North–South MRT line: Difference between revisions
C151 lover (talk | contribs) |
No edit summary Tags: Mobile edit Mobile web edit |
||
Line 1: | Line 1: | ||
{{Short description|Mass Rapid Transit line in Singapore}} |
|||
{{Multiple issues| |
|||
{{good article}} |
|||
{{refimprove|date=June 2016}} |
|||
{{ |
{{Use Singapore English|date=April 2022}} |
||
{{Use dmy dates|date=August 2023}} |
|||
}} |
|||
{{About|the MRT line in Singapore|the MRT Line in Jakarta|North–South Line (Jakarta MRT)|similarly named rapid transit lines in other cities|North–South line (disambiguation){{!}}North–South line}} |
|||
{{Infobox rail line |
{{Infobox rail line |
||
| box_width = width:12em; |
|||
| name = [[File:MRT Singapore Destination 4.svg|25px]] [[File:MRT Singapore Destination 5.svg|25px]] |
|||
<br />North–South Line |
|||
| color = {{rcr|SMRT|North South}} |
|||
| native_name = Laluan MRT Utara Selatan<br />{{lang|zh|南北地铁线}}<br />{{lang|ta|வடக்கு தெற்கு எம்ஆர்டி வழி}} |
|||
| logo = North South Line logo.svg |
|||
| logo_width = 250px |
|||
| image = NS15 Yio Chu Kang Station.jpg |
|||
| logo_width = |
|||
| image_width = 300px |
|||
| caption = [[Yio Chu Kang MRT station|Yio Chu Kang]] station is one of the oldest stations of the line. |
|||
| image_width = 300px |
|||
| type = [[Rapid transit]] |
|||
| caption = The North South Line is coloured red on system maps. |
|||
| system = [[Mass Rapid Transit (Singapore)]] |
|||
| status = Operational |
|||
| system = [[Mass Rapid Transit (Singapore)]] |
|||
| locale = [[Singapore]] |
|||
| status = Operational <br> Under Construction ([[Canberra MRT Station|Canberra]]) |
|||
| start = [[Jurong East MRT station|Jurong East]] |
|||
| locale = |
|||
| end = [[Marina South Pier MRT station|Marina South Pier]] |
|||
| stations = 29 (27 in operation, 2 under planning) |
|||
| end = [[Marina South Pier MRT Station|Marina South Pier]] |
|||
| routes = 2 |
|||
| stations = 26 (''excluding reserved station at Sungei Kadut and station under construction at Canberra'') |
|||
| daily_ridership = 456,323 (July 2020)<ref>{{cite web |title=Land Transport DataMall |url=https://www.mytransport.sg/content/mytransport/home/dataMall.html |website=mytransport.sg |access-date=20 August 2020 |archive-date=21 August 2020 |archive-url=https://web.archive.org/web/20200821123230/https://www.mytransport.sg/content/mytransport/home/dataMall.html |url-status=live }}</ref> |
|||
| routes = 1 |
|||
| open = {{start date and age|df=yes|1987|11|07}} (First section)<br />{{start date and age|df=yes|1989|11|04}} (Initial line complete)<br />{{start date and age|df=yes|1996|02|10}} (Woodlands extension)<br />{{start date and age|df=yes|2014|11|23}} ({{mrts|Marina South Pier}})<br />{{start date and age|df=yes|2019|11|02}} ({{mrts|Canberra}}) |
|||
| ridership = |
|||
| planopen = {{start date and age|df=yes|2034}} ({{mrts|Brickland}}) <br> {{start date and age|df=yes|2035}} ({{mrts|Sungei Kadut}}) |
|||
| open = 7 November 1987 |
|||
| close = |
|||
| owner = [[Land Transport Authority]] |
|||
| operator = [[SMRT Trains]] ([[SMRT Corporation]]) |
|||
| character = Elevated ([[Jurong East MRT station|Jurong East]] – [[Ang Mo Kio MRT station|Ang Mo Kio]])<br />Ground-level ([[Bishan MRT station|Bishan]])<br />Underground ([[Braddell MRT station|Braddell]] – [[Marina South Pier MRT station|Marina South Pier]]) |
|||
| stock = [[Kawasaki Heavy Industries C151]] (KHI)<br />[[Kawasaki Heavy Industries & CRRC Qingdao Sifang C151A|Kawasaki–Sifang C151A]] (KSF A)<br />[[Kawasaki Heavy Industries & CRRC Qingdao Sifang C151B|Kawasaki–Sifang C151B]] (KSF B)<br />[[Kawasaki Heavy Industries & CRRC Qingdao Sifang C151C|Kawasaki–Sifang C151C]] (KSF C)<br />[[Alstom Movia R151]] (ALS) |
|||
| linelength = {{convert|45|km|mi|abbr=on}} |
|||
| tracklength = |
|||
| tracks = 2; 3 (Ang Mo Kio) |
|||
| notrack = |
|||
| gauge = {{RailGauge|sg|allk=on}} |
|||
| electrification = {{750 V DC|conductor=y}} |
|||
| speed = limit of {{convert|80|km/h|mph|abbr=on}} |
|||
| elevation = |
|||
| map = {{North–South MRT line|inline=yes}} |
|||
| map_state = hide |
|||
|depot = [[Bishan Depot|Bishan]]<br />[[Ulu Pandan Depot|Ulu Pandan]] |
| depot = [[Bishan Depot|Bishan]]<br />[[Ulu Pandan Depot|Ulu Pandan]] |
||
| map_name = Route diagram |
|||
}} |
}} |
||
[[File:Singapore MRT and LRT System Map.svg|thumb|upright=2.1|right|The North South Line is coloured {{Font color|#D42E12|red}} in the MRT system map.]] |
|||
The '''North South Line (NSL)''' is the first [[Mass Rapid Transit (Singapore)|Mass Rapid Transit]] (MRT) line in Singapore which stretches from [[Jurong East MRT Station|Jurong East]] (NS1) to [[Marina South Pier MRT Station|Marina South Pier]] (NS28). The line is {{convert|44|km|mi}} long with 27 stations, including [[Canberra MRT Station|Canberra]], which is under construction. 11 out of 27 stations are underground. <ref>{{cite news | title = North-South Line |
|||
| publisher = Land Transport Authority | date = | url = http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/north-south-line.html | accessdate=2015-12-24}}</ref> Travelling from one end of this line to the other end takes about one hour. The line is coloured '''<span style="color:red;">red</span>''' on the rail map. |
|||
The '''North–South Line''' ('''NSL''') is a high-capacity [[Mass Rapid Transit (Singapore)|Mass Rapid Transit]] (MRT) line in [[Singapore]], operated by [[SMRT Corporation]]. Coloured red on the Singapore rail map, the line is {{convert|45|km|mi}} long and serves 27 stations,<ref>{{Cite web |title=LTA {{!}} North–South Line |url=https://www.lta.gov.sg/content/ltagov/en/getting_around/public_transport/rail_network/north_south_line.html#:~:text=The%20North-South%20Line:%20Singapore%27s%20first%20MRT%20line&text=The%2027%20stations%20along%20the,East%20to%20Marina%20South%20Pier. |access-date=16 October 2022 |website=www.lta.gov.sg |archive-date=1 November 2019 |archive-url=https://web.archive.org/web/20191101093902/https://www.lta.gov.sg/content/ltagov/en/getting_around/public_transport/rail_network/north_south_line.html#:~:text=The%20North-South%20Line:%20Singapore%27s%20first%20MRT%20line&text=The%2027%20stations%20along%20the,East%20to%20Marina%20South%20Pier. |url-status=live }}</ref> 11 of which, between the [[Braddell MRT station|Braddell]] and [[Marina South Pier MRT station|Marina South Pier]] stations, are underground. It runs from [[Jurong East MRT station|Jurong East station]], located in [[West Region, Singapore|Western Singapore]], to Marina South Pier station in the [[Central Area, Singapore|Central Area]], via [[Woodlands MRT station|Woodlands station]] in [[North Region, Singapore|northern Singapore]]. The line operates for almost 20 hours a day (from approximately 5am to 1am the next day), with [[headway]]s of 1 to 2 minutes during peak hours and 5 to 6 minutes during off-peak hours. All the trains on the North–South Line run with a six-car formation. |
|||
The NSL running from [[Jurong East MRT Station|Jurong East]] (NS1) in the West to [[Marina South Pier MRT Station|Marina South Pier]] (NS28) in the South, via [[Woodlands MRT Station|Woodlands]] (NS9) in the North, with station codes NS6 reserved for future use and NS12 for [[Canberra MRT Station|Canberra station]]. The line runs on elevated viaducts along more than half of its length, and goes underground within the Central Area (between [[Bishan MRT Station|Bishan]] and [[Marina South Pier MRT Station|Marina South Pier]]) and along other short sections of its route. |
|||
It was the first MRT line to be built in Singapore, with the first section from [[Yio Chu Kang MRT station|Yio Chu Kang station]] to [[Toa Payoh MRT station|Toa Payoh station]] beginning service on 7 November 1987, followed by an extension southwards to [[Raffles Place MRT station|Raffles Place station]] on 12 December the same year and northwards to [[Yishun MRT station|Yishun station]] on 20 December 1988. After the southern extension to [[Marina Bay MRT station|Marina Bay station]] opened on 4 November 1989, the North–South Line was formed and split from the [[East–West MRT line|East–West Line]]. In the 1990s, the line extended to the north and west connecting to the [[Branch MRT line|Branch line]] via [[Woodlands, Singapore|Woodlands]] through the Woodlands line extension. |
|||
Trains on the North South Line operate in a six-car formation, based out of [[Ulu Pandan Depot|Ulu Pandan]] and [[Bishan Depot]]. The rolling stock is also used on [[East West MRT Line|East West Line]], which joins the North South Line at [[Jurong East MRT Station|Jurong East]] and [[Raffles Place MRT Station|Raffles Place]] / [[City Hall MRT Station|City Hall]]. |
|||
Since the 2010s, due to the ageing infrastructure of the North–South Line (being the oldest and heavily utilised MRT line), significant improvements have been made on this line, such as the replacement of [[railroad tie|sleepers]], [[third rail]] replacement and the introduction of new rolling stocks (the [[Kawasaki Heavy Industries & CSR Sifang C151B|C151B]], [[Kawasaki Heavy Industries & CSR Sifang C151C|C151C]] and [[Alstom Movia R151|R151]]) to replace the older rolling stocks and increase passenger capacity. The North–South Line is also the first line to have undergone a major re-signalling project, converting it from semi-automatic to fully automated operations in 2019. Other recent developments of the line include a new extension to [[Marina South Pier MRT station|Marina South Pier station]] on 23 November 2014 and a new infill station, [[Canberra MRT station|Canberra station]], on 2 November 2019. Two more infill stations ([[Brickland MRT station|Brickland]] and [[Sungei Kadut MRT station|Sungei Kadut]] stations) on the line are being planned and are set to be opened in the 2030s. |
|||
==Overview== |
|||
==History== |
|||
As the name implies, the line connects central [[Singapore]] to both northern and southern parts of the island. |
|||
===Initial developments=== |
|||
{{Main|History of the Mass Rapid Transit (Singapore)}} |
|||
{{Stack|float=right|[[File:NS19 Toa Payoh Plaque unveiled.jpg|thumb|A plaque at Toa Payoh station commemorating the opening of the first phase of the Singapore MRT]]}} |
|||
The Mass Rapid Transit (MRT) originated from a forecast in 1967 by the planners of the State and City Planning Project,<ref>{{cite news |author=<!--no by line; staff writer(s)--> |title='Unique nation State' plan |date=20 September 1967 |newspaper=[[The Straits Times]] |page=6 |via=[[National Library Board]] |url=https://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes19670920-1.2.22 |access-date=14 April 2020 |archive-url=https://web.archive.org/web/20191115204019/http://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes19670920-1.2.22 |archive-date=15 November 2019 |url-status=live }}</ref> which stated the need for a rail-based urban transport system in Singapore by 1992.<ref>{{cite book|last1=Seah C. M.|title=Southeast Asian Affairs.|date=1981|publisher=Singapore: Institute of Southeast Asian Studies|page=293|url=http://eservice.nlb.gov.sg/item_holding_s.aspx?bid=4183690|access-date=14 April 2020|archive-date=19 September 2020|archive-url=https://web.archive.org/web/20200919041256/https://eservice.nlb.gov.sg/item_holding.aspx?bid=4183690|url-status=live}}</ref><ref name=journey1>{{cite book | ref=sharp2005 | last=Sharp | first=Ilsa |title=The Journey — Singapore's Land Transport Story |publisher=SNP:Editions |year=2005 |isbn=978-981-248-101-6}}</ref>{{rp|66}}<ref>{{cite report |citeseerx = 10.1.1.119.9246 |author=Fwa Tien Fang |title=Sustainable Urban Transportation Planning and Development — Issues and Challenges for Singapore |date=4 September 2004 |publisher=Department of Civil Engineering, [[National University of Singapore]]}}</ref> Following a debate on whether a bus-only system would be more cost-effective, then-Minister for Communications [[Ong Teng Cheong]] came to the conclusion that an all-bus system would be inadequate, as it would have to compete for road space in the land-scarce country.<ref name=ltahistory>{{cite web |url=http://www.lta.gov.sg/content/ltaweb/en/about-lta/our-history/1980s.html |title=1982 – The Year Work Began |publisher=Land Transport Authority |access-date=16 November 2013 |archive-url=https://web.archive.org/web/20130929173053/http://www.lta.gov.sg/content/ltaweb/en/about-lta/our-history/1980s.html |archive-date=29 September 2013 |url-status=live }}</ref><ref name=ongcna>{{cite news |author1=Lee Siew Hoon |author2=Chandra Mohan |name-list-style=amp |url= http://www.channelnewsasia.com/cna/obituaries/ongtengcheong/special2.htm |archive-url= https://web.archive.org/web/20020223222029/http://www.channelnewsasia.com/cna/obituaries/ongtengcheong/special2.htm |archive-date= 23 February 2002 |title=In Memoriam — Ong Teng Cheong: A Profile |work=[[Channel NewsAsia]] |location =Singapore |access-date=26 November 2007}}</ref> |
|||
After deciding on a rail-based system, the construction of Phase I of the MRT system,<ref>{{cite news |title=Project to go on line in three stages |url=https://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes19860708-1.2.54.13.2 |work=The Straits Times |date=8 July 1986 |page=8 |access-date=8 March 2021 |archive-date=12 April 2022 |archive-url=https://web.archive.org/web/20220412214257/https://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes19860708-1.2.54.13.2 |url-status=live }}</ref> which will be the North–South Line, was given priority as the line passes through areas having a higher demand for public transport, such as the densely populated housing estates of [[Toa Payoh]] and [[Ang Mo Kio]] and the [[Central Area, Singapore|Central Area]]. The line was expected to relieve the traffic congestion on the Thomson–Sembawang road corridor.<ref>{{Cite book|title=Annual report / Provisional Mass Rapid Transit Authority, Republic of Singapore.|publisher=Singapore: Provisional Mass Rapid Transit Authority|year=1983|pages=5}}</ref><ref>{{cite news |title=North–south line off first |url=https://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes19820829-1.2.2 |work=The Straits Times |date=29 August 1982 |access-date=19 December 2020 |archive-date=19 December 2020 |archive-url=https://web.archive.org/web/20201219051543/https://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes19820829-1.2.2 |url-status=live }}</ref> Construction of the MRT line (and also the MRT system itself) started on 22 October 1983,<ref>{{cite news |title=Work begins on the first part of MRT system |url=https://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes19831029-1.2.70.8 |work=The Straits Times |date=29 October 1983 |access-date=19 December 2020 |archive-date=19 December 2020 |archive-url=https://web.archive.org/web/20201219051544/https://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes19831029-1.2.70.8 |url-status=live }}</ref> and the first section from [[Yio Chu Kang MRT station|Yio Chu Kang station]] to [[Toa Payoh MRT station|Toa Payoh station]] opened on 7 November 1987.<ref>{{cite news|title=All aboard for the Subway Age|url=http://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes19871108-1.2.2|publisher=The Straits Times|date=8 November 1987|access-date=3 February 2020|archive-url=https://web.archive.org/web/20170912145237/http://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes19871108-1.2.2|archive-date=12 September 2017|url-status=live}}</ref><ref>{{Cite web|url=http://eresources.nlb.gov.sg/history/events/e926e24f-9c14-482b-b278-d582b535deb6|title=MRT system begins operations – Singapore History|website=eresources.nlb.gov.sg|access-date=8 April 2020|archive-url=https://web.archive.org/web/20200212134059/http://eresources.nlb.gov.sg/history/events/e926e24f-9c14-482b-b278-d582b535deb6|archive-date=12 February 2020|url-status=live}}</ref> At the inauguration ceremony, Ong Teng Cheong, who backed and commissioned the planning of the MRT system, attended the ceremony as a special Guest of Honour. Dr [[Yeo Ning Hong]], the Minister For Communications and Information, inaugurated the start of MRT operations and announced it to be the "beginning" of the MRT system.<ref>{{cite web |title=Speech by Dr Yeo Ning Hong, Minister For Communications and Information And Second Minister For Defence (Policy), at the inauguration of public service of the MRT system at the Toa Payoh Station on Saturday, 7 November 1987 at 9.00 am |url=https://www.nas.gov.sg/archivesonline/data/pdfdoc/ynh19871107s.pdf |website=nas.gov.sg |date=7 November 1987 |access-date=19 December 2020 |archive-date=19 July 2019 |archive-url=https://web.archive.org/web/20190719034357/http://www.nas.gov.sg/archivesonline/data/pdfdoc/ynh19871107s.pdf |url-status=live }}</ref> |
|||
