McGraw|first2=Jim|year=2006|publisher=McGraw Media|place=New Westminster, B.C.|page=14 |postscript=<!--None-->}}</ref> Expo Line was built in 1985 in time for Expo 86 and has 20 stations. Initially known only as SkyTrain due to it being elevated outside of downtown Vancouver, Expo Line was given its current name only after the Millennium Line was built. Expo Line ran only as far as [[New Westminster Station]] until 1989, when it was extended to Columbia Station, and in 1990, once the [[Skybridge (TransLink)|Skybridge]] was finished, it continued across the Fraser River to Scott Road in Surrey. In 1994 the current terminus of the Expo line became [[King George Station]] in Central Surrey. It was built on a budget of $854 million (1986 dollars).<ref>{{cite news|title=SkyTrain and Cambie Bridge taking us down road to Expo Series: The Eighties; [1* Edition]|work=The Province|last=Mason|first=Bruce|date=December 31, 1989|page=20}}</ref>
The Expo Line connects [[Waterfront station (Vancouver)|Waterfront station]] in Vancouver to [[King George station]] in [[Surrey, British Columbia|Surrey]], principally along a route established by the Westminster and Vancouver Tramway Company as an interurban line in 1890.<ref>{{Cite report |title=Your Ride Guide 2006 (Vancouver Sun, with TransLink and Bombardier) |last1=Heckenast |first1=Joe |last2=McGraw |first2=Jim |year=2006 |publisher=McGraw Media |place=New Westminster, BC |page=14}}</ref> The Expo Line (originally referred to as simply "SkyTrain" until the opening of the Millennium Line) was built in 1985 in time for [[Expo 86]]. It now has 24 stations. The Expo Line ran only as far as [[New Westminster station]] initially. In 1989, it was extended to [[Columbia station (SkyTrain)|Columbia station]] and in 1990, once the [[Skybridge (TransLink)|Skybridge]] was finished, it continued across the Fraser River to Scott Road station in Surrey. In 1994, the terminus of the Expo Line became King George station in central Surrey. It was built on a budget of $854{{nbsp}}million (1986 dollars).<ref>{{cite news |title=SkyTrain and Cambie Bridge taking us down road to Expo Series: The Eighties; [1* Edition] |work=The Province |last=Mason |first=Bruce |date=December 31, 1989 |page=20}}</ref> Effective October 22, 2016, Expo Line trains began operating on a new branch to [[Production Way–University station]], taking over the previous [[Millennium Line]] service between Waterfront and that station. During peak periods, trains between Waterfront and Columbia arrive every 2 to 3 minutes. Between Waterfront and King George, trains arrive every 2 to 5 minutes during peak hours, while trains between Waterfront and Production Way arrive every 6 to 7 minutes in the peak hours.<ref>{{Cite web|title=SkyTrain Schedules|url=https://www.translink.ca/schedules-and-maps/skytrain|access-date=January 3, 2022|website=www.translink.ca|language=en-CA}}</ref>


=== Millennium Line ===
=== Millennium Line ===
{{Main|Millennium Line}}
{{Main|Millennium Line}}
The Millennium Line shares tracks with the Expo Line from Waterfront Station to [[Columbia Station]] in New Westminster, then continues along its own elevated route through [[North Burnaby]] and [[East Vancouver]], ending at [[Vancouver Community College]]'s ([[VCC–Clark Station]]) in Vancouver. It was built on a $1.2-billion budget and the final extension from Commercial Drive Station to VCC–Clark Station was opened on January 6, 2006.<ref name="APTA">{{cite web|url=http://www.apta.com/services/intnatl/intfocus/skytrain2.cfm|title=Skytrain: The Smart Choice for Greater Vancouver|publisher=American Public Transportation Association|accessdate=January 14, 2007|archiveurl = http://web.archive.org/web/20070927220917/http://www.apta.com/services/intnatl/intfocus/skytrain2.cfm |archivedate = September 27, 2007|deadurl=yes}}</ref> The Millennium Line has 13 stations that are not shared with the Expo Line. Unlike the Expo Line, the Millennium Line's stations were designed by British Columbia's top architects, resulting in dramatically different stations from those on the Expo Line.<ref name="APTA" /> In 2004, Busby and Associates Architects, designers of the [[Brentwood Town Centre Station]] in [[Burnaby]], were honoured for their work with a [[Governor General's Awards|Governor General's Medal in Architecture]].<ref>{{cite web|url=http://www.raic.org/raic/honours_and_awards/awards/2004recipients/brentwood_e.htm|archiveurl=http://web.archive.org/web/20070927064733/http://www.raic.org/raic/honours_and_awards/awards/2004recipients/brentwood_e.htm|archivedate=2007-09-27|title=Governor General's Medal in Architecture|publisher=Royal Architectural Institute of Canada|accessdate=December 2, 2006}}</ref>
Prior to October 22, 2016, the Millennium Line shared tracks with the Expo Line from Waterfront station to Columbia station in New Westminster, then continued along its own elevated route through [[North Burnaby]] and [[East Vancouver]], ending at [[VCC–Clark station]], near [[Vancouver Community College]]'s Broadway campus. It was built on a $1.2-billion budget and the final extension from Commercial Drive station (now [[Commercial–Broadway station]]) to VCC–Clark station was opened on January 6, 2006.<ref name="APTA">{{cite web |url=http://www.apta.com/services/intnatl/intfocus/skytrain2.cfm |title=Skytrain: The Smart Choice for Greater Vancouver |publisher=American Public Transportation Association |access-date=January 14, 2007 |archive-url=https://web.archive.org/web/20070927220917/http://www.apta.com/services/intnatl/intfocus/skytrain2.cfm |archive-date=September 27, 2007}}</ref> From October 22, 2016, to December 1, 2016, the Millennium Line operated from VCC–Clark to Lougheed Town Centre station.<ref>{{cite web |title=Everything Evergreen: New SkyTrain operating pattern for Expo and Millennium Lines |url=http://buzzer.translink.ca/2016/09/everything-evergreen-new-skytrain-operating-pattern-for-expo-and-millennium-lines/ |last=Coling |first=Adrienne |date=September 19, 2016 |work=The Buzzer blog |publisher=TransLink |access-date=October 4, 2016 |archive-url=https://web.archive.org/web/20161005155327/http://buzzer.translink.ca/2016/09/everything-evergreen-new-skytrain-operating-pattern-for-expo-and-millennium-lines/ |archive-date=October 5, 2016}}</ref> As of December 2, 2016, the Millennium Line operates between VCC–Clark station in Vancouver and [[Lafarge Lake–Douglas station]] in Coquitlam. The Millennium Line has 17 stations, three of which are transfer stations with the Expo Line (Commercial–Broadway, Production Way–University, and Lougheed Town Centre) and two which connect with the West Coast Express commuter train ([[Moody Centre station|Moody Centre]] and [[Coquitlam Central station|Coquitlam Central]]). The original Millennium Line's stations were designed by British Columbia's top architects and are very different from those on the Expo Line.<ref name="APTA" /> In 2004, Busby and Associates Architects, designers of the [[Brentwood Town Centre station]] in [[Burnaby]], were honoured for their work with a [[Governor General's Awards|Governor General's Medal in Architecture]].<ref>{{cite web |url=http://www.raic.org/raic/honours_and_awards/awards/2004recipients/brentwood_e.htm |archive-url=https://web.archive.org/web/20070927064733/http://www.raic.org/raic/honours_and_awards/awards/2004recipients/brentwood_e.htm |archive-date=September 27, 2007 |title=Governor General's Medal in Architecture |publisher=Royal Architectural Institute of Canada |access-date=December 2, 2006}}</ref>


Construction on the Millennium Line's [[Evergreen Extension]], from Lougheed Town Centre in Burnaby to Lafarge Lake–Douglas in Coquitlam, was completed in 2016 and it was opened for revenue service on December 2, 2016.<ref name="open-date" /> This extension adds {{convert|11|km|mi|abbr=on}} and 6 new stations to the Millennium Line.<ref>{{cite web |url=http://www.translink.ca/evergreen |title=Evergreen Extension – Opening at noon on Dec. 2, 2016! |publisher=TransLink |access-date=December 2, 2016 |archive-url=https://web.archive.org/web/20161201214642/http://www.translink.ca/evergreen |archive-date=December 1, 2016 |url-status=live}}</ref>
==== Evergreen Extension (2017) ====
{{Main|Evergreen Extension}}
The Evergreen Extension will be a {{convert|10.9|km}} extension of SkyTrain from Lougheed Town Centre Station in Burnaby, running along North Road, alongside the CP Rail tracks into Port Moody, continuing to [[Coquitlam Central Station]], then heading north towards Douglas Station. Project cost is expected to be around $1.4 billion. When this line goes into service in early 2017,<ref name="delay2017">{{cite web|url=http://www.cbc.ca/news/canada/british-columbia/evergreen-skytrain-2017-skytrain-transit-translink-1.3340013|title="Evergreen Skytrain Delayed Until 2017|publisher=CBC|accessdate=2015-12-21}}</ref> the Millennium Line will be extended, with trains operating between [[Lafarge Lake–Douglas Station]] in Coquitlam to [[VCC-Clark Station]] in Vancouver via [[Lougheed Town Centre Station]] in Burnaby. The Expo Line will then take over the previous routing between [[Columbia Station]] and Lougheed Town Centre Station.<ref name="tnc2015">{{cite web|url=http://www.translink.ca/en/Plans-and-Projects/Managing-the-Transit-Network/Transit-Network-Consultation.aspx|title=Transit Network Consultation|publisher=TransLink|accessdate=October 24, 2015}}</ref>


=== Canada Line ===
=== Canada Line ===
{{Main|Canada Line}}
{{Main|Canada Line}}
The Canada Line begins at the [[Waterfront Station (Vancouver)|Waterfront Station]] hub, then continues south to the City of Richmond and Sea Island. From [[Bridgeport Station (TransLink)|Bridgeport Station]], the Canada Line splits into two branches, one heading west to the [[YVR–Airport Station]] at [[Vancouver International Airport]] and the other continuing south to the [[Richmond–Brighouse Station]] in Richmond's city center. Opened on August 17, 2009, the Canada Line added 15 stations and {{convert|19.2|km|mi|abbr=on}} to the SkyTrain network. [[Waterfront Station (Vancouver)|Waterfront Station]] is the only station where the Canada Line directly connects with the Expo Line and Millennium Line; however, [[Vancouver City Centre Station]] is within a three-minute walk from [[Granville Station (TransLink)|Granville Station]] via the [[Pacific Centre Mall]], making an unofficial transfer to the Expo Line. The Canada Line cost $1.9 billion, financed by the Governments of Canada and British Columbia, TransLink, and InTransitBC.<ref>{{cite web|url=http://canadaline.ca/aboutFinancing.asp|title=Canada Line Financing}}</ref> The Canada Line's trains, built by [[Hyundai Rotem|Rotem]], are fully automated, but are of a different design than the Expo and Millennium lines' Bombardier-built fleet, and use conventional electric motors rather than Bombardier's linear induction technology. Canada Line tracks do not interconnect with the older SkyTrain network, and it has a separate fleet maintenance depot.<ref>"Canada Line Opens In November 2009." ''Railway Gazette International'' 162.(2006 Jul.): 47. ''Associates Programs Source Plus.'' Web. 15 Dec. 2011.</ref>
The Canada Line begins at the Waterfront station hub, then continues south through Vancouver into the City of Richmond and Sea Island. From [[Bridgeport station (SkyTrain)|Bridgeport station]], the Canada Line splits into two branches, one heading west to the [[YVR–Airport station]] at [[Vancouver International Airport]] and the other continuing south to the [[Richmond–Brighouse station]] in Richmond's city centre. Opened on August 17, 2009, the Canada Line added 15 stations and {{convert|19.2|km|mi|abbr=on}} to the SkyTrain network. Waterfront station is the only station where the Canada Line directly connects with the Expo Line; however, [[Vancouver City Centre station]] is within a three-minute walk from [[Granville station (SkyTrain)|Granville station]] via the [[Pacific Centre]] mall, making an unofficial transfer to the Expo Line. The Canada Line cost $1.9{{nbsp}}billion, financed by the Governments of Canada and British Columbia, TransLink, and InTransitBC.<ref>{{cite web |url=http://canadaline.ca/aboutFinancing.asp |title=Canada Line Financing |archive-url=https://web.archive.org/web/20090808115201/http://canadaline.ca/aboutFinancing.asp |archive-date=August 8, 2009}}</ref> The Canada Line's trains, built by [[Hyundai Rotem]], are fully automated, but are of a different design from the Expo and Millennium Lines' Bombardier-built fleet. They use conventional electric motors rather than linear induction motor technology. Canada Line tracks do not interconnect with the rest of the SkyTrain network, and there is a separate fleet maintenance depot.<ref>"Canada Line Opens In November 2009." ''Railway Gazette International'' 162.(2006 Jul.): 47. ''Associates Programs Source Plus.'' Web. December 15, 2011.</ref>


== Operations ==
{| class="wikitable" style="background-color: inherit;"
{| class="wikitable" style="background-color: inherit;"
|-
|-
! rowspan="2" | Line
! rowspan="2" | Line
! rowspan="2" | Opening year
! rowspan="2" | Opening year
! rowspan="2" | Route length{{citation needed|date=November 2018}}
! rowspan="2" | Route length<ref name="TransLink 12, 63">{{citation | author=[[TransLink (British Columbia)|TransLink]] | author2=[[PTV America]] | publication-date=February 2007 | title=TransLink’s Rapid Transit Model - An Operations Planning Model under VISUM Project Report and Technical Documentation – Phase A | pages=12, 63}}</ref>
! rowspan="2" | Stations
! rowspan="2" | [[List of Vancouver SkyTrain stations|Stations]]
! colspan="2" rowspan="2" | Terminus stations
! colspan="2" rowspan="2" | Terminus stations
! rowspan="2" | Travel time
! rowspan="2" | Travel time
Line 69: Line 90:
! Off-peak
! Off-peak
|-
|-
| style="text-align:left; color:white; background:#0060a9;" | '''Expo Line'''
| style="text-align:left; background:#eaecf0;" rowspan="2" | {{rint|vancouver|expo}} [[Expo Line (SkyTrain)|Expo Line]]
| 1985
| 1985
| {{convert|28.9|km|abbr=on}}{{efn|name=expo-interlined|Expo Line service is interlined for 16 stations, accounting for {{convert|22.2|km|abbr=on}} of route, between Waterfront and Columbia.}}
| {{convert|28.9|km|abbr=on}}
| 20{{efn|name=expo-interlined}}
| 20
| rowspan="2" | [[Waterfront Station (Vancouver)|Waterfront]]
| rowspan="2" | {{stl|TransLink (BC)|Waterfront}}
| [[King George Station|King George]]
| {{stl|TransLink (BC)|King George}}
| 39 min
| 2.7 min
| 6–8 min
| rowspan="2" | 1.8 min
| rowspan="2" | 3–4 min
|-
| style="text-align:left; color:black; background:#ffd520;" | '''Millennium Line'''
| 2002
| {{convert|42.1|km|abbr=on}}<sup>1</sup>
| 29<sup>1</sup>
| [[VCC–Clark Station|VCC–Clark]]
| 57 min
| 5.4 min
| 6–8 min
|-
| style="text-align:left; color:white; background:#009ac8;" rowspan="2" | '''Canada Line'''
| rowspan="2" | 2009
| {{convert|14.4|km|abbr=on}}<sup>2</sup>
| rowspan="2" | 13<sup>2</sup>
| rowspan="2" | [[Waterfront Station (Vancouver)|Waterfront]]
| [[Richmond–Brighouse Station|Richmond–Brighouse]]
| 25 min
| 7 min
| 7–20 min
| rowspan="2" | 3.5 min
| rowspan="2" | 3.5–10 min
|-
| {{convert|15.1|km|abbr=on}}<sup>2</sup>
| [[YVR–Airport Station|YVR–Airport]]
| 25 min
| 7 min
| 7–20 min
|-
| colspan="11" style="text-align:left;" |<small>
<sup>1</sup> Millennium Line is interlined with Expo Line for 16 stations, accounting for {{convert|22|km|abbr=on}} of route, between Waterfront and Columbia.<br />
<sup>2</sup> Canada Line service is interlined for 10 stations, accounting for {{convert|11.1|km|abbr=on}} of route, between Waterfront and Bridgeport.
</small>
|}

'''Planned operation in 2017:''' <ref name="tnc2015"/>

{| class="wikitable" style="background-color: inherit;"
|-
! rowspan="2" | Line
! rowspan="2" | Opening year
! rowspan="2" | Route length<ref name="TransLink 12, 63"/>
! rowspan="2" | Stations
! colspan="2" rowspan="2" | Terminus stations
! rowspan="2" | Travel time
! colspan="2" | Frequency<ref name="schedule" />
! colspan="2" | Combined frequency
|-
! Peak
! Off-peak
! Peak
! Off-peak
|-
| style="text-align:left; color:white; background:#0060a9;" rowspan="2" | '''Expo Line'''
| 1985
| {{convert|28.9|km|abbr=on}} <sup>1</sup>
| rowspan="2" | 20 <sup>1 2</sup>
| rowspan="2" | {{TransLink (BC) stations|station=Waterfront}}
| {{TransLink (BC) stations|station=King George}}
| 39 min
| 2.7 min
| 6–8 min
| rowspan="2" | 1.8 min <sup>3</sup>
| rowspan="2" | 3–4 min
|-
| 2002
| {{convert|29.7|km|abbr=on}} <sup>1 2</sup>
| {{TransLink (BC) stations|station=Production Way–University}}
| 40 min
| 40 min
| 5.4 min
| 2–5 min
| 6–8 min
| 6–10 min
| rowspan="2" | 2–3 min{{efn|name=addpeak|Additional peak hour only service operates between Waterfront and Commercial–Broadway.}}
| rowspan="2" | 3–5 min
|-
|-
| 2016
| style="text-align:left; color:black; background:#ffd520;" | '''Millennium Line'''
| {{convert|29.7|km|abbr=on}}{{efn|name=expo-interlined}}{{efn|name=em-interlined|Expo and Millennium Line service is interlined for two stations, accounting for {{convert|1.8|km|abbr=on}} of route, between Lougheed Town Centre and Production Way–University.}}
| 2002
| 20{{efn|name=expo-interlined}}{{efn|name=em-interlined}}
| {{convert|23.5|km|abbr=on}} <sup>2</sup>
| {{stl|TransLink (BC)|Production Way–University}}
| 17 <sup>2</sup>
| 41 min
| {{TransLink (BC) stations|station=VCC–Clark}}
| 6–7 min
| {{TransLink (BC) stations|station=Lafarge Lake–Douglas}}
| 34 min
| 6–10 min
| 3 min
| ?
|-
|-
| style="text-align:left; color:white; background:#009ac8;" rowspan="2" | '''Canada Line'''
| style="text-align:left; background:#eaecf0;" | {{rint|vancouver|millennium}} [[Millennium Line]]
| 2002{{efn|name=e-start|Evergreen Extension started revenue service on December 2, 2016.<ref name="open-date" />}}
| 2009
| {{convert|14.4|km|abbr=on}} <sup>4</sup>
| {{convert|25.5|km|abbr=on}}{{efn|name=em-interlined}}
| 17{{efn|name=em-interlined}}
| rowspan="2" | 13 <sup>4</sup>
| rowspan="2" | {{TransLink (BC) stations|station=Waterfront}}
| {{stl|TransLink (BC)|VCC–Clark}}
| {{TransLink (BC) stations|station=Richmond–Brighouse}}
| {{stl|TransLink (BC)|Lafarge Lake–Douglas}}
| 25 min
| 36 min
| 7 min
| 3–4 min
| 7–20 min
| 6–10 min
| —
| rowspan="2" | 3.5 min
| —
| rowspan="2" | 3.5–10 min
|-
|-
| style="text-align:left; background:#eaecf0;" rowspan="2" | {{rint|vancouver|canada}} [[Canada Line]]
| 2009
| rowspan="2" | 2009
| {{convert|15.1|km|abbr=on}} <sup>4</sup>
| {{convert|14.4|km|abbr=on}}{{efn|name=c-interlined|Canada Line service is interlined for 10 stations, accounting for {{convert|11.1|km|abbr=on}} of route, between Waterfront and Bridgeport.}}
| {{TransLink (BC) stations|station=YVR–Airport}}
| 14{{efn|name=c-interlined}}
| rowspan="2" | Waterfront
| {{stl|TransLink (BC)|Richmond–Brighouse}}
| 25 min
| 25 min
| 7 min
| 6 min
| 7–20 min
| 6–20 min
| rowspan="2" | 3 min
| rowspan="2" | 3–10 min
|-
|-
| {{convert|15.1|km|abbr=on}}{{efn|name=c-interlined}}
| colspan="11" style="text-align:left;" |<small>
| 13{{efn|name=c-interlined}}
<sup>1</sup> Expo Line service is interlined for 16 stations, accounting for {{convert|22.2|km|abbr=on}} of route, between Waterfront and Columbia.<br />
| {{stl|TransLink (BC)|YVR–Airport}}
<sup>2</sup> Expo and Millennium Line service is interlined for 2 stations, accounting for {{convert|1.8|km|abbr=on}} of route, between Lougheed Town Centre and Production Way-University.<br />
| 26 min
<sup>3</sup> Additional peak hours-only service operating between Waterfront and Commercial-Broadway.<br />
| 6 min
<sup>4</sup> Canada Line service is interlined for 10 stations, accounting for {{convert|11.1|km|abbr=on}} of route, between Waterfront and Bridgeport.
| 6–20 min
</small>
|}
|}


{{notelist}}
== Operations ==


===Frequency===
=== Frequency ===
SkyTrain provides high-frequency service, with trains arriving every 2–7 minutes at all stations during peak hours.<ref name="schedule">{{cite web |url=http://tripplanning.translink.ca/hiwire?.a=iScheduleLookupSearch&LineName=999&LineAbbr=999 |title=Translink Transit Schedules |publisher=TransLink |date= |accessdate=July 24, 2014}}</ref> Trains operate between 5:00&nbsp;a.m. and 1:30&nbsp;a.m. on weekdays, with reduced hours on weekends on Expo and Millennium lines.<ref name="schedule" /> SkyTrain has longer hours of service during special events, such as New Year's Eve, the [[2010 Winter Olympics|Vancouver 2010 Olympics]], and marathons.
SkyTrain provides high-frequency service, with trains arriving every 2 to 6 minutes at all stations during peak hours.<ref name="schedule">{{cite web |url=http://www.translink.ca/en/Schedules-and-Maps/SkyTrain/SkyTrain-Schedules.aspx |title=TransLink SkyTrain Schedules |publisher=TransLink |access-date=July 11, 2018 |archive-url=https://web.archive.org/web/20180711151930/http://www.translink.ca/en/Schedules-and-Maps/SkyTrain/SkyTrain-Schedules.aspx |archive-date=July 11, 2018 |url-status=live}}</ref> Trains operate between 4:48&nbsp;a.m. and approximately 1:30&nbsp;a.m. on weekdays, with reduced hours on weekends on the Expo and Millennium lines.<ref name="schedule" /> SkyTrain has longer hours of service during special events, such as New Year's Eve, the [[2010 Winter Olympics|Vancouver 2010 Olympics]], and marathons.


{| class="wikitable" style="margin:10px" align="right" cellpadding="0" cellspacing="2"
{| class="wikitable" style="margin:10px" align="right" cellpadding="0" cellspacing="2"
|+ Cash fares as of July 1, 2024<ref>{{Cite web|url=https://www.translink.ca/transit-fares/pricing-and-fare-zones|title=Pricing and Fare Zones|website=www.translink.ca}}</ref>
|-
|-
| colspan="5" style="text-align:right;" |[[Image:TransLink-FareMap-20091108.svg|350px]]
| colspan="5" style="text-align:center;" |[[File:TransLink-FareMap-20091108.svg|frameless|upright=1.6]]
|-
|-
! Fare class||One zone||Two zones||Three zones||Airport AddFare
! Fare class||One zone||Two zones||Three zones||Airport AddFare
|-
|-
| Adult||$2.75||$4.00||$5.50||+$5.00
| Adult||$3.20||$4.65||$6.35||+$5.00
|-
|-
| Concession||$1.75||$2.75||$3.75||+$5.00
| Concession||$2.15||$3.15||$4.35||+$5.00
|}
|}


=== Fares ===
=== Fares ===
{{further2|[[TransLink fares (Vancouver)]]}}
{{further|TransLink (British Columbia)#Transit fares}}
[[Image:Skytrain ticket machine.jpg|right|thumb|A ticket vending machine (right), next to an old faresaver validator.]]
[[File:Skytrain ticket machine.jpg|right|thumb|A ticket vending machine (right), next to an old faresaver validator (2006)]]
TransLink's service area is divided into three zones, with fares varying depending on how many zone boundaries are crossed during one trip (two and three zone passengers are charged the one zone rate after 6:30 PM rush hour, and on weekends and statutory holidays). Customers may purchase fares using cash, debit cards, or credit cards from self-serve ticket vending machines at the mezzanine level of each station. A variety of transit passes are available, such as the pre-paid [[TransLink fares (Vancouver)#FareSavers|FareSaver]] ticket, daily [[TransLink fares (Vancouver)#DayPasses|DayPass]], monthly [[TransLink fares (Vancouver)#FareCards|FareCard]], annual EmployerPass, post-secondary student [[U-Pass (Vancouver)|U-Pass]], and other specialized passes. [[Canadian National Institute for the Blind]] identification cards are accepted without the need to be read by the fare box. One-time fares are valid for 90 minutes on any mode of transportation with any number of transfers, including all SkyTrain lines and bus and [[SeaBus]] routes. Concession fares are available for children (ages 6–13), secondary school students with a valid Go-Card and the elderly.<ref>{{cite web|title=Greater Vancouver Transportation Authority Transit Tariff| date=January 1, 2005| publisher=TransLink|url=http://translink.bc.ca/files/board_files/meet_agenda_min/2004/12_08_04/3.12_Attachment_2.pdf|format=PDF|accessdate=June 17, 2007 |archiveurl = http://web.archive.org/web/20050513140830/http://www.translink.bc.ca/files/board_files/meet_agenda_min/2004/12_08_04/3.12_Attachment_2.pdf |archivedate = May 13, 2005}}</ref>
TransLink's SkyTrain service area is divided into three zones, with fares varying depending on how many zone boundaries are crossed during one trip (two- and three-zone passengers are charged the one zone rate after 6:30 pm rush hour, and on weekends and statutory holidays). Customers may purchase fares using cash, debit cards, or credit cards from self-serve ticket vending machines at the mezzanine level of each station. A variety of transit passes are available, such as the pre-paid FareSaver ticket, daily DayPass, monthly FareCard, annual EmployerPass, post-secondary student [[U-Pass BC|U-Pass]], and other specialized passes. [[Canadian National Institute for the Blind]] identification cards are accepted without the need to be read by the fare box. One-time fares are valid for 90 minutes on any mode of transportation with any number of transfers, including all SkyTrain lines and bus and [[SeaBus]] routes. Concession fares are available for secondary school students with a valid Go-Card and the elderly.<ref>{{cite web |title=Greater Vancouver Transportation Authority Transit Tariff |date=January 1, 2005 |publisher=TransLink |url=http://translink.bc.ca/files/board_files/meet_agenda_min/2004/12_08_04/3.12_Attachment_2.pdf |access-date=June 17, 2007 |archive-url=https://web.archive.org/web/20050513140830/http://www.translink.bc.ca/files/board_files/meet_agenda_min/2004/12_08_04/3.12_Attachment_2.pdf |archive-date=May 13, 2005}}</ref> Children under 12 have been able to ride the system for free since September 2021.<ref>{{Cite web|date=August 9, 2021|title=Children 12 and under will soon ride free on B.C. public transit|url=https://news.gov.bc.ca/releases/2021PREM0051-001564|access-date=January 3, 2022|website=BC Government News}}</ref>


{{As of|May 2013}}, SkyTrain's fare system was a [[proof-of-payment]] system; there were no [[turnstile]]s at the entrances to train platforms. Instead, fares were enforced by random ticket inspections – usually by police or transit security but occasionally by SkyTrain attendants – through trains and stations, or at special events such as after [[BC Lions]] or [[Vancouver Canucks]] games. The fine for failure to show proof of payment, fare evasion, ticket reselling, or other scams is $173.<ref>{{cite news|date=August 9, 2006|title='Helping hands' part of SkyTrain scam|url=http://www.vancourier.com/issues06/082106/news/082106nn3.html|archiveurl=http://web.archive.org/web/20070630232559/http://www.vancourier.com/issues06/082106/news/082106nn3.html|archivedate=2007-06-30|last=Thomas|first=Sandra|work=[[Vancouver Courier]] |accessdate=February 24, 2007}}</ref><ref>{{cite web|title=The Buzzer |format=PDF |url=http://translink.bc.ca/files/buzzer/2007/Buzzer_Mar2.pdf |date=2 March 2007 |accessdate=March 4, 2007 |deadurl=yes |archiveurl=https://web.archive.org/20110706165322/http://translink.bc.ca/files/buzzer/2007/Buzzer_Mar2.pdf |archivedate=July 6, 2011 }}</ref>
Until April 2016, SkyTrain's fare system was a [[proof-of-payment]] system; there were no [[turnstile]]s at the entrances to train platforms. Instead, fares were typically enforced by random ticket inspections – usually by police or transit security but occasionally by SkyTrain attendants – through trains and stations. This was supplemented by controlled access – with the payment of a fare or proof of payment required to pass through a staffed gate – at special events where extremely high ridership was expected, such as immediately after [[BC Lions]] or [[Vancouver Canucks]] games.<ref>{{cite news |date=August 9, 2006 |title='Helping hands' part of SkyTrain scam |url=http://www.vancourier.com/issues06/082106/news/082106nn3.html |archive-url=https://web.archive.org/web/20070630232559/http://www.vancourier.com/issues06/082106/news/082106nn3.html |archive-date=June 30, 2007 |last=Thomas |first=Sandra |work=[[Vancouver Courier]] |access-date=February 24, 2007}}</ref><ref>{{cite web |title=The Buzzer |url=http://translink.bc.ca/files/buzzer/2007/Buzzer_Mar2.pdf |date=March 2, 2007 |access-date=March 4, 2007 |archive-url=https://web.archive.org/web/20140904033729/http://translink.bc.ca/files/buzzer/2007/Buzzer_Mar2.pdf |archive-date=September 4, 2014}}</ref>


==== Fare gates (Compass card) ====
==== Fare gates ====
[[Image:Compass fategates at Gilmore station.JPG|thumb|right|Compass faregates at Gilmore station]]
[[File:New Westminter fare gates.jpg|thumb|right|Fare gates at [[New Westminster station|New Westminster]] (2018)]]


{{Main|Compass Card (TransLink)}}
{{See|Compass card (British Columbia)}}


Installing faregates to prevent [[fare evasion]] was considered, but originally rejected because the expense of implementing, maintaining, and enforcing them would exceed the losses prevented.<ref name="province">{{cite news|work=The Province|publisher=CanWest MediaWorks Publications Inc|url=http://www.canada.com/cityguides/vancouver/features/transportation/story.html?id=53003bd7-2626-4c4b-a9ce-c68076557682|title=Riding without paying will cost $173|date=20 March 2005|accessdate=December 14, 2006}}</ref> As of 2005, TransLink estimated it loses $4 million (5% of revenue attributed to SkyTrain) annually to fare evasion on SkyTrain.<ref>{{cite journal|author=Translink|title=Canada Line Controlled Access, Safety & Security and Fare Evasion|date=December 1, 2005|url = http://www.llbc.leg.bc.ca/public/PubDocs/bcdocs/379548/ControlledAccess.pdf |format=PDF|accessdate=June 18, 2007|page=8}}</ref> The Canada Line opened in 2009 without fare gates, despite previously stated intentions to include them. The Canada Line and Millennium Line stations were designed to allow for future fare gates.<ref>{{cite news|work=Richmond News|url=http://www.richmond-news.com/issues05/072205/news/072205nn5.html|archiveurl=http://web.archive.org/web/20070926231722/http://www.richmond-news.com/issues05/072205/news/072205nn5.html|archivedate=2007-09-26|title=Beating boosts call for transit turnstiles|last=Bennett|first=Nelson|accessdate=December 25, 2006}}</ref> Expo Line stations are being redesigned and retrofitted to accommodate the new fare gate system.
Installing faregates to prevent [[fare evasion]] was considered as early as at the time of the system's opening, but was rejected multiple times because the expense of implementing, maintaining, and enforcing them would exceed the losses prevented.<ref name="province">{{cite news |work=The Province |publisher=CanWest MediaWorks Publications Inc |url=http://www.canada.com/cityguides/vancouver/features/transportation/story.html?id=53003bd7-2626-4c4b-a9ce-c68076557682 |title=Riding without paying will cost $173 |date=March 20, 2005 |access-date=December 14, 2006 |archive-url=https://web.archive.org/web/20070929110710/http://www.canada.com/cityguides/vancouver/features/transportation/story.html?id=53003bd7-2626-4c4b-a9ce-c68076557682 |archive-date=September 29, 2007 |url-status=live}}</ref> In 2005, TransLink estimated it was losing $4{{nbsp}}million (5 percent of revenue attributed to SkyTrain) annually to fare evasion on SkyTrain.<ref>{{cite web |publisher=TransLink |title=Canada Line Controlled Access, Safety & Security and Fare Evasion |date=December 1, 2005 |url=http://www.llbc.leg.bc.ca/public/PubDocs/bcdocs/379548/ControlledAccess.pdf |access-date=June 18, 2007 |page=8 |archive-url=https://web.archive.org/web/20190202095336/http://www.llbc.leg.bc.ca/public/PubDocs/bcdocs/379548/ControlledAccess.pdf |archive-date=February 2, 2019 |url-status=live}}</ref> While the Canada Line stations, along with those on the Millennium Line, were designed to allow for future fare gates, the Canada Line opened in 2009 without them, despite stated intentions to include them.<ref>{{cite news |work=Richmond News |url=http://www.richmond-news.com/issues05/072205/news/072205nn5.html |archive-url=https://web.archive.org/web/20070926231722/http://www.richmond-news.com/issues05/072205/news/072205nn5.html |archive-date=September 26, 2007 |title=Beating boosts call for transit turnstiles |last=Bennett |first=Nelson |access-date=December 25, 2006}}</ref> Expo Line stations have since been redesigned and retrofitted to accommodate the new fare gate system.