In the Southbound direction, the North South Line starts at [[Jurong East MRT Station|Jurong East]], where [[cross-platform interchange]] with the [[East West MRT Line|East West Line]] is possible. The line is elevated and passes through [[Choa Chu Kang MRT Station|Choa Chu Kang]], where it interchanges with the [[Bukit Panjang LRT Line|Bukit Panjang LRT]], and [[Woodlands MRT Station|Woodlands]], where it will interchange with the [[Thomson-East Coast MRT Line|Thomson-East Coast Line]] from 2019. Between [[Ang Mo Kio MRT Station|Ang Mo Kio]] and [[Bishan MRT Station|Bishan]] stations, the North South Line descents into a subsurface structure and passes through [[Bishan MRT Station|Bishan]], where it interchanges with the [[Circle MRT Line|Circle Line]].<ref>{{cite web|url=http://www.sgtrains.com/network-nsl.html |title=North South Line |publisher=SGTrains.com |date= |accessdate=2016-09-27}}</ref> |
|||
Nine more stations from [[Novena MRT station|Novena station]] to [[Outram Park MRT station|Outram Park station]] via [[Raffles Place MRT station|Raffles Place]] opened on 12 December that year.<ref>{{Cite news|url=http://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes19871212-1.2.3|title=Shopping for Xmas the MRT way...|last=Rav|first=Dhaliwal|date=12 December 1987|work=Straits Times|access-date=19 September 2017|via=eResources|archive-url=https://web.archive.org/web/20180124011005/http://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes19871212-1.2.3|archive-date=24 January 2018|url-status=live}}</ref> The line was extended northward to [[Yishun MRT station|Yishun station]] on 20 December 1988 as part of phase 2B<ref>{{cite news|title=MRT Yishun opens, two-thirds of system now complete|url=http://eresources.nlb.gov.sg/newspapers/Digitised/Article/newpaper19881220-1.2.11.2|publisher=The New Paper|date=20 December 1988|location=NewspaperSG|page=8|language=en|access-date=3 February 2020|archive-url=https://web.archive.org/web/20171007221657/http://eresources.nlb.gov.sg/newspapers/Digitised/Article/newpaper19881220-1.2.11.2|archive-date=7 October 2017|url-status=live}}</ref> and it began independent operations on 4 November 1989 as the North–South Line when the extension to [[Marina Bay MRT station|Marina Bay station]] was opened.<ref>{{cite news |title=New names for eight stations |publisher=Singapore Monitor |date=30 November 1982}}</ref><ref>{{Cite news|last=Dhaliwal|first=Rav|url=https://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes19891104-1.2.33.1|title=East-enders get ticket to ride as MRT opens line|work=The Straits Times|access-date=21 April 2020|archive-date=19 September 2020|archive-url=https://web.archive.org/web/20200919041254/https://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes19891104-1.2.33.1|url-status=live}}</ref> |
|||
Running on a mix of elevated viaducts, at-grade embankments, subsurface sections and underground tunnels, the line goes underground within the Central Area (between [[Bishan MRT Station|Bishan]] and [[Marina South Pier MRT Station|Marina South Pier]]) to avoid building tracks at surface level<ref>{{cite web|title=Alignment of the North South Line|url=http://landtransportguru.net/train/nsl/|website=Land Transport Guru}}</ref>. The North South Line interchanges with the [[Downtown MRT Line|Downtown Line]] at [[Newton MRT Station|Newton]]. It then passes through [[Orchard MRT Station|Orchard]] at the western end of [[Orchard Road]], where it will interchange the [[Thomson-East Coast MRT Line|Thomson-East Coast Line]] from 2021. At the eastern end of Orchard Road, it interchanges with the [[North East MRT Line|North East Line]] and the [[Circle MRT Line|Circle Line]] at [[Dhoby Ghaut MRT Station|Dhoby Ghaut]]. Cross-platform interchange with the [[East West MRT Line|East West Line]] is possible at [[City Hall MRT Station|City Hall]] and [[Raffles Place MRT Station|Raffles Place]]. |
|||
===Woodlands extension=== |
|||
All southbound trains now terminate at [[Marina South Pier MRT Station|Marina South Pier]]. Previously, majority of these trains still terminate at [[Marina Bay MRT Station|Marina Bay]] despite the opening of Marina South Pier, where one can transfer to the [[Circle MRT Line|Circle Line]], and from 2021, the [[Thomson-East Coast MRT Line|Thomson-East Coast Line]]<ref>{{cite web|url=http://www.tunneltalk.com/Singapore-MRT-02July2014-Ground-freezing-for-Thomson-Line-construction.php|title=Ground freezing first for Singapore rail project|website=TunnelTalk|date=2 July 2014|accessdate=18 December 2014}}</ref>. |
|||
{{Quote box |
|||
|class = <!-- Advanced users only. See the "Custom classes" section below. --> |
|||
|title = |
|||
|quote = The growth of the Mass Rapid Transit (MRT) system demonstrates the Government's commitment to develop a top-rate public transport system for the benefit of our people. Now [the Woodlands residents] too can enjoy the high quality service provided by the MRT... Achieving a world class land transport system takes time. Whether we can do so or not does not depend on the Government alone. It depends on all of us. If the people and the Government continue to work together, as we have done in the past, we will produce the economic growth and budget surpluses to build, not just a world-class transport system, but also the most attractive Singapore for our children to grow up in the 21st Century. |
|||
|author = – Then-Prime Minister [[Goh Chok Tong]], at the official opening of the Woodlands MRT line, on 10 February 1996.<ref>{{cite web |url=https://www.nas.gov.sg/archivesonline/data/pdfdoc/19960210_0001.pdf |title=Speech by Prime Minister Goh Chok Tong at the Opening of Woodlands MRT Line on Saturday, 10 February 1996 at 10.00 AM |last=Goh |first=Chok Tong |date=10 February 1996 |website=National Archives of Singapore |access-date=3 February 2020 |archive-date=14 July 2019 |archive-url=https://web.archive.org/web/20190714093300/http://www.nas.gov.sg/archivesonline/data/pdfdoc/19960210_0001.pdf |url-status=live }}</ref> |
|||
|align = left |
|||
|width = 30em |
|||
|border = |
|||
|fontsize = |
|||
|bgcolor = |
|||
|style = |
|||
|title_bg = |
|||
|title_fnt = |
|||
|tstyle = |
|||
|qalign = |
|||
|qstyle = |
|||
|quoted = |
|||
|salign = |
|||
|sstyle = |
|||
}} |
|||
After the [[Branch MRT line|Branch line]] (from the [[Jurong East MRT station|Jurong East]] to [[Choa Chu Kang MRT/LRT station|Choa Chu Kang]] stations) opened in 1990, the Woodlands MRT line was envisioned so as to close the gap between [[Yishun MRT station|Yishun]] and [[Choa Chu Kang MRT/LRT station|Choa Chu Kang]] stations.<ref>{{Cite news|date=11 March 1988|title=MRTC considering extending line to Woodlands|work=The Straits Times|url=https://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes19880311-1.2.5|archive-date=19 September 2020|archive-url=https://web.archive.org/web/20200919041253/https://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes19880311-1.2.5|url-status=live}}</ref><ref name=":0">{{Cite web|url=http://eresources.nlb.gov.sg/infopedia/articles/SIP_364_2005-01-28.html|title=Woodlands MRT line {{!}} Infopedia|publisher=[[National Library Board]]|website=eresources.nlb.gov.sg|access-date=19 September 2017|archive-url=https://web.archive.org/web/20180101140912/http://eresources.nlb.gov.sg/infopedia/articles/SIP_364_2005-01-28.html|archive-date=1 January 2018|url-status=live}}</ref><ref>{{Cite news|title=Work on Woodlands MRT line to begin later this year|last=Leong|first=C. T.|date=26 February 1991|work=The Straits Times}}</ref> Numerous changes were made to the number of stations for the extension mainly to accommodate the 1991 Concept Plan by the [[Urban Redevelopment Authority]],<ref>{{Cite web|url=https://www.ura.gov.sg/Corporate/Planning/Concept-Plan/Past-Concept-Plans|title=Past Concept Plans|website=www.ura.gov.sg|access-date=30 January 2020|archive-url=https://web.archive.org/web/20200130132455/https://www.ura.gov.sg/Corporate/Planning/Concept-Plan/Past-Concept-Plans|archive-date=30 January 2020|url-status=live}}</ref> which aimed to make Woodlands a regional centre for northern Singapore.<ref>{{Cite book|title=Living the next lap: towards a tropical city of excellence.|publisher=Urban Redevelopment Authority|year=1991|pages=14}}</ref> |
|||
==History== |
|||
During the initial planning of the line, [[Sembawang MRT station|Sembawang]] station was only intended as a provisional station, to be built at a later date due to the underdevelopment of [[Sembawang]], and construction began on 19 November 1992.<ref>{{Cite news|title=Better layouts for six new MRT stations|date=19 November 1992|work=The Straits Times}}</ref> Sembawang station<ref>{{Cite news|title=Another station added to Woodlands MRT line|date=19 November 1992|work=The Straits Times}}</ref> and [[Kranji MRT station|Kranji]] station<ref name="Kranji MRT station">{{cite web | url=http://infopedia.nl.sg/articles/SIP_365_2005-01-28.html | title=Kranji MRT station | publisher=National Library Board Singapore | date=11 November 2003 | access-date=3 February 2012 | author=Thulaja, Naidu Ratnala | url-status=dead | archive-url=https://web.archive.org/web/20131231050129/http://infopedia.nl.sg/articles/SIP_365_2005-01-28.html | archive-date=31 December 2013 }}</ref> were later included in the construction after the second round of planning (construction began at the same time on 19 November 1992) and Sungei Kadut station was then omitted. Sungei Kadut will be built later if the town's population justifies the necessity for the station.<ref>{{cite news |title=Station names for Woodlands line have ties to surroundings |work=The Straits Times |date=20 November 1991 |page=3 |quote=Sembawang will be in the proposed town centre of Sembawang New Town, while Kadut station will be in Sungei Kadut Industrial Estate, earmarked for redevelopment into a new town}}</ref> |
|||
===First phase of development=== |
|||
During the construction, a total of 19 new trains were purchased for almost S$259 million for the new MRT line, designed by German company [[Siemens]] Aktiengesellschaft, to complement the 66 first-generation [[Kawasaki Heavy Industries C151|C151]] trains. There was also a need to level the land covered in thick vegetation in Kadut, Woodlands and Sembawang for the MRT line.<ref>{{Cite news|title=Woodlands MRT closer|date=4 October 1994|work=The Straits Times}}</ref> |
|||
[[File:Toa Payoh MRT.JPG|200px|thumb|left|Toa Payoh Station, the Oldest Station on the MRT Line and the Singapore MRT System]] |
|||
The North South line was the first MRT line in Singapore, with the first section from [[Yio Chu Kang MRT Station|Yio Chu Kang]] to [[Toa Payoh MRT Station|Toa Payoh]] opening on 7 November 1987. Nine more stations from [[Novena MRT Station|Novena]] to [[Outram Park MRT Station|Outram Park]] followed on 12 December 1987, with through service onto what is today the [[East West MRT Line|East West Line]]. The northern terminal was extended to [[Yishun MRT Station|Yishun]] on 20 December 1988 when [[Yishun MRT Station|Yishun]] and [[Khatib MRT Station|Khatib]] stations opened. Separate operation of the North South and [[East West MRT Line|East West]] Lines only started on 4 November 1989, when the extension to [[Marina Bay MRT Station|Marina Bay]] was opened. |
|||
With the official opening of the Woodlands extension on 10 February 1996 by then [[Prime Minister of Singapore|Prime Minister]] [[Goh Chok Tong]], the [[Branch MRT line|Branch line]] was incorporated into the North–South Line.<ref name=":0" /> The extension was built at a cost of $1.2 billion.<ref>{{Cite web|url=https://www.nas.gov.sg/archivesonline/data/pdfdoc/19960210_0001.pdf|title=Speech by Prime Minister Goh Chok Tong at the opening of Woodlands MRT line on Saturday, 10 February 1996 at 10.00 am|date=10 February 1996|url-status=live|archive-url=https://web.archive.org/web/20190714093300/http://www.nas.gov.sg/archivesonline/data/pdfdoc/19960210_0001.pdf|archive-date=14 July 2019}}</ref> |
|||
===Second phase of development (Woodlands Extension)=== |
|||
{{clear|left}} |
|||
[[File:Ns9woodlands.jpg|175px|thumb|Woodlands MRT Station]] |
|||
After the [[Branch MRT Line|Branch Line]] opened in 1990, the Woodlands Extension MRT line was envisioned to close the gap between [[Yishun MRT Station|Yishun]] and [[Choa Chu Kang MRT Station|Choa Chu Kang]]. During the initial planning of the line, [[Sembawang MRT Station|Sembawang]] station was only intended as a provisional station to be built at a later date due to the underdevelopment of the town and [[Kranji MRT Station|Kranji]] station was not planned. But on the second round of planning, the government decided to build these stations and omit Sungei Kadut station from the plan. Sungei Kadut station will be built later if the town's population justifies the necessity for the station.<ref>[http://infopedia.nl.sg/articles/SIP_364_2005-01-28.html Woodlands MRT line | Infopedia<!-- Bot generated title -->]</ref> With the completion of the Woodlands Extension in 1996, the [[Branch MRT Line|Branch Line]] became part of the North South Line and ceased to exist. |
|||
===Subsequent developments=== |
|||
===Jurong East Modification Project (JEMP)=== |
|||
{{main|Marina South Pier MRT station|Canberra MRT station}} |
|||
[[File:JurongeastMRT.JPG|175px|thumb|right|Jurong East MRT Station before the JEMP, at night]] |
|||
[[File:NS12 Canberra MRT Station.jpg|left|thumb|Canberra MRT station.]] |
|||
The Jurong East Modification Project consisted of the construction of a new platform and the addition of a fourth track to [[Jurong East MRT Station|Jurong East Station]].<ref>{{cite web |url=http://app.lta.gov.sg/corp_press_content.asp?start%3D1964 |title=Jurong East Modification Project|accessdate=January 31, 2012 |deadurl=yes |archiveurl=https://web.archive.org/web/20120212162757/http://app.lta.gov.sg/corp_press_content.asp?start=1964 |archivedate=February 12, 2012 }}</ref> It has been in use since 27 May 2011.<ref>{{cite web |url=http://www.lta.gov.sg/apps/news/page.aspx?c=2&id=9h18aw9i6asknrt367xu15fsk5yfn42ppgtynwhh6ob20585f8 |title=New Platform At Jurong East Station To Open On 27 May |publisher=Land Transport Authority of Singapore |date=16 May 2011 |accessdate=2014-11-22}}</ref> Originally it opened from 7am to 9am, this was expanded from 27 December 2011 and it also opens during the evening peak hour.<ref>[http://www.channelnewsasia.com/stories/singaporelocalnews/view/1173577/1/.html Jurong East station opens new platform – Channel NewsAsia<!-- Bot generated title -->]</ref> |
|||
The NSL platforms of the [[Bishan MRT station|Bishan station]] underwent major alterations to increase the passenger capacity of the station from 1,250 to 2,020. A new air-conditioned platform to serve southbound trains then to Marina Bay was constructed and opened for service on 27 July 2008, connected to Junction 8 via Exit E. The station was expanded to handle increased passenger traffic when the CCL station opens.<ref>{{Cite news|title=New Platform at Bishan Station ready|date=26 July 2008|work=The Straits Times}}</ref> As the original platform, now serving northbound trains to Jurong East, remained in service, upgrading works for the platform (Platform A) was hindered and took about a year to complete. While the re-tiling of the platform was done during the day, the Platform Screen Doors (PSDs) were installed in sections through the night. An air-conditioning system was also installed as part of the upgrade. Upgrading works for the platform were fully completed on 23 May 2009.<ref>{{cite news |title=Bishan MRT station ready for Circle crowds |work=The Straits Times |date=22 May 2009|page=49}}</ref> |
|||
Under the Land Transport Master Plan 2008, the Jurong East Modification Project entailed the construction of a new platform and the addition of a fourth track to [[Jurong East MRT station|Jurong East station]] to reduce waiting times and crowding at the station during peak hours.<ref>{{cite web |url=http://app.lta.gov.sg/corp_press_content.asp?start%3D1964 |title=Jurong East Modification Project|access-date=31 January 2012 |url-status=dead |archive-url=https://web.archive.org/web/20120212162757/http://app.lta.gov.sg/corp_press_content.asp?start=1964 |archive-date=12 February 2012 }}</ref> The modification project was completed on 27 May 2011.<ref>{{cite web |url=http://www.lta.gov.sg/apps/news/page.aspx?c=2&id=9h18aw9i6asknrt367xu15fsk5yfn42ppgtynwhh6ob20585f8 |title=New Platform At Jurong East Station To Open On 27 May |publisher=Land Transport Authority of Singapore |date=16 May 2011 |access-date=22 November 2014 |archive-url=https://web.archive.org/web/20141220064357/http://www.lta.gov.sg/apps/news/page.aspx?c=2&id=9h18aw9i6asknrt367xu15fsk5yfn42ppgtynwhh6ob20585f8 |archive-date=20 December 2014 |url-status=live }}</ref> The track and platform was initially opened during morning peak hours only, but since December 2011, they also operate during the evening peak hours.<ref>{{Cite web|url=https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=9h18aw9i6asknrt367xu15fsk5yfn42ppgtynwhh6ob20585f8|title=New Platform At Jurong East Station To Open On 27 May {{!}} Press Room {{!}} Land Transport Authority|website=www.lta.gov.sg|language=en|access-date=23 September 2017|archive-url=https://web.archive.org/web/20170923145050/https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=9h18aw9i6asknrt367xu15fsk5yfn42ppgtynwhh6ob20585f8|archive-date=23 September 2017|url-status=live}}</ref> |
|||
===North South Line Extension (NSLe)=== |
|||
A {{convert|1|km|mi|1|adj=on}}, one station extension from [[Marina Bay MRT Station|Marina Bay]] to [[Marina South Pier MRT Station|Marina South Pier station]] was opened on 23 November 2014, one year earlier than originally planned.<ref name=autogenerated1>{{cite web|url=http://www.lta.gov.sg/corp_info/doc/250108.pdf | title=SPEECH BY MR RAYMOND LIM,MINISTER FOR TRANSPORT, AT THE VISIT TO KIM CHUAN DEPOT, 25 JANUARY 2008, 9.00 AM | publisher=Singapore Government Media Release | date=2008-01-25}}</ref> The extension serves the [[Marina South Pier]] and the [[Marina Bay Cruise Centre Singapore]] in [[Marina Bay, Singapore|Marina Bay]]. |
|||
In the 2008 Land Transport Master Plan, the {{convert|1|km|mi|1|adj=on}} North–South Line extension was announced as one of the upcoming projects rolled out by the [[Land Transport Authority]] to expand Singapore's rail network.<ref>{{Cite web|url=https://www.lta.gov.sg/content/dam/ltaweb/corp/PublicationsResearch/files/ReportNewsletter/LTMP-Report.pdf|title=Land Transport Master Plan 2008 (Pg 34)|date=February 2008|website=www.lta.gov.sg|url-status=live|archive-url=https://web.archive.org/web/20121111133443/http://www.lta.gov.sg/content/dam/ltaweb/corp/PublicationsResearch/files/ReportNewsletter/LTMP-Report.pdf|archive-date=11 November 2012|access-date=8 November 2019}}</ref> The one kilometre extension from [[Marina Bay MRT station|Marina Bay]] to [[Marina South Pier MRT station|Marina South Pier station]] was opened on 23 November 2014.<ref>{{Cite web|url=https://www.straitstimes.com/singapore/transport/marina-south-pier-mrt-station-on-north-south-line-to-open-on-sunday|title=Marina South Pier MRT Station on North–South Line to open on Sunday|date=22 November 2014|website=The Straits Times|language=en|url-status=live|archive-url=https://web.archive.org/web/20180224163243/http://www.straitstimes.com/singapore/transport/marina-south-pier-mrt-station-on-north-south-line-to-open-on-sunday|archive-date=24 February 2018|access-date=8 November 2019}}</ref><ref>{{Cite web|url=http://www.lta.gov.sg/apps/news/page.aspx?c=2&id=4518c4b9-a674-42a4-9f27-81d9325bb983|title=Marina South Pier Station to Open on 23 November|date=17 November 2014|website=lta.gov.sg|url-status=live|archive-url=https://web.archive.org/web/20150307081123/http://www.lta.gov.sg/apps/news/page.aspx?c=2&id=4518c4b9-a674-42a4-9f27-81d9325bb983|archive-date=7 March 2015|access-date=8 November 2019}}</ref> This extension serves the [[Marina South Pier]], the [[Marina Bay Cruise Centre Singapore]], and future developments in the [[Marina Bay, Singapore|Marina Bay]] Downtown area.<ref name=":1">{{Cite web|url=https://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/north-south-line-extension.html|title=North–South Line Extension {{!}} Projects {{!}} Public Transport {{!}} Land Transport Authority|website=www.lta.gov.sg|language=en|access-date=19 September 2017|archive-url=https://web.archive.org/web/20120930005359/http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/north-south-line-extension.html|archive-date=30 September 2012|url-status=live}}</ref> |
|||
===Canberra station=== |
|||
{{Main article|Canberra MRT Station}}On 27 April 2015, construction started on [[Canberra MRT Station|Canberra]] Station (NS 12) which will be built along an operational section of the line and costing S$90 million.<ref>{{cite web|url=http://www.channelnewsasia.com/news/singapore/work-starts-on-canberra/1809560.html|title=Work starts on Canberra MRT station|website=Channel NewsAsia|access-date=2016-03-03}}</ref> Similar to [[Dover MRT Station|Dover Station]], the station platform will be of an elevated side platform layout. Construction is expected to be completed by 2019 to serve the upcoming developments near the station.<ref>{{cite web|url=http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/canberra.html|title=Canberra Station {{!}} Projects {{!}} Public Transport {{!}} Land Transport Authority|website=www.lta.gov.sg|access-date=2016-03-03}}</ref> |
|||
On 17 January 2013, the [[Land Transport Authority]] (LTA) announced that a feasibility study was conducted to construct [[Canberra MRT station]].<ref>{{cite web |url=https://www.mot.gov.sg/news-centre/news/Detail/Speech%20by%20Mr%20Lui%20Tuck%20Yew%20at%20visit%20to%20DTL1%20Chinatown%20Station%20on%2017%20January%202013/ |title=Speech by Mr Lui Tuck Yew at visit to DTL1 Chinatown Station on 17 January 2013 |website=MOT |access-date=19 September 2019 |date=17 January 2013 |archive-url=https://web.archive.org/web/20200226205104/https://www.mot.gov.sg/news-centre/news/Detail/Speech%20by%20Mr%20Lui%20Tuck%20Yew%20at%20visit%20to%20DTL1%20Chinatown%20Station%20on%2017%20January%202013/ |archive-date=26 February 2020 |url-status=live }}</ref><ref>{{cite web | url=http://app.lta.gov.sg/apps/news/page.aspx?c=2&id=38dc4ca3-5e70-4bf8-97bc-87f78e6303e7 | title=Two New Rail Lines And Three New Extensions To Expand Rail Network By 2030 | publisher=Land Transport Authority | date=17 January 2013 | access-date=1 August 2014 | url-status=dead | archive-url=https://web.archive.org/web/20140706170425/http://app.lta.gov.sg/apps/news/page.aspx?c=2&id=38dc4ca3-5e70-4bf8-97bc-87f78e6303e7 | archive-date=6 July 2014 }}</ref> The feasibility study was completed in 2014 and LTA announced Canberra as a new station.<ref>{{cite web | url=http://www.straitstimes.com/news/singapore/transport/story/new-mrt-station-north-south-line-canberra-20140627 | title=New MRT station for North–South Line: Canberra | publisher=The Straits Times | date=27 June 2014 | access-date=1 August 2014 | archive-url=https://web.archive.org/web/20140808063321/http://www.straitstimes.com/news/singapore/transport/story/new-mrt-station-north-south-line-canberra-20140627 | archive-date=8 August 2014 | url-status=live }}</ref> Construction of Canberra station commenced on 26 March 2016.<ref>{{Cite web|url=https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=7de0099c-4e9d-4a67-bb3f-217885a85fe3|title=Work Starts for Canberra MRT Station on North–South Line|date=26 March 2016|website=LTA|archive-url=https://web.archive.org/web/20171011181151/https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=7de0099c-4e9d-4a67-bb3f-217885a85fe3|archive-date=11 October 2017|url-status=dead|access-date=11 October 2017}}</ref> The station, which is an [[infill station]] with [[side platforms]], was built along an operational section of the line between [[Sembawang MRT station|Sembawang]] and [[Yishun MRT station|Yishun]]. The station cost S$90 million to build,<ref>{{cite web|url=http://www.channelnewsasia.com/news/singapore/work-starts-on-canberra/1809560.html|title=Work starts on Canberra MRT station|website=Channel NewsAsia|access-date=3 March 2016|archive-url=https://web.archive.org/web/20160306190102/http://www.channelnewsasia.com/news/singapore/work-starts-on-canberra/1809560.html|archive-date=6 March 2016|url-status=live}}</ref> and is meant to serve upcoming developments at the vicinity. Canberra station opened on 2 November 2019.<ref>{{cite web | url=https://www.channelnewsasia.com/news/singapore/canberra-mrt-station-open-nov-2-lta-11548606 | title=Canberra MRT station to open on Nov 2 | publisher=CNA | date=20 May 2019 | access-date=20 May 2019 | archive-url=https://web.archive.org/web/20190520150011/https://www.channelnewsasia.com/news/singapore/canberra-mrt-station-open-nov-2-lta-11548606 | archive-date=20 May 2019 | url-status=live }}</ref> |
|||
===Installation of half-height platform screen doors=== |
|||
After the government announced plans to install [[automatic platform gate|half-height platform screen doors]] on the above-ground stations in January 2008,<ref>{{cite news |work=The Straits Times |title=Platform screen doors for all above-ground MRT stations by 2012 |date=25 January 2008 |url=http://www.straitstimes.com/Latest+News/Singapore/STIStory_199958.html|archiveurl=https://web.archive.org/web/20080128072930/http://www.straitstimes.com/Latest+News/Singapore/STIStory_199958.html|archivedate=2008-01-28}}</ref> they were first installed at [[Jurong East MRT Station|Jurong East]] and [[Yishun MRT Station|Yishun]] stations in 2009 as trial runs.<ref name="stplatformdoorselevated">{{cite news |title=Platform doors for elevated MRT stations |author=Yeo Ghim Lay |date=3 September 2008 |work=The Straits Times |page=26}}</ref> Subsequently, installation began in May 2011 at [[Ang Mo Kio MRT Station]]. By 14 March 2012, [[Kranji MRT Station]] was the last station to put the platform screen doors into operation.<ref>{{cite web |url=http://app.lta.gov.sg/apps/news/page.aspx?c=2&id=c5vt4cu2rdq2830rqy7436d0l5leacbpr223gyg5g67rvnb7ns |title=LTA Completes Installation of Half Height Platform Screen Doors |publisher=Land Transport Authority |date=14 March 2012 | accessdate=2013-11-16}}</ref> |
|||
===Incidents=== |
|||
===Timeline of stations opened=== |
|||
On 3 March 2003, a 23-year-old man lost control of his vehicle along Lentor Avenue, crashed through the fence, and landed on a stretch of track between [[Yio Chu Kang MRT station|Yio Chu Kang]] and [[Khatib MRT station|Khatib]] stations. The incident forced a train carrying hundreds of commuters to come to a screeching halt, but not before flattening the front of the car. The accident disrupted train services for more than three hours and cost SMRT between [[Singapore Dollars|S$]]100,000 and $150,000 in damages and lost revenue.<ref>{{cite news | title = Car accident on the MRT track | publisher = RIMAS | date = March 2003 | url = http://www.rimas.org.sg/files/Article%20-%20An%20MRT%20Accident.doc | access-date = 3 February 2020 | archive-url = https://web.archive.org/web/20120208072834/http://www.rimas.org.sg/files/Article%20-%20An%20MRT%20Accident.doc | archive-date = 8 February 2012 | url-status = dead }}</ref> |
|||
* 7 November 1987: [[Yio Chu Kang MRT Station|Yio Chu Kang]] – [[Toa Payoh MRT Station|Toa Payoh]] (First section opened) |
|||
* 12 December 1987: [[Toa Payoh MRT Station|Toa Payoh]] – [[Raffles Place MRT Station|Raffles Place]] |
|||
* 20 December 1988: [[Yio Chu Kang MRT Station|Yio Chu Kang]] – [[Yishun MRT Station|Yishun]] |
|||
* 4 November 1989: [[Raffles Place MRT Station|Raffles Place]] – [[Marina Bay MRT Station|Marina Bay]] (start of separate North South Line & East West Line) |
|||
* 10 March 1990: [[Jurong East MRT Station|Jurong East]] – [[Choa Chu Kang MRT/LRT Station|Choa Chu Kang]] (initially operated as the [[Branch MRT Line|Branch Line]] of the East West Line) |
|||
* 10 February 1996: [[Yishun MRT Station|Yishun]] – [[Choa Chu Kang MRT/LRT Station|Choa Chu Kang]] (the former [[Branch MRT Line|Branch Line]] became part of the present North South Line) |
|||
* 23 November 2014: [[Marina South Pier MRT Station|Marina South Pier]] |
|||
* 2019: [[Canberra MRT Station|Canberra]] (Under Construction) |
|||
On 15 December 2011, train services between [[Bishan MRT station|Bishan]] and [[Marina Bay MRT station|Marina Bay]] stations were disrupted due to damage sustained on the power rail between [[City Hall MRT station|City Hall]] and [[Dhoby Ghaut MRT station|Dhoby Ghaut]]. Trains along this stretch were stalled and caused a service disruption until 11:40{{nbsp}}pm on that day.<ref>{{cite news|title=North–South MRT line breakdown hits thousands|url=http://www.channelnewsasia.com/stories/singaporelocalnews/view/1171573/1/.html|newspaper=Channel News Asia|date=15 December 2011|access-date=17 March 2012|archive-url=https://web.archive.org/web/20120329170737/http://www.channelnewsasia.com/stories/singaporelocalnews/view/1171573/1/.html|archive-date=29 March 2012|url-status=live}}</ref><ref name="S2nd Update – SMRT statement : Service disruption on North–South Line (Northbound): Marina Bay Station to Bishan Station">{{cite web|url=http://www.smrt.com.sg/Upload/2011121610464247486.pdf|title=2nd Update – SMRT statement: Service disruption on North–South Line (Northbound): Marina Bay Station to Bishan Station|url-status=dead|archive-url=https://web.archive.org/web/20120414224606/http://www.smrt.com.sg/Upload/2011121610464247486.pdf|archive-date=14 April 2012}}</ref> Two days later, a similar problem caused a seven-hour disruption between [[Ang Mo Kio MRT station|Ang Mo Kio]] and [[Marina Bay MRT station|Marina Bay]].<ref>{{cite news | title = MRT breaks down again | newspaper = Channel NewsAsia | date = 17 December 2011 | url = http://www.channelnewsasia.com/stories/singaporelocalnews/view/1171888/1/.html | access-date = 17 December 2011 | archive-url = https://web.archive.org/web/20120107150702/http://www.channelnewsasia.com/stories/singaporelocalnews/view/1171888/1/.html | archive-date = 7 January 2012 | url-status = live }}</ref><ref>{{cite news | title = North–South Line service resumes after 7-hour disruption | newspaper = Channel NewsAsia | date = 17 December 2011 | url = http://www.channelnewsasia.com/stories/singaporelocalnews/view/1171914/1/.html | access-date = 17 December 2011 | archive-url = https://web.archive.org/web/20120107185109/http://www.channelnewsasia.com/stories/singaporelocalnews/view/1171914/1/.html | archive-date = 7 January 2012 | url-status = live }}</ref> According to SMRT, the disruption was caused by damage to the [[third rail]] and the trains' [[Current collector|collector shoes]]. Seven trains were damaged in this incident.<ref name="Service disruption on North–South Line on 17 Dec 2011">{{cite web |url=http://www.smrt.com.sg/Upload/2011121715425352588.pdf |title=Service disruption on North–South Line on 17 Dec 2011 |url-status=dead |archive-url=https://web.archive.org/web/20120414224614/http://www.smrt.com.sg/Upload/2011121715425352588.pdf |archive-date=14 April 2012 }}</ref> These two service disruptions on the North–South line were both related to damaged rail, and became one of the worst disruption since SMRT's inception in 1987.<ref>{{cite news | title = Minister Updates Parliament on MRT Disruptions | publisher = Ministry Of Transport | date = 9 January 2012 | url = http://app.mot.gov.sg/News_Centre/Perspective/VID/68B1100028F13900/Minister_Updates_Parliament_on_MRT_Disruptions.aspx | url-status=dead | archive-url = https://web.archive.org/web/20120702205320/http://app.mot.gov.sg/News_Centre/Perspective/VID/68B1100028F13900/Minister_Updates_Parliament_on_MRT_Disruptions.aspx | archive-date = 2 July 2012 | df = dmy-all }}</ref> |
|||
==Improvement Works== |
|||
On 7 July 2015, train services on the North–South and East–West lines were temporarily disrupted due to massive power trips detected along both lines. A cause of the disruption was due to damaged insulators which caused a failure to properly supply power.<ref>{{Cite web|url=http://www.channelnewsasia.com/news/singapore/power-trip-on-mrt-network/2733272.html|title=Power trip on MRT network due to power fault on NSEWL|last=LTA|archive-url=https://web.archive.org/web/20160427123605/http://www.channelnewsasia.com/news/singapore/power-trip-on-mrt-network/2733272.html|archive-date=27 April 2016|url-status=dead}}</ref><ref name="Tan 2015">{{cite web | last=Tan | first=Christopher | title=Full train service resumes; no suspension of North–South line at 11am | website=The Straits Times | date=7 July 2015 | url=https://www.straitstimes.com/singapore/transport/full-train-service-resumes-no-suspension-of-north-south-line-at-11am | access-date=23 August 2020 | archive-date=23 August 2020 | archive-url=https://web.archive.org/web/20200823131752/https://www.straitstimes.com/singapore/transport/full-train-service-resumes-no-suspension-of-north-south-line-at-11am | url-status=live }}</ref><ref name="TODAYonline 2015">{{cite news|title=MRT breakdown: North–South, East–West lines down for hours|last=Tang|first=Louisa|newspaper=Today|location=Singapore|publisher=Mediacorp|date=7 July 2015|url=https://www.todayonline.com/singapore/train-services-down-north-south-and-east-west-lines|access-date=23 August 2020|archive-date=23 August 2020|archive-url=https://web.archive.org/web/20200823131710/https://www.todayonline.com/singapore/train-services-down-north-south-and-east-west-lines|url-status=live}}</ref><ref>{{Cite news|url=http://www.channelnewsasia.com/news/singapore/cause-of-massive-nsewl/2014794.html|title=Cause of massive NSEWL train disruption in July identified, says SMRT|work=CNA|location=Singapore|publisher=Mediacorp|date=22 August 2015|author=Malinda, Kyle|access-date=3 March 2016|archive-date=6 March 2016|archive-url=https://web.archive.org/web/20160306190436/http://www.channelnewsasia.com/news/singapore/cause-of-massive-nsewl/2014794.html|url-status=live}}</ref> For this disruption that brought inconvenience to 413,000 commuters, LTA imposed a 'record' fine of S$5.4 million on SMRT.<ref>{{Cite news |url=http://www.channelnewsasia.com/news/singapore/smrt-to-be-fined-a-record/2146104.html |title=SMRT to be fined a record S$5.4m for July 7 MRT breakdown |work=Channel NewsAsia |location=Singapore |date=23 September 2015 |access-date=3 March 2016 |archive-date=17 January 2016 |archive-url=https://web.archive.org/web/20160117124430/http://www.channelnewsasia.com/news/singapore/smrt-to-be-fined-a-record/2146104.html |url-status=live }}</ref> |