The 2008 Provincial Transit Plan outlined several SkyTrain system upgrades, including replacement of the proof-of-payment system with a gated-ticket system.<ref name="PTP">{{cite web|url=http://www.th.gov.bc.ca/Transit_Plan/Provincial_Transit_Plan_LR.pdf|format=PDF|title=Provincial Transit Plan Brochure|accessdate=January 17, 2008}}</ref> According to then-Minister of Transportation [[Kevin Falcon]], the gated-ticket system would be implemented by a private company by 2010.<ref>{{cite news|url=http://www.ctvbc.ctv.ca/servlet/an/local/CTVNews/20080611/BC_skytrain_gated_080611/20080612/?hub=BritishColumbiaHome|date=June 12, 2008|work=CTV British Columbia|title=BGates and smart cards on the way at Skytrain|accessdate=December 5, 2008}}</ref> In April 2009 it was announced that the provincial and federal governments would spend $100 million<ref>{{cite news|url=http://buzzer.translink.ca/index.php/2009/04/faregates-and-smartcards-coming-to-skytrain-in-spring-2010|date=April 9, 2009|work=The Buzzer Blog|title=Faregates and Smartcards coming to SkyTrain in spring 2010}}</ref> to put the gates in place by the end of 2010. However, in August 2009 a TransLink spokesman said the gates will not be installed before 2012, and that a smart card system will be implemented at the same time.<ref>{{cite news|url=http://www.cbc.ca/canada/british-columbia/story/2009/08/14/bc-skytrain-canada-turnstiles-delayed.html|date=August 14, 2009|work=CBC British Columbia|title=No turnstiles for SkyTrains until 2012}}</ref>
The 2008 Provincial Transit Plan outlined several SkyTrain system upgrades, including replacement of the proof-of-payment system with a gated-ticket system.<ref name="PTP">{{cite web |url=http://www.th.gov.bc.ca/Transit_Plan/Provincial_Transit_Plan_LR.pdf |title=Provincial Transit Plan Brochure |access-date=January 17, 2008 |archive-url=https://web.archive.org/web/20080411125756/http://www.th.gov.bc.ca/Transit_Plan/Provincial_Transit_Plan_LR.pdf |archive-date=April 11, 2008}}</ref> According to Minister of Transportation [[Kevin Falcon]], the gated-ticket system was to be implemented by a private company by 2010.<ref>{{cite news |url=https://bc.ctvnews.ca/gates-and-smart-cards-on-the-way-at-skytrain-1.301652 |date=June 12, 2008 |work=CTV British Columbia |title=BGates and smart cards on the way at Skytrain |access-date=December 5, 2008 |archive-url=https://web.archive.org/web/20090124221208/http://www.ctvbc.ctv.ca/servlet/an/local/CTVNews/20080611/BC_skytrain_gated_080611/20080612/?hub=BritishColumbiaHome |archive-date=January 24, 2009 |url-status=live}}</ref> In April 2009, it was announced that the provincial and federal governments would spend $100{{nbsp}}million<ref>{{cite news |url=http://buzzer.translink.ca/index.php/2009/04/faregates-and-smartcards-coming-to-skytrain-in-spring-2010 |date=April 9, 2009 |work=The Buzzer Blog |title=Faregates and Smartcards coming to SkyTrain in spring 2010 |access-date=August 8, 2010 |archive-url=https://web.archive.org/web/20100814064054/http://buzzer.translink.ca/index.php/2009/04/faregates-and-smartcards-coming-to-skytrain-in-spring-2010 |archive-date=August 14, 2010 |url-status=live}}</ref> to put the gates in place by the end of 2010. However, in August 2009, a TransLink spokesman said the gates would not be installed before 2012, and that a smart card system would be implemented at the same time.<ref>{{cite news |url=https://www.cbc.ca/news/canada/british-columbia/no-turnstiles-for-skytrains-until-2012-1.862286 |date=August 14, 2009 |work=CBC British Columbia |title=No turnstiles for SkyTrains until 2012 |access-date=September 21, 2009 |archive-url=https://web.archive.org/web/20090817232755/https://www.cbc.ca/news/canada/british-columbia/no-turnstiles-for-skytrains-until-2012-1.862286 |archive-date=August 17, 2009 |url-status=live}}</ref>


It was announced August 14, 2013, that current bus transfer system (magnetic strip paper cards) will continue to be used for cash fares, and bus to bus transfers, but will not work at the turnstiles at train stations, which will require a Compass (RFID) card. This means that a bus rider paying cash will be required to buy an additional ticket to transfer to a train.
It was announced on August 14, 2013, that bus-issued transfers (magnetic strip paper cards) would continue to be issued for cash fares paid on buses, but that these transfers would not work at SkyTrain or SeaBus station fare gates, which require a Compass Card or a 90-minute paper Compass ticket to operate. This means that a bus rider paying cash is required to pay a second fare to transfer to SkyTrain or SeaBus. Those transit users paying cash but beginning their trips at a SkyTrain or SeaBus station are not subject to this second fare because they are issued Compass tickets which are accepted as valid transfers on TransLink buses.


Construction of SkyTrain fare gates has been completed as of May 2014, however, as of March 2016 Translink announced that the fare gates will be closing in April of that year during peak hours and one gate remaining open during off-peak times for disabled people, who cannot open the gates with their hands. The approximately 85,000 users who currently hold a Compass Card are expected to tap in and tap out as they pass through the gates. Holders of paper tickets and FareSaver tickets continue to pass through the gates into the fare paid zone unimpeded, although they are subject to having their fare inspected by transit security or transit police once inside the fare paid zone. Full implementation of the fare gates continues to be delayed by ongoing problems with the Compass Card when riders are tapping out as they exit transit buses. The tapping out process on buses is too slow and doesn't always record the tap which can result in the customer being charged for travelling through three zones when in fact they only traveled through one or two zones.<ref name="vancouver sun">{{cite news |title=Card system struggles with another glitch |newspaper=The Vancouver Sun |publisher=Postmedia Network Inc |url=http://www.vancouversun.com/TransLink+Compass+Card+system+struggles+with+another+glitch/10332972/story.html |date=29 October 2014 |accessdate=4 February 2015}}</ref> This has been a serious setback for Translink as the entire system was originally supposed to be operational by 2013. Translink has not given a date for when the fare gates will begin full operation, but have simply stated that the fare gates will remain open until the Compass system is in full swing.<ref>[http://www.translink.ca/en/Fares-and-Passes/Compass-Card/Compass-Timeline.aspx Compass Timeline.] 2015 TransLink.ca.</ref>
Construction of SkyTrain fare gates was completed in May 2014, but they remained open until April 2016 owing to multiple system problems. While open for the nearly two-year period, holders of paper-based monthly passes, bus-issued transfers, and FareSaver tickets continued to pass through the gates into the stations' fare-paid zones unimpeded, although they were subject to having their fare inspected by transit security or transit police once inside the fare-paid zone. Starting in April 2016, they were initially fully closed only during peak hours, with one gate remaining open during off-peak times for people with accessibility issues who could not reach their Compass Cards to the fare gates to tap in or out. Full implementation of the fare gates was also delayed by problems with Compass Cards when riders were tapping out as they exited buses. The tapping-out process on buses was too slow and did not always record the tap which—because the system initially deducted a three-zone fare until a tap-out was recorded and a refund was issued to those having only travelled one or two zones—often resulted in customers being charged for travelling through three zones when in fact they had only travelled through one or two.<ref name="vancouver sun">{{cite news |title=Card system struggles with another glitch |newspaper=The Vancouver Sun |publisher=Postmedia Network Inc |url=https://vancouversun.com/TransLink+Compass+Card+system+struggles+with+another+glitch/10332972/story.html |date=October 29, 2014 |access-date=February 4, 2015 |archive-url=https://web.archive.org/web/20150208024750/http://www.vancouversun.com/TransLink+Compass+Card+system+struggles+with+another+glitch/10332972/story.html |archive-date=February 8, 2015 |url-status=live}}</ref> This was a serious setback for TransLink as the entire system was supposed to be operational by 2013. A solution was finally implemented where the requirement to tap out of buses was removed and all bus travel was considered as within a single zone, creating significant savings for those travelling multiple zones using buses only and in some cases changing transit usage patterns.<ref>{{cite web |url=http://www.vancitybuzz.com/2016/03/seabus-ridership-decline/ |title=SeaBus ridership hits all-time low after one-zone bus travel introduced |date=March 18, 2016 |access-date=October 20, 2017 |work=VancityBuzz |archive-url=https://web.archive.org/web/20171021112432/http://www.vancitybuzz.com/2016/03/seabus-ridership-decline/ |archive-date=October 21, 2017 |url-status=live}}</ref> The last fare gates left open for users with accessibility issues were closed on July 25, 2016, and the system has been in full operation since.<ref>{{cite web |url=http://www.cbc.ca/news/canada/british-columbia/translink-fare-gates-1.3686416 |title=TransLink to close accessible fare gates |date=July 25, 2016 |work=CBC News |access-date=October 20, 2017 |archive-url=https://web.archive.org/web/20160924183556/http://www.cbc.ca/news/canada/british-columbia/translink-fare-gates-1.3686416 |archive-date=September 24, 2016 |url-status=live}}</ref>


==== Fares in the Airport Zone ====
==== Airport surcharge ====
Travel on the Canada Line is free between the three Sea Island stations near the airport: Templeton, Sea Island Centre, and YVR–Airport. A normal paid fare is required to enter or leave Sea Island.
Travel on the Canada Line is free between the three [[Sea Island (British Columbia)|Sea Island]] stations near the Vancouver International Airport: [[Templeton station|Templeton]], [[Sea Island Centre station|Sea Island Centre]], and YVR–Airport.


Cash fares purchased at ticket machines within the Airport Zone include an AddFare of $5.00 on top of the normal fare. However, the AddFare only applies to cash fares purchased on Sea Island; it does not apply to cash fares purchased outside Sea Island, pre-paid FareSaver tickets, or transit passes.<ref>{{cite web|title=The Canada Line YVR Add Fare Questions and Answers|date=January 11, 2010|website=Translink.ca|url=http://www.translink.ca/en/About-Us/Media/2010/January/The-Canada-Line-YVR-Add-Fare-Questions-and-Answers.aspx}}</ref> Pre-paid FareSaver tickets can be purchased from retailers within the airport to avoid the surcharge. The AddFare came into effect on January 18, 2010.<ref>{{cite web|title=Canada Line YVR AddFare coming Mon Jan 18|date=January 7, 2009|publisher=Translink Buzzer Blog|url=http://buzzer.translink.ca/index.php/2010/01/canada-line-yvr-addfare-coming-mon-jan-18-heres-how-it-works/}}</ref>
Single-use Compass tickets purchased with cash at Compass vending machines in stations on Sea Island include a surcharge, the "YVR AddFare", of $5.00 on top of the normal fare. This charge is also added to trips initiated at Sea Island stations for travel east to Bridgeport station and beyond using Compass Card stored value or DayPasses. It is not applied to trips using monthly passes, nor to trips travelling to the airport using DayPasses or single-use Compass tickets which were purchased and activated off Sea Island.<ref name="YVR">{{cite web |title=Canada Line YVR AddFare |access-date=September 19, 2016 |website=TransLink.ca |url=http://www.translink.ca/en/Fares-and-Passes/Canada-Line-YVR-AddFare.aspx |archive-url=https://web.archive.org/web/20160922111637/http://www.translink.ca/en/Fares-and-Passes/Canada-Line-YVR-AddFare.aspx |archive-date=September 22, 2016 |url-status=live}}</ref><ref>{{cite web |title=The Canada Line YVR Add Fare Questions and Answers |date=January 11, 2010 |website=TransLink.ca |url=http://www.translink.ca/en/About-Us/Media/2010/January/The-Canada-Line-YVR-Add-Fare-Questions-and-Answers.aspx |access-date=May 13, 2014 |archive-url=https://web.archive.org/web/20140514015550/http://www.translink.ca/en/About-Us/Media/2010/January/The-Canada-Line-YVR-Add-Fare-Questions-and-Answers.aspx |archive-date=May 14, 2014}}</ref> The YVR AddFare came into effect on January 18, 2010.<ref>{{cite web |title=Canada Line YVR AddFare coming Mon Jan 18 |date=January 7, 2009 |publisher=TransLink |work=The Buzzer Blog |url=http://buzzer.translink.ca/index.php/2010/01/canada-line-yvr-addfare-coming-mon-jan-18-heres-how-it-works/ |access-date=January 8, 2010 |archive-url=https://web.archive.org/web/20100111012414/http://buzzer.translink.ca/index.php/2010/01/canada-line-yvr-addfare-coming-mon-jan-18-heres-how-it-works/ |archive-date=January 11, 2010 |url-status=live}}</ref> The revenue collected from the AddFare goes back to TransLink.<ref name="YVR" />


=== Ridership ===
=== Ridership ===
[[Image:Skytrain-overpass.jpg|thumb|A Mark II train travelling along the Expo/Millennium Line between [[Commercial–Broadway Station]] and [[Main Street – Science World Station]].]]
[[File:Expo Line pano.jpg|thumb|Interior of a Mark I train travelling along the Expo Line between Commercial–Broadway and [[Main Street–Science World station]] (2019)]]
[[Image:Canada Line Skytrain Cars-2008-04-22.JPG|thumb| Two [[Canada Line]] trains near [[Vancouver International Airport]].]]
[[File:Vancouver Airport Skytrain Station 2008-04-22.JPG|thumb|[[Canada Line]] trains at [[Vancouver International Airport]] (2008)]]
Passengers on SkyTrain made an average of 390,600 trips on weekdays during the third quarter of 2014.<ref name="APTA-Q4-2014" /> In 2014, the network carried a total of 117.7 million passengers in 2014.<ref name="APTA-Q4-2014">{{cite web |url=http://www.apta.com/resources/statistics/Documents/Ridership/2014-q4-ridership-APTA.pdf |title=Transit Ridership Report Fourth Quarter and End-of-Year 2014 |publisher=[[American Public Transportation Association]] (APTA) |format=PDF |page=33 |date=March 3, 2015 |accessdate=March 12, 2015}}</ref> This compares to 117.4 million passengers in 2010, including 38,447,725 on the Canada Line and 78,965,214 on the interlined Expo and Millennium Lines.<ref>{{cite web|url=http://www.translink.ca/en/About-TransLink/Media/2011/February/TransLink-2010-Ridership.aspx|title=Translink 2010 Ridership|publisher=Translink|accessdate=June 1, 2011}}</ref> The Canada Line carried an average of 110,000 passengers per weekday in early 2011, and is three years ahead of ridership forecasts.<ref name="Rise in transit">{{cite web|title=Rise in transit use called Olympic legacy |url=http://www.bclocalnews.com/surrey_area/surreyleader/news/115777789.html |publisher=BC Local News |accessdate=February 11, 2011}}</ref>
Passengers on SkyTrain made an average of 526,400 trips on weekdays {{as of|2019|09|lc=yes|alt=by the end of September 2019}}.<ref name="APTA-2019">{{cite web |url=https://www.apta.com/wp-content/uploads/2019-Q3-Ridership-APTA.pdf |title=APTA Q3 2019 Ridership Report |publisher=American Public Transportation Association |pages=37 |date=November 22, 2019 |access-date=December 18, 2019 |archive-url=https://web.archive.org/web/20190508212304/https://www.apta.com/wp-content/uploads/2018-Q4-Ridership-APTA.pdf |archive-date=May 8, 2019 |url-status=live}}</ref> Overall in 2017, the network carried a total of 151{{nbsp}}million passengers.<ref name="Translink 2017 Results">{{cite web |title=2017—a record year for transit ridership in Metro Vancouver |publisher=TransLink |url=https://buzzer.translink.ca/2018/02/2017-a-record-year-for-transit-ridership-in-metro-vancouver/ |access-date=February 15, 2018 |archive-url=https://web.archive.org/web/20180216143924/http://buzzer.translink.ca/2018/02/2017-a-record-year-for-transit-ridership-in-metro-vancouver/ |archive-date=February 16, 2018 |date=February 8, 2018 |url-status=live}}</ref> This compares to 117.4{{nbsp}}million passengers in 2010: 38,447,725 on the Canada Line and 78,965,214 on the interlined Expo and Millennium Lines.<ref>{{cite web |url=http://www.translink.ca/en/About-TransLink/Media/2011/February/TransLink-2010-Ridership.aspx |title=TransLink 2010 Ridership |publisher=TransLink |access-date=June 1, 2011 |archive-url=https://web.archive.org/web/20110221223028/http://www.translink.ca/en/About-TransLink/Media/2011/February/TransLink-2010-Ridership.aspx |archive-date=February 21, 2011}}</ref> The Canada Line carried an average of 110,000 passengers per weekday in early 2011, and is three years ahead of ridership forecasts.<ref name="Rise in transit">{{cite web |title=Rise in transit use called Olympic legacy |url=http://www.bclocalnews.com/surrey_area/surreyleader/news/115777789.html |publisher=BC Local News |access-date=February 11, 2011 |archive-url=https://web.archive.org/web/20110707215629/http://www.bclocalnews.com/surrey_area/surreyleader/news/115777789.html |archive-date=July 7, 2011}}</ref>


SkyTrain's highest ridership came during the [[2010 Winter Olympics]] when each event ticket included unlimited day-of transit usage. During the 17-day event, Canada Line ridership rose 110 per cent to an average of 228,000 per day, with a single-day record of 287,400 on February 19, 2010. Expo and Millennium Line ridership rose 64 per cent to an average of 394,000 per day, with a single-day record of 567,000 on February 20, 2010. At times, every available train was in service on all three lines.<ref>{{cite web|title=Olympic transit may turn small profit| date=March 23, 2010| publisher=BC Local News|url=http://www.bclocalnews.com/surrey_area/cloverdalereporter/news/88932792.html}}</ref> After the Olympics ended, overall transit usage remained 7.8 percent above the previous year.<ref name="Rise in transit" />
SkyTrain's highest ridership came during the [[2010 Winter Olympics]] when each event ticket included unlimited day-of transit usage. During the 17-day event, Canada Line ridership rose 110 per cent to an average of 228,000 per day, with a single-day record of 287,400 on February 19, 2010. Expo and Millennium Line ridership rose 64 per cent to an average of 394,000 per day, with a single-day record of 567,000 on February 20, 2010. At times, every available train was in service on all three lines.<ref>{{cite web |title=Olympic transit may turn small profit |date=March 23, 2010 |publisher=BC Local News |url=http://www.bclocalnews.com/surrey_area/cloverdalereporter/news/88932792.html}}{{dead link|date=July 2017 |bot=InternetArchiveBot |fix-attempted=yes}}</ref> After the Olympics ended, overall transit usage remained 7.8 percent above the previous year.<ref name="Rise in transit" />

{| class="wikitable"
|+ TransLink SkyTrain ridership by year
! Year
! 2016<ref>{{Cite web|title=APTA 2016 Q4 Ridership Report|url=https://www.apta.com/wp-content/uploads/Resources/resources/statistics/Documents/Ridership/2016-q4-ridership-APTA.pdf|access-date=July 10, 2021|website=American Public Transportation Association}}</ref>
! 2017<ref>{{Cite web|title=APTA 2017 Q4 Ridership Report|url=https://www.apta.com/wp-content/uploads/Resources/resources/statistics/Documents/Ridership/2017-Q4-Ridership-APTA.pdf|access-date=July 10, 2021|website=American Public Transportation Association}}</ref>
! 2018<ref>{{Cite web|title=APTA 2018 Q4 Ridership Report|url=https://www.apta.com/wp-content/uploads/2018-Q4-Ridership-APTA.pdf|access-date=July 10, 2021|website=American Public Transportation Association}}</ref>
! 2019<ref>{{Cite web|title=APTA 2019 Q4 Ridership Report|url=https://www.apta.com/wp-content/uploads/2019-Q4-Ridership-APTA.pdf|access-date=July 10, 2021|website=American Public Transportation Association}}</ref>
! 2020<ref name="APTA2020">{{Cite web|title=APTA 2020 Q4 Ridership Report|url=https://www.apta.com/wp-content/uploads/2020-Q4-Ridership-APTA.pdf|access-date=July 10, 2021|website=American Public Transportation Association}}</ref>
! 2021<ref name="APTA2022">{{Cite web|title=APTA 2022 Q4 Ridership Report|url=https://www.apta.com/wp-content/uploads/2022-Q4-Ridership-APTA.pdf|website=American Public Transportation Association}}</ref>
! 2022<ref name="APTA2022" />
|-
! Trips (millions)
| 137.4
| 151.4
| 160.0
| 165.1
| 74.5{{efn|name=CovidDecrease|Represents a significant ridership decrease from prior years owing to the [[impact of the COVID-19 pandemic on public transport]].}}
| 76.32
| 116.6
|-
|colspan="6"|
{{Graph:Chart|width=400|height=150|type=rect
| xAxisTitle = Year
| yAxisTitle = Trips (millions)
| x = 2016, 2017, 2018, 2019, 2020
| y1 = 137.4, 151.4, 160.0, 165.1, 74.5
}}
|}

{{TransLink British Columbia ridership by mode}}


=== Funding ===
=== Funding ===
The cost of operating SkyTrain in 2008, with an estimated 73.5{{nbsp}}million boardings, was $83{{nbsp}}million.<ref name="2008annualreport">{{cite web |title=TransLink Annual Report 2008 |publisher=TransLink |url=https://www.translink.ca/-/media/Documents/about_translink/corporate_overview/corporate_reports/annual_reports/2008.pdf |website=TransLink.ca |access-date=April 8, 2019 |url-status=live |archive-url=https://web.archive.org/web/20190408193315/https://www.translink.ca/-/media/Documents/about_translink/corporate_overview/corporate_reports/annual_reports/2008.pdf |archive-date=April 8, 2019}}</ref><ref name="2008perfreport">{{dead link|date=October 2012}}{{cite web |title=TransLink 2008 Financial and Performance Report |publisher=TransLink |url=http://www.translink.ca/~/media/Documents/Board/Board%202009/Board%20Meeting%2027%2003%202009/Finanical_and_Performance_Report_08.ashx |website=TransLink.ca |access-date=February 8, 2010}}{{dead link|date=July 2017 |bot=InternetArchiveBot |fix-attempted=yes}}</ref> To cover this, TransLink draws mostly from transit fares, advertising ($360{{nbsp}}million in 2008) and tax ($262{{nbsp}}million from fuel taxes and $298{{nbsp}}million from property taxes in 2008), funds which are also shared with bus services, roads and bridge maintenance, and other infrastructure and services.<ref name="2008annualreport" /> The capital costs of building the system are shared with other government agencies. Capital expenses were $216{{nbsp}}million<ref name="2008annualreport" /> in 2008. For example, the cost of building the Canada Line was shared between TransLink ($335{{nbsp}}million or 22 percent), the federal government (29 percent), the provincial government (28 percent), the airport authority (19 percent), and the City of Vancouver (2 percent).<ref>{{cite report |title=Working: Annual Report 2006 |author=Canada Line Rapid Transit Inc. |url=http://www.canadaline.ca/files/uploads/docs/doc796.pdf |page=33 |access-date=June 17, 2007 |archive-url=https://web.archive.org/web/20070621182644/http://www.canadaline.ca/files/uploads/docs/doc796.pdf |archive-date=June 21, 2007}}</ref> While TransLink has run surpluses for operating costs since 2001,<ref name="2005annualreport">{{cite web |title=TransLink Annual Report 2005 |publisher=TransLink |website=TransLink.ca |url=https://www.translink.ca/-/media/Documents/about_translink/corporate_overview/corporate_reports/annual_reports/2005.pdf |pages=12, 22, 38, 45 |access-date=April 8, 2019 |archive-url=https://web.archive.org/web/20190408193525/https://www.translink.ca/-/media/Documents/about_translink/corporate_overview/corporate_reports/annual_reports/2005.pdf |archive-date=April 8, 2019 |url-status=live}}</ref><ref>{{cite web |title=TransLink Annual Report 2003 |publisher=TransLink |url=https://www.translink.ca/-/media/Documents/about_translink/corporate_overview/corporate_reports/annual_reports/2003.pdf |page=22 |access-date=April 8, 2019 |archive-url=https://web.archive.org/web/20190408085909/https://www.translink.ca/-/media/Documents/about_translink/corporate_overview/corporate_reports/annual_reports/2003.pdf |archive-date=April 8, 2019 |url-status=live}}</ref> it incurs debt to cover these capital costs. As a whole, TransLink had $1.1{{nbsp}}billion in long-term debt in 2006, of which $508{{nbsp}}million was transferred from the province in 1999 when responsibility for SkyTrain was given to TransLink.<ref name="2005annualreport" /><ref>{{cite report |title=Debt Statistics 1998/99 |author=Ministry of Finance and Corporate Relations |publisher=British Columbia |url=http://www.fin.gov.bc.ca/debtmgmt/debtstat98-99.pdf |date=August 31, 1999 |page=5 |access-date=June 17, 2007 |archive-url=https://web.archive.org/web/20070621182644/http://www.fin.gov.bc.ca/debtmgmt/debtstat98-99.pdf |archive-date=June 21, 2007}}</ref> The province retained ownership of the causeway, bridge, certain services, and a portion of SkyTrain's debt.<ref>{{cite web |title=TransLink board-inbrief- April 17, 2003 |url=http://www.richmond.ca/__shared/assets/042803_pg322841.pdf |publisher=[[Greater Vancouver Regional District]] |access-date=December 5, 2008 |archive-url=https://web.archive.org/web/20090225134427/http://www.richmond.ca/__shared/assets/042803_pg322841.pdf |archive-date=February 25, 2009 |url-status=live}}</ref>
{{citations broken|small=yes|date=October 2012}}
The cost of operating SkyTrain in 2008, with an estimated 73.5 million boardings, was $83 million.{{citation needed|date=October 2012}}<ref name="2008annualreport">{{dead link|date=October 2012}}{{cite journal |title= TransLink Annual Report 2008|author=Translink| url=http://www.translink.ca/~/media/Documents/About%20TransLink/Annual%20Reports/2008%20TransLink%20Annual%20Report.ashx|format=PDF|accessdate=1 Feb 2010}}</ref><ref name="2008perfreport">{{dead link|date=October 2012}}{{cite journal |title= TransLink 2008 Financial and Performance Report|author=Translink| url=http://www.translink.ca/~/media/Documents/Board/Board%202009/Board%20Meeting%2027%2003%202009/Finanical_and_Performance_Report_08.ashx|format=PDF|accessdate=8 Feb 2010}}</ref> To cover this, TransLink draws mostly from transit fares, advertising ($360 million in 2008) and tax ($262 million from fuel taxes and $298 million from property taxes in 2008), funds which are also shared with bus services, roads and bridge maintenance, and other infrastructure and services.{{citation needed|date=October 2012}}<ref name="2008annualreport" /> The capital costs of building the system are shared with other government agencies. Capital expenses were $216 million{{citation needed|date=October 2012}}<ref name="2008annualreport" /> in 2008. For example, the cost of building the Canada Line was shared between TransLink ($335 million or 22 percent), the federal government (29 percent), the provincial government (28 percent), the airport authority (19 percent), and the City of Vancouver (2 percent).<ref>{{cite journal |title= Working: Annual Report 2006 |author=Canada Line Rapid Transit Inc.| url=http://www.canadaline.ca/files/uploads/docs/doc796.pdf|format=PDF|page=33|accessdate=June 17, 2007|archiveurl = http://web.archive.org/web/20070621182644/http://www.canadaline.ca/files/uploads/docs/doc796.pdf |archivedate = June 21, 2007|deadurl=yes}}</ref> While TransLink has run surpluses for operating costs since 2001,<ref name="2005annualreport">{{cite journal|title=TransLink Annual Report 2005 |author=Translink |url=http://www.translink.bc.ca/files/pdf/2005AnnualReport.pdf |format=PDF |pages=12, 22, 38, 45 |accessdate=June 17, 2007 |deadurl=yes |archiveurl=https://web.archive.org/20110611145320/http://www.translink.bc.ca/files/pdf/2005AnnualReport.pdf |archivedate=June 11, 2011 }}</ref><ref>{{cite journal |title= TransLink Annual Report 2003|author=Translink| url=http://www.translink.bc.ca/files/pdf/TL_AR_2003.pdf| archiveurl=http://web.archive.org/web/20040829010502/http://www.translink.bc.ca/files/pdf/TL_AR_2003.pdf| archivedate=2004-08-29|format=PDF|page=22|accessdate=June 17, 2007}}</ref> it incurs debt to cover these capital costs. As a whole, TransLink has $1.1 billion in long-term debt, as of 2006, of which $508 million was downloaded from the province during the 1999 transfer of responsibility for SkyTrain.<ref name="2005annualreport" /><ref>{{cite journal|title= Debt Statistics 1998/99 |author=Ministry of Finance and Corporate Relations|publisher=British Columbia| url=http://www.fin.gov.bc.ca/debtmgmt/debtstat98-99.pdf|format=PDF|date=August 31, 1999|page=5|accessdate=June 17, 2007}}</ref> As the province retained ownership of the causeway, bridge, and certain services, it retained a portion of SkyTrain's debt as well.<ref>{{cite web|title=Translink board-inbrief- April 17, 2003|format=PDF|url=http://www.richmond.ca/__shared/assets/042803_pg322841.pdf|publisher=[[Greater Vancouver Regional District]]|accessdate=December 5, 2008}}</ref>


=== Security ===
=== Security ===
[[Image:Gvta-police-ad cropped.jpg|thumb|Bus advertisement for the [[South Coast British Columbia Transportation Authority Police Service|SCBCTAPS]] police]]
[[File:Gvta-police-ad cropped.jpg|thumb|Bus advertisement for the [[Metro Vancouver Transit Police]] (2007)]]
[[Image:Canada Line 002.jpg|right|thumb|Canada and Millennium Line stations are designed for future fare gates; Expo Line stations will be retrofitted by 2013.]]
[[File:Canada Line 002.jpg|right|thumb|Canada and Millennium Line stations were designed for fare gates (2009).]]
Law enforcement services are provided by the [[South Coast British Columbia Transportation Authority Police Service]] (SCBCTAPS), formerly the [[Greater Vancouver Transportation Authority Police Service]] (GVTAPS). They replaced the old TransLink [[Special constable|Special Provincial Constables]], who had limited authority.
Law enforcement services are provided by the [[Metro Vancouver Transit Police]] (MVTP). They replaced the old TransLink [[Special constable|Special Provincial Constables]], who had limited authority.