|||
===Timber to concrete sleeper replacement works=== |
|||
Timber sleepers are designed to last 15 to 25 years, and they have to be replaced when they are near the end of their lifespan, or when they show signs of significant wear and tear. The new sleepers installed will allow trains to move along the tracks smoothly and without the current speed restrictions. In order to carry out works at night when trains are not operational, train services were ended earlier on the North South Line. The sleeper replacement work was divided into two phases: Phase 1 (Bishan-Admiralty) and Phase 2 (Admiralty-Jurong East), and were completed in April 2015. After the completion of sleeper replacement works, the last train timings reverted to the original timings before the replacement works.<ref>{{Cite web|url=http://www.straitstimes.com/singapore/project-to-replace-mrt-sleepers-done|title=Project to replace MRT sleepers done|last=|first=|date=|website=|archive-url=|archive-date=|dead-url=|access-date=}}</ref> |
|||
On 7 October 2017, a 20-hour long disruption started due to [[Bishan tunnel flooding|flooding in the tunnels]] between [[Braddell MRT station|Braddell station]] and [[Bishan MRT station|Bishan station]] due to a faulty drainage system, resulting in disruption of train services between [[Ang Mo Kio MRT station|Ang Mo Kio]] and [[Marina South Pier MRT station|Marina South Pier]] stations in both directions for several hours. A trackside fire between [[Raffles Place MRT station|Raffles Place]] and [[Marina Bay MRT station|Marina Bay]] stations further exacerbated the disruption. Train services between [[Marina South Pier MRT station|Marina South Pier]] and [[Newton MRT station|Newton]] resumed at about 9:20{{nbsp}}pm on the same day, followed by Newton and Ang Mo Kio at around 2{{nbsp}}pm the following day.<ref>{{Cite news|url=http://www.channelnewsasia.com/news/singapore/nsl-disruption-flooded-mrt-tunnel-sunday-9290220?view=DEFAULT|title=NSL disruption: No train services between Ang Mo Kio, Newton 'till further notice', says SMRT|work=Channel NewsAsia|access-date=8 October 2017|language=en-SG|archive-url=https://web.archive.org/web/20171008044136/http://www.channelnewsasia.com/news/singapore/nsl-disruption-flooded-mrt-tunnel-sunday-9290220?view=DEFAULT|archive-date=8 October 2017|url-status=live}}</ref> Although no injuries or casualties were reported, SMRT fired a total of eight employees from the maintenance crew, and incurred a S$2 million fine, following the incident.<ref>{{Cite news|url=http://www.channelnewsasia.com/news/singapore/lta-on-flooded-mrt-tunnel-9290804|title=NSL disruption: Malfunctioning water pumping system resulted in flooded MRT tunnel, says LTA|work=Channel NewsAsia|access-date=8 October 2017|language=en-GB|archive-url=https://web.archive.org/web/20171008181159/http://www.channelnewsasia.com/news/singapore/lta-on-flooded-mrt-tunnel-9290804|archive-date=8 October 2017|url-status=live}}</ref> |
|||
===Resignalling works=== |
|||
A new signalling system, supplied by Thales, will replace the current ageing signalling system on the North South Line. Upgrading works on the signalling system for NSEW Line will be completed in phases from 2016. Commuters on the North-South Line can expect shorter waiting times as the upgraded signalling system allows trains to run in shorter intervals.<ref name="North-South Line Projects">{{cite web|last1=LTA Website|url=https://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/north-south-line.html|title=North-South Line Signal Upgrade |website=Land Transport Authority}}</ref> The new system is expected to be operational from mid-March 2017. MRT trains are also progressively being retrofitted with new equipment on board to be compatible with the new signalling system. |
|||
On 14 October 2020, train services from Jurong East to Woodlands stations were disrupted for more than three and a half hours, owing to a faulty power cable, which affected the East–West Line and Circle Line too. The power fault began at 7{{nbsp}}pm and by 7:30{{nbsp}}pm, commuters were stuck in the trains. Free bus bridging services were activated at all affected stations, and bus operators increased the frequency of regular services serving these areas. Service resumed at all stations along the North–South and East–West Lines at 10:35{{nbsp}}pm.<ref>{{Cite web|last=hermesauto|date=14 October 2020|title=Train services restored on North–South, East–West, Circle lines after disruption due to power fault|url=https://www.straitstimes.com/singapore/transport/power-fault-on-north-south-line-east-west-line-results-in-extra-train-travel|access-date=15 October 2020|website=The Straits Times|language=en|archive-date=15 October 2020|archive-url=https://web.archive.org/web/20201015023308/https://www.straitstimes.com/singapore/transport/power-fault-on-north-south-line-east-west-line-results-in-extra-train-travel|url-status=live}}</ref> A total of 36 stations were affected by the power fault.<ref name=":4">{{Cite web |title=Oct 14 MRT breakdown: Manufacturer to replace power cables along Tuas West Extension, 2 SMRT staff suspended |url=https://www.todayonline.com/singapore/oct-14-train-breakdown-all-power-cables-trip-coils-along-tuas-west-extension-be-replaced |access-date=1 April 2022 |website=TODAY |language=en |archive-date=1 April 2022 |archive-url=https://web.archive.org/web/20220401023420/https://www.todayonline.com/singapore/oct-14-train-breakdown-all-power-cables-trip-coils-along-tuas-west-extension-be-replaced |url-status=live }}</ref> The incident led to a replacement of 150km of power cables for the Tuas West Extension and two SMRT staff being suspended.<ref name=":4" /> |
|||
The new signalling system was tested in the evening of 28 March 2017, when train services were paused to facilitate the testing. Trials of the new system had been ongoing during off-service hours since August 2016.<ref>{{cite web |url=http://www.channelnewsasia.com/news/singapore/trial-of-new-train-signalling-system-to-start-on-mar-28/3628052.html |title=Trial of new train signalling system to start on Mar 28 |publisher=Channel NewsAsia |date=27 March 2017 | accessdate=2017-03-29}}</ref> From 16 April 2017, the new system will commence full-day testing on Sundays for two months, along with the commencing of operations of the new [[Kawasaki Heavy Industries & CSR Sifang C151B|C151B]] rolling stock on these testing days. <ref>{{cite web|title=Full-day Sunday Trials of New Signalling System on NSL|url=https://www.facebook.com/media/set/?set=a.1446818488721716.1073742044.132581033478808&type=3}}</ref> From 29 May 2017, the new signalling system will commence full-day operation on the North South Line. |
|||
On 27 October 2023, trains skipped [[Novena MRT station]] for about 2 hours during the evening travel peak, after an air-conditioning unit filled the underground station with smoke. Free bus bridging services were provided between [[Newton MRT station]] and [[Toa Payoh MRT station]], and ended shortly after the station was reopened at around 7:30pm.<ref>{{Cite news |last=Hamzah |first=Aqil |date=2023-10-27 |title=Novena MRT station reopens after closure caused by smoke from air-con unit |language=en |work=The Straits Times |url=https://www.straitstimes.com/singapore/novena-mrt-station-reopens-after-closure-caused-by-smoke-from-air-conditioning-unit-at-concourse-level |access-date=2023-11-16 |issn=0585-3923}}</ref> |
|||
The old signalling system will be retired in 2018. <ref>{{Cite web|url=http://mothership.sg/2017/07/the-very-long-story-behind-why-there-have-been-will-still-be-so-many-delays-on-the-north-south-line/|title=The (very) long story behind why there have been, & will still be, so many delays on the North-South Line|website=Mothership.sg|language=en-US|access-date=2017-07-25}}</ref> |
|||
On 3 June 2024, around 5.50pm, a lightning strike caused traction power to trip, as well as a small fire breaking out in a power control box next to the train track located about 20 meters from the platform of [[Kranji MRT station]]. No injuries were reported. This resulted in train services to be suspended between [[Choa Chu Kang MRT/LRT station|Choa Chu Kang]] and [[Woodlands MRT station|Woodlands]] stations for more than two hours. According to the [[Singapore Civil Defence Force]], the fire had burned itself out before its officers arrived. Train services were progressively restored at 8.10pm.<ref>{{Cite news |last=Ang |first=Qing |date=2024-06-03 |title=Lightning strike sparks power trip that disrupted MRT services on NSL for over 2 hours |url=https://www.straitstimes.com/singapore/transport/lightning-strike-sparks-power-trip-that-disrupted-mrt-services-on-nsl-for-over-2-hours |access-date=2024-06-03 |work=The Straits Times |language=en |issn=0585-3923}}</ref> |
|||
===Third-rail replacement=== |
|||
Replacement works on the third rail, which provides electricity to the trains, are ongoing. A new third rail is being installed to replace the current one in use since 1987 and this will increase reliability of the electrical system.<ref>{{Cite web|url=http://blog.smrt.com.sg/third-rail-replacement-of-the-north-south-east-west-line/|title=Third Rail Replacement on North South and East West Line|last=|first=|date=|website=|archive-url=|archive-date=|dead-url=|access-date=}}</ref> |
|||
===Future plans=== |
|||
== Line disruptions == |
|||
[[File:Singapore NSL Sungei Kadut and Brickland stations.png|thumb|Locator maps of Brickland and Sungei Kadut stations]] |
|||
{{main|Brickland MRT station|Sungei Kadut MRT station}} |
|||
In the Land Transport Master Plan 2040 (LTMP2040), two new infill stations are projected to be built along the existing North–South Line. [[Brickland MRT station|Brickland station]] will be built between [[Bukit Gombak MRT station|Bukit Gombak]] and [[Choa Chu Kang MRT/LRT station|Choa Chu Kang]] stations, while [[Sungei Kadut MRT station|Sungei Kadut station]] will be built between [[Yew Tee MRT station|Yew Tee]] and [[Kranji MRT station|Kranji]] stations and provide an additional interchange with the Downtown Line. Both stations are expected to be completed by around mid-2030s.<ref name="LTMP2040 Sungei">{{cite news|url=https://www.straitstimes.com/singapore/transport/new-sungei-kadut-mrt-station-linking-north-south-and-downtown-lines-could|title=New Sungei Kadut MRT station linking North–South and Downtown lines could shorten trips by 30 mins|website=The Straits Times|date=25 May 2019 |access-date=25 May 2019|archive-url=https://web.archive.org/web/20190525105557/https://www.straitstimes.com/singapore/transport/new-sungei-kadut-mrt-station-linking-north-south-and-downtown-lines-could|archive-date=25 May 2019|url-status=live}}</ref><ref>{{Cite web|url=https://www.mot.gov.sg/ltmp2040/|title=Land Transport Master Plan 2040|website=www.mot.gov.sg|access-date=11 December 2019|archive-url=https://web.archive.org/web/20190713174806/https://www.mot.gov.sg/ltmp2040/|archive-date=13 July 2019|url-status=live}}</ref><ref name="LTMP2040">{{cite web |title=Land Transport Master Plan 2040: Bringing Singapore Together {{!}} Press Room {{!}} Land Transport Authority |url=https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=de83f659-4b0d-4609-840e-3deb3ac9b4b9 |website=Land Transport Authority |access-date=26 May 2019 |archive-url=https://web.archive.org/web/20190823063103/https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=de83f659-4b0d-4609-840e-3deb3ac9b4b9 |archive-date=23 August 2019 |url-status=live }}</ref><ref name="LTMP2040_today">{{cite web | url=https://www.todayonline.com/singapore/at-a-glance-key-updates-to-mrt-bus-network-and-more-2040-master-plan | title=At a glance: Key updates to MRT, bus network and more for 2040 master plan | publisher=TODAYonline | date=25 May 2019 | access-date=28 May 2019 | archive-url=https://web.archive.org/web/20190525141717/https://www.todayonline.com/singapore/at-a-glance-key-updates-to-mrt-bus-network-and-more-2040-master-plan | archive-date=25 May 2019 | url-status=live }}</ref> |
|||
On 15 December 2011, services between [[Bishan MRT Station|Bishan]] and [[Marina Bay MRT Station|Marina Bay]] stations were suspended due to 40 metres of the power rail being damaged between City Hall and Dhoby Ghaut stations. Trains along the stretch were stalled, causing a disruption to the train service for almost 5 hours. Train service fully resumed at 11.40pm.<ref>{{cite news|title=North-South MRT Line breakdown hits thousands|url=http://www.channelnewsasia.com/stories/singaporelocalnews/view/1171573/1/.html|newspaper=Channel News Asia|date=15 December 2011|accessdate=2012-03-17}}</ref><ref name="S2nd Update - SMRT statement : Service disruption on North-South Line (Northbound): Marina Bay Station to Bishan Station">{{cite web |url=http://www.smrt.com.sg/Upload/2011121610464247486.pdf|title= 2nd Update – SMRT statement : Service disruption on North-South Line (Northbound): Marina Bay Station to Bishan Station}}</ref> |
|||
==Network and operations== |
|||
On 17 December 2011, a similar fault caused a 7-hour disruption between Ang Mo Kio and Marina Bay stations.<ref>{{cite news | title = MRT breaks down again | newspaper = Channel NewsAsia | date = 17 December 2011 | url = http://www.channelnewsasia.com/stories/singaporelocalnews/view/1171888/1/.html}}</ref><ref>{{cite news | title = North-South Line service resumes after 7-hour disruption | newspaper = Channel NewsAsia | date = 17 December 2011 | url = http://www.channelnewsasia.com/stories/singaporelocalnews/view/1171914/1/.html}}</ref> According to SMRT, the disruption was caused by damage to the [[third rail]] and the trains' [[Current collector|collector shoes]]. Seven trains were damaged in this incident.<ref name="Service disruption on North-South Line on 17 Dec 2011">{{cite web |url=http://www.smrt.com.sg/Upload/2011121715425352588.pdf |title= Service disruption on North-South Line on 17 Dec 2011}}</ref> |
|||
===Services=== |
|||
Train services on the North–South Line operates from approximately 5:30{{nbsp}}am to around midnight daily. In general, during peak hours, train frequency is 2 to 3 minutes while during non-peak hours the frequency is reduced to 5 minutes throughout the entire route.<ref>{{Cite web|url=https://www.lta.gov.sg/content/ltagov/en/getting_around/public_transport/rail_network.html|title=LTA {{!}} Getting Around {{!}} Public Transport {{!}} Rail Network|website=www.lta.gov.sg|access-date=5 April 2020|archive-url=https://web.archive.org/web/20191101093543/https://www.lta.gov.sg/content/ltagov/en/getting_around/public_transport/rail_network.html|archive-date=1 November 2019|url-status=live}}</ref> Each day, the first train begins service at the following timings: |
|||
* 4:59 am (5:19 am on Sundays and public holidays) from Jurong East to Yew Tee stations, which will reach one loop at 5:27 am. |
|||
These two service disruptions on the North-South Line were the second worst ever since SMRT started operation for 24 years since 1987.<ref>{{cite news | title = Minister Updates Parliament on MRT Disruptions | publisher = Ministry Of Transport | date = 9 January 2012 | url = http://app.mot.gov.sg/News_Centre/Perspective/VID/68B1100028F13900/Minister_Updates_Parliament_on_MRT_Disruptions.aspx}}</ref> |
|||
* 5:00 am (5:22 am on Sundays and public holidays) from Ang Mo Kio to Yew Tee stations, which will reach Yew Tee at 5:33 am. |
|||
* 5:05 am (5:25 am on Sundays and public holidays) from Jurong East to Ang Mo Kio stations, which will reach Ang Mo Kio at 5:48 am. |
|||
* 5:10 am (5:30 am on Sundays and public holidays) from Ang Mo Kio as downroute to start at Bishan station, which will reach Bishan at 5:45 am. |
|||
Extra downroute trips were added to start from Newton, Bishan and Kranji to cater to the demand. From 11pm onwards, selected trains from Jurong East station will terminate at either Ang Mo Kio, Toa Payoh or Yew Tee stations.<ref>{{Cite web|url=http://journey.smrt.com.sg/journey/station_info/jurong-east/first-and-last-train/|title=SMRT Journeys|website=journey.smrt.com.sg|access-date=5 April 2020|archive-url=https://web.archive.org/web/20190904072806/http://journey.smrt.com.sg/journey/station_info/jurong-east/first-and-last-train|archive-date=4 September 2019|url-status=live}}</ref> Selected trains departing from Marina South Pier station will also terminate at Kranji, Yishun or Ang Mo Kio stations in the late evenings. There are no express services.<ref>{{Cite web|url=http://journey.smrt.com.sg/journey/station_info/marina-south-pier/first-and-last-train/|title=SMRT Journeys|website=journey.smrt.com.sg|access-date=5 April 2020|archive-date=19 September 2020|archive-url=https://web.archive.org/web/20200919041252/http://journey.smrt.com.sg/journey/station_info/marina-south-pier/first-and-last-train/|url-status=live}}</ref> Additionally, short-working trips do run from Yishun to Marina South Pier, which only operate during peak hours. |
|||
On July 7, 2015, the NSEWL was shut down due to massive power trips detected along the two lines. This was the worst breakdown in history after the December 2011 issue. Investigations have been completed and the cause has been narrowed down to damaged insulators which failed to supply power properly.<ref>{{Cite web|url=http://www.channelnewsasia.com/news/singapore/power-trip-on-mrt-network/2733272.html|title=Power trip on MRT network due to power fault on NSEWL|last=LTA|first=|date=|website=|archive-url=|archive-date=|dead-url=|access-date=}}</ref> |
|||
In the late 2010s, services on the North–South Line were also subjected to maintenance and renewal works, usually on selected Fridays, Saturdays or Sundays, with shuttle bus services occasionally provided throughout the duration of the early closures and late openings for affected commuters.<ref>{{Cite web|url=https://www.smrt.com.sg/Announcements/articleid/1220|title=Early Closure of Selected North–South Line Stations from January to March 2020|website=www.smrt.com.sg|access-date=5 April 2020|archive-url=https://web.archive.org/web/20191229171330/http://www.smrt.com.sg/Announcements/articleid/1220|archive-date=29 December 2019|url-status=live}}</ref> Operations of the North–South Line were affected by the [[COVID-19 pandemic in Singapore|COVID-19 pandemic]], leading to the drop in ridership.<ref>{{cite web |title=Last train services for MRT and LRT (Annex B) |url=https://www.lta.gov.sg/content/dam/ltagov/news/press/2020/20200414_Last%20train%20service%20for%20MRT%20and%20LRT_AnnexB.pdf |website=LTA |access-date=15 April 2020 |archive-url=https://web.archive.org/web/20200417141415/https://www.lta.gov.sg/content/dam/ltagov/news/press/2020/20200414_Last%20train%20service%20for%20MRT%20and%20LRT_AnnexB.pdf |archive-date=17 April 2020 |url-status=live }}</ref><ref>{{Cite web|url=https://www.lta.gov.sg/content/ltagov/en/newsroom/2020/april/news-releases/Changes_to_public_bus_and_train_operating_hours.html|title=Changes to Public Bus and Train Operating Hours and Frequency|website=www.lta.gov.sg|access-date=15 April 2020|archive-url=https://web.archive.org/web/20200417141400/https://www.lta.gov.sg/content/ltagov/en/newsroom/2020/april/news-releases/Changes_to_public_bus_and_train_operating_hours.html|archive-date=17 April 2020|url-status=live}}</ref> |
|||
==Stations== |
|||
{| style="margin-left: 1em; margin-bottom: 1em; color: black; border-collapse: collapse; font-size: 95%" class="wikitable sortable" border="1" cellpadding="2" |
|||
===Route=== |
|||
|- style="color:white" align="center" bgcolor="#{{SMRT color|North South}}" |
|||
[[File:MRT Route Map NS.svg|thumb|right|300px|Geographically accurate map of the North–South MRT line.]] |
|||
| '''Station Number''' |
|||
The North–South line forms an incomplete loop from [[Jurong East]] in the [[West Region, Singapore|West Region]] of Singapore, [[North Region, Singapore|north]] to [[Woodlands, Singapore|Woodlands]] and [[Sembawang]], and south to the [[Central Area, Singapore|Central Area]].<ref name="NSL LTA"/> It is {{convert|45|km|mi}} long and is predominantly double-tracked, but certain short sections at the [[Woodlands MRT station|Woodlands]], [[Yishun MRT station|Yishun]] and [[Ang Mo Kio MRT station|Ang Mo Kio]] stations widen to three tracks,<ref>{{Cite map |author = [[OpenStreetMap]] contributors |date = 28 March 2020 |map = Woodlands MRT station |map-url = https://www.openstreetmap.org/#map=19/1.43542/103.78297 |title = OpenStreetMap |access-date = 28 March 2020 }}</ref><ref>{{Cite map |author = [[OpenStreetMap]] contributors |date = 28 March 2020 |map = Yishun MRT station |map-url = https://www.openstreetmap.org/#map=19/1.43453/103.83434 |title = OpenStreetMap |access-date = 28 March 2020 }}</ref><ref>{{Cite map |author = [[OpenStreetMap]] contributors |date = 28 March 2020 |map = Ang Mo Kio MRT station |map-url = https://www.openstreetmap.org/node/1839603981#map=17/1.37008/103.84953 |title = OpenStreetMap |access-date = 28 March 2020}}</ref> and four tracks at [[Jurong East MRT station|Jurong East station]].<ref>{{Cite map |author = [[OpenStreetMap]] contributors |date = 28 March 2020 |map = Jurong East MRT station |map-url = https://www.openstreetmap.org/node/209451066#map=17/1.33348/103.74369 |title = OpenStreetMap |access-date = 28 March 2020 }}</ref> The line begins above ground at Jurong East station<ref>{{Cite web|url=https://onemap.sg/main/v2/|title=OneMap|website=OneMap|access-date=24 April 2020|archive-date=18 April 2020|archive-url=https://web.archive.org/web/20200418055059/https://www.onemap.sg/main/v2/|url-status=live}}</ref><ref name="LTA system map">{{Cite web|url=https://www.lta.gov.sg/content/dam/ltagov/getting_around/public_transport/rail_network/pdf/sm-20-03-en-exp.pdf|title=MRT System Map|website=LTA|archive-date=21 August 2020|archive-url=https://web.archive.org/web/20200821064838/https://www.lta.gov.sg/content/dam/ltagov/getting_around/public_transport/rail_network/pdf/sm-20-03-en-exp.pdf|url-status=live}}</ref> from where it continues north on a set of elevated viaducts, with the exception of a short tunnel between the [[Bukit Batok MRT station|Bukit Batok]] and [[Bukit Gombak MRT station|Bukit Gombak]] stations,<ref>{{Cite map |author = [[OpenStreetMap]] contributors |date = 28 March 2020 |map = Tunnel between Bukit Batok and Bukit Gombak |map-url = https://www.openstreetmap.org/#map=19/1.35209/103.75176|title = OpenStreetMap |access-date = 28 March 2020 }}</ref> and a surface section of track between the Bukit Gombak and Choa Chu Kang stations.<ref>{{Cite map |author = [[OpenStreetMap]] contributors |date = 28 March 2020 |map = Surface section of track between Bukit Gombak and Choa Chu Kang |map-url = https://www.openstreetmap.org/#map=18/1.37540/103.74391|title = OpenStreetMap |access-date = 28 March 2020 }}</ref> The line curves from the [[Yew Tee MRT station|Yew Tee]] to [[Kranji MRT station|Kranji]] stations and continues eastwards, paralleling Woodlands Avenue 3 (which the line briefly cuts underneath between Kranji and [[Marsiling MRT station|Marsiling]] stations)<ref>{{Cite map |author = [[OpenStreetMap]] contributors |date = 28 March 2020 |map = Tunnel underneath Woodlands Avenue 3 |map-url = https://www.openstreetmap.org/#map=18/1.42887/103.76629|title = OpenStreetMap |access-date = 28 March 2020 }}</ref> and Avenue 7 main roads.<ref>{{Cite map |author = [[OpenStreetMap]] contributors |date = 31 March 2020 |map = NSL along Avenue 7 |map-url = https://www.openstreetmap.org/#map=17/1.43929/103.79270|title = OpenStreetMap |access-date = 28 March 2020 }}</ref> |
|||
| '''Station Name''' |
|||
| '''Image''' |
|||
After [[Sembawang MRT station|Sembawang station]], the line follows the route of Canberra Link and Yishun Avenue 2, curving southwards. Between [[Khatib MRT station|Khatib]] and [[Yio Chu Kang MRT station|Yio Chu Kang]] stations parallel to Lentor Avenue, the line continues at surface level; this section is the longest distance between any two MRT stations in Singapore.<ref>{{Cite map |author = [[OpenStreetMap]] contributors |date = 28 March 2020 |map = Surface section of track between Khatib and Yio Chu Kang |map-url = https://www.openstreetmap.org/#map=17/1.39679/103.83200|title = OpenStreetMap |access-date = 28 March 2020 }}</ref> The line continues above ground for the Yio Chu Kang and Ang Mo Kio stations, then it goes back to surface level for [[Bishan MRT station|Bishan station]], the MRT system's only at-grade station. A branch line to [[Bishan Depot]] exists between the Ang Mo Kio and Bishan stations.<ref>{{Cite map |author = [[OpenStreetMap]] contributors |date = 31 March 2020 |map = Bishan Depot |map-url = https://www.openstreetmap.org/way/633298871| title = OpenStreetMap |access-date = 28 March 2020 }}</ref> After Bishan, the line goes underground through the Central Area. The North–South Line runs parallel to the [[East–West MRT line|East–West Line]] at the [[City Hall MRT station|City Hall]] and [[Raffles Place MRT station|Raffles Place]] stations, which are also cross-platform interchanges to the East–West Line. The line ends at Marina South Pier station.<ref name="LTA system map"/> |
|||
| '''Interchange/Notes''' |
|||
===Stations=== |
|||
The line serves 27 MRT stations across {{convert|45|km|mi}} of track, and station codes for the line are red, corresponding to the line's colour on the system map.<ref name="NSL LTA">{{cite web|url=http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/north-south-line.html|title=North–South Line|access-date=24 December 2015|publisher=Land Transport Authority|archive-url=https://web.archive.org/web/20170107085131/https://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/north-south-line.html|archive-date=7 January 2017|url-status=live}}</ref><ref name="NSL ext">{{Cite web|url=https://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/north-south-line-extension.html|title=North–South Line Extension|website=LTA|archive-url=https://web.archive.org/web/20120930005359/http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/north-south-line-extension.html|archive-date=30 September 2012|url-status=dead|access-date=11 October 2017}}</ref> 11 stations, from [[Braddell MRT station|Braddell]] to [[Marina South Pier MRT station|Marina South Pier]] are underground, with the rest being ground-level or elevated.<ref>{{cite book |author=<!--Staff writer(s); no by-line.--> |title=Singapore Bilingual Street Directory |publisher=Mighty Minds Publishing Pte Ltd |page= fold out map |date= 2017 |isbn=9789812501189}}</ref> With the exception of Bishan, Braddell and Canberra stations, the other stations have island platforms. |
|||
{| class="wikitable" |
|||
|+ North–South Line Stations Timeline |
|||
! Date !! Project !! Description |
|||
|- |
|- |
||
| 7 November 1987 || rowspan="2"|Phase 1 || [[Yio Chu Kang MRT station|Yio Chu Kang]] – [[Toa Payoh MRT station|Toa Payoh]] |
|||
|{{SMRT code 2I/C|NS|1|EW|24}} ||[[Jurong East MRT Station|Jurong East]]||[[File:Platform of Jurong East MRT Station, Singapore - 20100320.jpg|100px]]||Cross-Platform Interchange with the {{rint|sg|ew}} [[East West MRT Line|'''{{fontcolor|#009530|East West Line}}''']] |
|||
|- |
|- |
||
| 12 December 1987 || [[Toa Payoh MRT station|Toa Payoh]] – [[Outram Park MRT station|Outram Park]] (Direct train service to Outram Park via Raffles Place) |
|||
|{{SMRT code|NS|2}}||[[Bukit Batok MRT Station|Bukit Batok]]|||| |
|||
|- |
|- |
||
| 12 March 1988 || Phase 1A || [[Outram Park MRT station|Outram Park]] – [[Clementi MRT station|Clementi]] (Now part of the East–West Line) |
|||
|{{SMRT code|NS|3}}||[[Bukit Gombak MRT Station|Bukit Gombak]]|||| |
|||
|- |
|- |
||
| 5 November 1988 || rowspan="2"|Phase 2B || [[Clementi MRT station|Clementi]] – [[Lakeside MRT station|Lakeside]] (Now part of the East–West Line) |
|||
|{{SMRT-SLRT code 2I/C|NS|4|BP|1}}||[[Choa Chu Kang MRT/LRT Station|Choa Chu Kang]]||[[File:Cck-mrt.JPG|100px]]||Interchange with the {{rint|sg|bp}} {{SLRT lines|Bukit Panjang}} |
|||
|- |
|- |
||
| 20 December 1988 || [[Yio Chu Kang MRT station|Yio Chu Kang]] – [[Yishun MRT station|Yishun]] |
|||
|{{SMRT code|NS|5}}||[[Yew Tee MRT Station|Yew Tee]]||[[File:Yew Tee with New Signage.jpg|100px]]|| |
|||
|- |
|- |
||
| 4 November 1989 || Phase 2A || [[Raffles Place MRT station|Raffles Place]] – [[Marina Bay MRT station|Marina Bay]] (Separation of the North–South Line & East–West Line) |
|||
|{{SMRT code|NS|6}}||Reserved Station||||<small>''(reserved for future use)''</small> |
|||
|- |
|- |
||
| 10 March 1990 || Phase 2B || [[Jurong East MRT station|Jurong East]] – [[Choa Chu Kang MRT/LRT station|Choa Chu Kang]] (Operates as a branch line from Jurong East) |
|||
|{{SMRT code|NS|7}}||[[Kranji MRT Station|Kranji]]||[[File:Ns7 Kranji.jpg|100px]]|| |
|||
|- |
|- |
||
| 10 February 1996 || Woodlands Extension || [[Choa Chu Kang MRT/LRT station|Choa Chu Kang]] – [[Yishun MRT station|Yishun]] |
|||
|{{SMRT code|NS|8}}||[[Marsiling MRT Station|Marsiling]]|||| |
|||
|- |
|- |
||
| 23 November 2014 || North–South Line Extension || [[Marina Bay MRT station|Marina Bay]] – [[Marina South Pier MRT station|Marina South Pier]] |
|||
|{{SMRT code 2I/C|NS|9|TE|2}}||[[Woodlands MRT Station|Woodlands]]||[[File:Woodlands MRT Station (NSL) - C151 at Platform B.jpg|100px]]||Interchange with the {{rint|sg|te}} [[Thomson-East Coast MRT Line|'''{{fontcolor|#734538|Thomson-East Coast Line}}''']] <small>''(2019)''</small> |
|||
|- |
|- |
||
| 2 November 2019 || Canberra Station || [[Canberra MRT station|Canberra station]] between [[Sembawang MRT station|Sembawang]] and [[Yishun MRT station|Yishun]] |
|||
|{{SMRT code|NS|10}}||[[Admiralty MRT Station|Admiralty]]|||| |
|||
|- |
|- |
||
| 2034 || rowspan="2"|Future infill stations between existing stations || [[Brickland MRT station|Brickland station]] between [[Bukit Gombak MRT station|Bukit Gombak]] and [[Choa Chu Kang MRT/LRT station|Choa Chu Kang]] |
|||
|{{SMRT code|NS|11}}||[[Sembawang MRT Station|Sembawang]]||[[File:Ns11sembawang.jpg|100px]]|| |
|||
|- |
|- |
||
| 2035 || [[Sungei Kadut MRT station|Sungei Kadut station]] between [[Yew Tee MRT station|Yew Tee]] and [[Kranji MRT station|Kranji]] |
|||
|{{SMRT code|NS|12}}||[[Canberra MRT Station|Canberra]]||[[File:Canberra MRT Station (NSL) - Construction.jpg|100px]]||One of the two stations on the NSL with side platforms <br> Station added on operational line <small>''(under construction)''</small> |
|||
|- |
|- |
||
|} |
|||
|{{SMRT code|NS|13}}||[[Yishun MRT Station|Yishun]]||[[File:Yishun MRT Station with PSDs.jpg|100px]]|| |
|||
'''Legend''' |
|||
{| class="wikitable" style="text-align:center;" |
|||
|- |
|- |
||
| [[File:Aiga escalator up.svg|15px|link=]]<br>Elevated || [[File:MRT Singapore Destination 1.svg|15px|link=]] [[File:MRT Singapore Destination 14.svg|15px|link=]]<br>Line [[Train station#Terminus|terminus]] || [[File:Barrier turnstile icon.svg|12px|link=]]<br>Transfer outside [[paid area]] |
|||
|{{SMRT code|NS|14}}||[[Khatib MRT Station|Khatib]]||[[File:KhatibMRT.JPG|100px]]|| |
|||
|- |
|- |
||
| [[File:Aiga escalator.svg|15px|link=]]<br>Ground-level |
|||
|{{SMRT code|NS|15}}||[[Yio Chu Kang MRT Station|Yio Chu Kang]]|||| |
|||
| style='border-style: none none none none;' | [[File:MUTCD D9-6.svg|15px|link=]]<br>Wheelchair accessible |
|||
| [[File:Bus-logo.svg|15px|link=]]<br>Bus interchange |
|||
|- |
|- |
||
| [[File:Aiga escalator down.svg|15px|link=]]<br>Underground || [[File:ISO 7010 W003.svg|15px|link=]]<br>[[Singapore Civil Defence Force|Civil Defence]] [[Air raid shelter|Shelter]] |
|||
|{{SMRT code|NS|16}}||[[Ang Mo Kio MRT Station|Ang Mo Kio]]||[[File:AngMoKioMRT-TopView.JPG|100px]]|| |
|||
| [[File:Aiga carrental cropped.svg|10px|link=]] [[File:BSicon Mono-CHN.svg|10px|link=]] [[File:BSicon AETRAM.svg|10px|link=]] [[File:Aiga watertransportation.svg|10px|link=]] [[File:20 airtransportation.svg|10px|link=]] [[File:Aiga immigration.svg|10px|link=]] <br> Other transportation modes |
|||
|} |
|||
'''List''' |
|||
{| class="wikitable" style="color: black; border-collapse: collapse; font-size: 95%" |
|||
|- |
|- |
||
! scope="col" style="color: white; background:#{{rcr|SMRT|North South}}" | Station code |
|||
|{{SMRT code 2I/C|NS|17|CC|15}}||[[Bishan MRT Station|Bishan]]||[[File:Bishan MRT Station (NSL) - Platform B.jpg|100px]]||Interchange with the {{rint|sg|cc}} [[Circle MRT Line|'''{{fontcolor|#ff9a00|Circle Line}}''']] |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|North South}}" | Station name |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|North South}}" | Images |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|North South}}" | Interchange;<br><small>Adjacent transportation</small> |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|North South}}" | Opening |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|North South}}" | Cost |
|||
|- |
|- |
||
|scope="row" |[[File:MRT Singapore Destination 4.svg|15px|link=]] <br> {{SMRT code|NS|1|EW|24|JE|5}} <br> [[File:Aiga escalator up.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Jurong East MRT station|Jurong East]]||[[File:Jurong East MRT Station NSL 2.jpg|100x100px]]||[[File:Aiga escalator up.svg|15px|link=]] {{rbox|East–West Line|East–West MRT line|#{{rcr|SMRT|EW}}|White}} <br> [[File:Aiga escalator up.svg|15px|link=]] {{rbox|JRL ''East Branch''|Jurong Region MRT line|#{{rcr|SMRT|JE}}|White}} <small>''(2028)''</small><br> ― <br>[[File:Bus-logo.svg|15px|link=]] <small>[[Jurong East Bus Interchange|Jurong East]]</small> || {{center| 5 November 1988; <br> {{Years or months ago|1988|11}}}} || rowspan="3" | S$5 billion |
|||
|{{SMRT code|NS|18}}||[[Braddell MRT Station|Braddell]]||[[File:Ns18braddell.jpg|100px]]||One of the two stations on the NSL with side platforms |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|NS|2}} <br> [[File:Aiga escalator up.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Bukit Batok MRT station|Bukit Batok]]||[[File:Bukit Batok MRT Station 202407.jpg|100x100px]]||[[File:Bus-logo.svg|15px|link=]] <small>[[Bukit Batok Bus Interchange|Bukit Batok]]</small> || rowspan="2" | {{center| 10 March 1990; <br> {{Years or months ago|1990|3}}}} |