On December 4, 2005, GVTAPS officers became the first and only [[transit police]] force in Canada to have full police powers and carry firearms. There was public concern in March 2005 when it was announced that transit police would carry firearms. Then-Solicitor General of British Columbia [[John Les]] defended the move, saying that it was necessary to enhance SkyTrain security.<ref>{{cite news|url=http://www.cbc.ca/canada/british-columbia/story/2005/12/05/bc_transit-cops-guns20051205.html|work=CBC News|date=December 5, 2005|title=SkyTrain gets armed transit cops|accessdate=January 20, 2007}}</ref> Transit officers receive the same training as officers in municipal and RCMP forces. They may arrest people for outstanding warrants, enforce drug laws, enforce the criminal code beyond TransLink property, and deal with offences that begin off TransLink property and make their way onto it. They issue tickets for fare evasion and other infractions on SkyTrain, transit buses, [[SeaBus]], and [[West Coast Express]].<ref>{{cite news|title=Vancouver transit police begin packing guns|work=CBC News|url=http://www.cbc.ca/canada/story/2005/12/05/vancouver-transit-051205.html|date=5 December 2005|accessdate=December 25, 2006}}</ref>
On December 4, 2005, MVTP officers became the first and only [[transit police]] force in Canada to have full police powers and carry firearms. There was public concern in March 2005 when it was announced that transit police would carry firearms. Solicitor General of British Columbia [[John Les]] defended the move at the time, saying that it was necessary to enhance SkyTrain security.<ref>{{cite news |url=https://www.cbc.ca/news/canada/british-columbia/skytrain-gets-armed-transit-cops-1.533469 |work=CBC News |date=December 5, 2005 |title=SkyTrain gets armed transit cops |access-date=January 20, 2007 |archive-url=https://archive.today/20190408194100/https://www.cbc.ca/news/canada/british-columbia/skytrain-gets-armed-transit-cops-1.533469 |archive-date=April 8, 2019 |url-status=live}}</ref> Transit officers receive the same training as officers in municipal and RCMP forces. They may arrest people for outstanding warrants, enforce drug laws, enforce the criminal code beyond TransLink property, and deal with offences that begin off TransLink property and make their way onto it. They issue tickets for fare evasion and other infractions on SkyTrain, transit buses, [[SeaBus]], and [[West Coast Express]].<ref>{{cite news |title=Vancouver transit police begin packing guns |work=CBC News |url=https://www.cbc.ca/news/canada/vancouver-transit-police-begin-packing-guns-1.530139 |date=December 5, 2005 |access-date=December 25, 2006 |archive-url=https://web.archive.org/web/20131203205424/http://www.cbc.ca/news/canada/vancouver-transit-police-begin-packing-guns-1.530139 |archive-date=December 3, 2013 |url-status=live}}</ref>


Both transit police officers and Transit Security personnel inspect fares at Skytrain stations as part of TransLink's Fare Audit. Transit Security mostly focus their efforts on the bus system, bus loops, and SeaBus. As of September 2012, Transit Security Officers have the authority to issue tickets for Fare Evasion.
Transit police officers and Transit Security officers inspect fares at Skytrain stations as part of TransLink's fare audit. Transit Security officers mostly focus their efforts on the bus system, bus loops, and SeaBus.


SkyTrain Attendants provide customer service and first aid, troubleshoot train and station operations, and perform fare checks alongside the transit police force.<ref>{{cite web|title=Common Questions|publisher=Greater Vancouver Transportation Authority Police Service|url=http://www.gvtaps.bc.ca/common_qs/default.htm|accessdate=December 15, 2006 |archiveurl = http://web.archive.org/web/20061208165134/http://www.gvtaps.bc.ca/common_qs/default.htm |archivedate = December 8, 2006}}</ref> SkyTrain Attendants can be identified by their uniforms which say "SkyTrain" on them.
SkyTrain attendants provide customer service and first aid, troubleshoot train and station operations, and perform fare checks alongside the transit police force.<ref>{{cite web |title=Common Questions |publisher=Greater Vancouver Transportation Authority Police Service |url=http://www.gvtaps.bc.ca/common_qs/default.htm |access-date=December 15, 2006 |archive-url=https://web.archive.org/web/20061208165134/http://www.gvtaps.bc.ca/common_qs/default.htm |archive-date=December 8, 2006}}</ref> SkyTrain attendants can be identified by their uniforms which say "SkyTrain" on them.


Over the years, violence and other criminal activities have been concerns, but TransLink insists the system is safe.<ref>{{cite news|url=http://archive.vancourier.com/issues02/095102/news/095102nn5.html|work=Vancouver Courier|last=Carrigg|first=David|title=SkyTrain says system safe despite latest attack|date=5 August 2004|accessdate=March 18, 2009}}</ref><ref>{{cite news|work=CBC News|title=Murder charge laid after teen killed at B.C. SkyTrain stop|url=http://www.cbc.ca/canada/story/2005/07/04/kytrain-attack050704.html|date=4 July 2005|accessdate=January 5, 2007}}</ref>{{Update after|2010|11|13|Rail transport articles in need of updating}} Then-Inspector Kash Heed of the [[Vancouver Police Department]] says that little crime takes place in the stations themselves. However, criminal activity becomes more visible {{convert|400|-|700|m|sigfig=1}} outside them.<ref>{{cite news|work=VancouverCourier|last=Howell|first=Mike|date=28 August 2005|url=http://archive.vancourier.com/issues05/084205/news/084205nn8.html|title=Cyclist warns of crime increase|accessdate=March 18, 2009}}</ref>
Over the years, violence and other criminal activities have been concerns at time, but TransLink maintains that the system is safe.<ref>{{cite news |url=http://archive.vancourier.com/issues02/095102/news/095102nn5.html |work=Vancouver Courier |last=Carrigg |first=David |title=SkyTrain says system safe despite latest attack |date=August 5, 2004 |access-date=March 18, 2009 |archive-url=https://archive.today/20090910042918/http://archive.vancourier.com/issues02/095102/news/095102nn5.html |archive-date=September 10, 2009}}</ref><ref>{{cite news |work=CBC News |title=Murder charge laid after teen killed at B.C. SkyTrain stop |url=https://www.cbc.ca/news/canada/murder-charge-laid-after-teen-killed-at-b-c-skytrain-stop-1.519631 |date=July 4, 2005 |access-date=January 5, 2007 |archive-url=https://web.archive.org/web/20070505063048/http://www.cbc.ca/canada/story/2005/07/04/kytrain-attack050704.html |archive-date=May 5, 2007 |url-status=live}}</ref>{{Update after|2010|11|13|Rail transport articles in need of updating}} In 2009, Inspector Kash Heed of the [[Vancouver Police Department]] said that little crime takes place in the stations themselves; however, criminal activity becomes more visible {{convert|400|-|700|m|sigfig=1}} outside them.<ref>{{cite news |work=VancouverCourier |last=Howell |first=Mike |date=August 28, 2005 |url=http://archive.vancourier.com/issues05/084205/news/084205nn8.html |title=Cyclist warns of crime increase |access-date=March 18, 2009 |archive-url=https://archive.today/20090911040751/http://archive.vancourier.com/issues05/084205/news/084205nn8.html |archive-date=September 11, 2009}}</ref>


Each station is monitored with an average of 23 [[closed-circuit television]] cameras, allowing SkyTrain operators to monitor passenger and station activity.<ref>{{cite web| url=http://www.skytrain.info/safetysecurity.aspx|title=Safety & Security on SkyTrain|accessdate=April 10, 2010}}</ref> Designated wait areas have enhanced lighting, waiting benches, and emergency telephones. Trains have yellow strips above each window which, when pressed, silently alert operators of a security hazard. On-board speaker phones provide two-way communication between passengers and control operators.<ref>{{cite web|title=Safety and Security on SkyTrain|url=http://www.translink.bc.ca/Transportation_Services/SkyTrain/SkyTrain_Safety.asp|archiveurl=http://web.archive.org/web/20061004133742/http://www.translink.bc.ca/Transportation_Services/SkyTrain/SkyTrain_Safety.asp|archivedate=2006-10-04|publisher=TransLink|accessdate=December 26, 2006}}</ref>
Each station is monitored with an average of 23 [[closed-circuit television]] cameras, allowing SkyTrain operators to monitor passenger and station activity.<ref>{{cite web |url=http://www.skytrain.info/safetysecurity.aspx |title=Safety & Security on SkyTrain |access-date=April 10, 2010 |archive-url=https://web.archive.org/web/20100223203138/http://www.skytrain.info/safetysecurity.aspx |archive-date=February 23, 2010}}</ref> Designated waiting areas have enhanced lighting, benches, and emergency telephones. Trains have yellow strips above each window which, when pressed, silently alert operators of a security hazard. On-board speaker phones provide two-way communication between passengers and control operators.<ref>{{cite web |title=Safety and Security on SkyTrain |url=http://www.translink.bc.ca/Transportation_Services/SkyTrain/SkyTrain_Safety.asp |archive-url=https://web.archive.org/web/20061004133742/http://www.translink.bc.ca/Transportation_Services/SkyTrain/SkyTrain_Safety.asp |archive-date=October 4, 2006 |publisher=TransLink |access-date=December 26, 2006}}</ref>


In 2007, it was reported that the entire surveillance system was upgraded from analogue two-hour tape recording to digital technology, which was to allow police to retrieve previous footage for up to seven days.<ref>{{cite news|title=SkyTrain crime fear 'overblown'|work=The News, Maple Ridge|page=17|date=13 January 2007}}</ref> However, incidents since the upgrade have still limited police to a two-hour loop, resulting in loss of potential evidence.<ref>{{cite web|title=SkyTrain evidence taped over after alert failed|date=2008-05-07|url=http://www.canada.com/theprovince/news/story.html?id=14b6a3fc-7b40-4f17-aab8-f598bd8184e3|publisher=The Vancouver Province|accessdate=2011-12-15}}</ref>
In 2007, it was reported that the entire surveillance system was upgraded from analogue two-hour tape recording to digital technology, which was to allow police to retrieve previous footage for up to seven days.<ref>{{cite news |title=SkyTrain crime fear 'overblown' |work=The News, Maple Ridge |page=17 |date=January 13, 2007}}</ref> However, incidents since the upgrade have still limited police to a two-hour loop, resulting in loss of potential evidence.<ref>{{cite news |title=SkyTrain evidence taped over after alert failed |date=May 7, 2008 |url=http://www.canada.com/theprovince/news/story.html?id=14b6a3fc-7b40-4f17-aab8-f598bd8184e3 |newspaper=The Vancouver Province |access-date=December 15, 2011 |archive-url=https://web.archive.org/web/20150904113844/http://www.canada.com/theprovince/news/story.html?id=14b6a3fc-7b40-4f17-aab8-f598bd8184e3 |archive-date=September 4, 2015}}</ref>


As of November 2008, at least 54 deaths have occurred on the platforms and tracks of the Expo and Millennium Lines. 44 of those deaths were suicides, while the remaining ten were accidental.<ref>[http://thetyee.ca/News/2008/11/18/SkyTrain/ SkyTrain's Mounting Death Toll] at The Tyee. Retrieved 2011-11-20.</ref>
By November 2008, at least 54 deaths had occurred on the platforms and tracks of the Expo and Millennium Lines. 44 of those deaths were suicides, while the remaining ten were accidental.<ref>[https://thetyee.ca/News/2008/11/18/SkyTrain/ SkyTrain's Mounting Death Toll] {{Webarchive|url=https://web.archive.org/web/20170820155819/https://thetyee.ca/News/2008/11/18/SkyTrain/ |date=August 20, 2017}} at The Tyee. Retrieved November 20, 2011.</ref>


== History ==
== History ==
{{Main|History of the SkyTrain}}
{{Main|History of the SkyTrain}}
[[Image:Bennett commemoration.jpg|thumb|left|A [[commemorative plaque|plaque commemorating]] the inauguration of the SkyTrain.]]
[[File:Bennett commemoration.jpg|thumb|left|A [[commemorative plaque|plaque commemorating]] the inauguration of the SkyTrain]]


===Planning===
=== Planning ===
Vancouver had plans as early as the 1950s to build a monorail system, with modernist architect [[Wells Coates]] pencilled in to design it; that project was abandoned.{{Citation needed|date=February 2010}} The lack of a rapid transit system was said to be the cause of traffic problems in the 1970s, and the municipal government could not fund the construction of such a system.<ref>{{cite news|work=[[The Globe and Mail]]|date=19 November 1977|title=Rapid transit system still a pipedream|last=Clarke|first=John|page=8}}</ref> During the same period, [[Urban Transportation Development Corporation]], then an [[Ontario]] crown corporation, was developing a new rapid transit technology known as an "Intermediate Capacity Transit System".<ref>{{cite news|title=$61 million experiment could go down the drain New money crucial to give 'sky subvway <nowiki>[</nowiki>''[{{sic}}]''<nowiki>]</nowiki> a shot at markets|work=The Globe and Mail|last=Keating|first=Michael|date=November 13, 1971|page=P5}}</ref> In 1980 the need for rapid transit was great, and Ontario needed buyers for its new technology. "Advanced Rapid Transit" was selected to be built in Vancouver to showcase the Ontario project at Expo 86.
Vancouver had plans as early as the 1950s to build a [[monorail]] system, with modernist architect [[Wells Coates]] to design it; that project was abandoned.<ref>{{Cite web|date=May 25, 2012|title=Friday fun guest post: A history of monorails in Vancouver |first=Michael |last=Taylor-Noonan|url=https://buzzer.translink.ca/2012/05/friday-fun-guest-post-a-history-of-monorails-in-vancouver-by-michael-taylor-noonan/|access-date=December 8, 2021|website=The Buzzer blog|language=en-CA}}</ref> The lack of a rapid transit system was said to be the cause of traffic problems in the 1970s, and the municipal government could not fund the construction of such a system.<ref>{{cite news |work=[[The Globe and Mail]] |date=November 19, 1977 |title=Rapid transit system still a pipedream |last=Clarke |first=John |page=8}}</ref> During the same period, [[Urban Transportation Development Corporation]], then an [[Ontario]] crown corporation, was developing a new rapid transit technology known as an "Intermediate Capacity Transit System".<ref>{{cite news |title=$61{{nbsp}}million experiment could go down the drain New money crucial to give 'sky subvway <nowiki>[</nowiki>''[{{sic}}]''<nowiki>]</nowiki> a shot at markets|work=The Globe and Mail|last=Keating|first=Michael|date=November 13, 1971|page=P5}}</ref> In 1980, the "Advanced Light Rapid Transit" system was selected by the British Columbia provincial government for use on one of two planned corridors, connecting Vancouver to New Westminster in time for [[Expo 86]].<ref>{{cite news |last=Baldrey |first=Keith |date=January 3, 1986 |title=History of SkyTrain |page=A20 |work=The Vancouver Sun |url=https://www.newspapers.com/clip/114333131/history-of-skytrain/ |via=[[Newspapers.com]] |accessdate=December 8, 2022}}</ref>


====Expo Line====
=== Expo Line ===
[[File:Vancouver Skytrain Rupert station train.jpg|thumb|A first-generation Bombardier Mark II train at Rupert station (2005)]]
{{Main|Expo Line (TransLink)}}
{{Main|Expo Line (SkyTrain)}}
SkyTrain was conceived as a legacy project of Expo 86 and the first line was finished in time to showcase the fair's theme: "Transportation and Communication: World in Motion – World in Touch".<ref>{{cite web|title=Canada at International Expositions - Expo '86 in Vancouver|url=http://www.pch.gc.ca/progs/expo/pre_e.cfm#expo86|publisher=Government of Canada|accessdate=2010-03-27}}</ref>
Construction was funded by the provincial and federal governments.<ref>{{cite news|title=Ontario train system may be used in Vancouver|date=November 21, 1980|work=Globe and Mail|last=Williamson|first=Robert|page=8}}</ref> It was built through the [[Dunsmuir Tunnel]] under downtown, which had originally been built for the [[Canadian Pacific Railway]].


SkyTrain was conceived as a legacy project of Expo 86 and the first line was finished in time to showcase the fair's theme: "Transportation and Communication: World in Motion – World in Touch".<ref>{{cite web |title=Canada at International Expositions – Expo '86 in Vancouver |url=http://www.pch.gc.ca/progs/expo/pre_e.cfm#expo86 |publisher=Government of Canada |access-date=March 27, 2010 |archive-url=https://web.archive.org/web/20110515011558/http://www.pch.gc.ca/progs/expo/pre_e.cfm#expo86 |archive-date=May 15, 2011 |url-status=live}}</ref> Construction was funded by the provincial and federal governments and began in March 1982.<ref>{{cite news |title=Ontario train system may be used in Vancouver |date=November 21, 1980 |work=Globe and Mail |last=Williamson |first=Robert |page=8}}</ref><ref name="Sun-WeekinHistory">{{cite news |last=Mackie |first=John |date=March 4, 2022 |title=This Week in History, 1982: Work begins on Vancouver's SkyTrain |url=https://vancouversun.com/news/local-news/this-week-in-history-1982-work-begins-on-vancouvers-skytrain |work=Vancouver Sun |accessdate=December 8, 2022}}</ref> It was built through the [[Dunsmuir Tunnel]] under downtown, which had originally been built for the [[Canadian Pacific Railway]], to save costs.<ref name="Sun-WeekinHistory" />
Until 1989, SkyTrain terminated at [[New Westminster Station]]; in 1987 construction began on an extension including the Skybridge, [[Columbia Station]], and [[Scott Road Station]], extending service to [[Surrey, British Columbia|Surrey]].<ref>{{cite book|last=Davis|first=Chuck|url=http://www.discovervancouver.com/GVB/vancouver-bridges.asp|title=The Greater Vancouver Book: an Urban Encyclopedia|publisher=Linkman Press|location=Surrey, BC|year=1997|isbn=1-896846-00-9}}</ref> The line was expanded yet again in 1994 with the opening of the [[Gateway Station|Gateway]], [[Surrey Central Station|Surrey Central]], and [[King George Station|King George]] stations. SkyTrain is part of the 1996 [[Greater Vancouver Regional District]]'s (GVRD) Livable Region Strategic Plan, which discusses strategies to deal with the anticipated increase of population in the region. These strategies include increasing transportation choices and transit use.<ref>{{cite web|title=Details of The Livable Region Strategic Plan|url=http://vancouver.ca/commsvcs/cityplans/region/livableplan.htm|publisher=City of Vancouver|accessdate=May 25, 2007|archiveurl = http://web.archive.org/web/20060103002758/http://vancouver.ca/commsvcs/cityplans/region/livableplan.htm |archivedate = January 3, 2006|deadurl=yes}}</ref>


The first {{convert|21.4|km|mi}} of the system, from Waterfront to [[New Westminster station]], opened for limited and fare-free service on December 11, 1985.<ref>{{cite news |last1=Farrow |first1=Moira |last2=Cox |first2=Sarah |date=December 11, 1985 |title=Glitter, bands and balloons |page=A1 |work=The Vancouver Sun |url=https://www.newspapers.com/clip/114332575/glitter-bands-and-balloons/ |via=Newspapers.com |accessdate=December 8, 2022}}</ref> Revenue service began on January 3, 1986, and within its first year the line had carried over 30&nbsp;million passengers—including visitors to Expo 86.<ref>{{cite news |date=January 3, 1986 |title=In business, on time: System's first riders all had their reasons |page=A1 |work=The Vancouver Sun |url=https://www.newspapers.com/clip/114333059/in-business-on-time-systems-first/ |via=Newspapers.com |accessdate=December 8, 2022}}</ref><ref>{{cite news |last=Hall |first=Neal |date=December 27, 1986 |title=Happy birthday, SkyTrain |page=B12 |work=The Vancouver Sun |url=https://www.newspapers.com/clip/114333205/happy-birthday-skytrain/ |via=Newspapers.com |accessdate=December 8, 2022}}</ref> The following year, construction began on an extension including the SkyBridge, Columbia station, and [[Scott Road station]], extending service by {{convert|3.1|km|mi}} to Surrey; it opened on March 16, 1990.<ref>{{cite news |last=Schaefer |first=Glen |date=March 16, 1990 |title=Ride across river offers new views |page=14 |work=The Province |url=https://www.newspapers.com/clip/114333349/ride-across-river-offers-new-views/ |via=Newspapers.com |accessdate=December 8, 2022}}</ref><ref>{{cite book |last=Davis |first=Chuck |url=http://www.discovervancouver.com/GVB/vancouver-bridges.asp |title=The Greater Vancouver Book: an Urban Encyclopedia |publisher=Linkman Press |location=Surrey, BC |year=1997 |isbn=978-1-896846-00-2 |archive-url=https://web.archive.org/web/20070806125246/http://www.discovervancouver.com/GVB/vancouver-bridges.asp |archive-date=August 6, 2007}}</ref> The line was expanded again in 1994 with the opening of [[Gateway station (SkyTrain)|Gateway]], [[Surrey Central station|Surrey Central]], and [[King George station|King George]] stations. SkyTrain is part of the 1996 [[Greater Vancouver Regional District]]'s (GVRD) Livable Region Strategic Plan, which discusses strategies to deal with the anticipated increase of population in the region. These strategies include increasing transportation choices and transit use.<ref>{{cite web |title=Details of The Livable Region Strategic Plan |url=http://vancouver.ca/commsvcs/cityplans/region/livableplan.htm |publisher=City of Vancouver |access-date=May 25, 2007 |archive-url=https://web.archive.org/web/20060103002758/http://vancouver.ca/commsvcs/cityplans/region/livableplan.htm |archive-date=January 3, 2006}}</ref>
[[Image:Vancouver Skytrain Rupert station train.jpg|thumb|A first-generation Bombardier Mark II train at Rupert Station]]
[[Image:Skytrain-below.jpg|right|thumb|A Mark I train passing by in the Grandview Cut between [[VCC–Clark Station]] and [[Commercial–Broadway Station]].]]


====Millennium Line====
=== Millennium Line ===
[[File:Skytrain-below.jpg|right|thumb|A Mark I train passing by in the Grandview Cut between [[VCC–Clark station|VCC–Clark]] and Commercial–Broadway stations (2006)]]
{{Main|Millennium Line}}
{{Main|Millennium Line}}
The first section of the Millennium Line opened in 2002, with [[Braid Station|Braid]] and [[Sapperton Station|Sapperton]] stations. Most of the remaining portion began operating later that year, serving [[North Burnaby]] and [[East Vancouver]]. Phase I of the Millennium Line was completed $50 million under budget. Critics of the project dubbed it the "SkyTrain to Nowhere", claiming that the route of the new line was based on political concerns, not the needs of commuters.<ref>{{cite news|last=Sullivan|first=Paul|title=B.C.'s SkyTrain to Nowhere|publisher=Globe and Mail|date=January 8, 2002|url=http://www.theglobeandmail.com/servlet/GIS.Servlets.HTMLTemplate?current_row=96&tf=tgam/columnists/FullColumn.html&cf=tgam/columnists/FullColumn.cfg&configFileLoc=tgam/config&date=&dateOffset=&hub=paulSullivan&title=Paul_Sullivan&cache_key=paulSullivan&start_row=96&num_rows=1|accessdate=June 6, 2007|archiveurl = http://web.archive.org/web/20070930082441/http://www.theglobeandmail.com/servlet/GIS.Servlets.HTMLTemplate?current_row=96&tf=tgam/columnists/FullColumn.html&cf=tgam/columnists/FullColumn.cfg&configFileLoc=tgam/config&date=&dateOffset=&hub=paulSullivan&title=Paul_Sullivan&cache_key=paulSullivan&start_row=96&num_rows=1 |archivedate = September 30, 2007|deadurl=yes}}</ref> One illustration of the legitimacy of this complaint is that the end of the Millennium Line is located in a vacant field, originally chosen because it was supposed to be the location for a new high-tech development and is close to the head office of QLT Inc., but additional development has been slow to get off the ground.<ref name="critics">{{cite news| last =Carrigg| first =David| title =SkyTrain critics have their say| work=Vancouver Courier| date =February 19, 2001| url =http://www.vancourier.com/issues01/02401/top4.htm| archiveurl =http://web.archive.org/web/20061021053929/http://www.vancourier.com/issues01/02401/top4.htm| archivedate =2006-10-21| accessdate = December 21, 2006 }}</ref><ref>{{cite web|url=http://maps.google.com/maps?f=q&source=s_q&hl=en&geocode=&q=Vancouver&sll=37.0625,-95.677068&sspn=54.928982,90.351563&ie=UTF8&ll=49.265697,-123.080285&spn=0.005426,0.011029&t=h&z=17 |title=Google map showing location of VCC station |publisher=Maps.google.com |date=1970-01-01 |accessdate=2010-06-23}}</ref> That station, [[VCC–Clark Station|VCC–Clark]] near Clark Drive and Broadway, did not open until 2006 because of difficulty in negotiating the right-of-way from BNSF, but it is still five kilometres short of the original proposed Phase II terminus at Granville Street and 10th Avenue. At the time the VCC-Clark Station opened, it was revealed that the additional westward extension and its three stations was out of favour and "not a high priority anymore".<ref>{{cite news| last =Carrigg| first =David| title =SkyTrain extension off the rails| work=Vancouver Courier| date=August 5, 2004| url =http://www.vancourier.com/issues02/045102/news/045102nn6.html| archiveurl =http://web.archive.org/web/20061019174201/http://www.vancourier.com/issues02/045102/news/045102nn6.html| archivedate =2006-10-19| accessdate = December 21, 2006}}</ref>
The first section of the Millennium Line opened in 2002, with [[Braid station|Braid]] and [[Sapperton station|Sapperton]] stations. Most of the remaining portion began operating later that year, serving [[North Burnaby]] and [[East Vancouver]]. Phase I of the Millennium Line was completed $50{{nbsp}}million under budget. Critics of the project dubbed it the "SkyTrain to Nowhere", claiming that the route of the new line was based on political concerns, not the needs of commuters.<ref>{{cite news |last=Sullivan |first=Paul |title=B.C.'s SkyTrain to Nowhere |newspaper=Globe and Mail |date=January 8, 2002 |url=https://www.theglobeandmail.com/opinion/bcs-skytrain-to-nowhere/article752468/ |access-date=June 6, 2007 |archive-url=https://web.archive.org/web/20170403173157/https://www.theglobeandmail.com/opinion/bcs-skytrain-to-nowhere/article752468/ |archive-date=April 3, 2017 |url-status=live}}</ref> One illustration of the legitimacy of this complaint is that the end of the Millennium Line is located in a vacant field, chosen because it was supposed to be the location for a new high-tech development and is close to the head office of QLT Inc., but additional development was slow to get off the ground.<ref name="critics">{{cite news |last=Carrigg |first=David |title=SkyTrain critics have their say |work=Vancouver Courier |date=February 19, 2001 |url=http://www.vancourier.com/issues01/02401/top4.htm |archive-url=https://web.archive.org/web/20061021053929/http://www.vancourier.com/issues01/02401/top4.htm |archive-date=October 21, 2006 |access-date=December 21, 2006}}</ref><ref>{{cite web |url=https://maps.google.com/maps?f=q&source=s_q&hl=en&geocode=&q=Vancouver&sll=37.0625,-95.677068&sspn=54.928982,90.351563&ie=UTF8&ll=49.265697,-123.080285&spn=0.005426,0.011029&t=h&z=17 |title=Google map showing location of VCC station |date=January 1, 1970 |access-date=June 23, 2010}}</ref> That station, [[VCC–Clark station|VCC–Clark]] near Clark Drive and Broadway, did not open until 2006 due to the struggles of negotiating the right-of-way with BNSF, the owner of the freight tracks beside the station, but it is still five kilometres short of the original proposed Phase II terminus at Granville Street and 10th Avenue. At the time VCC–Clark station opened, it was revealed that the additional westward extension and its three stations was out of favour and "not a high priority anymore".<ref>{{cite news |last=Carrigg |first=David |title=SkyTrain extension off the rails |work=Vancouver Courier |date=August 5, 2004 |url=http://www.vancourier.com/issues02/045102/news/045102nn6.html |archive-url=https://web.archive.org/web/20061019174201/http://www.vancourier.com/issues02/045102/news/045102nn6.html |archive-date=October 19, 2006 |access-date=December 21, 2006}}</ref>