|||
|{{SMRT code|NS|19}}||[[Toa Payoh MRT Station|Toa Payoh]]||[[File:Toapayohmrtplatform.jpg|100px]]|| |
|||
|- |
|- |
||
|{{SMRT code|NS| |
|scope="row"|{{SMRT code|NS|3}} <br> [[File:Aiga escalator up.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Bukit Gombak MRT station|Bukit Gombak]]||[[File:Bukit Gombak MRT Station.jpg|100x100px]]|| rowspan="2" {{sdash}} |
||
|- |
|- |
||
|scope="row"|{{SMRT code|NS|3A}} <br> <small>''[[Infill station]]''</small> <br> [[File:Aiga escalator up.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||''[[Brickland MRT station|Brickland]]''||{{CNone}}||{{center| 2034; <br> {{Years or months ago|2034}}}}||{{TBA}} |
|||
|{{SMRT code 2I/C|NS|21|DT|11}}||[[Newton MRT Station|Newton]]||[[File:Ns21 newton.jpg|100px]]||Interchange with the {{rint|sg|dt}} [[Downtown MRT Line|'''{{fontcolor|#0354A6|Downtown Line}}''']] |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|NS|4|BP|1|JS|1}} <br> [[File:Aiga escalator up.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Choa Chu Kang MRT/LRT station|Choa Chu Kang]]||[[File:Choa Chu Kang MRT Station 202407.jpg|100x100px]]||[[File:Aiga escalator up.svg|15px|link=]] {{rbox|Bukit Panjang LRT|Bukit Panjang LRT line|#{{rcr|SLRT|Bukit Panjang}}|White}} <br> [[File:Aiga escalator up.svg|15px|link=]] {{rbox|Jurong Region Line|Jurong Region MRT line|#{{rcr|SMRT|JS}}|White}} <small>''(2027)''</small><br> ― <br>[[File:Bus-logo.svg|15px|link=]] <small>[[Choa Chu Kang Bus Interchange|Choa Chu Kang]]</small> || {{center| 10 March 1990; <br> {{Years or months ago|1990|3}}}} || S$5 billion |
|||
|{{SMRT code 2I/C|NS|22|TE|14}}||[[Orchard MRT Station|Orchard]]||[[File:Orchard MRT B.JPG|100px]]||Interchange with the {{rint|sg|te}} [[Thomson-East Coast MRT Line|'''{{fontcolor|#734538|Thomson-East Coast Line}}''']] <small>''(2021)''</small> |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|NS|5}} <br> [[File:Aiga escalator up.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Yew Tee MRT station|Yew Tee]]||[[File:Yew Tee MRT Station 202407.jpg|100x100px]]||{{sdash}} || {{center| 10 February 1996; <br> {{Years or months ago|1996|2}}}} || S$1.2 billion<ref>{{cite web|url=http://eresources.nlb.gov.sg/infopedia/articles/SIP_364_2005-01-28.html|title=Woodlands MRT line|access-date=10 October 2019|archive-date=1 January 2018|archive-url=https://web.archive.org/web/20180101140912/http://eresources.nlb.gov.sg/infopedia/articles/SIP_364_2005-01-28.html|url-status=live}}</ref> |
|||
|{{SMRT code|NS|23}}||[[Somerset MRT Station|Somerset]]|||| |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|NS|6|DE|2}} <br> <small>''[[Infill station]]''</small> <br> [[File:Aiga escalator up.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||''[[Sungei Kadut MRT station|Sungei Kadut]]''||{{CNone}}||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|Downtown Line|Downtown MRT line|#{{rcr|SMRT|DT}}|White}} <small>''(2035)''</small>||{{center| 2035; <br> {{Years or months ago|2035}}}} ||{{TBA}} |
|||
|{{SMRT code 3I/C|NS|24|NE|6|CC|1}}||[[Dhoby Ghaut MRT Station|Dhoby Ghaut]]||[[File:Dhoby Ghaut MRT (8643534516).jpg|100px]]||Interchange with the {{rint|sg|ne}} [[North East MRT Line|'''{{fontcolor|#9016b2|North East Line}}''']] and the {{rint|sg|cc}} [[Circle MRT Line|'''{{fontcolor|#ff9a00|Circle Line}}''']] |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|NS|7}} <br> [[File:Aiga escalator up.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Kranji MRT station|Kranji]]||[[File:Kranji MRT Station.jpg|100x100px]]||rowspan="2" {{sdash}} || rowspan="5" | {{center| 10 February 1996; <br> {{Years or months ago|1996|2}}}} || rowspan="5" | S$1.2 billion<ref>{{cite web|url=http://eresources.nlb.gov.sg/infopedia/articles/SIP_364_2005-01-28.html|title=Woodlands MRT line|access-date=10 October 2019|archive-date=1 January 2018|archive-url=https://web.archive.org/web/20180101140912/http://eresources.nlb.gov.sg/infopedia/articles/SIP_364_2005-01-28.html|url-status=live}}</ref> |
|||
|{{SMRT code 2I/C|NS|25|EW|13}}||[[City Hall MRT Station|City Hall]]||[[File:City Hall MRT-platform A.JPG|100px]]||Cross-Platform Interchange with the {{rint|sg|ew}} [[East West MRT Line|'''{{fontcolor|#009530|East West Line}}''']] <br> Out of system transfer to the [[Circle MRT Line|'''{{fontcolor|#ff9a00|Circle Line}}''']] at [[Esplanade MRT Station|{{SMRT code|CC|3}} Esplanade]] |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|NS|8}} <br> [[File:Aiga escalator up.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Marsiling MRT station|Marsiling]]||[[File:Marsiling MRT Station.jpg|100x100px]] |
|||
|{{SMRT code 2I/C|NS|26|EW|14}}||[[Raffles Place MRT Station|Raffles Place]]||[[File:Ns25 rafflesplace.jpg|100px]]||Cross-Platform Interchange with the {{rint|sg|ew}} [[East West MRT Line|'''{{fontcolor|#009530|East West Line}}''']] |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|NS|9|TE|2}} <br> [[File:Aiga escalator up.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Woodlands MRT station|Woodlands]]||[[File:Woodlands MRT Station 202407.jpg|100x100px]]||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|Thomson–East Coast Line|Thomson–East Coast MRT line|#{{rcr|SMRT|TE}}|White}}<br> ― <br>[[File:Bus-logo.svg|15px|link=]] <small>[[Woodlands Bus Interchange|Woodlands]]</small><br>[[File:Bus-logo.svg|15px|link=]] <small>[[Woodlands Temporary Bus Interchange|Woodlands Temporary]]</small> |
|||
|{{SMRT code 3I/C|NS|27|CE|2|TE|20}}||[[Marina Bay MRT Station|Marina Bay]]||[[File:Marina Bay MRT Station platform 20161204.jpg|100px]]||Interchange with the {{rint|sg|cc}} [[Circle MRT Line|'''{{fontcolor|#ff9a00|Circle Line}}''']] and the {{rint|sg|te}} [[Thomson-East Coast MRT Line|'''{{fontcolor|#734538|Thomson-East Coast Line}}''']] <small>''(2021)''</small> |
|||
|- |
|- |
||
|{{SMRT code|NS| |
|scope="row"|{{SMRT code|NS|10}} <br> [[File:Aiga escalator up.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Admiralty MRT station|Admiralty]]||[[File:Admiralty MRT Station.jpg|100x100px]]||{{sdash}} |
||
|- |
|||
|scope="row"|{{SMRT code|NS|11}} <br> [[File:Aiga escalator up.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Sembawang MRT station|Sembawang]]||[[File:Sembawang MRT Station.jpg|100x100px]]||[[File:Bus-logo.svg|15px|link=]] <small>[[Sembawang Bus Interchange|Sembawang]]</small> |
|||
|- |
|||
|scope="row"|{{SMRT code|NS|12}} <br> [[File:Aiga escalator up.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Canberra MRT station|Canberra]]||[[File:Canberra MRT Station 2.jpg|100x100px]]||{{sdash}} || {{center| 2 November 2019; <br> {{Years or months ago|2019|11}}}} || S$274 million<ref>{{cite web|url=http://www.singaporebudget.gov.sg/budget_2018/BudgetSpeech/RevenueExpenditure/RevenueExpenditureEstimates.aspx|title=Revenue & Expenditure Estimates|website=www.singaporebudget.gov.sg|language=en-US|access-date=17 April 2018|archive-date=18 April 2018|archive-url=https://web.archive.org/web/20180418092803/http://www.singaporebudget.gov.sg/budget_2018/BudgetSpeech/RevenueExpenditure/RevenueExpenditureEstimates.aspx|url-status=live}}</ref> |
|||
|- |
|||
|scope="row"|{{SMRT code|NS|13}} <br> [[File:Aiga escalator up.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Yishun MRT station|Yishun]]||[[File:Yishun MRT Station 202407.jpg|100x100px]]||[[File:Bus-logo.svg|15px|link=]] <small>[[Yishun Bus Interchange|Yishun]]</small> || rowspan="2" | {{center| 20 December 1988; <br> {{Years or months ago|1988|12}}}} || rowspan="15" | S$5 billion |
|||
|- |
|||
|scope="row"|{{SMRT code|NS|14}} <br> [[File:Aiga escalator up.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Khatib MRT station|Khatib]]||[[File:Khatib MRT Station.jpg|100x100px]]||{{sdash}} |
|||
|- |
|||
|scope="row"|{{SMRT code|NS|15}} <br> [[File:Aiga escalator up.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Yio Chu Kang MRT station|Yio Chu Kang]]||[[File:Yio Chu Kang MRT Station 202407 2.jpg|100x100px]]||[[File:Bus-logo.svg|15px|link=]] <small>[[Yio Chu Kang Bus Interchange|Yio Chu Kang]]</small> || rowspan="5" | {{center| 7 November 1987; <br> {{Years or months ago|1987|11}}}} |
|||
|- |
|||
|scope="row"|{{SMRT code|NS|16|CR|11}} <br> [[File:Aiga escalator up.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Ang Mo Kio MRT station|Ang Mo Kio]]||[[File:Ang Mo Kio MRT Station.jpg|100x100px]]||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|Cross Island Line|Cross Island MRT line|#{{rcr|SMRT|CR}}|Black}} <small>''(2030)''</small><br> ― <br>[[File:Bus-logo.svg|15px|link=]] <small>[[Ang Mo Kio Bus Interchange|Ang Mo Kio]]</small> |
|||
|- |
|||
|scope="row"|{{SMRT code|NS|17|CC|15}} <br> [[File:Aiga escalator.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Bishan MRT station|Bishan]]||[[File:Bishan MRT Station.jpg|100x100px]]||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|Circle Line|Circle MRT line|#{{rcr|SMRT|CC}}|Black}}<br> ― <br>[[File:Bus-logo.svg|15px|link=]] <small>[[Bishan Bus Interchange|Bishan]]</small> |
|||
|- |
|||
|scope="row"|{{SMRT code|NS|18}} <br> [[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Braddell MRT station|Braddell]]||[[File:Braddell MRT Station 202407.jpg|100x100px]]||{{sdash}} |
|||
|- |
|||
|scope="row"|{{SMRT code|NS|19}} <br> [[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Toa Payoh MRT station|Toa Payoh]]||[[File:Toa Payoh MRT Station 202407.jpg|100x100px]]||[[File:Bus-logo.svg|15px|link=]] <small>[[Toa Payoh Bus Interchange|Toa Payoh]]</small> |
|||
|- |
|||
|scope="row"|{{SMRT code|NS|20}} <br> [[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Novena MRT station|Novena]]||[[File:Novena MRT Station 202407.jpg|100x100px]]||{{sdash}} || rowspan="7" | {{center| 12 December 1987; <br> {{Years or months ago|1987|12}}}} |
|||
|- |
|||
|scope="row"|{{SMRT code|NS|21}}–{{SMRT code|DT|11}} <br> [[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Newton MRT station|Newton]]||[[File:Newton MRT Station 202407.jpg|100x100px]]||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|Downtown Line|Downtown MRT line|#{{rcr|SMRT|DT}}|White}} [[File:Barrier turnstile icon.svg|12px|link=]] |
|||
|- |
|||
|scope="row"|{{SMRT code|NS|22|TE|14}} <br> [[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Orchard MRT station|Orchard]]||[[File:Orchard MRT Station 202407.jpg|100x100px]]||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|Thomson–East Coast Line|Thomson–East Coast MRT line|#{{rcr|SMRT|TE}}|White}} |
|||
|- |
|||
|scope="row"|{{SMRT code|NS|23}} <br> [[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Somerset MRT station|Somerset]]||[[File:Somerset MRT Station 202407 2.jpg|100x100px]]||{{sdash}} |
|||
|- |
|||
|scope="row" |[[File:MRT Singapore Destination 8.svg|15px|link=]] <br> {{SMRT code|NS|24|NE|6|CC|1}} <br> [[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Dhoby Ghaut MRT station|Dhoby Ghaut]]||[[File:Dhoby Ghaut MRT Station 202407 2.jpg|100x100px]]||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|North East Line|North East MRT line|#{{rcr|SMRT|NE}}|White}} <br> [[File:Aiga escalator down.svg|15px|link=]] {{rbox|Circle Line|Circle MRT line|#{{rcr|SMRT|CC}}|Black}} |
|||
|- |
|||
|scope="row"|{{SMRT code|NS|25|EW|13}} <br> [[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[City Hall MRT station|City Hall]]||[[File:City hall MRT Station.jpg|100x100px]]||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|East–West Line|East–West MRT line|#{{rcr|SMRT|EW}}|White}} |
|||
|- |
|||
|scope="row"|{{SMRT code|NS|26|EW|14}} <br> [[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Raffles Place MRT station|Raffles Place]]||[[File:Raffles Place MRT Station 202407.jpg|100x100px]]||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|East–West Line|East–West MRT line|#{{rcr|SMRT|EW}}|White}} |
|||
|- |
|||
|scope="row" |[[File:MRT Singapore Destination 10.svg|15px|link=]] <br> {{SMRT code|NS|27|CE|2|TE|20}} <br> [[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Marina Bay MRT station|Marina Bay]]||[[File:Marina Bay MRT Station 202407.jpg|100x100px]]||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|Circle Line ''Extension''|Circle MRT line|#{{rcr|SMRT|CE}}|Black}} <br> [[File:Aiga escalator down.svg|15px|link=]] {{rbox|Thomson–East Coast Line|Thomson–East Coast MRT line|#{{rcr|SMRT|TE}}|White}} || {{center| 4 November 1989; <br> {{Years or months ago|1989|11}}}} |
|||
|- |
|||
|scope="row" |[[File:MRT Singapore Destination 5.svg|15px|link=]] <br> {{SMRT code|NS|28}} <br> [[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Marina South Pier MRT station|Marina South Pier]]||[[File:Marina South Pier MRT Station 202407.jpg|100x100px]]||[[File:Aiga watertransportation.svg|10px|link=]] <small>[[Marina South Pier]]</small> [[File:Aiga immigration.svg|10px|link=]] <br> [[File:Aiga watertransportation.svg|10px|link=]] <small>[[Marina Bay Cruise Centre Singapore|Marina Bay Cruise Centre]]</small> [[File:Aiga immigration.svg|10px|link=]] || {{center| 23 November 2014; <br> {{Years or months ago|2014|11}}}} || S$357.5 million<ref name="LTA Map">{{cite web | url=http://www.lta.gov.sg/projects/proj_maps_rail_l.htm | title=Projects | publisher=Land Transport Authority | date=3 May 2010 | access-date=14 June 2022 | archive-date=5 June 2011 | archive-url=https://web.archive.org/web/20110605124529/http://www.lta.gov.sg/projects/proj_maps_rail_l.htm | url-status=live }}</ref> |
|||
|} |
|} |
||
===Depots=== |
|||
The North South Line's numbering scheme reserves station code "{{SMRT code|NS|6}}" between {{SMRT code|NS|5}} [[Yew Tee MRT Station|Yew Tee]] and {{SMRT code|NS|7}} [[Kranji MRT Station|Kranji]] for future use. |
|||
{| class="wikitable" style="color: black; border-collapse: collapse; font-size: 95%" |
|||
|- |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|North South}}" | Number |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|North South}}" | Depot name;<br>Lines |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|North South}}" | Location |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|North South}}" | Images |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|North South}}" | Line-specific<br>stabling capacity |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|North South}}" | Cost |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|North South}}" | Opening |
|||
|- |
|||
| {{center|1}} || [[File:Aiga escalator.svg|15px|link=]] {{rbox|Bishan|Bishan Depot|#{{rcr|SMRT|NS}}|White}} || [[Bishan, Singapore|Bishan]] || [[File:NSL Bishan MRT Depot 20201013 183038.jpg|100px]] || 59 trains || S$300 million || {{center|7 November 1987; <br> {{Years or months ago|1987|11}}}} |
|||
|- |
|||
| {{center|2}} || [[File:Aiga escalator.svg|15px|link=]] {{rbox|Ulu Pandan|Ulu Pandan Depot|#{{rcr|SMRT|NS}}|White}} <br> [[File:Aiga escalator.svg|15px|link=]] {{rint|sg|ew}} || [[Jurong East]] || [[File:Ulu Pandan Depot.jpg|100px]] || 45 trains || S$130 million || {{center|12 March 1988; <br> {{Years or months ago|1988|03}}}} |
|||
|} |
|||
==Infrastructure== |
|||
===Rolling stock=== |
|||
{{multiple image |
|||
| align = center |
|||
| direction = horizontal |
|||
| header = A variety of [[List of Singapore MRT and LRT rolling stock|rolling stock]] on the North-South Line |
|||
| header_align = center |
|||
| image1 = Bishan Depot trains.jpg |
|||
| caption1 = Various older generation rolling stock of the North-South Line parked at [[Bishan Depot]]. |
|||
| width1 = {{#expr: (150 * 1600/ 1200) round 0}} |
|||
| image2 = C151C, Choa Chu Kang MRT Station.jpg |
|||
| caption2 = A newer rolling stock C151C at Choa Chu Kang MRT Station |
|||
| width2 = {{#expr: (150 * 1600/ 1200) round 0}} |
|||
}} |
|||