====Canada Line====
==== Evergreen Extension ====
[[File:Lincoln Station Exterior.jpg|right|thumb|Coquitlam's Lincoln station on the Evergreen Extension of the Millennium Line (2017)]]
{{Main|Canada Line}}
{{Main|Evergreen Extension}}
The Canada Line was built as a public–private partnership, with the winning bidder, led by [[SNC-Lavalin]] (now known as ProTransBC), contributing funds toward its construction and operating it for 35 years. A minimum ridership was guaranteed to ProTransBC by TransLink.<ref>Campbell's 'kaputski' on RAV line financing tops the list of keepers so far, Vaughn Palmer, The Vancouver Sun, Dec 3, 2004. p. A3
The Evergreen Extension, known as the Evergreen Line during construction, is the second phase of the Millennium Line, extending from Lougheed Mall in Burnaby to the Douglas College campus in Coquitlam. Originally referred to as the Port Moody-Coquitlam (PMC) Line, it provides a "one-seat ride" from Coquitlam to Vancouver. Switches to the PMC Line were installed to the east of Lougheed Town Centre station during its initial construction and a third platform at the station was roughed-in in anticipation of the extension. Phase II was postponed following a change in provincial government and a shuffling of priorities that led to prioritizing building the Canada Line due to Vancouver's hosting of the 2010 Olympics. Preliminary construction of the Evergreen Extension began in July 2012 and major construction started in June 2013 with the construction of support columns for the line. The extension began revenue service on December 2, 2016.<ref>{{Cite web |url=http://www.translink.ca/en/Plans-and-Projects/Rapid-Transit-Projects/Evergreen-Extension.aspx |title=Evergreen Extension |website=transLink.ca |publisher=TransLink |access-date=November 30, 2016 |archive-url=https://web.archive.org/web/20161121041916/http://www.translink.ca/en/Plans-and-Projects/Rapid-Transit-Projects/Evergreen-Extension.aspx |archive-date=November 21, 2016}}</ref>
</ref> The Canada Line opened on August 17, 2009, 15 weeks ahead of schedule and on budget.<ref name="Smooth Ride">{{cite news|url=http://www.theglobeandmail.com/news/national/british-columbia/canada-line-delivers-a-smooth-ride/article1413646/|work=The Globe and Mail|title=Canada Line Delivers a Smooth Ride|date=December 28, 2009|accessdate=December 28, 2009}}</ref> Ridership has risen three years ahead of forecasts, hitting 100,000 passengers per weekday in May 2010 and over 136,000 passengers per weekday in June 2011.<ref name="New record">{{cite web|url=http://www.translink.ca/en/About-Us/Media/2011/August/TransLink-reports-transit-ridership-heading-for-a-new-record.aspx|publisher=Translink|title=TransLink reports transit ridership heading for a new record|date=August 22, 2011|accessdate=December 28, 2009}}</ref> The Canada Line is operationally independent from other SkyTrain lines, using different rolling stock (shorter overall train/station length, but wider cars) which is incompatible.<ref name="RelationshipWithSkyTrain">{{cite web|url=http://vancouver.ca/engsvcs/transport/rto/canadaline/faq.htm#skytrain|title=Frequently Asked Questions, Canada Line|publisher=Rapid Transit Office, City of Vancouver|accessdate=December 2, 2008}}</ref><ref name="Translink-CanadaLineSkyTrain">{{cite web|url=http://www.translink.ca/en/Rider-Info/Canada-Line.aspx|title=Making the Connection to a World of Choice|publisher=TransLink|accessdate=April 23, 2009}}</ref>


=== Canada Line ===
====Evergreen Extension (under construction)====
{{Main|Evergreen Line (TransLink)}}
{{Main|Canada Line}}
The Canada Line was built as a public–private partnership, with the winning consortium (now known as ProTransBC), led by [[SNC-Lavalin]], contributing funds toward its construction and operating it for 35 years. A minimum ridership was guaranteed to ProTransBC by TransLink.<ref>Campbell's 'kaputski' on RAV line financing tops the list of keepers so far, Vaughn Palmer, The Vancouver Sun, December 3, 2004. p. A3</ref> The Richmond–Vancouver corridor had been considered for a rapid transit line as early as 1979 but such a project was not funded until the early 2000s with the approval of the Canada Line.<ref name="Sun-WeekinHistory" /> The line opened on August 17, 2009, 15 weeks ahead of schedule and on budget.<ref name="Smooth Ride">{{cite news |url=https://www.theglobeandmail.com/news/national/british-columbia/canada-line-delivers-a-smooth-ride/article1413646/ |work=The Globe and Mail |title=Canada Line Delivers a Smooth Ride |date=December 28, 2009 |access-date=December 28, 2009 |archive-url=https://web.archive.org/web/20100101061420/http://www.theglobeandmail.com/news/national/british-columbia/canada-line-delivers-a-smooth-ride/article1413646/ |archive-date=January 1, 2010 |url-status=live}}</ref> Ridership rose three years ahead of forecasts, hitting 100,000 passengers per weekday in May 2010 and 136,000 passengers per weekday in June 2011.<ref name="New record">{{cite web |url=http://www.translink.ca/en/About-Us/Media/2011/August/TransLink-reports-transit-ridership-heading-for-a-new-record.aspx |publisher=TransLink |title=TransLink reports transit ridership heading for a new record |date=August 22, 2011 |access-date=December 28, 2009 |archive-url=https://web.archive.org/web/20111020085954/http://www.translink.ca/en/About-Us/Media/2011/August/TransLink-reports-transit-ridership-heading-for-a-new-record.aspx |archive-date=October 20, 2011}}</ref> The Canada Line is operationally independent from the other SkyTrain lines, using different rolling stock (shorter overall train and station length, but wider cars) that is incompatible with the Expo and Millennium Lines.<ref name="RelationshipWithSkyTrain">{{cite web |url=http://vancouver.ca/engsvcs/transport/rto/canadaline/faq.htm#skytrain |title=Frequently Asked Questions, Canada Line |publisher=Rapid Transit Office, City of Vancouver |access-date=December 2, 2008 |archive-url=https://web.archive.org/web/20110917115309/http://vancouver.ca/engsvcs/transport/rto/canadaline/faq.htm#skytrain |archive-date=September 17, 2011 |url-status=live}}</ref><ref name="TransLink-CanadaLineSkyTrain">{{cite web |url=http://www.translink.ca/en/Rider-Info/Canada-Line.aspx |title=Making the Connection to a World of Choice |publisher=TransLink |access-date=April 23, 2009 |archive-url=https://web.archive.org/web/20090821224043/http://www.translink.ca/en/Rider-Info/Canada-Line.aspx |archive-date=August 21, 2009}}</ref>
The Evergreen Extension, formally known as the Evergreen Line, is the second phase of the Millennium Line. The extension is now under construction, extending from Lougheed Mall to Coquitlam (then known as the Port Moody-Coquitlam (PMC) Line), providing a "one seat ride" from Coquitlam to VCC–Clark Station. Switches to the PMC Line were installed to the east of Lougheed Town Centre Station and a third platform was roughed-in in anticipation of the extension. Phase II was postponed following a change in provincial government and a re-focus of priorities on the Canada Line due to the hosting of the 2010 Olympics. Preliminary construction of the line began in July 2012 with major construction starting in June 2013 with the construction of columns for support of the line. The project is expected to begin revenue service in early 2017.

The Evergreen Extension will add a total of six new stations and eleven additional kilometres to the SkyTrain system making Vancouver's rapid transit system the longest metro in Canada.<ref>[[Evergreen Line (TransLink)]]</ref>


=== Impact ===
=== Impact ===
SkyTrain has had a significant impact on the development of areas near stations, and has helped to shape urban density in Metro Vancouver. Between 1991 and 2001, the population living within 500 m of SkyTrain increased by 37 per cent, compared to the regional average of 24 per cent.<ref name="Translink-CanadaLineSkyTrain" /> Since SkyTrain opened, the total population of the service area rose from 400,000 to 1.3 million people.<ref>{{cite book|last=Newman|first=Peter W. G|author2=Jeffrey R. Kenworthy |author3=Dr Peter Newman |title=Sustainability and Cities|isbn=1-55963-660-2|page=221|year=1999|publisher=Island Press|location=Washington, D.C.}}</ref> According to BC Transit's document ''SkyTrain: A catalyst for development'', more than $5 billion of private money had been invested within a 10–15 minute walking distance of the SkyTrain and [[SeaBus]]. The report claimed that the two modes of transportation were the driving force of the investment, though it did not disaggregate the general growth in that area.<ref name="seattle">{{cite web|title=Vancouver BC SkyTrain|publisher=City of Seattle|url=http://www.seattle.gov/transportation/SAP/TOD_Case_Studies/Vancouver_Skytrain.pdf|format=PDF|accessdate=February 23, 2007}}</ref>
SkyTrain has had a significant impact on the development of areas near stations, and has helped to shape [[urban density]] in Metro Vancouver. Between 1991 and 2001, the population living within {{Convert|500|m|4=0|abbr=on}} of SkyTrain increased by 37 percent, compared to the regional average of 24 percent.<ref name="TransLink-CanadaLineSkyTrain" /> Since SkyTrain opened, the total population of the service area rose from 400,000 to 1.3{{nbsp}}million people.<ref>{{cite book |last1=Newman |first1=Peter W. G |first2=Jeffrey R. |last2=Kenworthy |first3=Peter |last3=Newman |title=Sustainability and Cities |isbn=978-1-55963-660-5 |page=221 |year=1999 |publisher=Island Press |location=Washington, D.C.}}</ref> According to BC Transit's document ''SkyTrain: A catalyst for development'', more than $5{{nbsp}}billion of private money had been invested within a 10–15 minute walking distance of the SkyTrain and [[SeaBus]]. The report claimed that the two modes of transportation were the driving force of the investment, though it did not disaggregate the general growth in that area.<ref name="seattle">{{cite web |title=Vancouver BC SkyTrain |publisher=City of Seattle |url=http://www.seattle.gov/transportation/SAP/TOD_Case_Studies/Vancouver_Skytrain.pdf |access-date=February 23, 2007 |archive-url=https://web.archive.org/web/20070621182643/http://www.seattle.gov/transportation/SAP/TOD_Case_Studies/Vancouver_Skytrain.pdf |archive-date=June 21, 2007}}</ref>


== Design ==
== Design ==
=== Routes ===
{{Sky Train (Vancouver)|left}}
{{TransLink Major Route Diagram|left}}
[[File:Vancouver SkyTrain track diagram.svg|thumb|350px|The SkyTrain network's schematic diagram.]]
[[File:Vancouver SkyTrain track diagram v3.svg|thumb|upright=1.6|A schematic diagram of the SkyTrain network as of late 2020]]


The Expo and Millennium lines follow a common route between [[Waterfront Station (Vancouver)|Waterfront Station]] in [[Downtown Vancouver]] and [[Columbia Station]] in [[New Westminster]], serving the cities of Vancouver, [[Burnaby]], and New Westminster. From Columbia, Expo Line trains continue through [[Surrey, British Columbia|Surrey]] to [[King George Station]]; Millennium Line trains loop back through New Westminster, Burnaby, and Vancouver to [[VCC–Clark Station]]. The Canada Line travels southward from [[Waterfront Station (Vancouver)|Waterfront Station]] in Downtown Vancouver to [[Richmond, British Columbia|Richmond]], where the track splits at [[Bridgeport Station (TransLink)|Bridgeport Station]]; trains alternate between a southern branch ending at [[Richmond–Brighouse Station]] and a western branch ending at [[Vancouver International Airport]]. Although most of the system is elevated, SkyTrain runs at or below [[Grade separation|grade]] through Downtown Vancouver, for half of the Canada Line's length, and for short stretches in Burnaby and New Westminster.
There are three main routes: the Expo Line, Millennium Line and Canada Line. The Expo Line travels between Waterfront station in [[Downtown Vancouver]] and Columbia station in [[New Westminster]], serving the cities of Vancouver, [[Burnaby]], and New Westminster. From Columbia, the Expo Line splits into two branches. One branch travels through Surrey to [[King George station]], while the other travels through New Westminster and Burnaby, terminating at [[Production Way–University station]].


Millennium Line trains travel between [[VCC–Clark station]] and [[Lafarge Lake–Douglas station]] in the city of [[Coquitlam]]. Near the western end of the line is a major transfer point with the Expo Line at Commercial–Broadway station. Further east, [[Lougheed Town Centre station]] and [[Production Way–University station]] serve as two more transfer points with the Expo Line.
As of 2006, SkyTrain was the longest fully automated rapid-transit system in the world .<ref name="SkyTrain">{{cite web|title=SkyTrain|publisher=TransLink|url=http://www.translink.bc.ca/Transportation_Services/SkyTrain/|archiveurl=http://web.archive.org/web/20061004132840/http://www.translink.bc.ca/Transportation_Services/SkyTrain/|archivedate=2006-10-04|accessdate=December 16, 2006}}</ref> The system uses [[Thales Rail Signalling Solutions|Thales]]' [[SelTrac]] signalling technology to run trains automatically. The program was developed by [[Alcatel]], and loads from a [[Floppy disk|3.5" diskette]]. There are four computer systems called the VCC (Vehicle Control Computer), three divided over the mainline and one for the storage yard. Each VCC is a cluster of three Intel-IA32 Based Processors with proprietary hardware, configured in a fault tolerant setup. For every command that is sent to the VCC, at least two of the processors must agree with the action, otherwise an error is generated and the command is ignored. The VCCs communicates with the train's VOBC (Vehicle On Board Computer), whose data is transmitted through leaky coax cable laid along the tracks. There are up to two VOBCs per married-pair trains, i.e. 4-car train would have two VOBCs. If the VCCs fail or communication between the VCC and the VOBC is lost, the train will 'time-out' and (EB) emergency-brake through a [[Quester Tangent Corporation|Quester Tangent]] BAM (Brake Assurance Monitor) that controls propulsion and braking systems.<ref name="HMU"/> The VCCs have a command-line-console, but normally the trains are controlled through a system known as the SMC, which also provides scheduling. All commands from the SMC are verified to be safe by the VCC before execution. However if the SMC fails, the system can still be operated through the VCC. This is known as 'degraded mode'. The SkyTrain HMU (Health Monitoring Unit) developed by [[Quester Tangent Corporation|Quester Tangent]] <ref name="HMU">[http://www.questertangent.com/our-projects/?pid=448 Quester Tangent - SkyTrain for Fleet Operators]</ref> provides monitoring and diagnostic functionality for vehicle maintenance by connecting to CAN vehicle network and providing a maintenance display in the Hoslter Panel.<ref name="HMU"/>


The Canada Line travels southward from Waterfront station in Downtown Vancouver to [[Richmond, British Columbia|Richmond]], where the track splits at [[Bridgeport station (SkyTrain)|Bridgeport station]]; trains alternate between a southern branch ending at [[Richmond–Brighouse station]] and a western branch ending at [[Vancouver International Airport]].
The Expo Line and Millennium Line have a punctuality record of over 96 per cent; passenger interference with train doors is a principal cause of delays.<ref>{{cite web|title=A Timely SkyTrain Safety Reminder / A near-miss: a timely reminder – wait for the next train!|url=http://www.translink.ca/en/About-TransLink/Media/2009/July/A-Timely-SkyTrain-Safety-Reminder.aspx|publisher=TransLink|date=July 17, 2009|quote=In 2007 and 2008, 981 delays were caused by vehicle issues: 55% of those involved the doors, many of them held open by passengers....With over 96% on-time performance, SkyTrain is rapid, ready and reliable.}}</ref> There has been one derailment and no collisions in the system's history.<ref>{{cite news|title=Translink investigates train derailment|url=http://www.vancouversun.com/TransLink+investigates+SkyTrain+derailment/3084244/story.html|work= Vancouver Sun |accessdate=May 28, 2010}}</ref> SkyTrain uses the world's longest bridge dedicated to transit services. [[Skybridge (TransLink)|Skybridge]] crosses the [[Fraser River]] between [[New Westminster]] and [[Surrey, British Columbia|Surrey]]. It is a 616&nbsp;m (2,021&nbsp;ft) long [[cable-stayed bridge]],<ref>{{cite web|title=Vancouver SkyTrain — a proven success story|format=PDF|url=http://www.jrtr.net/jrtr16/pdf/f44_vancouver.pdf|publisher=Japan railways and transport review|accessdate=January 28, 2007}}</ref> with 123&nbsp;m (404&nbsp;ft) tall towers. Two additional transit-only bridges, the [[North Arm Bridge]] and the [[Middle Arm Bridge]], were built for the Canada Line. The North Arm Bridge is an [[extradosed bridge]] with a total length of 562&nbsp;m (1844&nbsp;ft), with shorter 47&nbsp;m (154&nbsp;ft) towers necessitated by its proximity to the [[Vancouver International Airport]]. The North Arm Bridge also has a pedestrian/bicycle deck connecting the bicycle networks of Vancouver and Richmond.<ref>[http://www.canadaline.ca/files/uploads/docs/doc56.pdf Key Features of the North Arm Fraser Bridge]</ref> The Middle Arm Bridge is a shorter [[box girder bridge]].


Although most of the system is elevated, SkyTrain runs at or below [[Grade separation|grade]] through Downtown Vancouver, for the Vancouver portion of the Canada Line until just before it reaches Richmond at Marine Drive station, through the {{convert|2.1|km|mi|adj=on}} tunnel used by the Millennium Line between Coquitlam and Port Moody, through the {{convert|0.6|km|mi|1|adj=on}} tunnel between Columbia and Sapperton stations in New Westminster, and for short stretches in Burnaby and New Westminster.
The SkyTrain network is fully accessible, including vehicles and stations. Mark I train cars have one designated wheelchair position, Mark II and Hyundai Rotem cars have two, and all stations have elevators. TransLink upgraded all Expo Line platform station edges to match those on the Millennium Line shortly after it was completed. The new, wider edges are brighter and are tiled to provide a safer environment for the visually impaired. The Canada Line also uses this safety feature in its stations.<ref>{{cite news|last=Thomas|first=Sandra|url=http://archive.vancourier.com/issues02/113102/news/113102nn9.html|title=TransLink putting in tactile strips on Expo Line to help visually impaired|work=The Vancouver Courier|date=5 August 2005|accessdate=March 18, 2009}}</ref> Since the opening of the Millennium Line, aside from platform tile upgrading, many Expo line stations have also been refitted with new signage and ticket vending machines.


SkyTrain's Expo Line uses the world's second longest bridge dedicated to transit services, the SkyBridge, which crosses the [[Fraser River]] between [[New Westminster]] and Surrey. It is a {{convert|616|m|ft|adj=mid|-long|comma=5}} [[cable-stayed bridge]],<ref>{{cite web |url=http://www.jrtr.net/jrtr16/pdf/f44_vancouver.pdf |title=Vancouver SkyTrain — a proven success story |publisher=Japan railways and transport review |access-date=January 28, 2007 |archive-url=https://web.archive.org/web/20061008015010/http://www.jrtr.net/jrtr16/pdf/f44_vancouver.pdf |archive-date=October 8, 2006}}</ref> with {{convert|123|m|ft|adj=mid|-tall|comma=5}} towers. Two additional transit-only bridges, the [[North Arm Bridge]] and the [[Middle Arm Bridge]], were built for the Canada Line. The North Arm Bridge is an [[extradosed bridge]] with a total length of {{convert|562|m|ft|abbr=on|comma=5}}, with shorter {{convert|47|m|ft|adj=on|comma=5}} towers necessitated by its proximity to the [[Vancouver International Airport]], and also has a pedestrian/bicycle deck connecting the bicycle networks of Vancouver and Richmond.<ref>[http://www.canadaline.ca/files/uploads/docs/doc56.pdf Key Features of the North Arm Fraser Bridge] {{webarchive|url=https://web.archive.org/web/20070112111316/http://www.canadaline.ca/files/uploads/docs/doc56.pdf |date=January 12, 2007}}</ref> The Middle Arm Bridge is a shorter [[box girder bridge]].
The distinctive three-tone chime used in the SkyTrain system was recorded in 1984–85 at [[Little Mountain Sound Studios]] in Vancouver.<ref>{{cite web|url=http://buzzer.translink.ca/index.php/2008/12/podcast-the-story-of-the-skytrain-chime/|title=Podcast: the story of the SkyTrain chime|publisher=The Buzzer Blog (TransLink)|date=1 December 2008}}</ref> The automated train announcements have been voiced by Laureen Regan since the opening of the Millennium Line in 2002, and by Karen Kelm between 1985 and 2001.<ref>{{cite web|url=http://buzzer.translink.ca/index.php/2008/10/buzzer-podcast-voice-of-the-skytrain/|title=Buzzer Podcast: Voice of the SkyTrain|publisher=The Buzzer Blog (TransLink)|date=20 October 2008}}</ref>


=== Rolling stock ===
=== Technology ===
The [[railway signalling|signalling technology]] used on all three SkyTrain lines to run trains automatically was originally developed by [[Alcatel-Lucent|Alcatel]] and loaded from a [[Floppy disk|3.5" diskette]]. There were initially four systems called the vehicle control computer (VCC) with three divided over the mainline and one for the storage yard. VCC1 controls trains from Waterfront to Royal Oak; VCC2 controls trains from Royal Oak to King George (it now also controls a portion of the Millennium Line); and VCC3 controls trains in the yard. Additional VCCs were added as Skytrain expanded. Each VCC is a cluster of three IBM Type 7588 rack-mount single-board computers with Intel-IA32 Pentium processors and proprietary hardware in a fault-tolerant configuration.<ref>{{Cite web|url=https://vancouversun.com/news/metro/inside-the-skytrain-control-room |title=Inside the SkyTrain control room |work=Vancouver Sun |date=August 4, 2014 |access-date=December 27, 2024 |first=Kelly |last=Sinoski |archive-url=https://web.archive.org/web/20241227193153/https://vancouversun.com/news/metro/inside-the-skytrain-control-room |archive-date=December 27, 2024}}</ref> For example, VCC3 is composed of CPU1, CPU2, and CPU3. For every command that is sent to a train, at least two of the CPUs must agree with the action, otherwise an error is generated and the command is ignored. The VCC communicates with the train's vehicle on board computer (VOBC), whose data is transmitted through coax cables laid along the tracks. There are up to two VOBCs per married-pair trains, i.e. 4-car train would have two VOBCs. If the VCCs fail or communication between the VCC and the VOBC is lost, the train will "time-out" and emergency-brake (EB) through a [[Quester Tangent Corporation|Quester Tangent]] brake assurance monitor (BAM) that controls propulsion and braking systems.<ref name="HMU" /> The VCCs have a command-line-console, but normally the trains are controlled through a system known as the SMC, which also provides scheduling. All commands from the SMC are verified to be safe by the VCC before execution. However if the SMC fails, the system can still be operated through the VCC. This is known as "degraded mode". The SkyTrain health monitoring unit (HMU) developed by [[Quester Tangent Corporation|Quester Tangent]]<ref name="HMU">{{Cite web |url=http://www.questertangent.com/our-projects/?pid=448 |title=Quester Tangent – SkyTrain for Fleet Operators |access-date=March 25, 2015 |archive-url=https://web.archive.org/web/20150306193310/http://www.questertangent.com/our-projects/?pid=448 |archive-date=March 6, 2015 |url-status=live}}</ref> provides monitoring and diagnostic functionality for vehicle maintenance by connecting to CAN vehicle network and providing a maintenance display in the Hostler Panel.<ref name="HMU" />
{{Main|Skytrain rolling stock}}


SkyTrain's signalling system later provided the basis of [[SelTrac]], which is currently maintained and sold by [[Thales Rail Signalling Solutions|Thales]] and has equipped many lines around the world. Largely as a result of this, the Expo and Millennium Lines have a combined punctuality record of over 96 percent; the principal cause of train delays is passenger interference with train doors.<ref>{{cite web |title=A Timely SkyTrain Safety Reminder / A near-miss: a timely reminder – wait for the next train! |url=http://www.translink.ca/en/About-TransLink/Media/2009/July/A-Timely-SkyTrain-Safety-Reminder.aspx |publisher=TransLink |date=July 17, 2009 |quote=In 2007 and 2008, 981 delays were caused by vehicle issues: 55% of those involved the doors, many of them held open by passengers.... With over 96% on-time performance, SkyTrain is rapid, ready and reliable. |access-date=August 11, 2009 |archive-url=https://web.archive.org/web/20090819135028/http://www.translink.ca/en/About-TransLink/Media/2009/July/A-Timely-SkyTrain-Safety-Reminder.aspx |archive-date=August 19, 2009}}</ref> There have been two derailments during revenue service in the system's history.<ref>{{cite news |title=TransLink investigates train derailment |url=https://vancouversun.com/TransLink+investigates+SkyTrain+derailment/3084244/story.html |work=Vancouver Sun |access-date=May 28, 2010 |archive-url=https://web.archive.org/web/20100531193010/http://www.vancouversun.com/TransLink+investigates+SkyTrain+derailment/3084244/story.html |archive-date=May 31, 2010}}</ref><ref>{{Cite web |title=Two sheared bolts caused SkyTrain derailment: FOI documents |url=https://biv.com/article/2022/09/two-sheared-bolts-caused-skytrain-derailment-foi-documents |access-date=2023-08-23 |website=Business in Vancouver |date=September 28, 2022 |language=en}}</ref>
==== Expo and Millennium Lines ====
Expo, Millennium and the planned Evergreen Extension use [[Bombardier Transportation|Bombardier]]'s [[Bombardier Advanced Rapid Transit|Advanced Rapid Transit]] (ART) technology, a system of automated trains driven by [[linear motor|linear induction motors]], formerly known as Intermediate Capacity Transit System (ICTS). These trains reach speeds of 90&nbsp;km/h (56&nbsp;mph);<ref>{{cite web|title=Equipment Limits of Approach - Contractor Safety While Working Near SkyTrain|publisher=The British Columbia Rapid Transit Company Ltd|url=http://www.translink.ca/-/media/Documents/about_translink/doing_business_with_translink/real_estate/equipment_limits_of_approach_expo_millennium_line.pdf|accessdate=February 3, 2016}}</ref> including wait times at stops, the end-to-end average speed is 45&nbsp;km/h (28&nbsp;mph), three times faster than a bus and almost twice as fast as a [[B-Line (Vancouver)|B-Line]] express bus.<ref>{{cite web|url=http://www.translink.bc.ca/files/pdf/plan_proj/area_plans/burnaby-summary-report.pdf|archiveurl=http://web.archive.org/web/20050109020315/http://www.translink.bc.ca/files/pdf/plan_proj/area_plans/burnaby-summary-report.pdf|archivedate=2005-01-09|title=Burnaby/New Westminster Area Transit Plan Summary Report|format=PDF|accessdate=December 13, 2006}}</ref>
[[Image:Skytrain-mk1.jpg|right|thumb|The interior of an older Mark I train.]]