Electric Multiple Unit (EMU) trains on the North–South Line operate in a six-car formation, based out of [[Bishan Depot]] and [[Ulu Pandan Depot]], which provide train maintenance, inspection and overhaul facilities.<ref>{{Cite news|url=http://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes19840610-1.2.36|title=10 shortlisted for Bishan Depot deal|date=10 June 1984|work=The Straits Times|access-date=11 October 2017|archive-url=https://web.archive.org/web/20171011182744/http://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes19840610-1.2.36|archive-date=11 October 2017|url-status=live}}</ref><ref>{{Cite news|url=http://eresources.nlb.gov.sg/newspapers/Digitised/Article/biztimes19861017-1.2.10.14|title=Building the MRT's third depot|date=17 October 1986|work=The Straits Times|access-date=11 October 2017|archive-url=https://web.archive.org/web/20171011183249/http://eresources.nlb.gov.sg/newspapers/Digitised/Article/biztimes19861017-1.2.10.14|archive-date=11 October 2017|url-status=live}}</ref><ref name=":3">{{Cite news|url=http://www.channelnewsasia.com/news/singapore/north-south-line-signalling-system-to-take-up-to-6-months-to-9031560|title=North–South Line signalling system to take up to 6 months to stabilise|work=Channel NewsAsia|access-date=11 October 2017|language=en-US|archive-url=https://web.archive.org/web/20171119100248/http://www.channelnewsasia.com/news/singapore/north-south-line-signalling-system-to-take-up-to-6-months-to-9031560|archive-date=19 November 2017|url-status=live}}</ref> This rolling stock is shared with the [[East–West MRT line|East–West Line]], with an electrification of 750 V [[Direct current|DC]] powered by a [[third rail]]. With the exception of the [[Siemens C651|C651]] and [[Alstom Movia R151|R151]] trains, the current rolling stock was manufactured by [[Kawasaki Heavy Industries]], in a joint venture with [[CRRC Qingdao Sifang]] for the subsequent rolling stocks of the [[Kawasaki Heavy Industries & CSR Sifang C151A|C151A]], [[Kawasaki Heavy Industries & CSR Sifang C151B|C151B]] and [[Kawasaki Heavy Industries & CRRC Sifang C151C|C151C]] trains.<ref>{{Cite web|url=https://www.khi.co.jp/mobility/rail/export.html|title=海外向け車両 {{!}} 鉄道車両|website=川崎重工業株式会社|language=ja|access-date=8 April 2020|archive-url=https://web.archive.org/web/20190922082314/http://www.khi.co.jp/mobility/rail/export.html|archive-date=22 September 2019|url-status=live}}</ref> When the initial line opened, the rolling stock of the North–South Line consisted of 66 first-generation [[Kawasaki Heavy Industries C151|C151]] trains only. The 19 second-generation [[Siemens C651|C651]] trains were introduced during the Woodlands extension to complement the existing 66 first-generation C151 trains.<ref>{{Cite news|title=$290 million contracts for Woodlands MRT line|date=16 August 1992|work=The Straits Times}}</ref> The 21 third-generation [[Kawasaki Heavy Industries & Nippon Sharyo C751B|C751B]] trains were introduced during the Changi Airport extension to complement the existing 66 first-generation C151 trains and 19 second-generation C651 trains.<ref>{{cite web | title = EMU Trains for the Singapore Land Transport Authority | url = http://www.khi.co.jp/english/rs/product/detail/pro_singapore.html | publisher = Kawasaki Heavy Industries | access-date = 5 November 2012 | archive-url = https://web.archive.org/web/20121231070440/http://www.khi.co.jp/english/rs/product/detail/pro_singapore.html | archive-date = 31 December 2012 | url-status = live }}</ref><ref>{{Cite web|url=https://global.kawasaki.com/en/mobility/rail/rapid_transit/index.html|title=Rapid Transit {{!}} Kawasaki Heavy Industries|website=global.kawasaki.com|access-date=8 April 2020|archive-url=https://web.archive.org/web/20200408010932/https://global.kawasaki.com/en/mobility/rail/rapid_transit/index.html|archive-date=8 April 2020|url-status=live}}</ref> In 2011, the fourth-generation C151A trains were introduced, increasing the passenger capacity of both the North–South and East–West lines by 15%.<ref>{{cite web |url=http://www.railwaygazette.com/news/single-view/view//extra-metro-trains-for-singapore.html |title=Extra metro trains for Singapore |publisher=[[Railway Gazette International]] |date=7 May 2009 |url-status=dead |archive-url=https://web.archive.org/web/20091113051116/http://www.railwaygazette.com/news/single-view/view/extra-metro-trains-for-singapore.html |archive-date=13 November 2009 }}</ref><ref>{{cite web|url=http://www.smrt.com.sg/Upload/20115161592799442.pdf |title=Five new trains added to boost capacity of North–South and East–West Lines |publisher=[[SMRT Corporation]] |date=16 May 2011 |url-status=dead |archive-url=https://web.archive.org/web/20110927090934/http://www.smrt.com.sg/Upload/20115161592799442.pdf |archive-date=27 September 2011 }}</ref><ref>{{Cite web|url=http://www.straitstimes.com/BreakingNews/Singapore/Story/STIStory_733460.html|title=Train capacity to rise by up to 50% in 4 years|access-date=8 April 2020|archive-url=https://web.archive.org/web/20120229180453/http://www.straitstimes.com/BreakingNews/Singapore/Story/STIStory_733460.html|archive-date=29 February 2012|url-status=live}}</ref> The C151A trains were the first successful joint venture between Kawasaki Heavy Industries and CSR Qingdao Sifang in the international market.<ref>{{cite web|url=http://www.csrgc.com.cn/ens/xwzx/2009-05-13/1277.shtml |archive-url=https://archive.today/20120723075002/http://www.csrgc.com.cn/ens/xwzx/2009-05-13/1277.shtml |url-status=dead |archive-date=23 July 2012 |title=CSR Sifang and Kawasaki Heavy Industries Won the Bid in the Subway Vehicle Project of Singapore |date=13 May 2009 |access-date=8 February 2012 }}</ref> |
|||
As part of efforts to further increase passenger capacity on the line, newer C151B and C151C trains were subsequently delivered in 2017 and 2018 respectively.<ref name="Sundays">{{cite web | title = New signalling system trials extended to full day every Sunday: SMRT, LTA | url = http://www.channelnewsasia.com/news/singapore/new-signalling-system-trials-extended-to-full-day-every-sunday/3671664.html | publisher = Channel NewsAsia | date = 12 April 2017 | access-date = 8 April 2020 | archive-url = https://web.archive.org/web/20170415202840/http://www.channelnewsasia.com/news/singapore/new-signalling-system-trials-extended-to-full-day-every-sunday/3671664.html | archive-date = 15 April 2017 | url-status = live }}</ref><ref>{{Cite web|url=http://global.kawasaki.com/en/corp/newsroom/news/detail/?f=20150922_0034|title=LTA Singapore Orders 12 MRT Trains (72 cars) for North–South/East–West Lines {{!}} Kawasaki Heavy Industries, Ltd.|date=29 April 2016|access-date=8 June 2017|archive-url=https://web.archive.org/web/20160429033133/http://global.kawasaki.com/en/corp/newsroom/news/detail/?f=20150922_0034|archive-date=29 April 2016}}</ref> The introduction of the C151B trains saw the introduction of [[SMRT Active Route Map Information System|STARiS 2.0]], which is also seen in subsequent rolling stocks.<ref name="SMRT press">{{cite web | url = http://www.smrt.com.sg/Media/Press-release/News/articleid/733/%20News%20Releases/parentId/180/year/2016?category=Announcements%20 | title = SMRT Boosts Service Excellence Efforts with first Customer Experience Innovation Conference | publisher = SMRT Corporation | date = 21 January 2016 | access-date = 8 April 2020 | archive-date = 19 September 2020 | archive-url = https://web.archive.org/web/20200919041330/http://www.smrt.com.sg/News-Room/Announcements-News-Releases/articleid/733/%20News%20Releases/parentId/180/year/2016?category=Announcements+ | url-status = live }}</ref> The C151C trains are also the first MRT rolling stock on the NSEWL to be fitted with tip-up seats, in addition to the current features of the C151B trains.<ref>{{Cite news|last=Tan|first=Christopher|url=https://www.straitstimes.com/singapore/transport/smrt-adding-12-trains-to-two-most-heavily-used-lines|title=SMRT adding 12 trains to two most heavily used lines|date=14 August 2018|work=The Straits Times|url-status=live|archive-url=https://web.archive.org/web/20200408010247/https://www.straitstimes.com/singapore/transport/smrt-adding-12-trains-to-two-most-heavily-used-lines|archive-date=8 April 2020}}</ref><ref>{{Cite web|url=https://www.lta.gov.sg/content/ltagov/en/newsroom/2015/9/2/12-more-trains-to-boost-capacity-of-north-south-and-east-west-lines.html|title=LTA {{!}} News Room {{!}} News Releases {{!}} 12 More Trains to Boost Capacity of North–South and East–West Lines|website=www.lta.gov.sg|access-date=15 April 2020|archive-url=https://web.archive.org/web/20191227140330/https://www.lta.gov.sg/content/ltagov/en/newsroom/2015/9/2/12-more-trains-to-boost-capacity-of-north-south-and-east-west-lines.html|archive-date=27 December 2019|url-status=live}}</ref> |
|||
Another generation of rolling stock, the [[Alstom Movia R151|R151]] trains, will be delivered from 2022 to 2026, to replace all 66 first-generation [[Kawasaki Heavy Industries C151|C151]] trains which will be retired by 2025, as well as all 19 second-generation [[Siemens C651|C651]] and 21 third-generation [[Kawasaki Heavy Industries & Nippon Sharyo C751B|C751B]] trains which were fully phased out by 2024. The R151 trains will be the first rolling stock on the North–South Line to be manufactured by [[Bombardier Transportation]] (Bought by [[Alstom]] in 2021), which has also supplied trains for the [[Downtown MRT line|Downtown Line]].<ref>{{Cite web|url=https://www.lta.gov.sg/content/ltagov/en/newsroom/2018/7/2/bombardier-to-supply-66-new-trains-for-north-south-and-east-west-lines.html|title=LTA {{!}} News Room {{!}} News Releases {{!}} Bombardier to Supply 66 New Trains for North–South and East–West Lines|website=www.lta.gov.sg|access-date=8 February 2020|archive-date=15 November 2019|archive-url=https://web.archive.org/web/20191115185341/https://www.lta.gov.sg/content/ltagov/en/newsroom/2018/7/2/bombardier-to-supply-66-new-trains-for-north-south-and-east-west-lines.html|url-status=live}}</ref><ref>{{Cite news|url=https://www.channelnewsasia.com/news/singapore/new-fleet-to-replace-66-oldest-mrt-trains-from-2021-10561652|title=New fleet to replace 66 oldest MRT trains from 2021|work=Channel NewsAsia|access-date=25 July 2018|language=en-US|archive-date=25 July 2018|archive-url=https://web.archive.org/web/20180725183703/https://www.channelnewsasia.com/news/singapore/new-fleet-to-replace-66-oldest-mrt-trains-from-2021-10561652|url-status=live}}</ref><ref>{{Cite news|url=https://www.straitstimes.com/singapore/transport/bombardier-awarded-12-billion-contract-to-replace-66-oldest-mrt-trains|title=Bombardier awarded $1.2 billion contract to replace 66 oldest MRT trains|last=hermesauto|date=25 July 2018|work=The Straits Times|access-date=25 July 2018|language=en|archive-date=18 December 2019|archive-url=https://web.archive.org/web/20191218205005/https://www.straitstimes.com/singapore/transport/bombardier-awarded-12-billion-contract-to-replace-66-oldest-mrt-trains|url-status=live}}</ref> |
|||
===Signalling=== |
|||
Previously, southbound North-South Line train starting from Jurong East will alternate its terminus between {{SMRT code 3I/C|NS|27|CE|2|TE|20}} Marina Bay and {{SMRT code|NS|28}} Marina South Pier where out of 4 trains, 3 trains will terminate at the former and final train at the latter despite the opening of Marina South Pier station. This restriction however, was removed due to the new signalling system. All southbound trains now terminate at Marina South Pier at all occasions. |
|||
Initially, the North–South line used a semi-automatic signalling system consisting of the [[Westinghouse Brake and Signal Company Ltd|Westinghouse]] [[Railway Signalling|fixed block signalling system]] with [[automatic train control]] under [[automatic train operation]] Grades of Automation (GoA) 2.<ref name="Westinghouse FS2K">{{Cite web|last=Woodland|first=Daniel|date=August 2004|title=Optimisation of Automatic Train Protection Systemstion Systems|url=http://etheses.whiterose.ac.uk/14543/1/531116.pdf|page=Appendix C Page 32 to Page 33|url-status=live|archive-url=https://web.archive.org/web/20200615155037/http://etheses.whiterose.ac.uk/14543/1/531116.pdf|archive-date=15 June 2020|access-date=15 June 2020}}</ref><ref>{{Cite web|url=http://www.mot.gov.sg/news-centre/news/Detail/%20Oral%20Reply%20by%20Minister%20for%20Transport%20Khaw%20Boon%20Wan%20to%20Parliamentary%20Question%20on%20North-South%20Line%20Resignalling(1)/|title=Oral Reply by Minister for Transport Khaw Boon Wan to Parliamentary Question on North–South Line Resignalling|website=www.mot.gov.sg|language=en|access-date=25 April 2020|archive-date=16 June 2020|archive-url=https://web.archive.org/web/20200616000115/https://www.mot.gov.sg/news-centre/news/Detail/%20Oral%20Reply%20by%20Minister%20for%20Transport%20Khaw%20Boon%20Wan%20to%20Parliamentary%20Question%20on%20North-South%20Line%20Resignalling(1)/|url-status=live}}</ref> However, the ageing system had undermined the rail reliability on the line, requiring the NSL to upgrade its signalling system.<ref>{{Cite web|url=http://www.mot.gov.sg/news-centre/news/Detail/Speech%20by%20Minister%20Khaw%20Boon%20Wan%20at%20the%20Fourth%20Joint%20Forum%20on%20Infrastructure%20Maintenance/|title=Speech by Minister Khaw Boon Wan at the Fourth Joint Forum on Infrastructure Maintenance|website=www.mot.gov.sg|language=en|access-date=25 April 2020|archive-date=19 September 2020|archive-url=https://web.archive.org/web/20200919041330/https://www.mot.gov.sg/news-centre/news/Detail/Speech%20by%20Minister%20Khaw%20Boon%20Wan%20at%20the%20Fourth%20Joint%20Forum%20on%20Infrastructure%20Maintenance/|url-status=live}}</ref> Since 2019, the North–South Line is fully equipped with [[Thales Rail Signalling Solutions|Thales]] [[SelTrac]] [[Communications-based train control]] [[moving block]] signalling system with automatic train control under automatic train operation (ATO) GoA 3.<ref>{{Cite web|url=https://www.thalesgroup.com/en/press-release/thales-awarded-signalling-contracts-singapore-north-south-east-west-lines-and-tuas|title=Thales awarded signalling contracts for Singapore North–South, East–West lines and Tuas West Extension|website=www.thalesgroup.com|language=en|access-date=4 July 2017|archive-url=https://web.archive.org/web/20170820160452/https://www.thalesgroup.com/en/press-release/thales-awarded-signalling-contracts-singapore-north-south-east-west-lines-and-tuas|archive-date=20 August 2017|url-status=dead}}</ref><ref>{{Cite web|url=http://www.uitp.org/sites/default/files/Metro%20automation%20-%20facts%20and%20figures.pdf|title=Metro automation facts, figures and trends|website=International Association of Public Transport|url-status=live|archive-url=https://web.archive.org/web/20160501034433/http://www.uitp.org/sites/default/files/Metro%20automation%20-%20facts%20and%20figures.pdf|archive-date=1 May 2016}}</ref> The subsystems consist of [[automatic train protection]] to govern train speed, NetTrac MT Automatic Train Supervision (ATS) to track and schedule trains and a [[Computer-based interlocking]] system that prevents incorrect signal and track points to be set.<ref>{{cite web |url= https://www.thalesgroup.com/en/content/thales-awarded-signalling-contracts-singapore-north-south-east-west-lines-and-tuas-west |title= Thales awarded signalling contracts for Singapore North–South, East–West lines and Tuas West Extension |date= 6 February 2012 |publisher= Thales Group |url-status=dead |archive-url= https://web.archive.org/web/20150630183155/https://www.thalesgroup.com/en/content/thales-awarded-signalling-contracts-singapore-north-south-east-west-lines-and-tuas-west |archive-date= 30 June 2015 |df= dmy-all }}</ref> |
|||
A new moving-block signalling system, supplied by Thales, replaced the ageing fixed-block signalling system on the North–South Line. The upgrading works were completed in phases from 2016. With the upgraded signalling system, trains are now able to run closer to each other.<ref name="Thales Brochure">{{Cite web|title=THALES Urban Rail Signalling Singapore – North–South / East-West Lines|url=http://tda-armements.com/sites/default/files/asset/document/seltracr_in_singapore.pdf|url-status=live|archive-url=https://web.archive.org/web/20200615163959/http://tda-armements.com/sites/default/files/asset/document/seltracr_in_singapore.pdf|archive-date=15 June 2020|access-date=16 June 2020}}</ref><ref name="North–South Line Projects">{{cite web|last1=LTA Website|url=https://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/north-south-line.html|title=North–South Line Signal Upgrade|website=Land Transport Authority|access-date=21 April 2017|archive-url=https://web.archive.org/web/20180617192724/https://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/north-south-line.html|archive-date=17 June 2018|url-status=live}}</ref> The new system was tested on the evening of 28 March 2017. Train services were paused for ten minutes as the old signalling system was being changed to the new system.<ref name="Trial begins">{{cite web | title=Joint Media Release by the Land Transport Authority (LTA) & SMRT – New Signalling System Trial on North–South Line Begins on 28 March 2017 | website=LTA | date=28 March 2017 | url=https://www.lta.gov.sg/content/ltagov/en/newsroom/2017/3/2/joint-media-release-by-the-land-transport-authority-lta-smrt---new-signalling-system-trial-on-north-south-line-begins-o.html | access-date=22 April 2020 | archive-date=19 September 2020 | archive-url=https://web.archive.org/web/20200919041330/https://www.lta.gov.sg/content/ltagov/en/newsroom/2017/3/2/joint-media-release-by-the-land-transport-authority-lta-smrt---new-signalling-system-trial-on-north-south-line-begins-o.html | url-status=live }}</ref> From 16 April 2017, the new system commenced full-day testing on Sundays for two months. The new [[Kawasaki Heavy Industries & CSR Sifang C151B|C151B]] rolling stock were first introduced to the line on these testing days.<ref name="LTA 2017">{{cite web | title=Factsheet by the Land Transport Authority (LTA) & SMRT: Full-day Sunday Trial of New Signalling System for North–South Line from 16 April 2017 | website=LTA | date=16 April 2017 | url=https://www.lta.gov.sg/content/ltagov/en/newsroom/2017/4/2/factsheet-by-the-land-transport-authority-lta-smrt-full-day-sunday-trial-of-new-signalling-system-for-north-south-line-.html | access-date=22 April 2020 | archive-date=19 September 2020 | archive-url=https://web.archive.org/web/20200919041330/https://www.lta.gov.sg/content/ltagov/en/newsroom/2017/4/2/factsheet-by-the-land-transport-authority-lta-smrt-full-day-sunday-trial-of-new-signalling-system-for-north-south-line-.html | url-status=live }}</ref> Since 28 May 2017, the new signalling system has been operating full-day on the North–South Line.<ref>{{Cite web|url=http://blog.smrt.com.sg/7-questions-about-smrt-trains-new-signalling-system/|title=7 Questions about SMRT Trains' New Signalling System – SMRT Blog|website=blog.smrt.com.sg|date=6 June 2017 |language=en-GB|access-date=11 October 2017|archive-url=https://web.archive.org/web/20171011182458/http://blog.smrt.com.sg/7-questions-about-smrt-trains-new-signalling-system/|archive-date=11 October 2017|url-status=live}}</ref> The old signalling system then ceased operations on 2 January 2019.<ref name=":3" /> |