=== Accessibility ===
'''UTDC ICTS Mark I fleet'''
The SkyTrain network is fully mobility-needs accessible, including vehicles and stations. Mark I train cars have one designated wheelchair position, Mark II, Mark III and [[Hyundai Rotem]] cars have two, and all stations have elevators. TransLink upgraded all Expo Line platform station edges to match those on the Millennium Line shortly after it was completed. The new, wider edges are brighter and are tiled to provide a safer environment for the visually impaired. The Canada Line also uses this safety feature in its stations.<ref>{{cite news |last=Thomas |first=Sandra |url=http://archive.vancourier.com/issues02/113102/news/113102nn9.html |title=TransLink putting in tactile strips on Expo Line to help visually impaired |work=The Vancouver Courier |date=August 5, 2005 |access-date=March 18, 2009 |archive-url=https://archive.today/20090911040715/http://archive.vancourier.com/issues02/113102/news/113102nn9.html |archive-date=September 11, 2009}}</ref> Since the opening of the Millennium Line, aside from platform tile upgrading, many Expo line stations have also been refitted with new signage and ticket vending machines. Accessibility is provided for deaf individuals through real-time English signage and displays at stations and on newer trains, although a reliance on verbal communication for service disruptions has been identified as a transportation barrier.<ref name="TranslinkAccessibility23">{{Cite report |url=https://www.translink.ca/-/media/translink/documents/rider-guide/transit-accessibility/accessibility-plan/2023_translink_accessibility_plan.pdf |title=Accessibility Plan 2023 |date=2023 |access-date=2024-01-03}}</ref>{{rp|33}}


The distinctive three-tone chime used in the SkyTrain system was recorded in 1984–85 at [[Little Mountain Sound Studios]] in Vancouver.<ref>{{cite web |url=http://buzzer.translink.ca/index.php/2008/12/podcast-the-story-of-the-skytrain-chime/ |title=Podcast: the story of the SkyTrain chime |work=The Buzzer blog |publisher=The Buzzer Blog (TransLink) |date=December 1, 2008 |access-date=May 26, 2009 |archive-url=https://web.archive.org/web/20090910012445/http://buzzer.translink.ca/index.php/2008/12/podcast-the-story-of-the-skytrain-chime/ |archive-date=September 10, 2009 |url-status=live}}</ref> The automated train announcements have been voiced by Laureen Regan since the opening of the Millennium Line in 2002, and by Karen Kelm between 1985 and 2001.<ref>{{cite web |url=http://buzzer.translink.ca/index.php/2008/10/buzzer-podcast-voice-of-the-skytrain/ |title=Buzzer Podcast: Voice of the SkyTrain |work=The Buzzer blog |publisher=The Buzzer Blog (TransLink) |date=October 20, 2008 |access-date=May 26, 2009 |archive-url=https://web.archive.org/web/20090819025936/http://buzzer.translink.ca/index.php/2008/10/buzzer-podcast-voice-of-the-skytrain/ |archive-date=August 19, 2009 |url-status=live}}</ref>
The initial fleet consists of {{convert|12.7|m|ft|1|abbr=on}} lightweight Mark I ICTS cars from [[Urban Transportation Development Corporation]], similar to those used by Toronto's [[Scarborough RT]] and the [[Detroit People Mover]]. Mark I vehicles are composed of mated pairs and normally run as four-car trains, but can be run in two-, four-, or six-car configurations. The maximum based on current station platform lengths is a six-car configuration, totaling {{convert|76.2|m|ft|abbr=on}}. The SkyTrain fleet includes 150 (168?) Mark I cars. These trains have a mix of forward-, reverse- and side-facing seats; red, white, and blue interiors; and four doors per car, two per side.{{citation needed|date=April 2013}}


== Rolling stock ==
'''Bombardier ART Mark II fleet'''
{{Main|SkyTrain (Vancouver) rolling stock}}


=== Expo and Millennium Lines ===
When the Millennium Line was built, TransLink ordered new-generation Mark II ART trains from [[Bombardier Transportation]], some of which were assembled in a Burnaby factory.<ref>{{cite news|title=Questions about Skytrain $|work=CBC News|date=May 25, 2000|url=http://www.cbc.ca/news/story/2000/05/25/bc_bombardier000524.html|accessdate=February 3, 2007}}</ref> Similar trains are used in Kuala Lumpur's [[Kuala Lumpur Putra Light Rail Transit|Kelana Jaya Line]], New York's [[AirTrain JFK|JFK AirTrain]], and the new [[Airport Express (Beijing Subway)|Beijing Airport Express]]. These trains are usually seen in four-car configurations (except for two-car configurations for turn-back trains running between Waterfront and Commercial-Broadway stations while Main Street-Science World station is being re-constructed). Each pair of cars is semi-permanently joined together in a [[twin unit]] or 'married pair', with a length of 33.4 m. Mark II trains have a streamlined front and rear, an articulated joint allowing passengers to walk the length of a married pair, white/grey/blue interior, and six doors per car, three per side. Translink also ordered 48 Mark II ART (2009/2010 model) in 2009 to further supplement supply and integrate new features like CCTV and visual maps with LED lights.<ref>{{cite web|title=The Buzzer blog $|publisher=Translink|date=July 3, 2009|url=http://buzzer.translink.ca/index.php/2009/07/the-buzzer-rides-the-first-of-the-new-skytrain-cars/|accessdate=February 3, 2007}}</ref>
The Expo Line and Millennium Line use [[Bombardier Transportation|Bombardier]]'s [[Bombardier Advanced Rapid Transit|Advanced Rapid Transit]] (ART) system, a system of automated trains driven by [[linear motor|linear induction motors]], formerly known as Intermediate Capacity Transit System (ICTS). These trains reach speeds of {{Convert|90|km/h|4=1|abbr=on}};<ref>{{cite web |title=Equipment Limits of Approach – Contractor Safety While Working Near SkyTrain |publisher=The British Columbia Rapid Transit Company Ltd |url=http://www.translink.ca/-/media/Documents/about_translink/doing_business_with_translink/real_estate/equipment_limits_of_approach_expo_millennium_line.pdf |access-date=February 3, 2016 |archive-url=https://web.archive.org/web/20160206214817/http://www.translink.ca/-/media/Documents/about_translink/doing_business_with_translink/real_estate/equipment_limits_of_approach_expo_millennium_line.pdf |archive-date=February 6, 2016}}</ref> including wait times at stops, the end-to-end average speed is {{Convert|45|km/h|4=1|abbr=on}}, three times faster than a bus and almost twice as fast as a [[B-Line (Vancouver)|B-Line]] express bus.<ref>{{cite web |url=http://www.translink.bc.ca/files/pdf/plan_proj/area_plans/burnaby-summary-report.pdf |archive-url=https://web.archive.org/web/20050109020315/http://www.translink.bc.ca/files/pdf/plan_proj/area_plans/burnaby-summary-report.pdf |archive-date=January 9, 2005 |title=Burnaby/New Westminster Area Transit Plan Summary Report |access-date=December 13, 2006}}</ref> During cold weather, TransLink crews use [[hockey stick]]s to clear snow and ice from train doors, which would otherwise prevent some doors from being able to open.<ref>{{cite news |last=Tung |first=Allen |date=December 29, 2021 |title=The most Canadian solution to keep SkyTrain customers moving, eh? |url=https://buzzer.translink.ca/2021/12/translink-hockey-sticks-canada-skytrain/ |work=The Buzzer |publisher=TransLink |accessdate=December 19, 2022}}</ref> The trains are also slowed and staffed by TransLink attendants, who can manually override the automatic controls in the event of an obstruction caused by snow or ice.<ref>{{cite news |last=Tung |first=Allen |date=January 5, 2022 |title=This is why you see SkyTrain Attendants onboard during snow |url=https://buzzer.translink.ca/2022/01/this-is-why-you-see-skytrain-attendants-onboard-during-snow/ |work=The Buzzer |publisher=TransLink |accessdate=December 19, 2022}}</ref>


'''Bombardier ART Mark III fleet (future)'''
==== UTDC ICTS Mark I fleet ====
[[File:Skytrain Mk I in new Translink livery arriving at Holdom Skytrain station.jpg|right|thumb|An original Mark I train (2013)]]
The Bombardier ART model has undergone several redesigns from the original UTDC ICTS model, and the Mark II design has been updated by Bombardier, with its newest offering being the Mark III. Dimensions are expected to be similar to the Mark II, with possible capacity improvements offered over the outgoing model through redesigned car layout. TransLink has released conceptual renderings of what future Mark III cars might look like in Vancouver's SkyTrain network. The vehicles appear sleeker, with larger windows on the sides of the train, and redesigned windows and headlights on the ends of the cars. Translink ordered 28 cars for the Evergreen Line in a 4-car articulated configure, with two centre cars, to allow full length train movements by passengers. Delivery started in 2015 with an in service date of 2016 for all trains. Although ordered for the Evergreen Line, these trains will be utilized on the Expo Line and 2-car Mark II ART trains will be used on the Evergreen Line at launch. <ref>{{cite web|title=sleek-looking, longer SkyTrain trains arriving this year|url=http://www.vancitybuzz.com/2015/06/sleek-looking-longer-skytrain-trains-arriving-this-year/|website=Buzzer Blog}}</ref>
The initial fleet consisted of {{convert|12.7|m|ftin||abbr=on|frac=16}} lightweight Mark I ICTS cars from [[Urban Transportation Development Corporation]], similar to those used by Toronto's [[Line 3 Scarborough]] and the [[Detroit People Mover]]. Mark I vehicles are composed of mated pairs and normally run as six-car trains and only on the Expo Line, but can be run in two-, four-, or six-car configurations. The maximum based on current station platform lengths is a six-car configuration, totalling {{convert|76.2|m|ft}}. The SkyTrain fleet includes 150 Mark I cars. These trains have a mix of forward-, reverse- and side-facing seats; red, white, and blue interiors; and four doors per car, two per side.


==== Canada Line ====
==== Bombardier ART Mark II fleet ====
[[File:Canada Line train interior.jpg|thumb|right|Canada Line's Hyundai Rotem trains are wider than Bombardier Mark II trains, with spaces assigned for bicycles and luggage.]]
[[File:Mark II Expo Line train, March 2019.jpg|thumb|A second generation Mark II train in New Westminster (2019)]]
When the Millennium Line was built, TransLink ordered new-generation Mark II ART trains from [[Bombardier Transportation]], some of which were assembled in a Burnaby factory.<ref>{{cite news |title=Questions about Skytrain $ |work=CBC News |date=May 25, 2000 |url=https://www.cbc.ca/amp/1.232558 |access-date=February 3, 2007 |archive-url=https://web.archive.org/web/20070321080828/http://www.cbc.ca/news/story/2000/05/25/bc_bombardier000524.html |archive-date=March 21, 2007 |url-status=live}}</ref> Similar trains are used in Kuala Lumpur's [[Kuala Lumpur Putra Light Rail Transit|Kelana Jaya Line]], New York's [[AirTrain JFK|JFK AirTrain]], and the [[Airport Express (Beijing Subway)|Beijing Airport Express]]. These trains are run in four-car configurations on the Expo Line, and two-car configurations on the Millennium Line. Each pair of cars is semi-permanently joined together in a [[twin unit]] or "married pair", with a length of {{Convert|33.4|m|ft}}. Mark II trains have a streamlined front and rear, an articulated joint allowing passengers to walk the length of a married pair, white/grey/blue interior, and six doors per car, three per side. TransLink also ordered 48 Mark II ART (2009/2010 model) in 2009 to further supplement supply and integrate new features like CCTV and visual maps with LED lights.<ref>{{cite web |title=The Buzzer rides the first of the new SkyTrain cars! |last=Pabillano |first=Jhenifer |publisher=TransLink |date=July 3, 2009 |url=http://buzzer.translink.ca/index.php/2009/07/the-buzzer-rides-the-first-of-the-new-skytrain-cars/ |access-date=February 3, 2007 |archive-url=https://web.archive.org/web/20090715075106/http://buzzer.translink.ca/index.php/2009/07/the-buzzer-rides-the-first-of-the-new-skytrain-cars/ |archive-date=July 15, 2009 |url-status=live}}</ref>
[[File:Canada Line 001.JPG|right|thumb|Real-time information is provided on every station platform on the Canada Line]]

'''Hyundai Rotem EMU fleet'''
==== Bombardier Innovia Metro 300 (ART Mark III) fleet ====
The Canada Line uses different train propulsion technology than the other SkyTrain lines, with cars powered by conventional electric motors rather than linear induction motor (LIM) technology, and are therefore incompatible with the other lines. There are a total of 20 trains, which operate as two-carriage articulated units, and can reach a speed of {{convert|80|km/h|mph}}.<ref>{{cite web|title=The Canada Line Factsheet – The Canada Line Vehicle|format=PDF|url=http://vancouver.ca/engsvcs/transport/rto/canadaline/documents/20071214UpdatedFactSheetNo.1CanadaLineVehicle.pdf|publisher=[[Greater Vancouver Regional District]]|accessdate=December 5, 2008}}</ref> They are maintained at a yard next to [[Bridgeport Station (TransLink)|Bridgeport Station]] in Richmond.
[[File:SkyTrain Mark III arriving at Stadium Chinatown Station.jpg|thumb|4-car Bombardier Innovia Metro 300 (ART Mark III) train arriving at Stadium-Chinatown station (2016)]]

The Bombardier ART model has undergone several redesigns from the original UTDC ICTS model, and the Mark II design has been updated by Bombardier, with this newest offering being the [[Bombardier Innovia Metro|Innovia Metro 300]]. Dimensions are similar to the Mark II, with capacity improvements offered over the outgoing model through redesigned car layout. TransLink ordered 28 Mark III cars, which began delivery in 2015, and went into service beginning in August 2016.<ref>{{Cite web |url=http://www.translink.ca/en/About-Us/Media/2016/August/TransLink-launches-first-Mark-III-train.aspx |title=TransLink launches first Mark III train |publisher=TransLink |date=August 18, 2016 |access-date=August 19, 2016 |archive-url=https://web.archive.org/web/20160828011314/http://www.translink.ca/en/About-Us/Media/2016/August/TransLink-launches-first-Mark-III-train.aspx |archive-date=August 28, 2016 |url-status=live}}</ref><ref name=":0">{{Cite web |url=http://www.news1130.com/2016/08/18/new-skytrain-cars-coming-to-expo-line/ |title=New SkyTrain cars coming to Expo Line |date=August 18, 2016 |work=NEWS 1130 |access-date=August 19, 2016 |archive-url=https://web.archive.org/web/20160819155101/http://www.news1130.com/2016/08/18/new-skytrain-cars-coming-to-expo-line/ |archive-date=August 19, 2016 |url-status=live}}</ref> The vehicles appear sleeker, with larger windows on the sides of the train, and redesigned windows and headlights on the ends of the cars. The interior is largely similar to the second generation of Mark II cars, with the some seats removed to better accommodate bicycles and strollers.<ref name=":1">{{Cite web |url=http://www.cbc.ca/news/canada/british-columbia/translink-mark-skytrain-1.3726941 |title=More passengers, less noise: TransLink unveils SkyTrain Mark III |access-date=August 19, 2016 |archive-url=https://web.archive.org/web/20160819002023/http://www.cbc.ca/news/canada/british-columbia/translink-mark-skytrain-1.3726941 |archive-date=August 19, 2016 |url-status=live}}</ref> TransLink has claimed that the interior of the Mark III offers better sound and heat insulation.<ref name=":0" /><ref name=":1" /> TransLink ordered the cars for the Evergreen Extension in a 4-car articulated configuration, with two centre cars, to allow full-length train movements by passengers. However, due to a shortage of trains, the Mark IIIs are being used on the Expo Line, while 2-car Innovia 200 (Mk2) serve the Millennium Line. On December 16, 2016, TransLink ordered 28 more Mark III cars, bringing the total of Mark III cars to 56 by the end of 2019.<ref>{{Cite web |url=https://www.translink.ca/en/About-Us/Media/2016/December/28-new-SkyTrain-cars-ordered-to-improve-transit-in-Metro-Vancouver.aspx |title=28 new SkyTrain cars ordered to improve transit in Metro Vancouver |date=December 16, 2016 |website=TransLink.ca |access-date=January 2, 2017 |archive-url=https://web.archive.org/web/20170103102538/http://www.translink.ca/en/About-Us/Media/2016/December/28-new-SkyTrain-cars-ordered-to-improve-transit-in-Metro-Vancouver.aspx |archive-date=January 3, 2017 |url-status=live}}</ref><ref name="2018feb_order" /> On February 22, 2018, TransLink announced a further order of 28 Mark III cars, which will bring the total number of Mark III cars to 84 once all trains are in service by the end of 2020.<ref name="2018feb_order">{{cite web |date=February 22, 2018 |title=TransLink accelerating delivery of new SkyTrain cars |url=https://www.translink.ca/About-Us/Media/2018/February/TransLink-accelerating-delivery-of-new-SkyTrain-cars.aspx |url-status=dead |archive-url=https://web.archive.org/web/20190807225718/https://www.translink.ca/About-Us/Media/2018/February/TransLink-accelerating-delivery-of-new-SkyTrain-cars.aspx |archive-date=August 7, 2019 |access-date=Oct 10, 2023 |website=TransLink}}</ref>

=== Canada Line ===
[[File:Canada Line train interior.jpg|thumb|right|Canada Line's Hyundai Rotem trains are wider than Bombardier Mark II trains, with spaces assigned for wheelchairs, bicycles and luggage (2009).]]
[[File:Canada Line 001.JPG|right|thumb|Real-time information is provided on every station platform on the Canada Line (2009).]]

The Canada Line uses Hyundai Rotem [[Electric multiple unit|EMU]] vehicles, with cars powered by conventional electric motors instead of the linear induction motor (LIM) technology used by the Expo and Millennium Line vehicles; as a result, the Canada Line vehicles cannot be used on the Expo and Millennium Lines. There are 20 trains, which operate as two-carriage articulated units and can reach a speed of {{convert|80|km/h|mph|1|abbr=on}}.<ref>{{cite web |title=The Canada Line Factsheet – The Canada Line Vehicle |url=http://vancouver.ca/engsvcs/transport/rto/canadaline/documents/20071214UpdatedFactSheetNo.1CanadaLineVehicle.pdf |publisher=[[Greater Vancouver Regional District]] |access-date=December 5, 2008 |archive-url=https://web.archive.org/web/20090326090147/http://vancouver.ca/engsvcs/transport/rto/canadaline/documents/20071214UpdatedFactSheetNo.1CanadaLineVehicle.pdf |archive-date=March 26, 2009}}</ref> They are maintained at a yard next to [[Bridgeport station (SkyTrain)|Bridgeport station]] in Richmond.

On February 22, 2018, TransLink announced an additional order of 24 Canada Line cars to be brought into service by 2020, bringing the total to 32 trains operating as two-car units.<ref name="2018feb_order" />


== Future expansion ==
== Future expansion ==
Several possible expansions to the SkyTrain network have been announced. The Evergreen Line (now known as the Evergreen Extension of the Millennium Line), which will run from [[Lougheed Town Centre]] to [[Coquitlam Town Centre]] and [[Douglas College]], will be opening in early 2017. TransLink has previously released a ten-year outlook<ref>{{cite web|url=http://www.translink.bc.ca/files/pdf/10year_project-summary.pdf|archiveurl=http://web.archive.org/web/20050902145713/http://www.translink.bc.ca/files/pdf/10year_project-summary.pdf|archivedate=2005-09-02|format=PDF|title=Translink Three-Year Plan and Ten-Year Outlook}}</ref> outlining a potential UBC Line and further expansion of the Expo Line into Surrey.<ref>{{cite web|title=UBC Line Rapid Transit Study - Alternative Designs|url=http://www.translink.ca/en/Be-Part-of-the-Plan/Public-Consultation/UBC-Line-Rapid-Transit-Study/Alternative-Designs.aspx|publisher=Translink|accessdate=April 21, 2011}}</ref> More recently in 2011, two separate rapid transit studies have given further examination and consultation into rapid transit options for expansion for both the UBC/Broadway Corridor as well as Surrey and the South of Fraser region. Expo Line capacity upgrades are also being planned to meet future demand.
Several possible expansions to the SkyTrain network have been announced. In 2005, TransLink released a ten-year outlook outlining a potential line to the [[University of British Columbia]] (UBC) and further expansion of the Expo Line into Surrey.<ref>{{cite web |url=http://www.translink.bc.ca/files/pdf/10year_project-summary.pdf |archive-url=https://web.archive.org/web/20050902145713/http://www.translink.bc.ca/files/pdf/10year_project-summary.pdf |archive-date=September 2, 2005 |title=TransLink Three-Year Plan and Ten-Year Outlook}}</ref> In 2011, two separate rapid transit studies have given further examination and consultation into rapid transit options for expansion for the UBC–Broadway corridor, and Surrey and the South of Fraser region.<ref>{{cite web |title=UBC Line Rapid Transit Study Alternative Designs |url=http://www.translink.ca/en/Be-Part-of-the-Plan/Public-Consultation/UBC-Line-Rapid-Transit-Study/Alternative-Designs.aspx |publisher=TransLink |access-date=April 21, 2011 |archive-url=https://web.archive.org/web/20150904113844/http://www.translink.ca/en/Be-Part-of-the-Plan/Public-Consultation/UBC-Line-Rapid-Transit-Study/Alternative-Designs.aspx |archive-date=September 4, 2015}}</ref> Expo Line capacity upgrades are also being planned to meet future demand.


A pair of expansions—the Broadway corridor extension and the Expo Line to Langley—began construction in the early 2020s alongside the addition of 235 new cars and upgrades to SkyTrain facilities.<ref>{{cite news |last=Tung |first=Allen |date=September 26, 2023 |title=TransLink embarks on transformative SkyTrain Expansion Program |url=https://buzzer.translink.ca/2023/09/translink-embarks-on-transformative-skytrain-expansion-program/ |work=The Buzzer |publisher=TransLink |accessdate=September 27, 2023}}</ref><ref name=":3">{{Cite web |date=May 28, 2024 |title=Alstom will supply 6 additional Vancouver SkyTrain Mark V trains |url=https://www.alstom.com/press-releases-news/2024/5/alstom-will-supply-6-additional-vancouver-skytrain-mark-v-trains |access-date=May 28, 2024 |website=Alstom.com}}</ref>
=== Evergreen Extension (2017) ===
{{Main|Evergreen Extension (TransLink)}}
The Evergreen Extension had been scheduled to be completed in 2009, but was delayed to 2017 because of budget concerns and unexpected difficulties during tunneling.<ref>{{cite news|url=http://www.theglobeandmail.com/news/national/british-columbia/evergreen-line-to-be-on-time-premier-says/article1494338/|work=The Globe and Mail|date=8 March 2010|title=Evergreen line to be on time, Premier says |accessdate=10 April 2010}}</ref><ref>{{cite web|url=http://www.translink.bc.ca/About_TransLink/News_Releases/news07270601.asp|archiveurl=http://web.archive.org/web/20061004134758/http://www.translink.bc.ca/About_TransLink/News_Releases/news07270601.asp|archivedate=19 July 2006|title=Burnaby/New Westminster Area Transit Plan Summary Report|format=PDF|accessdate=10 April 2010}}</ref><ref>{{Cite web|title = Evergreen Line delayed until 2017, Port Moody mayor 'not happy'|url = http://www.cbc.ca/news/canada/british-columbia/evergreen-skytrain-2017-skytrain-transit-translink-1.3340013|website = www.cbc.ca|access-date = 2016-02-23}}</ref> The line will connect Lougheed Town Centre Station in [[Burnaby]] to [[Coquitlam]] City Centre.


===Broadway corridor extension<span id="broadwayextension"></span><span id="Broadway corridor extension"></span>===
Light Rail Transit (LRT) was selected as the preferred technology for the route. However, further planning review resulted in an announcement on February 1, 2008 that the provincial government's preferred system was Automated Metro Rail Transit, or SkyTrain-like technology.<ref>{{cite press release|url=http://www.th.gov.bc.ca/evergreen_line/|title=Provincial Government and TransLink releases the business case ART for the Evergreen Line |publisher=Ministry of Transportation|date=1 February 2008|accessdate=February 1, 2008}}</ref> The goal of this latest change is to boost projected ridership by adding capacity and speed, and by integrating the system with the Millennium Line to reduce the number of times users need to change systems. The expected cost of the line is $1.4 billion.
{{Main|Millennium Line#Broadway extension}}


Early proposals planned to extend SkyTrain west along the Broadway corridor, but stopped well short of UBC because of the cost, estimated at $700{{nbsp}}million in 1999.<ref>{{cite web |url=http://vancouver.ca/engsvcs/transport/rto/millennium_extension.htm |archive-url=https://web.archive.org/web/20060207233528/http://vancouver.ca/engsvcs/transport/rto/millennium_extension.htm |archive-date=February 7, 2006 |title=Rapid Transit Office Millennium Line Extension |publisher=City of Vancouver |access-date=December 15, 2006}}</ref> However, the Provincial Transit Plan, released in February 2008, included funding for the entire Broadway corridor to UBC. The line would replace the region's busiest bus routes, where over 100,000 trips are made daily. The line would also include an interchange with the Canada Line at Cambie Street. In 2008, the new line was estimated to cost $2.8{{nbsp}}billion, with an expected completion date of 2020.<ref name="PTP" />
Millennium Line trains will operate between [[VCC–Clark station]] and [[Lafarge Lake–Douglas station]], extending existing service northeast beyond [[Lougheed Town Centre station]], while current service east of Lougheed Town Centre will switch to the Expo Line. The Millennium Line will run elevated along North and Clarke Roads, through a tunnel under the Clarke Road corridor. It will exit the tunnel heading east through Port Moody, and towards Coquitlam Centre, where it will run at grade alongside the Canadian Pacific rail line. It will then connect with the [[Coquitlam Central railway station|Coquitlam Central station]], integrating with the existing bus loop and the West Coast Express station. Elevated again, it will turn northward along Pinetree Way and end near Douglas College.<ref>{{cite press release|url=http://www.evergreenline.gov.bc.ca/route_and_stations.htm|title=Evergreen Line Project Overview|publisher=Ministry of Transportation|date=15 April 2011}}</ref>


Government statements suggested that the UBC line would be an extension of the SkyTrain network from VCC–Clark station via elevated platforms or a tunnel along Broadway ending at [[University of British Columbia Vancouver]]. This would mean that riders travelling from Coquitlam to UBC would not need to change trains, as Millennium Line trains would continue to UBC from Lafarge Lake–Douglas station. Riders from the Evergreen Extension east of Commercial–Broadway station would also have a secondary route to downtown with the option of transferring to the Canada Line instead of the Expo Line. However, light rail and higher-capacity [[bus rapid transit]] were also proposed.<ref>{{cite web |title=Rapid Transit Principles for the Broadway Corridor and the UBC Line Rapid Transit Study |url=https://council.vancouver.ca/20100122/documents/penv1.pdf |publisher=City of Vancouver |access-date=April 10, 2010 |archive-url=https://web.archive.org/web/20160314081128/http://council.vancouver.ca/20100122/documents/penv1.pdf |archive-date=March 14, 2016 |url-status=live}}</ref>
Funding was in place in October 2011. The line is expected to open for service in early 2017.<ref>{{cite press release|url=http://www.evergreenline.gov.bc.ca/documents/NewsReleases/2011TRAN0096-001456.pdf|title=Evergreen Line RFP released|publisher=Ministry of Transportation|date=9 November 2011}}</ref><ref>[http://www.evergreenline.gov.bc.ca/about.htm Evergreenline.gov.bc.ca]</ref>


In 2011, with the UBC Line Rapid Transit Study, SkyTrain was evaluated as a possible technology for rapid transit expansion along the Broadway corridor to UBC, along with light rail transit and bus rapid Transit. The June 2014 plan proposes a first phase that would extend the Millennium Line from VCC–Clark station to Arbutus Street using SkyTrain technology, with an interchange with the Canada Line at [[Broadway–City Hall station]]; a second phase would see the line extended from Arbutus to UBC.<ref>{{cite web |url=https://www.translink.ca/Plans-and-Projects/Rapid-Transit-Projects/Broadway-Subway-Project.aspx |title=Broadway Subway Project |publisher=TransLink |access-date=April 8, 2019 |archive-url=https://web.archive.org/web/20190325033721/https://www.translink.ca/Plans-and-Projects/Rapid-Transit-Projects/Broadway-Subway-Project.aspx |archive-date=March 25, 2019 |url-status=live}}</ref> [[TransLink (British Columbia)#2015 plebiscite|A plebiscite]] to raise 25 percent of the funds required for the Broadway extension to Arbutus, among other transit expansion plans, was defeated in 2015.<ref>{{cite news |url=https://www.theglobeandmail.com/news/british-columbia/transit-results/article25228292/ |title=Vancouver-region voters reject sales-tax hike to fund transit projects |work=The Globe and Mail |date=July 2, 2015 |first=Frances |last=Bula |access-date=September 1, 2017 |url-status=live |archive-url=https://web.archive.org/web/20170224010517/https://www.theglobeandmail.com/news/british-columbia/transit-results/article25228292/ |archive-date=February 24, 2017}}</ref>
=== UBC Line/Broadway Corridor extension (~2020) ===
Early proposals planned to extend SkyTrain west along the Broadway corridor, but stopped well short of UBC because of the cost, estimated at $700 million in 1999.<ref>{{cite web|url=http://vancouver.ca/engsvcs/transport/rto/millennium_extension.htm|archiveurl=http://web.archive.org/web/20060505211557/http://web.archive.org/web/20060207233528/http://vancouver.ca/engsvcs/transport/rto/millennium_extension.htm|archivedate=2006-05-05|title=Rapid Transit Office Millennium Line Extension|publisher=City of Vancouver|accessdate=December 15, 2006}}</ref> However, the Provincial Transit Plan, released in February 2008, includes funding for the entire Broadway corridor to UBC. The line would replace the region's busiest bus routes, where over 100,000 trips are made daily. The line would also include an interchange with the Canada Line at Cambie Street. The new line is estimated to cost $2.8 billion and to be completed by 2020.<ref name="PTP" />


On March 16, 2018, the provincial government approved the construction of an extension of the Millennium Line underneath Broadway, which will extend the line underground west to Arbutus Street, while adding six new stations. Early work was slated to begin in 2019 with a completion date set for 2025.<ref>{{cite news |first=Kenneth |last=Chan |title=It's official: Broadway Subway and Surrey LRT will be built in $7-billion transit plan |url=https://dailyhive.com/vancouver/translink-mayors-council-broadway-subway-surrey-lrt-march-2018 |work=Daily Hive Vancouver |date=March 16, 2018 |access-date=March 17, 2018 |archive-url=https://web.archive.org/web/20180317033101/http://dailyhive.com/vancouver/translink-mayors-council-broadway-subway-surrey-lrt-march-2018 |archive-date=March 17, 2018 |url-status=live}}</ref> On April 19, 2018, the UBC Board of Governors indicated it would consider contributing funds towards accelerating the extension of the Millennium Line from its new planned terminus at Arbutus to the university.<ref>{{Cite news |url=https://news.ubc.ca/2018/04/19/ubc-to-advocate-completion-of-rapid-transit-to-campus/ |title=UBC to advocate completion of rapid transit to campus |date=April 19, 2018 |work=UBC News |access-date=April 22, 2018 |archive-url=https://web.archive.org/web/20180422132938/https://news.ubc.ca/2018/04/19/ubc-to-advocate-completion-of-rapid-transit-to-campus/ |archive-date=April 22, 2018 |url-status=live}}</ref>
Government statements suggest that the UBC line will be an extension of the SkyTrain network from VCC–Clark Station via elevated platforms or a tunnel along Broadway ending at the [[University of British Columbia]] in the [[University Endowment Lands]]. This would mean that commuters from Coquitlam to UBC would not need to change trains during their commute, as Millennium Line trains would continue to UBC from [[Lafarge Lake–Douglas station]]. Commuters from the Evergreen Extension east of [[Commercial-Broadway Station]] would also have a secondary route to downtown with the option of transferring to the Canada Line instead of the Expo/Millennium Line. However, light rail and higher-capacity [[bus rapid transit]] have also been proposed.<ref>{{cite web|title=Rapid Transit Principles for the Broadway Corridor and the UBC Line Rapid Transit Study|url=http://vancouver.ca/ctyclerk/cclerk/20100122/documents/penv1.pdf|publisher=City of Vancouver|accessdate=10 April 2010}}</ref>


On January 30, 2019, [[Vancouver City Council]] endorsed building the line underground all the way to UBC.<ref>{{Cite web |url=https://www.thestar.com/vancouver/2019/01/30/vancouver-moves-forward-on-38-billion-subway-extension-to-ubc.html |title=Vancouver moves forward on $3.8{{nbsp}}billion subway extension to UBC &#124; the Star |website=[[Toronto Star]] |date=January 30, 2019 |access-date=January 31, 2019 |archive-url=https://web.archive.org/web/20190201065628/https://www.thestar.com/vancouver/2019/01/30/vancouver-moves-forward-on-38-billion-subway-extension-to-ubc.html |archive-date=February 1, 2019 |url-status=live}}</ref>
In 2011, with the UBC Line Rapid Transit Study, SkyTrain was evaluated as a possible technology for rapid transit expansion along the Broadway corridor to UBC, along with Light Rail Transit and Bus Rapid Transit. As of June 2014, the current plan is to extend the Millennium Line from VCC-Clark station to Arbutus Street at first, with a crossover with the Canada Line at [[Broadway–City Hall station]], before continuing a second phase to extend the line all the way to UBC.<ref>http://www.translink.ca/en/Plans-and-Projects/Rapid-Transit-Projects/Broadway-SkyTrain-Extension.aspx</ref>


On July 17, 2020, the British Columbia government announced that the [[Acciona]]–Ghella Joint Venture Company had been selected to receive the design–build contract for the Broadway extension.<ref>{{cite news|last1=Smith|first1=Charlie|date=July 17, 2020|title=B.C. government announces who will design, build, and partially finance Broadway Subway Project|work=The Georgia Straight|url=https://www.straight.com/news/bc-government-announces-who-will-design-build-and-partially-finance-broadway-subway-project|access-date=September 4, 2020}}</ref> Premier John Horgan confirmed on September 4, 2020, that construction would proceed in the fourth quarter of 2020 despite the ongoing [[COVID-19 pandemic in British Columbia]]. Horgan also confirmed that the extension is expected to be in service by 2025. Transportation Minister Claire Trevena also stated that there were no immediate plans to extend the line towards the UBC campus.<ref>{{cite news|date=September 4, 2020|title=Construction on Broadway SkyTrain project to begin this fall|work=CBC News|url=https://www.cbc.ca/news/canada/british-columbia/broadway-subway-construction-2020-vancouver-1.5711005|access-date=September 4, 2020}}</ref>
=== Expo Line extension (~2020) ===
The 2008 Provincial Transit Plan included a 6-km extension of the Expo line from King George Station in Surrey east to [[Guildford Town Centre|Guildford]], then along 152 Street to the [[Fraser Highway]] and southeast as far as 168 Street.<ref name="surreyleader">Nagel, Jeff (January 16, 2008) [http://web.archive.org/web/20080120191344/http://www.bclocalnews.com/surrey_area/surreyleader/news/More_SkyTrains_for_Surrey.html "More SkyTrains for Surrey"]. Surrey North Delta Leader. Retrieved on: January 25, 2008.</ref>


The provincial government announced on November 24, 2022, that the opening of the extension would be pushed back to early 2026 owing to a labour dispute affecting concrete workers which took place that June.<ref name=":22">{{Cite web |last=Chan |first=Kenneth |date=November 24, 2022 |title=Broadway Subway opening delayed to 2026 |url=https://dailyhive.com/vancouver/broadway-subway-skytrain-millennium-line-extension-opening-date |archive-url=https://web.archive.org/web/20221125034617/https://dailyhive.com/vancouver/broadway-subway-skytrain-millennium-line-extension-opening-date |archive-date=November 25, 2022 |access-date=November 25, 2022 |website=Daily Hive Vancouver |language=en}}</ref> On May 24, 2024, the provincial government announced that the extension opening would be further delayed to late 2027, due to various delays which occurred during the tunnel-boring process.<ref>{{Cite web |last=Chan |first=Kenneth |date=May 24, 2024 |title=Broadway Subway opening further delayed until Fall 2027 |url=https://dailyhive.com/vancouver/broadway-subway-skytrain-opening-delayed-2027 |archive-url=https://web.archive.org/web/20240524202408/https://dailyhive.com/vancouver/broadway-subway-skytrain-opening-delayed-2027 |archive-date=May 24, 2024 |access-date=May 28, 2024 |website=Daily Hive Vancouver |language=en}}</ref>
In 2011, as part of phase 2 of the Surrey Rapid Transit Study, different possibilities have been examined for expanding rapid transit along multiple corridors in the South of Fraser region.<ref>{{cite web|title=Rapid Transit Principles for the Broadway Corridor and the UBC Line Rapid Transit Study|url=http://www.translink.ca/en/Be-Part-of-the-Plan/Rapid-Transit-Projects/Surrey-Rapid-Transit-Study.aspx|publisher=TransLink|accessdate=November 2011}}</ref> SkyTrain is one of several technology options being considered, along with Light Rail Transit and Bus Rapid Transit.

=== Expo Line extension ===
{{Main|Expo Line (SkyTrain)#Surrey–Langley extension}}
The 2008 Provincial Transit Plan included a {{convert|6|km|adj=on|}} extension of the Expo Line from King George station in Surrey east to [[Guildford, British Columbia|Guildford]], then along 152 Street to [[Fraser Highway]] and southeast to 168 Street; a further extension to [[Willowbrook Shopping Centre]] in [[Langley City]] was also included in the plan.<ref name="surreyleader">{{cite web |first=Jeff |last=Nagel |title=More SkyTrains for Surrey |work=Surrey Leader |date=January 16, 2008 |url=http://www.bclocalnews.com/surrey_area/surreyleader/news/More_SkyTrains_for_Surrey.html |archive-url=https://web.archive.org/web/20080120191344/http://www.bclocalnews.com/surrey_area/surreyleader/news/More_SkyTrains_for_Surrey.html |archive-date=January 20, 2008 |access-date=January 25, 2008}}</ref> After a period of time where SkyTrain, [[light rail transit]], and bus rapid transit were considered for service expansion,<ref>{{cite web |title=Rapid Transit Principles for the Broadway Corridor and the UBC Line Rapid Transit Study |url=http://www.translink.ca/en/Be-Part-of-the-Plan/Rapid-Transit-Projects/Surrey-Rapid-Transit-Study.aspx |archive-url=https://web.archive.org/web/20120113171236/http://www.translink.ca/en/Be-Part-of-the-Plan/Rapid-Transit-Projects/Surrey-Rapid-Transit-Study.aspx |archive-date=January 13, 2012 |publisher=TransLink |access-date=November 17, 2011}}</ref><ref>{{Cite web |last=Nagel |first=Jeff |date=June 7, 2016 |title=Line to Langley may still be SkyTrain: TransLink CEO |url=https://www.abbynews.com/news/line-to-langley-may-still-be-skytrain-translink-ceo/ |url-status=live |archive-url=https://web.archive.org/web/20181130113041/https://www.abbynews.com/news/line-to-langley-may-still-be-skytrain-translink-ceo/ |archive-date=November 30, 2018 |access-date=February 13, 2018 |website=[[Abbotsford News]]}}</ref><ref>{{Cite web |last=McElroy |first=Justin |date=November 15, 2018 |title=Metro Vancouver mayors agree to suspend Surrey LRT, start process for SkyTrain to Langley |url=https://www.cbc.ca/news/canada/british-columbia/metro-vancouver-mayors-council-first-meeting-mccallum-1.4907048 |url-status=live |archive-url=https://web.archive.org/web/20211204173558/https://www.cbc.ca/news/canada/british-columbia/metro-vancouver-mayors-council-first-meeting-mccallum-1.4907048 |archive-date=December 4, 2021 |access-date=November 30, 2018 |website=CBC News}}</ref> federal funding was secured in 2021 to build a {{convert|16|km|adj=on|}} SkyTrain extension to Langley City at a total cost (shared between the federal government, provincial government, and TransLink) between $3.8 and $3.95{{nbsp}}billion.<ref name=":02">{{Cite web|last=Chan|first=Kenneth|date=July 9, 2021|title=Trudeau announces $1.3{{nbsp}}billion for Surrey-Langley SkyTrain, confirms UBC support {{!}} Urbanized|url=https://dailyhive.com/vancouver/surrey-langley-skytrain-funding-provincial-federal-trudeau-horgan|access-date=July 11, 2021|website=DailyHive}}</ref><ref>{{cite web|last=Weichel|first=Andrew|date=July 9, 2021|title=Federal government providing up to $1.3{{nbsp}}billion for Surrey-Langley SkyTrain extension|url=https://bc.ctvnews.ca/federal-government-providing-up-to-1-3-billion-for-surrey-langley-skytrain-extension-1.5502944|access-date=July 9, 2021|website=CTV News Vancouver}}</ref> In July 2022, the extension received approval from the provincial government to be built in one single phase, opening in 2028 with eight stations.<ref>{{cite web|title=16-km-long Surrey-Langley SkyTrain extension receives full provincial and federal approval|url=https://dailyhive.com/vancouver/surrey-langley-skytrain-business-case-approved-new|last=Chan|first=Kenneth|work=Daily Hive|date=July 14, 2022|accessdate=July 20, 2022}}</ref> Procurement for private contractors began in October 2022 and was scheduled to end with the selection of winning bids by December 2023. The project was divided into three general contracts—the guideway, stations, and electrical systems—and major construction is scheduled to start in 2024.<ref>{{Cite news |last=Chan |first=Kenneth |date=October 11, 2022 |title=Bidding process begins for $475 million contract to build Surrey-Langley SkyTrain's eight stations |url=https://dailyhive.com/vancouver/surrey-langley-skytrain-station-construction-bidding-contract |work=Daily Hive |access-date=2022-10-28}}</ref>


=== Expo Line capacity expansion ===
=== Expo Line capacity expansion ===
{{Main|Expo Line (SkyTrain)#Capacity upgrades}}
Ridership on the Expo Line is continually increasing, and plans are being developed for upgrading capacity to meet future ridership levels. Several options are being considered and/or planned, including:
Several options have been considered, planned, or implemented to improve capacity on the Expo Line, including operating longer trains, reducing operating headways, and extending station platforms beyond {{convert|80|m}}. In late 2020, TransLink ordered 41 [[Alstom]] Mark V trainsets in five-car configurations that will eventually replace older, lower-capacity trains.<ref>{{Cite web |title=TransLink to buy 205 new SkyTrain cars from Bombardier for $723 million {{!}} Urbanized |url=https://dailyhive.com/vancouver/translink-new-skytrain-cars-bombardier-alstom |access-date=August 17, 2023 |website=dailyhive.com |language=en}}</ref> Six more Alstom Mark V trainsets were ordered in May 2024, bring this total to 47 Mark V trainsets.<ref name=":3" />
* Purchasing middle "C" cars to use with some of the Mark II/III trainsets to maximize available platform space. Current platforms can fit six-car Mark I trains and five-car Mark II/III trains. Six-car Mark I trains are increasingly being used, but currently TransLink can only create two- and four-car Mark II trains with its fleet (2 or 2+2). By adding a middle "C" car to some Mark II/III couplets to create three-car trainsets, longer five-car trains can be used (2+3). Whether the middle "C" car implementation will use Mark II or Mark III vehicles is unclear at this time (November 2011).

* Current operating headway between trains during peak times is maintained at 108 seconds. SkyTrain can run at 75 second headways, which will allow for more trains to operate at peak times<ref>{{cite web|url=http://www.thalesgroup.com/Case_Studies/Markets/Security/D3S_casestudy_Skytrain/|title=Skytrain, Vancouver's advanced rapid transit system|publisher=Thales Group|accessdate=May 2013}}</ref>
=== Coquitlam maintenance facility ===
* After using longer trains and running trains at 75 second headways, the next option is to lengthen the station platforms to accommodate longer trains. This expansion option will be the most expensive as it will require heavy construction at all Expo Line stations
In March 2021, it was announced that a new yard would be constructed to provide storage space and maintenance needed for the upcoming extensions of the Expo and Millennium lines.<ref>{{Cite web|last=Strandberg|first=Diane|date=March 16, 2021|title=$300-million TransLink operations centre coming to Coquitlam|url=https://www.tricitynews.com/local-news/300-million-translink-operations-centre-coming-to-coquitlam-3550031#:~:text=%24300%2Dmillion%20TransLink%20operations%20centre%20coming%20to%20Coquitlam&text=The%20plans%20are%20to%20build,a%20cost%20of%20%2482.5%20million.|access-date=March 22, 2021}}</ref><ref>{{Cite web|last=Chan|first=Kenneth|date=March 11, 2021|title=TransLink buys 27-acre site near Braid Station for new SkyTrain maintenance centre|url=https://dailyhive.com/vancouver/225-north-road-coquitlam-skytrain-omc-maintenance-centre-translink|access-date=March 22, 2021}}</ref> This new facility is to be located near the New Westminster–Coquitlam border along North Road. The land was purchased for $82.5{{nbsp}}million, while the cost for the structure and additional tracks was estimated at an additional $300{{nbsp}}million. The new yard was expected to provide additional maintenance and space in time for the opening of the Millennium Line's [[Broadway extension (SkyTrain)|Broadway extension]] in early 2026.<ref name=":22" /> As of February 2024, the opening of the Coquitlam maintenance facility, which is expected to have a storage capacity of 145 cars, is scheduled to take place in 2027.<ref>{{Cite web |last=Chan |first=Kenneth |date=February 29, 2024 |title=This is what SkyTrain's new operations and maintenance centre will look like |url=https://dailyhive.com/vancouver/skytrain-omc4-trainyard |access-date=February 29, 2024 |website=Daily Hive Vancouver |language=en}}</ref>

=== University of British Columbia extension ===
On January 14, 2008, the British Columbia provincial government announced a commitment to the expansion of the Millennium Line to the [[University of British Columbia]] (UBC) by 2020 as part of a $14-billion transit spending package to address [[climate change]]. It was not clear what route the new line would take, but it was hinted that there would be less use of [[Tunnel#Cut-and-cover|cut-and-cover tunnelling]] to minimize disruption to businesses along Broadway and avoid [[Canada Line#Impact on local businesses|the same problems seen during the Canada Line construction]] along [[Cambie Street]].<ref>{{cite news |first=Vaughn |last=Palmer |title=Less than meets the eye, and light on details |url=http://www.canada.com/vancouversun/news/story.html?id=6cb8fa40-30d1-4437-aa0f-6be3080a6d95&p=2 |work=[[Vancouver Sun]] |publisher=[[CanWest Global Communications|CanWest MediaWorks Publications]] |date=January 15, 2008 |access-date=January 15, 2008 |archive-url=https://web.archive.org/web/20121103191941/http://www.canada.com/vancouversun/news/story.html?id=6cb8fa40-30d1-4437-aa0f-6be3080a6d95&p=2 |archive-date=November 3, 2012}}</ref> This expansion failed to materialize. On February 15, 2019, the TransLink Mayors' Council again approved an extension of the line to the UBC campus, although funding for this continuation past Arbutus Street had not yet been secured.<ref>{{cite web|url=https://www.cbc.ca/news/canada/british-columbia/skytrain-extension-ubc-1.5021463|title=Metro Vancouver mayors vote yes on SkyTrain extension to UBC | date=February 15, 2019 |work=CBC News |access-date=February 16, 2019}}</ref> In April 2022, TransLink assessed possible route options in the UBC area, including the provision of additional pocket storage tracks near the UBC terminus owing to the distance between the university and the nearest storage yard.<ref name=":2">{{Cite web |last=Chan |first=Kenneth |date=April 19, 2022 |title=TransLink outlines proposed UBC SkyTrain route and station locations |url=https://dailyhive.com/vancouver/ubc-skytrain-route-proposed-translink-vancouver |access-date=February 29, 2024 |website=Daily Hive Vancouver |language=en}}</ref> As a result, the terminus at UBC would hypothetically be larger in size in order to accommodate the additional storage space and operational flexibility.<ref name=":2" /> In March 2023, it was announced that a contractor would be hired to put together a business case for the extension, which was to be presented in December 2024.<ref>{{Cite web |title=Detailed design and planning set to begin for UBC SkyTrain extension {{!}} Urbanized |url=https://dailyhive.com/vancouver/ubc-skytrain-extension-design-planning-business-case |access-date=2023-03-22 |website=dailyhive.com |language=en}}</ref>

=== Port Coquitlam extension ===
When the [[Evergreen Extension]] was built, the first few metres of track and a track switch for an eventual eastward extension to [[Port Coquitlam]] were built at [[Coquitlam Central station]]. Such an extension would create two branches where trains would alternate between going east to Lafarge Lake–Douglas station or Port Coquitlam. A feasibility study was conducted, started during early 2020 and running for about six months. Both Port Coquitlam mayor Brad West, Port Coquitlam's city council, and Coquitlam's city council have stated support for the extension. However, as of 2022, no funding had been secured nor a formal plan created.<ref>{{cite web|url=https://dailyhive.com/vancouver/port-coquitlam-skytrain-study|title=Port Coquitlam to launch feasibility study on Skytrain Extension | date=November 28, 2019 |work=Daily Hive |access-date=November 28, 2019}}</ref>

=== North Shore connection ===
In 2019, the BC Ministry of Transportation and Infrastructure announced its intention to study a rapid transit link from Vancouver's city centre to the [[North Shore (Greater Vancouver)|North Shore]], possibly in the form of SkyTrain. By March 2020, the provincial government confirmed it had selected six possible routes for a "high-capacity, fixed-link, rapid transit crossing across [[Burrard Inlet]] between Vancouver and the North Shore".<ref>{{cite web|url=https://dailyhive.com/vancouver/north-shore-vancouver-rapid-transit-study-route-options|title=6 route options for North Shore to Vancouver rapid transit line: BC government|website=Daily Hive|date=March 2, 2020|access-date=March 4, 2020|archive-url=https://web.archive.org/web/20200304004540/https://dailyhive.com/vancouver/north-shore-vancouver-rapid-transit-study-route-options|archive-date=March 4, 2020|url-status=live}}</ref> In 2022, TransLink suggested that a North Shore link would likely be created using [[bus rapid transit]] first while a concurrent feasibility study of a longer-term light rail transit or SkyTrain connection is conducted.<ref>{{cite web |last1=Chan |first1=Kenneth |title=Buses first, SkyTrain maybe later: TransLink planning bus rapid transit from Park Royal to Metrotown |url=https://dailyhive.com/vancouver/north-shore-rapid-transit-bus-rapid-transit-park-royal-metrotown-brt |website=Daily Hive |access-date=16 March 2024}}</ref>


== See also ==
== See also ==
* [[Detroit People Mover]]
* [[Line 3 Scarborough]]
* [[List of metro systems]]
* [[List of metro systems]]

== Notes ==
{{notelist}}


== References ==
== References ==
{{Reflist|3}}
{{Reflist}}


== External links ==
== External links ==
{{Attached KML|display=title,inline}}
{{Commons}}
{{Commons}}
* [http://www.translink.ca/ TransLink] The transit authority that owns and operates SkyTrain
* [http://www.translink.ca/ TransLink] The transit authority that owns and operates SkyTrain
* [http://www.evergreenline.gov.bc.ca/ Evergreen Line] The Province of British Columbia's page for the Evergreen Extension of the Millennium Line
* [http://www.evergreenline.gov.bc.ca/ Evergreen Line] The Province of British Columbia's page for the Evergreen Extension of the Millennium Line
* [http://web.archive.org/web/20060505211557/http://web.archive.org/web/20060207233528/http://vancouver.ca/engsvcs/transport/rto/millennium_extension.htm Millennium Line Extension] Preliminary study by the city of Vancouver
* [https://web.archive.org/web/20060207233528/http://vancouver.ca/engsvcs/transport/rto/millennium_extension.htm Millennium Line Extension] Preliminary study by the city of Vancouver
* [http://maps.google.ca/maps/ms?ie=UTF8&oe=UTF-8&client=firefox-a&hl=en&msa=0&t=h&om=1&msid=113059281235500405957.00000112b4cf2b563dbbd&ll=49.239121,-122.980957&spn=0.163634,0.473785&z=11 Google map of SkyTrain Lines Vancouver] Map of Vancouver SkyTrain via Google Maps
* [http://maps.google.ca/maps/ms?ie=UTF8&oe=UTF-8&client=firefox-a&hl=en&msa=0&t=h&om=1&msid=113059281235500405957.00000112b4cf2b563dbbd&ll=49.239121,-122.980957&spn=0.163634,0.473785&z=11 Google map of SkyTrain Lines Vancouver] Map of Vancouver SkyTrain via Google Maps

* [http://www.gvtaps.bc.ca/index.htm Translink Police] – Official website of [[South Coast British Columbia Transportation Authority Police Service]]
{{TransLink Services}}
{{TransLink services}}
{{Canadian passenger rail systems}}
{{Canadianmetros}}
{{Internationally Metro Organizations}}
{{Automated trains and fixed-guideway transit}}


{{DEFAULTSORT:Skytrain (Vancouver)}}
[[Category:Railway lines opened in 1985]]
[[Category:SkyTrain (Vancouver)| ]]
[[Category:SkyTrain (Vancouver)| ]]
[[Category:Linear motor metros]]
[[Category:Underground rapid transit in Canada]]
[[Category:1985 establishments in British Columbia]]
[[Category:1985 establishments in British Columbia]]
[[Category:650 V DC railway electrification]]
[[Category:750 V DC railway electrification]]
[[Category:Railway lines opened in 1985]]
[[Category:Underground rapid transit in Canada]]
[[Category:Automated guideway transit]]

Latest revision as of 18:26, 6 January 2025

SkyTrain
Overview
OwnerProvince of British Columbia
LocaleMetro Vancouver, British Columbia
Transit typeMedium-capacity rapid transit system
Number of lines3
Number of stations54 (13 under construction) (List of stations)
Daily ridership455,700 (weekdays, Q3 2024)[1]
Annual ridership141,339,300 (2023)[2]
WebsiteTransLink
Operation
Began operationDecember 11, 1985; 39 years ago (1985-12-11)[3]
Operator(s)TransLink
CharacterElevated, underground, and at-grade
Number of vehicles298
Train length2-, 4- or 6-car trainsets
Headway
  • 2–10 minutes (Expo and Millennium Lines)
  • 3–20 minutes (Canada Line)
Technical
System length
  • 79.6 km (49.5 mi)[4]
  • 5.7 km (3.5 mi) under construction[5]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification650 V DC third rail linear induction (Expo and Millennium Lines)
750 V DC third rail conventional traction motors (Canada Line)
Average speed
  • 40 km/h (25 mph) (Expo and Millennium Lines)[6]
  • 32 km/h (20 mph) (Canada Line)[6]
Top speed80 km/h (50 mph)[7][8]
System map
Map
(2027)
Arbutus
Waterfront
(2027)
South Granville
Burrard
(2027)
Oak–VGH
Vancouver City Centre
Yaletown–Roundhouse
Granville
Olympic Village
Stadium–Chinatown
Broadway–
Main Street–
Science World
Amtrak
( 2027)
City Hall
Mount Pleasant
(2027)
King Edward
Great Northern
Way–Emily Carr
(2027)
VCC–Clark
Oakridge–
41st Avenue
Commercial–
Broadway
Renfrew
Langara–49th Avenue
Rupert
Nanaimo
Marine Drive
29th Avenue
Zone 1
Zone 2
Joyce–
Collingwood
Operations and
Maintenance Centre
Bridgeport
Patterson
Metrotown
Templeton
Royal Oak
Sea Island Centre
Gilmore
Vancouver International Airport YVR–Airport
Brentwood
Town Centre
Capstan
Holdom
Aberdeen
Sperling–
Burnaby Lake
Lansdowne
Lake City Way
Richmond–Brighouse
Production Way–
University
Edmonds
Lougheed
Town Centre
Edmonds Yard
22nd Street
future storage facility
New Westminster
Braid
Columbia
Sapperton
Zone 2
Zone 3
Scott Road
Burquitlam
Gateway
Surrey Central
Moody Centre
King George
Inlet Centre
(2028)
Green Timbers
vehicle storage facility
(2028)
152 Street
Coquitlam
Central
(2028)
Fleetwood
Lincoln
(2028)
Bakerview–166 Street
Lafarge Lake–
Douglas
(2028)
Hillcrest–184 Street
(2028)
Clayton
(2028)
Willowbrook
(2028)
Langley City Centre
Key
Canada Line
Expo Line
Handicapped/disabled access All stations are accessible
Millennium Line

SkyTrain is the medium-capacity rapid transit system serving the Metro Vancouver region in British Columbia, Canada.[9] SkyTrain has 79.6 km (49.5 mi) of track and uses fully automated trains on grade-separated tracks running on underground and elevated guideways, allowing SkyTrain to hold consistently high on-time reliability.[4][10] In 2023, the system had a ridership of 141,339,300, or about 455,700 per weekday as of the third quarter of 2024.

The name "SkyTrain" was coined for the system during Expo 86 because the first line (Expo) principally runs on elevated guideway outside of Downtown Vancouver, providing panoramic views of the metropolitan area. SkyTrain uses the world's third-longest cable-supported transit-only bridge, known as SkyBridge, to cross the Fraser River.[11]

With the opening of the Evergreen Extension on December 2, 2016, SkyTrain became the longest rapid transit system in Canada and the longest fully automated driverless system in the world.[12] The total lengths of the automated lines of the Shanghai Metro,[13] Singapore MRT, Kuala Lumpur Rapid KL and Dubai Metro have since surpassed those of SkyTrain.[14]

SkyTrain has 54 stations served by three lines: the Expo Line, the Millennium Line, and the Canada Line. The Expo and Millennium Lines are operated by British Columbia Rapid Transit Company under contract from TransLink (originally BC Transit), a regional government transportation agency. The Canada Line is operated on the same principles by the private concessionaire ProTrans BC under contract to TransLink and is an integrated part of the regional transport system. SkyTrain uses a fare system shared with other local transit services and is policed by the Metro Vancouver Transit Police. SkyTrain attendants (STAs) provide first aid, emergency response, directions and customer service, inspect fares, monitor train faults, and operate the trains manually if necessary.

Network

[edit]

Expo Line

[edit]

The Expo Line connects Waterfront station in Vancouver to King George station in Surrey, principally along a route established by the Westminster and Vancouver Tramway Company as an interurban line in 1890.[15] The Expo Line (originally referred to as simply "SkyTrain" until the opening of the Millennium Line) was built in 1985 in time for Expo 86. It now has 24 stations. The Expo Line ran only as far as New Westminster station initially. In 1989, it was extended to Columbia station and in 1990, once the Skybridge was finished, it continued across the Fraser River to Scott Road station in Surrey. In 1994, the terminus of the Expo Line became King George station in central Surrey. It was built on a budget of $854 million (1986 dollars).[16] Effective October 22, 2016, Expo Line trains began operating on a new branch to Production Way–University station, taking over the previous Millennium Line service between Waterfront and that station. During peak periods, trains between Waterfront and Columbia arrive every 2 to 3 minutes. Between Waterfront and King George, trains arrive every 2 to 5 minutes during peak hours, while trains between Waterfront and Production Way arrive every 6 to 7 minutes in the peak hours.[17]

Millennium Line

[edit]

Prior to October 22, 2016, the Millennium Line shared tracks with the Expo Line from Waterfront station to Columbia station in New Westminster, then continued along its own elevated route through North Burnaby and East Vancouver, ending at VCC–Clark station, near Vancouver Community College's Broadway campus. It was built on a $1.2-billion budget and the final extension from Commercial Drive station (now Commercial–Broadway station) to VCC–Clark station was opened on January 6, 2006.[18] From October 22, 2016, to December 1, 2016, the Millennium Line operated from VCC–Clark to Lougheed Town Centre station.[19] As of December 2, 2016, the Millennium Line operates between VCC–Clark station in Vancouver and Lafarge Lake–Douglas station in Coquitlam. The Millennium Line has 17 stations, three of which are transfer stations with the Expo Line (Commercial–Broadway, Production Way–University, and Lougheed Town Centre) and two which connect with the West Coast Express commuter train (Moody Centre and Coquitlam Central). The original Millennium Line's stations were designed by British Columbia's top architects and are very different from those on the Expo Line.[18] In 2004, Busby and Associates Architects, designers of the Brentwood Town Centre station in Burnaby, were honoured for their work with a Governor General's Medal in Architecture.[20]

Construction on the Millennium Line's Evergreen Extension, from Lougheed Town Centre in Burnaby to Lafarge Lake–Douglas in Coquitlam, was completed in 2016 and it was opened for revenue service on December 2, 2016.[12] This extension adds 11 km (6.8 mi) and 6 new stations to the Millennium Line.[21]

Canada Line

[edit]

The Canada Line begins at the Waterfront station hub, then continues south through Vancouver into the City of Richmond and Sea Island. From Bridgeport station, the Canada Line splits into two branches, one heading west to the YVR–Airport station at Vancouver International Airport and the other continuing south to the Richmond–Brighouse station in Richmond's city centre. Opened on August 17, 2009, the Canada Line added 15 stations and 19.2 km (11.9 mi) to the SkyTrain network. Waterfront station is the only station where the Canada Line directly connects with the Expo Line; however, Vancouver City Centre station is within a three-minute walk from Granville station via the Pacific Centre mall, making an unofficial transfer to the Expo Line. The Canada Line cost $1.9 billion, financed by the Governments of Canada and British Columbia, TransLink, and InTransitBC.[22] The Canada Line's trains, built by Hyundai Rotem, are fully automated, but are of a different design from the Expo and Millennium Lines' Bombardier-built fleet. They use conventional electric motors rather than linear induction motor technology. Canada Line tracks do not interconnect with the rest of the SkyTrain network, and there is a separate fleet maintenance depot.[23]

Operations

[edit]
Line Opening year Route length[citation needed] Stations Terminus stations Travel time Frequency[24] Combined frequency
Peak Off-peak Peak Off-peak
Expo Line 1985 28.9 km (18.0 mi)[a] 20[a] Waterfront King George 40 min 2–5 min 6–10 min 2–3 min[b] 3–5 min
2016 29.7 km (18.5 mi)[a][c] 20[a][c] Production Way–University 41 min 6–7 min 6–10 min
Millennium Line 2002[d] 25.5 km (15.8 mi)[c] 17[c] VCC–Clark Lafarge Lake–Douglas 36 min 3–4 min 6–10 min
Canada Line 2009 14.4 km (8.9 mi)[e] 14[e] Waterfront Richmond–Brighouse 25 min 6 min 6–20 min 3 min 3–10 min
15.1 km (9.4 mi)[e] 13[e] YVR–Airport 26 min 6 min 6–20 min
  1. ^ a b c d Expo Line service is interlined for 16 stations, accounting for 22.2 km (13.8 mi) of route, between Waterfront and Columbia.
  2. ^ Additional peak hour only service operates between Waterfront and Commercial–Broadway.
  3. ^ a b c d Expo and Millennium Line service is interlined for two stations, accounting for 1.8 km (1.1 mi) of route, between Lougheed Town Centre and Production Way–University.
  4. ^ Evergreen Extension started revenue service on December 2, 2016.[12]
  5. ^ a b c d Canada Line service is interlined for 10 stations, accounting for 11.1 km (6.9 mi) of route, between Waterfront and Bridgeport.

Frequency

[edit]

SkyTrain provides high-frequency service, with trains arriving every 2 to 6 minutes at all stations during peak hours.[24] Trains operate between 4:48 a.m. and approximately 1:30 a.m. on weekdays, with reduced hours on weekends on the Expo and Millennium lines.[24] SkyTrain has longer hours of service during special events, such as New Year's Eve, the Vancouver 2010 Olympics, and marathons.

Cash fares as of July 1, 2024[25]
Fare class One zone Two zones Three zones Airport AddFare
Adult $3.20 $4.65 $6.35 +$5.00
Concession $2.15 $3.15 $4.35 +$5.00

Fares

[edit]
A ticket vending machine (right), next to an old faresaver validator (2006)

TransLink's SkyTrain service area is divided into three zones, with fares varying depending on how many zone boundaries are crossed during one trip (two- and three-zone passengers are charged the one zone rate after 6:30 pm rush hour, and on weekends and statutory holidays). Customers may purchase fares using cash, debit cards, or credit cards from self-serve ticket vending machines at the mezzanine level of each station. A variety of transit passes are available, such as the pre-paid FareSaver ticket, daily DayPass, monthly FareCard, annual EmployerPass, post-secondary student U-Pass, and other specialized passes. Canadian National Institute for the Blind identification cards are accepted without the need to be read by the fare box. One-time fares are valid for 90 minutes on any mode of transportation with any number of transfers, including all SkyTrain lines and bus and SeaBus routes. Concession fares are available for secondary school students with a valid Go-Card and the elderly.[26] Children under 12 have been able to ride the system for free since September 2021.[27]

Until April 2016, SkyTrain's fare system was a proof-of-payment system; there were no turnstiles at the entrances to train platforms. Instead, fares were typically enforced by random ticket inspections – usually by police or transit security but occasionally by SkyTrain attendants – through trains and stations. This was supplemented by controlled access – with the payment of a fare or proof of payment required to pass through a staffed gate – at special events where extremely high ridership was expected, such as immediately after BC Lions or Vancouver Canucks games.[28][29]

Fare gates

[edit]
Fare gates at New Westminster (2018)

Installing faregates to prevent fare evasion was considered as early as at the time of the system's opening, but was rejected multiple times because the expense of implementing, maintaining, and enforcing them would exceed the losses prevented.[30] In 2005, TransLink estimated it was losing $4 million (5 percent of revenue attributed to SkyTrain) annually to fare evasion on SkyTrain.[31] While the Canada Line stations, along with those on the Millennium Line, were designed to allow for future fare gates, the Canada Line opened in 2009 without them, despite stated intentions to include them.[32] Expo Line stations have since been redesigned and retrofitted to accommodate the new fare gate system.

The 2008 Provincial Transit Plan outlined several SkyTrain system upgrades, including replacement of the proof-of-payment system with a gated-ticket system.[33] According to Minister of Transportation Kevin Falcon, the gated-ticket system was to be implemented by a private company by 2010.[34] In April 2009, it was announced that the provincial and federal governments would spend $100 million[35] to put the gates in place by the end of 2010. However, in August 2009, a TransLink spokesman said the gates would not be installed before 2012, and that a smart card system would be implemented at the same time.[36]

It was announced on August 14, 2013, that bus-issued transfers (magnetic strip paper cards) would continue to be issued for cash fares paid on buses, but that these transfers would not work at SkyTrain or SeaBus station fare gates, which require a Compass Card or a 90-minute paper Compass ticket to operate. This means that a bus rider paying cash is required to pay a second fare to transfer to SkyTrain or SeaBus. Those transit users paying cash but beginning their trips at a SkyTrain or SeaBus station are not subject to this second fare because they are issued Compass tickets which are accepted as valid transfers on TransLink buses.

Construction of SkyTrain fare gates was completed in May 2014, but they remained open until April 2016 owing to multiple system problems. While open for the nearly two-year period, holders of paper-based monthly passes, bus-issued transfers, and FareSaver tickets continued to pass through the gates into the stations' fare-paid zones unimpeded, although they were subject to having their fare inspected by transit security or transit police once inside the fare-paid zone. Starting in April 2016, they were initially fully closed only during peak hours, with one gate remaining open during off-peak times for people with accessibility issues who could not reach their Compass Cards to the fare gates to tap in or out. Full implementation of the fare gates was also delayed by problems with Compass Cards when riders were tapping out as they exited buses. The tapping-out process on buses was too slow and did not always record the tap which—because the system initially deducted a three-zone fare until a tap-out was recorded and a refund was issued to those having only travelled one or two zones—often resulted in customers being charged for travelling through three zones when in fact they had only travelled through one or two.[37] This was a serious setback for TransLink as the entire system was supposed to be operational by 2013. A solution was finally implemented where the requirement to tap out of buses was removed and all bus travel was considered as within a single zone, creating significant savings for those travelling multiple zones using buses only and in some cases changing transit usage patterns.[38] The last fare gates left open for users with accessibility issues were closed on July 25, 2016, and the system has been in full operation since.[39]

Airport surcharge

[edit]

Travel on the Canada Line is free between the three Sea Island stations near the Vancouver International Airport: Templeton, Sea Island Centre, and YVR–Airport.

Single-use Compass tickets purchased with cash at Compass vending machines in stations on Sea Island include a surcharge, the "YVR AddFare", of $5.00 on top of the normal fare. This charge is also added to trips initiated at Sea Island stations for travel east to Bridgeport station and beyond using Compass Card stored value or DayPasses. It is not applied to trips using monthly passes, nor to trips travelling to the airport using DayPasses or single-use Compass tickets which were purchased and activated off Sea Island.[40][41] The YVR AddFare came into effect on January 18, 2010.[42] The revenue collected from the AddFare goes back to TransLink.[40]

Ridership

[edit]
Interior of a Mark I train travelling along the Expo Line between Commercial–Broadway and Main Street–Science World station (2019)
Canada Line trains at Vancouver International Airport (2008)

Passengers on SkyTrain made an average of 526,400 trips on weekdays by the end of September 2019.[43] Overall in 2017, the network carried a total of 151 million passengers.[44] This compares to 117.4 million passengers in 2010: 38,447,725 on the Canada Line and 78,965,214 on the interlined Expo and Millennium Lines.[45] The Canada Line carried an average of 110,000 passengers per weekday in early 2011, and is three years ahead of ridership forecasts.[46]

SkyTrain's highest ridership came during the 2010 Winter Olympics when each event ticket included unlimited day-of transit usage. During the 17-day event, Canada Line ridership rose 110 per cent to an average of 228,000 per day, with a single-day record of 287,400 on February 19, 2010. Expo and Millennium Line ridership rose 64 per cent to an average of 394,000 per day, with a single-day record of 567,000 on February 20, 2010. At times, every available train was in service on all three lines.[47] After the Olympics ended, overall transit usage remained 7.8 percent above the previous year.[46]

TransLink SkyTrain ridership by year
Year 2016[48] 2017[49] 2018[50] 2019[51] 2020[52] 2021[53] 2022[53]
Trips (millions) 137.4 151.4 160.0 165.1 74.5[a] 76.32 116.6
TransLink ridership by mode, 2020[54]
Mode Trips % of total

SkyTrain
74,527,500 34.32

West Coast Express
790,500 0.36

SeaBus
2,305,800 1.06

Bus
139,514,100 64.25
Total 217,137,900[a] 100.00

Funding

[edit]

The cost of operating SkyTrain in 2008, with an estimated 73.5 million boardings, was $83 million.[55][56] To cover this, TransLink draws mostly from transit fares, advertising ($360 million in 2008) and tax ($262 million from fuel taxes and $298 million from property taxes in 2008), funds which are also shared with bus services, roads and bridge maintenance, and other infrastructure and services.[55] The capital costs of building the system are shared with other government agencies. Capital expenses were $216 million[55] in 2008. For example, the cost of building the Canada Line was shared between TransLink ($335 million or 22 percent), the federal government (29 percent), the provincial government (28 percent), the airport authority (19 percent), and the City of Vancouver (2 percent).[57] While TransLink has run surpluses for operating costs since 2001,[58][59] it incurs debt to cover these capital costs. As a whole, TransLink had $1.1 billion in long-term debt in 2006, of which $508 million was transferred from the province in 1999 when responsibility for SkyTrain was given to TransLink.[58][60] The province retained ownership of the causeway, bridge, certain services, and a portion of SkyTrain's debt.[61]

Security

[edit]
Bus advertisement for the Metro Vancouver Transit Police (2007)
Canada and Millennium Line stations were designed for fare gates (2009).

Law enforcement services are provided by the Metro Vancouver Transit Police (MVTP). They replaced the old TransLink Special Provincial Constables, who had limited authority.

On December 4, 2005, MVTP officers became the first and only transit police force in Canada to have full police powers and carry firearms. There was public concern in March 2005 when it was announced that transit police would carry firearms. Solicitor General of British Columbia John Les defended the move at the time, saying that it was necessary to enhance SkyTrain security.[62] Transit officers receive the same training as officers in municipal and RCMP forces. They may arrest people for outstanding warrants, enforce drug laws, enforce the criminal code beyond TransLink property, and deal with offences that begin off TransLink property and make their way onto it. They issue tickets for fare evasion and other infractions on SkyTrain, transit buses, SeaBus, and West Coast Express.[63]

Transit police officers and Transit Security officers inspect fares at Skytrain stations as part of TransLink's fare audit. Transit Security officers mostly focus their efforts on the bus system, bus loops, and SeaBus.

SkyTrain attendants provide customer service and first aid, troubleshoot train and station operations, and perform fare checks alongside the transit police force.[64] SkyTrain attendants can be identified by their uniforms which say "SkyTrain" on them.

Over the years, violence and other criminal activities have been concerns at time, but TransLink maintains that the system is safe.[65][66][needs update] In 2009, Inspector Kash Heed of the Vancouver Police Department said that little crime takes place in the stations themselves; however, criminal activity becomes more visible 400–700 metres (1,000–2,000 ft) outside them.[67]

Each station is monitored with an average of 23 closed-circuit television cameras, allowing SkyTrain operators to monitor passenger and station activity.[68] Designated waiting areas have enhanced lighting, benches, and emergency telephones. Trains have yellow strips above each window which, when pressed, silently alert operators of a security hazard. On-board speaker phones provide two-way communication between passengers and control operators.[69]

In 2007, it was reported that the entire surveillance system was upgraded from analogue two-hour tape recording to digital technology, which was to allow police to retrieve previous footage for up to seven days.[70] However, incidents since the upgrade have still limited police to a two-hour loop, resulting in loss of potential evidence.[71]

By November 2008, at least 54 deaths had occurred on the platforms and tracks of the Expo and Millennium Lines. 44 of those deaths were suicides, while the remaining ten were accidental.[72]

History

[edit]
A plaque commemorating the inauguration of the SkyTrain

Planning

[edit]

Vancouver had plans as early as the 1950s to build a monorail system, with modernist architect Wells Coates to design it; that project was abandoned.[73] The lack of a rapid transit system was said to be the cause of traffic problems in the 1970s, and the municipal government could not fund the construction of such a system.[74] During the same period, Urban Transportation Development Corporation, then an Ontario crown corporation, was developing a new rapid transit technology known as an "Intermediate Capacity Transit System".[75] In 1980, the "Advanced Light Rapid Transit" system was selected by the British Columbia provincial government for use on one of two planned corridors, connecting Vancouver to New Westminster in time for Expo 86.[76]

Expo Line

[edit]
A first-generation Bombardier Mark II train at Rupert station (2005)

SkyTrain was conceived as a legacy project of Expo 86 and the first line was finished in time to showcase the fair's theme: "Transportation and Communication: World in Motion – World in Touch".[77] Construction was funded by the provincial and federal governments and began in March 1982.[78][79] It was built through the Dunsmuir Tunnel under downtown, which had originally been built for the Canadian Pacific Railway, to save costs.[79]

The first 21.4 kilometres (13.3 mi) of the system, from Waterfront to New Westminster station, opened for limited and fare-free service on December 11, 1985.[80] Revenue service began on January 3, 1986, and within its first year the line had carried over 30 million passengers—including visitors to Expo 86.[81][82] The following year, construction began on an extension including the SkyBridge, Columbia station, and Scott Road station, extending service by 3.1 kilometres (1.9 mi) to Surrey; it opened on March 16, 1990.[83][84] The line was expanded again in 1994 with the opening of Gateway, Surrey Central, and King George stations. SkyTrain is part of the 1996 Greater Vancouver Regional District's (GVRD) Livable Region Strategic Plan, which discusses strategies to deal with the anticipated increase of population in the region. These strategies include increasing transportation choices and transit use.[85]

Millennium Line

[edit]
A Mark I train passing by in the Grandview Cut between VCC–Clark and Commercial–Broadway stations (2006)

The first section of the Millennium Line opened in 2002, with Braid and Sapperton stations. Most of the remaining portion began operating later that year, serving North Burnaby and East Vancouver. Phase I of the Millennium Line was completed $50 million under budget. Critics of the project dubbed it the "SkyTrain to Nowhere", claiming that the route of the new line was based on political concerns, not the needs of commuters.[86] One illustration of the legitimacy of this complaint is that the end of the Millennium Line is located in a vacant field, chosen because it was supposed to be the location for a new high-tech development and is close to the head office of QLT Inc., but additional development was slow to get off the ground.[87][88] That station, VCC–Clark near Clark Drive and Broadway, did not open until 2006 due to the struggles of negotiating the right-of-way with BNSF, the owner of the freight tracks beside the station, but it is still five kilometres short of the original proposed Phase II terminus at Granville Street and 10th Avenue. At the time VCC–Clark station opened, it was revealed that the additional westward extension and its three stations was out of favour and "not a high priority anymore".[89]

Evergreen Extension

[edit]
Coquitlam's Lincoln station on the Evergreen Extension of the Millennium Line (2017)

The Evergreen Extension, known as the Evergreen Line during construction, is the second phase of the Millennium Line, extending from Lougheed Mall in Burnaby to the Douglas College campus in Coquitlam. Originally referred to as the Port Moody-Coquitlam (PMC) Line, it provides a "one-seat ride" from Coquitlam to Vancouver. Switches to the PMC Line were installed to the east of Lougheed Town Centre station during its initial construction and a third platform at the station was roughed-in in anticipation of the extension. Phase II was postponed following a change in provincial government and a shuffling of priorities that led to prioritizing building the Canada Line due to Vancouver's hosting of the 2010 Olympics. Preliminary construction of the Evergreen Extension began in July 2012 and major construction started in June 2013 with the construction of support columns for the line. The extension began revenue service on December 2, 2016.[90]

Canada Line

[edit]

The Canada Line was built as a public–private partnership, with the winning consortium (now known as ProTransBC), led by SNC-Lavalin, contributing funds toward its construction and operating it for 35 years. A minimum ridership was guaranteed to ProTransBC by TransLink.[91] The Richmond–Vancouver corridor had been considered for a rapid transit line as early as 1979 but such a project was not funded until the early 2000s with the approval of the Canada Line.[79] The line opened on August 17, 2009, 15 weeks ahead of schedule and on budget.[92] Ridership rose three years ahead of forecasts, hitting 100,000 passengers per weekday in May 2010 and 136,000 passengers per weekday in June 2011.[93] The Canada Line is operationally independent from the other SkyTrain lines, using different rolling stock (shorter overall train and station length, but wider cars) that is incompatible with the Expo and Millennium Lines.[94][95]

Impact

[edit]

SkyTrain has had a significant impact on the development of areas near stations, and has helped to shape urban density in Metro Vancouver. Between 1991 and 2001, the population living within 500 m (1,640 ft) of SkyTrain increased by 37 percent, compared to the regional average of 24 percent.[95] Since SkyTrain opened, the total population of the service area rose from 400,000 to 1.3 million people.[96] According to BC Transit's document SkyTrain: A catalyst for development, more than $5 billion of private money had been invested within a 10–15 minute walking distance of the SkyTrain and SeaBus. The report claimed that the two modes of transportation were the driving force of the investment, though it did not disaggregate the general growth in that area.[97]

Design

[edit]

Routes

[edit]
TransLink major routes
Lonsdale Quay
UBC Exchange
Western Parkway
Sasamat
Waterfront
Burrard
Granville Street
Alma / W 10th
Granville
Macdonald
Vancouver City Centre
Yaletown–Roundhouse
Cambie Street
Arbutus
Stadium–Chinatown
Granville Street
Main Street–Science World
Heather / Willow
Olympic Village
Broadway–City Hall
Main Street
King Edward
Main Street
Fraser
Broadway
extension
(
under
construction
)
Clark Drive
VCC–Clark
Oakridge–41st Avenue
Commercial Drive
Commercial–Broadway
Nanaimo Street
Langara–49th Avenue
Renfrew Street
Marine Drive
Nanaimo
29th Avenue
Renfrew
Joyce–Collingwood
Rupert
Kootenay Loop
Gilmore
Gilmore Avenue
Bridgeport
Brentwood Town Centre
Patterson
Willingdon Avenue
Holdom
Hythe Avenue
Metrotown
Holdom Avenue
Royal Oak
Sperling–Burnaby Lake
Templeton
Kensington Avenue
Sea Island Centre
Lake City Way
YVR–Airport
Production Way–University
Edmonds
Duthie Avenue
22nd Street
Lougheed Town Centre
New Westminster
Braid
Columbia
Sapperton
Capstan
SFU Transportation Centre
Aberdeen
SFU Exchange
Lansdowne
Richmond–Brighouse
Guildford Exchange
Burquitlam
148 Street
Moody Centre
144 Street
Scott Road
140 Street
Gateway
Whalley
Surrey Central
Inlet Centre
King George
proposed Port
Coquitlam extension
proposed
Expo extension
Coquitlam Central
96 Avenue
Lincoln
88 Avenue
Lafarge Lake–Douglas
80 Avenue
76 Avenue
Port Coquitlam
Newton Exchange
Pitt Meadows
Maple Meadows
Port Haney
Mission City

Handicapped/disabled access All stops and stations are accessible
Legend
Expo Line
Millennium Line
Canada Line
West Coast Express
SeaBus
B-Line bus (99)
RapidBus (R1, R5)
Fare zones
 1 
 2 
 3 
 4 
West Coast Express only
 5 
West Coast Express only
A schematic diagram of the SkyTrain network as of late 2020

There are three main routes: the Expo Line, Millennium Line and Canada Line. The Expo Line travels between Waterfront station in Downtown Vancouver and Columbia station in New Westminster, serving the cities of Vancouver, Burnaby, and New Westminster. From Columbia, the Expo Line splits into two branches. One branch travels through Surrey to King George station, while the other travels through New Westminster and Burnaby, terminating at Production Way–University station.

Millennium Line trains travel between VCC–Clark station and Lafarge Lake–Douglas station in the city of Coquitlam. Near the western end of the line is a major transfer point with the Expo Line at Commercial–Broadway station. Further east, Lougheed Town Centre station and Production Way–University station serve as two more transfer points with the Expo Line.

The Canada Line travels southward from Waterfront station in Downtown Vancouver to Richmond, where the track splits at Bridgeport station; trains alternate between a southern branch ending at Richmond–Brighouse station and a western branch ending at Vancouver International Airport.

Although most of the system is elevated, SkyTrain runs at or below grade through Downtown Vancouver, for the Vancouver portion of the Canada Line until just before it reaches Richmond at Marine Drive station, through the 2.1-kilometre (1.3 mi) tunnel used by the Millennium Line between Coquitlam and Port Moody, through the 0.6-kilometre (0.4 mi) tunnel between Columbia and Sapperton stations in New Westminster, and for short stretches in Burnaby and New Westminster.

SkyTrain's Expo Line uses the world's second longest bridge dedicated to transit services, the SkyBridge, which crosses the Fraser River between New Westminster and Surrey. It is a 616-metre-long (2021 ft) cable-stayed bridge,[98] with 123-metre-tall (404 ft) towers. Two additional transit-only bridges, the North Arm Bridge and the Middle Arm Bridge, were built for the Canada Line. The North Arm Bridge is an extradosed bridge with a total length of 562 m (1844 ft), with shorter 47-metre (154 ft) towers necessitated by its proximity to the Vancouver International Airport, and also has a pedestrian/bicycle deck connecting the bicycle networks of Vancouver and Richmond.[99] The Middle Arm Bridge is a shorter box girder bridge.

Technology

[edit]

The signalling technology used on all three SkyTrain lines to run trains automatically was originally developed by Alcatel and loaded from a 3.5" diskette. There were initially four systems called the vehicle control computer (VCC) with three divided over the mainline and one for the storage yard. VCC1 controls trains from Waterfront to Royal Oak; VCC2 controls trains from Royal Oak to King George (it now also controls a portion of the Millennium Line); and VCC3 controls trains in the yard. Additional VCCs were added as Skytrain expanded. Each VCC is a cluster of three IBM Type 7588 rack-mount single-board computers with Intel-IA32 Pentium processors and proprietary hardware in a fault-tolerant configuration.[100] For example, VCC3 is composed of CPU1, CPU2, and CPU3. For every command that is sent to a train, at least two of the CPUs must agree with the action, otherwise an error is generated and the command is ignored. The VCC communicates with the train's vehicle on board computer (VOBC), whose data is transmitted through coax cables laid along the tracks. There are up to two VOBCs per married-pair trains, i.e. 4-car train would have two VOBCs. If the VCCs fail or communication between the VCC and the VOBC is lost, the train will "time-out" and emergency-brake (EB) through a Quester Tangent brake assurance monitor (BAM) that controls propulsion and braking systems.[101] The VCCs have a command-line-console, but normally the trains are controlled through a system known as the SMC, which also provides scheduling. All commands from the SMC are verified to be safe by the VCC before execution. However if the SMC fails, the system can still be operated through the VCC. This is known as "degraded mode". The SkyTrain health monitoring unit (HMU) developed by Quester Tangent[101] provides monitoring and diagnostic functionality for vehicle maintenance by connecting to CAN vehicle network and providing a maintenance display in the Hostler Panel.[101]

SkyTrain's signalling system later provided the basis of SelTrac, which is currently maintained and sold by Thales and has equipped many lines around the world. Largely as a result of this, the Expo and Millennium Lines have a combined punctuality record of over 96 percent; the principal cause of train delays is passenger interference with train doors.[102] There have been two derailments during revenue service in the system's history.[103][104]

Accessibility

[edit]

The SkyTrain network is fully mobility-needs accessible, including vehicles and stations. Mark I train cars have one designated wheelchair position, Mark II, Mark III and Hyundai Rotem cars have two, and all stations have elevators. TransLink upgraded all Expo Line platform station edges to match those on the Millennium Line shortly after it was completed. The new, wider edges are brighter and are tiled to provide a safer environment for the visually impaired. The Canada Line also uses this safety feature in its stations.[105] Since the opening of the Millennium Line, aside from platform tile upgrading, many Expo line stations have also been refitted with new signage and ticket vending machines. Accessibility is provided for deaf individuals through real-time English signage and displays at stations and on newer trains, although a reliance on verbal communication for service disruptions has been identified as a transportation barrier.[106]: 33 

The distinctive three-tone chime used in the SkyTrain system was recorded in 1984–85 at Little Mountain Sound Studios in Vancouver.[107] The automated train announcements have been voiced by Laureen Regan since the opening of the Millennium Line in 2002, and by Karen Kelm between 1985 and 2001.[108]

Rolling stock

[edit]

Expo and Millennium Lines

[edit]

The Expo Line and Millennium Line use Bombardier's Advanced Rapid Transit (ART) system, a system of automated trains driven by linear induction motors, formerly known as Intermediate Capacity Transit System (ICTS). These trains reach speeds of 90 km/h (55.9 mph);[109] including wait times at stops, the end-to-end average speed is 45 km/h (28.0 mph), three times faster than a bus and almost twice as fast as a B-Line express bus.[110] During cold weather, TransLink crews use hockey sticks to clear snow and ice from train doors, which would otherwise prevent some doors from being able to open.[111] The trains are also slowed and staffed by TransLink attendants, who can manually override the automatic controls in the event of an obstruction caused by snow or ice.[112]

UTDC ICTS Mark I fleet

[edit]
An original Mark I train (2013)

The initial fleet consisted of 12.7 m (41 ft 8 in) lightweight Mark I ICTS cars from Urban Transportation Development Corporation, similar to those used by Toronto's Line 3 Scarborough and the Detroit People Mover. Mark I vehicles are composed of mated pairs and normally run as six-car trains and only on the Expo Line, but can be run in two-, four-, or six-car configurations. The maximum based on current station platform lengths is a six-car configuration, totalling 76.2 metres (250 ft). The SkyTrain fleet includes 150 Mark I cars. These trains have a mix of forward-, reverse- and side-facing seats; red, white, and blue interiors; and four doors per car, two per side.

Bombardier ART Mark II fleet

[edit]
A second generation Mark II train in New Westminster (2019)

When the Millennium Line was built, TransLink ordered new-generation Mark II ART trains from Bombardier Transportation, some of which were assembled in a Burnaby factory.[113] Similar trains are used in Kuala Lumpur's Kelana Jaya Line, New York's JFK AirTrain, and the Beijing Airport Express. These trains are run in four-car configurations on the Expo Line, and two-car configurations on the Millennium Line. Each pair of cars is semi-permanently joined together in a twin unit or "married pair", with a length of 33.4 metres (110 ft). Mark II trains have a streamlined front and rear, an articulated joint allowing passengers to walk the length of a married pair, white/grey/blue interior, and six doors per car, three per side. TransLink also ordered 48 Mark II ART (2009/2010 model) in 2009 to further supplement supply and integrate new features like CCTV and visual maps with LED lights.[114]

Bombardier Innovia Metro 300 (ART Mark III) fleet

[edit]
4-car Bombardier Innovia Metro 300 (ART Mark III) train arriving at Stadium-Chinatown station (2016)

The Bombardier ART model has undergone several redesigns from the original UTDC ICTS model, and the Mark II design has been updated by Bombardier, with this newest offering being the Innovia Metro 300. Dimensions are similar to the Mark II, with capacity improvements offered over the outgoing model through redesigned car layout. TransLink ordered 28 Mark III cars, which began delivery in 2015, and went into service beginning in August 2016.[115][116] The vehicles appear sleeker, with larger windows on the sides of the train, and redesigned windows and headlights on the ends of the cars. The interior is largely similar to the second generation of Mark II cars, with the some seats removed to better accommodate bicycles and strollers.[117] TransLink has claimed that the interior of the Mark III offers better sound and heat insulation.[116][117] TransLink ordered the cars for the Evergreen Extension in a 4-car articulated configuration, with two centre cars, to allow full-length train movements by passengers. However, due to a shortage of trains, the Mark IIIs are being used on the Expo Line, while 2-car Innovia 200 (Mk2) serve the Millennium Line. On December 16, 2016, TransLink ordered 28 more Mark III cars, bringing the total of Mark III cars to 56 by the end of 2019.[118][119] On February 22, 2018, TransLink announced a further order of 28 Mark III cars, which will bring the total number of Mark III cars to 84 once all trains are in service by the end of 2020.[119]

Canada Line

[edit]
Canada Line's Hyundai Rotem trains are wider than Bombardier Mark II trains, with spaces assigned for wheelchairs, bicycles and luggage (2009).
Real-time information is provided on every station platform on the Canada Line (2009).

The Canada Line uses Hyundai Rotem EMU vehicles, with cars powered by conventional electric motors instead of the linear induction motor (LIM) technology used by the Expo and Millennium Line vehicles; as a result, the Canada Line vehicles cannot be used on the Expo and Millennium Lines. There are 20 trains, which operate as two-carriage articulated units and can reach a speed of 80 km/h (49.7 mph).[120] They are maintained at a yard next to Bridgeport station in Richmond.

On February 22, 2018, TransLink announced an additional order of 24 Canada Line cars to be brought into service by 2020, bringing the total to 32 trains operating as two-car units.[119]

Future expansion

[edit]

Several possible expansions to the SkyTrain network have been announced. In 2005, TransLink released a ten-year outlook outlining a potential line to the University of British Columbia (UBC) and further expansion of the Expo Line into Surrey.[121] In 2011, two separate rapid transit studies have given further examination and consultation into rapid transit options for expansion for the UBC–Broadway corridor, and Surrey and the South of Fraser region.[122] Expo Line capacity upgrades are also being planned to meet future demand.

A pair of expansions—the Broadway corridor extension and the Expo Line to Langley—began construction in the early 2020s alongside the addition of 235 new cars and upgrades to SkyTrain facilities.[123][124]

Broadway corridor extension

[edit]

Early proposals planned to extend SkyTrain west along the Broadway corridor, but stopped well short of UBC because of the cost, estimated at $700 million in 1999.[125] However, the Provincial Transit Plan, released in February 2008, included funding for the entire Broadway corridor to UBC. The line would replace the region's busiest bus routes, where over 100,000 trips are made daily. The line would also include an interchange with the Canada Line at Cambie Street. In 2008, the new line was estimated to cost $2.8 billion, with an expected completion date of 2020.[33]

Government statements suggested that the UBC line would be an extension of the SkyTrain network from VCC–Clark station via elevated platforms or a tunnel along Broadway ending at University of British Columbia Vancouver. This would mean that riders travelling from Coquitlam to UBC would not need to change trains, as Millennium Line trains would continue to UBC from Lafarge Lake–Douglas station. Riders from the Evergreen Extension east of Commercial–Broadway station would also have a secondary route to downtown with the option of transferring to the Canada Line instead of the Expo Line. However, light rail and higher-capacity bus rapid transit were also proposed.[126]

In 2011, with the UBC Line Rapid Transit Study, SkyTrain was evaluated as a possible technology for rapid transit expansion along the Broadway corridor to UBC, along with light rail transit and bus rapid Transit. The June 2014 plan proposes a first phase that would extend the Millennium Line from VCC–Clark station to Arbutus Street using SkyTrain technology, with an interchange with the Canada Line at Broadway–City Hall station; a second phase would see the line extended from Arbutus to UBC.[127] A plebiscite to raise 25 percent of the funds required for the Broadway extension to Arbutus, among other transit expansion plans, was defeated in 2015.[128]

On March 16, 2018, the provincial government approved the construction of an extension of the Millennium Line underneath Broadway, which will extend the line underground west to Arbutus Street, while adding six new stations. Early work was slated to begin in 2019 with a completion date set for 2025.[129] On April 19, 2018, the UBC Board of Governors indicated it would consider contributing funds towards accelerating the extension of the Millennium Line from its new planned terminus at Arbutus to the university.[130]

On January 30, 2019, Vancouver City Council endorsed building the line underground all the way to UBC.[131]

On July 17, 2020, the British Columbia government announced that the Acciona–Ghella Joint Venture Company had been selected to receive the design–build contract for the Broadway extension.[132] Premier John Horgan confirmed on September 4, 2020, that construction would proceed in the fourth quarter of 2020 despite the ongoing COVID-19 pandemic in British Columbia. Horgan also confirmed that the extension is expected to be in service by 2025. Transportation Minister Claire Trevena also stated that there were no immediate plans to extend the line towards the UBC campus.[133]

The provincial government announced on November 24, 2022, that the opening of the extension would be pushed back to early 2026 owing to a labour dispute affecting concrete workers which took place that June.[134] On May 24, 2024, the provincial government announced that the extension opening would be further delayed to late 2027, due to various delays which occurred during the tunnel-boring process.[135]

Expo Line extension

[edit]

The 2008 Provincial Transit Plan included a 6-kilometre (3.7 mi) extension of the Expo Line from King George station in Surrey east to Guildford, then along 152 Street to Fraser Highway and southeast to 168 Street; a further extension to Willowbrook Shopping Centre in Langley City was also included in the plan.[136] After a period of time where SkyTrain, light rail transit, and bus rapid transit were considered for service expansion,[137][138][139] federal funding was secured in 2021 to build a 16-kilometre (9.9 mi) SkyTrain extension to Langley City at a total cost (shared between the federal government, provincial government, and TransLink) between $3.8 and $3.95 billion.[140][141] In July 2022, the extension received approval from the provincial government to be built in one single phase, opening in 2028 with eight stations.[142] Procurement for private contractors began in October 2022 and was scheduled to end with the selection of winning bids by December 2023. The project was divided into three general contracts—the guideway, stations, and electrical systems—and major construction is scheduled to start in 2024.[143]

Expo Line capacity expansion

[edit]

Several options have been considered, planned, or implemented to improve capacity on the Expo Line, including operating longer trains, reducing operating headways, and extending station platforms beyond 80 metres (260 ft). In late 2020, TransLink ordered 41 Alstom Mark V trainsets in five-car configurations that will eventually replace older, lower-capacity trains.[144] Six more Alstom Mark V trainsets were ordered in May 2024, bring this total to 47 Mark V trainsets.[124]

Coquitlam maintenance facility

[edit]

In March 2021, it was announced that a new yard would be constructed to provide storage space and maintenance needed for the upcoming extensions of the Expo and Millennium lines.[145][146] This new facility is to be located near the New Westminster–Coquitlam border along North Road. The land was purchased for $82.5 million, while the cost for the structure and additional tracks was estimated at an additional $300 million. The new yard was expected to provide additional maintenance and space in time for the opening of the Millennium Line's Broadway extension in early 2026.[134] As of February 2024, the opening of the Coquitlam maintenance facility, which is expected to have a storage capacity of 145 cars, is scheduled to take place in 2027.[147]

University of British Columbia extension

[edit]

On January 14, 2008, the British Columbia provincial government announced a commitment to the expansion of the Millennium Line to the University of British Columbia (UBC) by 2020 as part of a $14-billion transit spending package to address climate change. It was not clear what route the new line would take, but it was hinted that there would be less use of cut-and-cover tunnelling to minimize disruption to businesses along Broadway and avoid the same problems seen during the Canada Line construction along Cambie Street.[148] This expansion failed to materialize. On February 15, 2019, the TransLink Mayors' Council again approved an extension of the line to the UBC campus, although funding for this continuation past Arbutus Street had not yet been secured.[149] In April 2022, TransLink assessed possible route options in the UBC area, including the provision of additional pocket storage tracks near the UBC terminus owing to the distance between the university and the nearest storage yard.[150] As a result, the terminus at UBC would hypothetically be larger in size in order to accommodate the additional storage space and operational flexibility.[150] In March 2023, it was announced that a contractor would be hired to put together a business case for the extension, which was to be presented in December 2024.[151]

Port Coquitlam extension

[edit]

When the Evergreen Extension was built, the first few metres of track and a track switch for an eventual eastward extension to Port Coquitlam were built at Coquitlam Central station. Such an extension would create two branches where trains would alternate between going east to Lafarge Lake–Douglas station or Port Coquitlam. A feasibility study was conducted, started during early 2020 and running for about six months. Both Port Coquitlam mayor Brad West, Port Coquitlam's city council, and Coquitlam's city council have stated support for the extension. However, as of 2022, no funding had been secured nor a formal plan created.[152]

North Shore connection

[edit]

In 2019, the BC Ministry of Transportation and Infrastructure announced its intention to study a rapid transit link from Vancouver's city centre to the North Shore, possibly in the form of SkyTrain. By March 2020, the provincial government confirmed it had selected six possible routes for a "high-capacity, fixed-link, rapid transit crossing across Burrard Inlet between Vancouver and the North Shore".[153] In 2022, TransLink suggested that a North Shore link would likely be created using bus rapid transit first while a concurrent feasibility study of a longer-term light rail transit or SkyTrain connection is conducted.[154]

See also

[edit]

Notes

[edit]
  1. ^ a b Represents a significant ridership decrease from prior years owing to the impact of the COVID-19 pandemic on public transport.

References

[edit]
  1. ^ "Transit Ridership Report Third Quarter 2024" (PDF). American Public Transportation Association. November 20, 2024. Retrieved November 23, 2024.
  2. ^ "Transit Ridership Report Fourth Quarter 2023" (PDF). American Public Transportation Association. March 4, 2024. Retrieved September 5, 2024.
  3. ^ "The Buzzer – 2011-01-14". TransLink. January 14, 2011. Archived from the original on October 12, 2013. Retrieved July 23, 2013.
  4. ^ a b "Evergreen Extension opening today". NEWS 1130. December 2, 2016. Archived from the original on August 31, 2017. Retrieved May 16, 2017.
  5. ^ "Broadway Subway Project – Government of British Columbia". Retrieved July 8, 2021.
  6. ^ a b "Rail: Key Characteristics by line". TransLink. 2022. Archived from the original on November 28, 2023. Retrieved December 7, 2023.
  7. ^ "Quick Facts". Archived from the original on August 6, 2019. Retrieved November 27, 2016.
  8. ^ "Canada Line Fact Sheet The Canada Line Vehicle" (PDF). canadaline.ca (TransLink). December 14, 2007. p. 2. Archived from the original (PDF) on March 26, 2009. Retrieved June 16, 2015.
  9. ^ "SkyTrain". TransLink. November 17, 2011. Archived from the original on July 15, 2016. Retrieved August 22, 2009.
  10. ^ "Expo Line Upgrades Improve Communications". TransLink. October 11, 2011. Archived from the original on December 12, 2011. Retrieved November 17, 2011.
  11. ^ "Skytrain Bridge". Buckland & Taylor Ltd. Archived from the original on July 6, 2008. Retrieved August 22, 2009.
  12. ^ a b c Slattery, Jill (December 1, 2016). "Evergreen SkyTrain Line launched". Global News. Archived from the original on December 3, 2016. Retrieved December 2, 2016.
  13. ^ "Shanghai opens two new lines on longest metro in world". The Independent. December 31, 2021. Retrieved February 16, 2022.
  14. ^ Briginshaw, David (July 20, 2016). "Automated metros set to reach 2200 km by 2025". Archived from the original on April 15, 2018. Retrieved May 16, 2018.
  15. ^ Heckenast, Joe; McGraw, Jim (2006). Your Ride Guide 2006 (Vancouver Sun, with TransLink and Bombardier) (Report). New Westminster, BC: McGraw Media. p. 14.
  16. ^ Mason, Bruce (December 31, 1989). "SkyTrain and Cambie Bridge taking us down road to Expo Series: The Eighties; [1* Edition]". The Province. p. 20.
  17. ^ "SkyTrain Schedules". www.translink.ca. Retrieved January 3, 2022.
  18. ^ a b "Skytrain: The Smart Choice for Greater Vancouver". American Public Transportation Association. Archived from the original on September 27, 2007. Retrieved January 14, 2007.
  19. ^ Coling, Adrienne (September 19, 2016). "Everything Evergreen: New SkyTrain operating pattern for Expo and Millennium Lines". The Buzzer blog. TransLink. Archived from the original on October 5, 2016. Retrieved October 4, 2016.
  20. ^ "Governor General's Medal in Architecture". Royal Architectural Institute of Canada. Archived from the original on September 27, 2007. Retrieved December 2, 2006.
  21. ^ "Evergreen Extension – Opening at noon on Dec. 2, 2016!". TransLink. Archived from the original on December 1, 2016. Retrieved December 2, 2016.
  22. ^ "Canada Line Financing". Archived from the original on August 8, 2009.
  23. ^ "Canada Line Opens In November 2009." Railway Gazette International 162.(2006 Jul.): 47. Associates Programs Source Plus. Web. December 15, 2011.
  24. ^ a b c "TransLink SkyTrain Schedules". TransLink. Archived from the original on July 11, 2018. Retrieved July 11, 2018.
  25. ^ "Pricing and Fare Zones". www.translink.ca.
  26. ^ "Greater Vancouver Transportation Authority Transit Tariff" (PDF). TransLink. January 1, 2005. Archived from the original (PDF) on May 13, 2005. Retrieved June 17, 2007.
  27. ^ "Children 12 and under will soon ride free on B.C. public transit". BC Government News. August 9, 2021. Retrieved January 3, 2022.
  28. ^ Thomas, Sandra (August 9, 2006). "'Helping hands' part of SkyTrain scam". Vancouver Courier. Archived from the original on June 30, 2007. Retrieved February 24, 2007.
  29. ^ "The Buzzer" (PDF). March 2, 2007. Archived from the original (PDF) on September 4, 2014. Retrieved March 4, 2007.
  30. ^ "Riding without paying will cost $173". The Province. CanWest MediaWorks Publications Inc. March 20, 2005. Archived from the original on September 29, 2007. Retrieved December 14, 2006.
  31. ^ "Canada Line Controlled Access, Safety & Security and Fare Evasion" (PDF). TransLink. December 1, 2005. p. 8. Archived (PDF) from the original on February 2, 2019. Retrieved June 18, 2007.
  32. ^ Bennett, Nelson. "Beating boosts call for transit turnstiles". Richmond News. Archived from the original on September 26, 2007. Retrieved December 25, 2006.
  33. ^ a b "Provincial Transit Plan Brochure" (PDF). Archived from the original (PDF) on April 11, 2008. Retrieved January 17, 2008.
  34. ^ "BGates and smart cards on the way at Skytrain". CTV British Columbia. June 12, 2008. Archived from the original on January 24, 2009. Retrieved December 5, 2008.
  35. ^ "Faregates and Smartcards coming to SkyTrain in spring 2010". The Buzzer Blog. April 9, 2009. Archived from the original on August 14, 2010. Retrieved August 8, 2010.
  36. ^ "No turnstiles for SkyTrains until 2012". CBC British Columbia. August 14, 2009. Archived from the original on August 17, 2009. Retrieved September 21, 2009.
  37. ^ "Card system struggles with another glitch". The Vancouver Sun. Postmedia Network Inc. October 29, 2014. Archived from the original on February 8, 2015. Retrieved February 4, 2015.
  38. ^ "SeaBus ridership hits all-time low after one-zone bus travel introduced". VancityBuzz. March 18, 2016. Archived from the original on October 21, 2017. Retrieved October 20, 2017.
  39. ^ "TransLink to close accessible fare gates". CBC News. July 25, 2016. Archived from the original on September 24, 2016. Retrieved October 20, 2017.
  40. ^ a b "Canada Line YVR AddFare". TransLink.ca. Archived from the original on September 22, 2016. Retrieved September 19, 2016.
  41. ^ "The Canada Line YVR Add Fare Questions and Answers". TransLink.ca. January 11, 2010. Archived from the original on May 14, 2014. Retrieved May 13, 2014.
  42. ^ "Canada Line YVR AddFare coming Mon Jan 18". The Buzzer Blog. TransLink. January 7, 2009. Archived from the original on January 11, 2010. Retrieved January 8, 2010.
  43. ^ "APTA Q3 2019 Ridership Report" (PDF). American Public Transportation Association. November 22, 2019. p. 37. Archived (PDF) from the original on May 8, 2019. Retrieved December 18, 2019.
  44. ^ "TransLink 2010 Ridership". TransLink. Archived from the original on February 21, 2011. Retrieved June 1, 2011.
  45. ^ a b "Rise in transit use called Olympic legacy". BC Local News. Archived from the original on July 7, 2011. Retrieved February 11, 2011.
  46. ^ "Olympic transit may turn small profit". BC Local News. March 23, 2010.[permanent dead link]
  47. ^ "APTA 2016 Q4 Ridership Report" (PDF). American Public Transportation Association. Retrieved July 10, 2021.
  48. ^ "APTA 2017 Q4 Ridership Report" (PDF). American Public Transportation Association. Retrieved July 10, 2021.
  49. ^ "APTA 2018 Q4 Ridership Report" (PDF). American Public Transportation Association. Retrieved July 10, 2021.
  50. ^ "APTA 2019 Q4 Ridership Report" (PDF). American Public Transportation Association. Retrieved July 10, 2021.
  51. ^ "APTA 2020 Q4 Ridership Report" (PDF). American Public Transportation Association. Retrieved July 10, 2021.
  52. ^ a b "APTA 2022 Q4 Ridership Report" (PDF). American Public Transportation Association.
  53. ^ "APTA 2020 Q4 Ridership Report" (PDF). American Public Transportation Association. March 4, 2021. Retrieved July 10, 2021.
  54. ^ a b c "TransLink Annual Report 2008" (PDF). TransLink.ca. TransLink. Archived (PDF) from the original on April 8, 2019. Retrieved April 8, 2019.
  55. ^ [dead link]"TransLink 2008 Financial and Performance Report". TransLink.ca. TransLink. Retrieved February 8, 2010.[permanent dead link]
  56. ^ Canada Line Rapid Transit Inc. Working: Annual Report 2006 (PDF) (Report). p. 33. Archived from the original (PDF) on June 21, 2007. Retrieved June 17, 2007.
  57. ^ a b "TransLink Annual Report 2005" (PDF). TransLink.ca. TransLink. pp. 12, 22, 38, 45. Archived (PDF) from the original on April 8, 2019. Retrieved April 8, 2019.
  58. ^ "TransLink Annual Report 2003" (PDF). TransLink. p. 22. Archived (PDF) from the original on April 8, 2019. Retrieved April 8, 2019.
  59. ^ Ministry of Finance and Corporate Relations (August 31, 1999). Debt Statistics 1998/99 (PDF) (Report). British Columbia. p. 5. Archived from the original (PDF) on June 21, 2007. Retrieved June 17, 2007.
  60. ^ "TransLink board-inbrief- April 17, 2003" (PDF). Greater Vancouver Regional District. Archived (PDF) from the original on February 25, 2009. Retrieved December 5, 2008.
  61. ^ "SkyTrain gets armed transit cops". CBC News. December 5, 2005. Archived from the original on April 8, 2019. Retrieved January 20, 2007.
  62. ^ "Vancouver transit police begin packing guns". CBC News. December 5, 2005. Archived from the original on December 3, 2013. Retrieved December 25, 2006.
  63. ^ "Common Questions". Greater Vancouver Transportation Authority Police Service. Archived from the original on December 8, 2006. Retrieved December 15, 2006.
  64. ^ Carrigg, David (August 5, 2004). "SkyTrain says system safe despite latest attack". Vancouver Courier. Archived from the original on September 10, 2009. Retrieved March 18, 2009.
  65. ^ "Murder charge laid after teen killed at B.C. SkyTrain stop". CBC News. July 4, 2005. Archived from the original on May 5, 2007. Retrieved January 5, 2007.
  66. ^ Howell, Mike (August 28, 2005). "Cyclist warns of crime increase". VancouverCourier. Archived from the original on September 11, 2009. Retrieved March 18, 2009.
  67. ^ "Safety & Security on SkyTrain". Archived from the original on February 23, 2010. Retrieved April 10, 2010.
  68. ^ "Safety and Security on SkyTrain". TransLink. Archived from the original on October 4, 2006. Retrieved December 26, 2006.
  69. ^ "SkyTrain crime fear 'overblown'". The News, Maple Ridge. January 13, 2007. p. 17.
  70. ^ "SkyTrain evidence taped over after alert failed". The Vancouver Province. May 7, 2008. Archived from the original on September 4, 2015. Retrieved December 15, 2011.
  71. ^ SkyTrain's Mounting Death Toll Archived August 20, 2017, at the Wayback Machine at The Tyee. Retrieved November 20, 2011.
  72. ^ Taylor-Noonan, Michael (May 25, 2012). "Friday fun guest post: A history of monorails in Vancouver". The Buzzer blog. Retrieved December 8, 2021.
  73. ^ Clarke, John (November 19, 1977). "Rapid transit system still a pipedream". The Globe and Mail. p. 8.
  74. ^ Keating, Michael (November 13, 1971). "$61 million experiment could go down the drain New money crucial to give 'sky subvway [[ [sic]]] a shot at markets". The Globe and Mail. p. P5.
  75. ^ Baldrey, Keith (January 3, 1986). "History of SkyTrain". The Vancouver Sun. p. A20. Retrieved December 8, 2022 – via Newspapers.com.
  76. ^ "Canada at International Expositions – Expo '86 in Vancouver". Government of Canada. Archived from the original on May 15, 2011. Retrieved March 27, 2010.
  77. ^ Williamson, Robert (November 21, 1980). "Ontario train system may be used in Vancouver". Globe and Mail. p. 8.
  78. ^ a b c Mackie, John (March 4, 2022). "This Week in History, 1982: Work begins on Vancouver's SkyTrain". Vancouver Sun. Retrieved December 8, 2022.
  79. ^ Farrow, Moira; Cox, Sarah (December 11, 1985). "Glitter, bands and balloons". The Vancouver Sun. p. A1. Retrieved December 8, 2022 – via Newspapers.com.
  80. ^ "In business, on time: System's first riders all had their reasons". The Vancouver Sun. January 3, 1986. p. A1. Retrieved December 8, 2022 – via Newspapers.com.
  81. ^ Hall, Neal (December 27, 1986). "Happy birthday, SkyTrain". The Vancouver Sun. p. B12. Retrieved December 8, 2022 – via Newspapers.com.
  82. ^ Schaefer, Glen (March 16, 1990). "Ride across river offers new views". The Province. p. 14. Retrieved December 8, 2022 – via Newspapers.com.
  83. ^ Davis, Chuck (1997). The Greater Vancouver Book: an Urban Encyclopedia. Surrey, BC: Linkman Press. ISBN 978-1-896846-00-2. Archived from the original on August 6, 2007.
  84. ^ "Details of The Livable Region Strategic Plan". City of Vancouver. Archived from the original on January 3, 2006. Retrieved May 25, 2007.
  85. ^ Sullivan, Paul (January 8, 2002). "B.C.'s SkyTrain to Nowhere". Globe and Mail. Archived from the original on April 3, 2017. Retrieved June 6, 2007.
  86. ^ Carrigg, David (February 19, 2001). "SkyTrain critics have their say". Vancouver Courier. Archived from the original on October 21, 2006. Retrieved December 21, 2006.
  87. ^ "Google map showing location of VCC station". January 1, 1970. Retrieved June 23, 2010.
  88. ^ Carrigg, David (August 5, 2004). "SkyTrain extension off the rails". Vancouver Courier. Archived from the original on October 19, 2006. Retrieved December 21, 2006.
  89. ^ "Evergreen Extension". transLink.ca. TransLink. Archived from the original on November 21, 2016. Retrieved November 30, 2016.
  90. ^ Campbell's 'kaputski' on RAV line financing tops the list of keepers so far, Vaughn Palmer, The Vancouver Sun, December 3, 2004. p. A3
  91. ^ "Canada Line Delivers a Smooth Ride". The Globe and Mail. December 28, 2009. Archived from the original on January 1, 2010. Retrieved December 28, 2009.
  92. ^ "TransLink reports transit ridership heading for a new record". TransLink. August 22, 2011. Archived from the original on October 20, 2011. Retrieved December 28, 2009.
  93. ^ "Frequently Asked Questions, Canada Line". Rapid Transit Office, City of Vancouver. Archived from the original on September 17, 2011. Retrieved December 2, 2008.
  94. ^ Newman, Peter W. G; Kenworthy, Jeffrey R.; Newman, Peter (1999). Sustainability and Cities. Washington, D.C.: Island Press. p. 221. ISBN 978-1-55963-660-5.
  95. ^ "Vancouver BC SkyTrain" (PDF). City of Seattle. Archived from the original (PDF) on June 21, 2007. Retrieved February 23, 2007.
  96. ^ "Vancouver SkyTrain — a proven success story" (PDF). Japan railways and transport review. Archived from the original (PDF) on October 8, 2006. Retrieved January 28, 2007.
  97. ^ Key Features of the North Arm Fraser Bridge Archived January 12, 2007, at the Wayback Machine
  98. ^ Sinoski, Kelly (August 4, 2014). "Inside the SkyTrain control room". Vancouver Sun. Archived from the original on December 27, 2024. Retrieved December 27, 2024.
  99. ^ a b c "Quester Tangent – SkyTrain for Fleet Operators". Archived from the original on March 6, 2015. Retrieved March 25, 2015.
  100. ^ "A Timely SkyTrain Safety Reminder / A near-miss: a timely reminder – wait for the next train!". TransLink. July 17, 2009. Archived from the original on August 19, 2009. Retrieved August 11, 2009. In 2007 and 2008, 981 delays were caused by vehicle issues: 55% of those involved the doors, many of them held open by passengers.... With over 96% on-time performance, SkyTrain is rapid, ready and reliable.
  101. ^ "TransLink investigates train derailment". Vancouver Sun. Archived from the original on May 31, 2010. Retrieved May 28, 2010.
  102. ^ "Two sheared bolts caused SkyTrain derailment: FOI documents". Business in Vancouver. September 28, 2022. Retrieved August 23, 2023.
  103. ^ Thomas, Sandra (August 5, 2005). "TransLink putting in tactile strips on Expo Line to help visually impaired". The Vancouver Courier. Archived from the original on September 11, 2009. Retrieved March 18, 2009.
  104. ^ Accessibility Plan 2023 (PDF) (Report). 2023. Retrieved January 3, 2024.
  105. ^ "Podcast: the story of the SkyTrain chime". The Buzzer blog. The Buzzer Blog (TransLink). December 1, 2008. Archived from the original on September 10, 2009. Retrieved May 26, 2009.
  106. ^ "Buzzer Podcast: Voice of the SkyTrain". The Buzzer blog. The Buzzer Blog (TransLink). October 20, 2008. Archived from the original on August 19, 2009. Retrieved May 26, 2009.
  107. ^ "Equipment Limits of Approach – Contractor Safety While Working Near SkyTrain" (PDF). The British Columbia Rapid Transit Company Ltd. Archived from the original (PDF) on February 6, 2016. Retrieved February 3, 2016.
  108. ^ "Burnaby/New Westminster Area Transit Plan Summary Report" (PDF). Archived from the original (PDF) on January 9, 2005. Retrieved December 13, 2006.
  109. ^ Tung, Allen (December 29, 2021). "The most Canadian solution to keep SkyTrain customers moving, eh?". The Buzzer. TransLink. Retrieved December 19, 2022.
  110. ^ Tung, Allen (January 5, 2022). "This is why you see SkyTrain Attendants onboard during snow". The Buzzer. TransLink. Retrieved December 19, 2022.
  111. ^ "Questions about Skytrain $". CBC News. May 25, 2000. Archived from the original on March 21, 2007. Retrieved February 3, 2007.
  112. ^ Pabillano, Jhenifer (July 3, 2009). "The Buzzer rides the first of the new SkyTrain cars!". TransLink. Archived from the original on July 15, 2009. Retrieved February 3, 2007.
  113. ^ "TransLink launches first Mark III train". TransLink. August 18, 2016. Archived from the original on August 28, 2016. Retrieved August 19, 2016.
  114. ^ a b "New SkyTrain cars coming to Expo Line". NEWS 1130. August 18, 2016. Archived from the original on August 19, 2016. Retrieved August 19, 2016.
  115. ^ a b "More passengers, less noise: TransLink unveils SkyTrain Mark III". Archived from the original on August 19, 2016. Retrieved August 19, 2016.
  116. ^ "28 new SkyTrain cars ordered to improve transit in Metro Vancouver". TransLink.ca. December 16, 2016. Archived from the original on January 3, 2017. Retrieved January 2, 2017.
  117. ^ a b c "TransLink accelerating delivery of new SkyTrain cars". TransLink. February 22, 2018. Archived from the original on August 7, 2019. Retrieved October 10, 2023.
  118. ^ "The Canada Line Factsheet – The Canada Line Vehicle" (PDF). Greater Vancouver Regional District. Archived from the original (PDF) on March 26, 2009. Retrieved December 5, 2008.
  119. ^ "TransLink Three-Year Plan and Ten-Year Outlook" (PDF). Archived from the original (PDF) on September 2, 2005.
  120. ^ "UBC Line Rapid Transit Study – Alternative Designs". TransLink. Archived from the original on September 4, 2015. Retrieved April 21, 2011.
  121. ^ Tung, Allen (September 26, 2023). "TransLink embarks on transformative SkyTrain Expansion Program". The Buzzer. TransLink. Retrieved September 27, 2023.
  122. ^ a b "Alstom will supply 6 additional Vancouver SkyTrain Mark V trains". Alstom.com. May 28, 2024. Retrieved May 28, 2024.
  123. ^ "Rapid Transit Office Millennium Line Extension". City of Vancouver. Archived from the original on February 7, 2006. Retrieved December 15, 2006.
  124. ^ "Rapid Transit Principles for the Broadway Corridor and the UBC Line Rapid Transit Study" (PDF). City of Vancouver. Archived (PDF) from the original on March 14, 2016. Retrieved April 10, 2010.
  125. ^ "Broadway Subway Project". TransLink. Archived from the original on March 25, 2019. Retrieved April 8, 2019.
  126. ^ Bula, Frances (July 2, 2015). "Vancouver-region voters reject sales-tax hike to fund transit projects". The Globe and Mail. Archived from the original on February 24, 2017. Retrieved September 1, 2017.
  127. ^ Chan, Kenneth (March 16, 2018). "It's official: Broadway Subway and Surrey LRT will be built in $7-billion transit plan". Daily Hive Vancouver. Archived from the original on March 17, 2018. Retrieved March 17, 2018.
  128. ^ "UBC to advocate completion of rapid transit to campus". UBC News. April 19, 2018. Archived from the original on April 22, 2018. Retrieved April 22, 2018.
  129. ^ "Vancouver moves forward on $3.8 billion subway extension to UBC | the Star". Toronto Star. January 30, 2019. Archived from the original on February 1, 2019. Retrieved January 31, 2019.
  130. ^ Smith, Charlie (July 17, 2020). "B.C. government announces who will design, build, and partially finance Broadway Subway Project". The Georgia Straight. Retrieved September 4, 2020.
  131. ^ "Construction on Broadway SkyTrain project to begin this fall". CBC News. September 4, 2020. Retrieved September 4, 2020.
  132. ^ a b Chan, Kenneth (November 24, 2022). "Broadway Subway opening delayed to 2026". Daily Hive Vancouver. Archived from the original on November 25, 2022. Retrieved November 25, 2022.
  133. ^ Chan, Kenneth (May 24, 2024). "Broadway Subway opening further delayed until Fall 2027". Daily Hive Vancouver. Archived from the original on May 24, 2024. Retrieved May 28, 2024.
  134. ^ Nagel, Jeff (January 16, 2008). "More SkyTrains for Surrey". Surrey Leader. Archived from the original on January 20, 2008. Retrieved January 25, 2008.
  135. ^ "Rapid Transit Principles for the Broadway Corridor and the UBC Line Rapid Transit Study". TransLink. Archived from the original on January 13, 2012. Retrieved November 17, 2011.
  136. ^ Nagel, Jeff (June 7, 2016). "Line to Langley may still be SkyTrain: TransLink CEO". Abbotsford News. Archived from the original on November 30, 2018. Retrieved February 13, 2018.
  137. ^ McElroy, Justin (November 15, 2018). "Metro Vancouver mayors agree to suspend Surrey LRT, start process for SkyTrain to Langley". CBC News. Archived from the original on December 4, 2021. Retrieved November 30, 2018.
  138. ^ Chan, Kenneth (July 9, 2021). "Trudeau announces $1.3 billion for Surrey-Langley SkyTrain, confirms UBC support | Urbanized". DailyHive. Retrieved July 11, 2021.
  139. ^ Weichel, Andrew (July 9, 2021). "Federal government providing up to $1.3 billion for Surrey-Langley SkyTrain extension". CTV News Vancouver. Retrieved July 9, 2021.
  140. ^ Chan, Kenneth (July 14, 2022). "16-km-long Surrey-Langley SkyTrain extension receives full provincial and federal approval". Daily Hive. Retrieved July 20, 2022.
  141. ^ Chan, Kenneth (October 11, 2022). "Bidding process begins for $475 million contract to build Surrey-Langley SkyTrain's eight stations". Daily Hive. Retrieved October 28, 2022.
  142. ^ "TransLink to buy 205 new SkyTrain cars from Bombardier for $723 million | Urbanized". dailyhive.com. Retrieved August 17, 2023.
  143. ^ Strandberg, Diane (March 16, 2021). "$300-million TransLink operations centre coming to Coquitlam". Retrieved March 22, 2021.
  144. ^ Chan, Kenneth (March 11, 2021). "TransLink buys 27-acre site near Braid Station for new SkyTrain maintenance centre". Retrieved March 22, 2021.
  145. ^ Chan, Kenneth (February 29, 2024). "This is what SkyTrain's new operations and maintenance centre will look like". Daily Hive Vancouver. Retrieved February 29, 2024.
  146. ^ Palmer, Vaughn (January 15, 2008). "Less than meets the eye, and light on details". Vancouver Sun. CanWest MediaWorks Publications. Archived from the original on November 3, 2012. Retrieved January 15, 2008.
  147. ^ "Metro Vancouver mayors vote yes on SkyTrain extension to UBC". CBC News. February 15, 2019. Retrieved February 16, 2019.
  148. ^ a b Chan, Kenneth (April 19, 2022). "TransLink outlines proposed UBC SkyTrain route and station locations". Daily Hive Vancouver. Retrieved February 29, 2024.
  149. ^ "Detailed design and planning set to begin for UBC SkyTrain extension | Urbanized". dailyhive.com. Retrieved March 22, 2023.
  150. ^ "Port Coquitlam to launch feasibility study on Skytrain Extension". Daily Hive. November 28, 2019. Retrieved November 28, 2019.
  151. ^ "6 route options for North Shore to Vancouver rapid transit line: BC government". Daily Hive. March 2, 2020. Archived from the original on March 4, 2020. Retrieved March 4, 2020.
  152. ^ Chan, Kenneth. "Buses first, SkyTrain maybe later: TransLink planning bus rapid transit from Park Royal to Metrotown". Daily Hive. Retrieved March 16, 2024.
[edit]
KML is not from Wikidata