|||
==Rolling stock== |
|||
[[File:Ulu Pandan MRT Depot, Singapore - 20050830.jpg|200px|thumb|From Left- 2 Siemens C651 trains and 2 Kawasaki C751B trains at Ulu Pandan Depot]] |
|||
Trains operating on the line are the [[Kawasaki Heavy Industries C151|C151s]], [[Siemens C651|C651s]], [[Kawasaki Heavy Industries & Nippon Sharyo C751B|C751Bs]], [[Kawasaki Heavy Industries & CSR Sifang C151A|C151As]] and [[Kawasaki Heavy Industries & CSR Sifang C151B|C151Bs]]. These trains operate from the [[Bishan Depot]] which serves maintenance and train overhaul facilities along the North South Line and [[Ulu Pandan Depot]] along the East West Line. The trains can also crossover to the East West Line as both the North South Line and East West Line are built as one system operating two different lines at both Jurong East and Raffles Place. |
|||
===Platform screen doors=== |
|||
==Train control== |
|||
[[File: |
[[File:Toapayohmrtplatform.jpg|thumb|Full-height platform screen doors at Toa Payoh station.]] |
||
When the line was first opened, full-height [[platform screen doors]] supplied by [[Westinghouse Rail Systems|Westinghouse]] were installed at underground stations. These doors serve to prevent suicides, enable climate control within the station, better security control by restricting access to the tunnels and tracks and for overall passenger safety considerations.<ref>[http://www.platformscreendoors.com/psd/projects/massrapid.php Westinghouse Platform Screen Doors – Completed Projects] {{webarchive|url=https://web.archive.org/web/20080213223641/http://www.platformscreendoors.com/psd/projects/massrapid.php |date=13 February 2008 }}</ref> The authorities initially rejected calls for platform screen doors to be installed at elevated stations by casting doubts over functionality and concerns about the high installation costs.<ref name="doublerail">{{cite press release|url=http://app.lta.gov.sg/corp_press_content.asp?start=1090 |title=Safety at MRT and LRT Stations — Respect The Yellow line |publisher=Land Transport Authority |date=20 November 2005 |url-status=dead |archive-url=https://web.archive.org/web/20070927182635/http://app.lta.gov.sg/corp_press_content.asp?start=1090 |archive-date=27 September 2007 }}</ref> Nevertheless, the LTA reversed its decision and made plans to install [[automatic platform gate|half-height platform screen doors]] on elevated stations on 25 January 2008.<ref>{{cite news |work=The Straits Times |title=Platform screen doors for all above-ground MRT stations by 2012 |date=25 January 2008 |url=http://www.straitstimes.com/Latest+News/Singapore/STIStory_199958.html|archive-url=https://web.archive.org/web/20080128072930/http://www.straitstimes.com/Latest+News/Singapore/STIStory_199958.html|archive-date=28 January 2008}}</ref><ref name="raymondspeech">{{cite press release|url=http://www.mot.gov.sg/News-Centre/News/2008/Speech-By-Mr-Raymond-Lim-At-The-Visit-To-Kim-Chuan-Depot-on-25-January-2008/|title=Speech by Mr Raymond Lim, Minister for Transport, at the Visit to Kim Chuan Depot, 25 January 2008, 9.00am|publisher=Ministry of Transport|date=25 January 2008|access-date=11 January 2015|archive-url=https://web.archive.org/web/20150112142646/http://www.mot.gov.sg/News-Centre/News/2008/Speech-By-Mr-Raymond-Lim-At-The-Visit-To-Kim-Chuan-Depot-on-25-January-2008/|archive-date=12 January 2015|url-status=dead}}</ref> The first platform screen doors by [[ST Electronics]] were installed at Pasir Ris, Jurong East and Yishun stations in 2009 as trial runs.<ref name="stplatformdoorselevated">{{cite news |title=Platform doors for elevated MRT stations |author=Yeo Ghim Lay |date=3 September 2008 |work=The Straits Times |page=26| url=http://www.straitstimes.com/Breaking%2BNews/Singapore/Story/STIStory_416017.html| archive-url=https://web.archive.org/web/20090816160221/http://www.straitstimes.com/Breaking+News/Singapore/Story/STIStory_416017.html | archive-date=16 August 2009|url-status=dead}}</ref> Subsequently, installation began in May 2011 at [[Ang Mo Kio MRT station|Ang Mo Kio station]]. On 14 March 2012, platform screen doors became operational at all elevated stations on the North–South Line.<ref name=":2">{{Cite news|url=http://www.channelnewsasia.com/news/singapore/lta-completes-installing-elevated-mrt-station-screen-doors-early-8443586|title=LTA completes installing elevated MRT station screen doors early|work=Channel NewsAsia|access-date=23 September 2017|language=en-US|archive-url=https://web.archive.org/web/20170924001503/http://www.channelnewsasia.com/news/singapore/lta-completes-installing-elevated-mrt-station-screen-doors-early-8443586|archive-date=24 September 2017|url-status=live}}</ref> |
|||
<!-- PLEASE NOTE: the new signalling system is not yet fully deployed full-time, and the original signalling system is still relevant --> |
|||
The new signalling system by Thales is currently undergoing full-time tests and is expected to be fully deployed later in 2017. Meanwhile, the old signalling system by Westinghouse will serve as a backup for the new system. |
|||
===Rail=== |
|||
The North South Line is currently equipped with [[Thales Rail Signalling Solutions|Thales]] [[SelTrac]]® [[Communications-based train control]] (CBTC) [[moving block]] signalling system<ref>{{Cite web|url=https://www.thalesgroup.com/en/press-release/thales-awarded-signalling-contracts-singapore-north-south-east-west-lines-and-tuas|title=Thales awarded signalling contracts for Singapore North-South, East-West lines and Tuas West Extension {{!}} Thales Group|website=www.thalesgroup.com|language=en|access-date=2017-07-04}}</ref> with [[Automatic train control]] (ATC) under [[Automatic train operation]] (ATO) GoA 3 (DTO)<ref>http://www.uitp.org/sites/default/files/Metro%20automation%20-%20facts%20and%20figures.pdf</ref>. The subsystems consist of [[Automatic train protection]] (ATP) to govern train speed, NetTrac MT Automatic Train Supervision (ATS) to track and schedule trains and a [[Computer-based interlocking]] (CBI) system that prevents incorrect signal and track points to be set.<ref>{{cite press release |url= https://www.thalesgroup.com/en/content/thales-awarded-signalling-contracts-singapore-north-south-east-west-lines-and-tuas-west |title= Thales awarded signalling contracts for Singapore North-South, East-West lines and Tuas West Extension |date=6 February 2012 |publisher=Thales Group}}</ref> |
|||
The NSL was built with wooden [[Railroad tie|sleepers]], which needed to be replaced when they neared the end of their lifespan of 15 to 25 years. The replacement sleepers, made out of concrete, have a significantly longer lifespan and enable smoother and safer rides.<ref name="SMRT blog">{{Cite web|url=http://blog.smrt.com.sg/smrt-rail-improvements/|title=SMRT Rail Improvements – Updates – SMRT Blog|website=blog.smrt.com.sg|date=17 October 2016 |language=en-GB|access-date=19 September 2017|archive-url=https://web.archive.org/web/20170923144948/http://blog.smrt.com.sg/smrt-rail-improvements/|archive-date=23 September 2017|url-status=live}}</ref> Since 2014, train services on the line have ended earlier for critical maintenance works, with the exception of a break between September 2016 and December 2016.<ref>{{Cite news|url=http://www.straitstimes.com/singapore/project-to-replace-mrt-sleepers-done|title=Project to replace MRT sleepers done|newspaper=The Straits Times |date=25 December 2016 |archive-url=https://web.archive.org/web/20170329142812/http://www.straitstimes.com/singapore/project-to-replace-mrt-sleepers-done|archive-date=29 March 2017|url-status=live}}</ref> |
|||
Trains on the NSL are powered via a [[third rail]]. However, constant contact between the train's Current Collector Devices (CCD) and the line saw the need for replacement works on the third rail, which were completed in August 2017.<ref name="SMRT blog"/><ref>{{Cite web|url=https://www.smrt.com.sg/Portals/0/Factsheet_%20Power%20Rail%20Replacement_vF_1.pdf|title=Factsheet on Power Rail Replacement Programme for the North–South and East–West Lines (NSEWL)|archive-url=https://web.archive.org/web/20170923144946/https://www.smrt.com.sg/Portals/0/Factsheet_%20Power%20Rail%20Replacement_vF_1.pdf|archive-date=23 September 2017|url-status=dead}}</ref> The new third rail replaced its 30-year-old predecessor, which was used since the opening of the line. The new electrical system is expected to make train services more reliable.<ref>{{Cite web|url=http://blog.smrt.com.sg/third-rail-replacement-of-the-north-south-east-west-line/|title=Third Rail Replacement on North South and East West Line|archive-url=https://web.archive.org/web/20170216050249/http://blog.smrt.com.sg/third-rail-replacement-of-the-north-south-east-west-line/|archive-date=16 February 2017|url-status=live}}</ref> |
|||
The old signalling system was overlaid during resignalling in 2017 but is still able to operate. The old signalling system consists of [[Westinghouse Brake and Signal Company Ltd|Westinghouse]] [[Railway Signalling|fixed block signalling system]] with [[Automatic train control]] (ATC) under [[Automatic train operation]] (ATO) GoA 2 (STO). The subsystems consist of [[Automatic train protection]] (ATP) to govern train speed, Automatic Train Supervision (ATS) to track and schedule trains and a [[Relay interlocking]] system that prevents incorrect signal and track points to be set. |
|||
Automatic full-height [[platform screen doors]] by Westinghouse were originally installed in all underground stations since opening, and half-height [[Platform screen doors#Automatic platform gate|platform screen gates]] by ST Electronics were installed at a later date on elevated stations. |
|||
==References== |
==References== |
||
{{reflist| |
{{reflist|group=note}} |
||
{{reflist|30em}} |
|||
==External links== |
==External links== |
||
{{commons category}} |
|||
* [http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/north-south-line.html North South Line] |
|||
* [https://www.lta.gov.sg/content/ltagov/en/getting_around/public_transport/rail_network/north_south_line.html North–South Line] |
|||
{{portalbar|Trains|Singapore}} |
|||
{{North South MRT Line navbox}} |
|||
{{Singapore MRT stations|north-south=yes}} |
|||
{{Mass Rapid Transit (Singapore)}} |
|||
{{Rail transport in Singapore}} |
|||
{{Singapore railway lines}} |
|||
{{Singapore MRT stations}} |
|||
{{Urban Rail Transit in ASEAN}} |
{{Urban Rail Transit in ASEAN}} |
||
Line 215: | Line 323: | ||
[[Category:Railway lines opened in 1987]] |
[[Category:Railway lines opened in 1987]] |
||
[[Category:1987 establishments in Singapore]] |
[[Category:1987 establishments in Singapore]] |
||
{{DEFAULTSORT:North-South MRT line}} |
Latest revision as of 15:13, 6 January 2025
North–South Line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Native name | Laluan MRT Utara Selatan 南北地铁线 வடக்கு தெற்கு எம்ஆர்டி வழி | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Land Transport Authority | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Singapore | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 29 (27 in operation, 2 under planning) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Mass Rapid Transit (Singapore) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | 2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | SMRT Trains (SMRT Corporation) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Bishan Ulu Pandan | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | Kawasaki Heavy Industries C151 (KHI) Kawasaki–Sifang C151A (KSF A) Kawasaki–Sifang C151B (KSF B) Kawasaki–Sifang C151C (KSF C) Alstom Movia R151 (ALS) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 456,323 (July 2020)[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Planned opening | 2034Brickland) 2035 (Sungei Kadut) | (|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 7 November 1987 4 November 1989 (Initial line complete) 10 February 1996 (Woodlands extension) 23 November 2014 (Marina South Pier) 2 November 2019 (Canberra) | (First section)|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 45 km (28 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of tracks | 2; 3 (Ang Mo Kio) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Elevated (Jurong East – Ang Mo Kio) Ground-level (Bishan) Underground (Braddell – Marina South Pier) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 750 V DC third rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | limit of 80 km/h (50 mph) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The North–South Line (NSL) is a high-capacity Mass Rapid Transit (MRT) line in Singapore, operated by SMRT Corporation. Coloured red on the Singapore rail map, the line is 45 kilometres (28 mi) long and serves 27 stations,[2] 11 of which, between the Braddell and Marina South Pier stations, are underground. It runs from Jurong East station, located in Western Singapore, to Marina South Pier station in the Central Area, via Woodlands station in northern Singapore. The line operates for almost 20 hours a day (from approximately 5am to 1am the next day), with headways of 1 to 2 minutes during peak hours and 5 to 6 minutes during off-peak hours. All the trains on the North–South Line run with a six-car formation.
It was the first MRT line to be built in Singapore, with the first section from Yio Chu Kang station to Toa Payoh station beginning service on 7 November 1987, followed by an extension southwards to Raffles Place station on 12 December the same year and northwards to Yishun station on 20 December 1988. After the southern extension to Marina Bay station opened on 4 November 1989, the North–South Line was formed and split from the East–West Line. In the 1990s, the line extended to the north and west connecting to the Branch line via Woodlands through the Woodlands line extension.
Since the 2010s, due to the ageing infrastructure of the North–South Line (being the oldest and heavily utilised MRT line), significant improvements have been made on this line, such as the replacement of sleepers, third rail replacement and the introduction of new rolling stocks (the C151B, C151C and R151) to replace the older rolling stocks and increase passenger capacity. The North–South Line is also the first line to have undergone a major re-signalling project, converting it from semi-automatic to fully automated operations in 2019. Other recent developments of the line include a new extension to Marina South Pier station on 23 November 2014 and a new infill station, Canberra station, on 2 November 2019. Two more infill stations (Brickland and Sungei Kadut stations) on the line are being planned and are set to be opened in the 2030s.
History
[edit]Initial developments
[edit]The Mass Rapid Transit (MRT) originated from a forecast in 1967 by the planners of the State and City Planning Project,[3] which stated the need for a rail-based urban transport system in Singapore by 1992.[4][5]: 66 [6] Following a debate on whether a bus-only system would be more cost-effective, then-Minister for Communications Ong Teng Cheong came to the conclusion that an all-bus system would be inadequate, as it would have to compete for road space in the land-scarce country.[7][8]
After deciding on a rail-based system, the construction of Phase I of the MRT system,[9] which will be the North–South Line, was given priority as the line passes through areas having a higher demand for public transport, such as the densely populated housing estates of Toa Payoh and Ang Mo Kio and the Central Area. The line was expected to relieve the traffic congestion on the Thomson–Sembawang road corridor.[10][11] Construction of the MRT line (and also the MRT system itself) started on 22 October 1983,[12] and the first section from Yio Chu Kang station to Toa Payoh station opened on 7 November 1987.[13][14] At the inauguration ceremony, Ong Teng Cheong, who backed and commissioned the planning of the MRT system, attended the ceremony as a special Guest of Honour. Dr Yeo Ning Hong, the Minister For Communications and Information, inaugurated the start of MRT operations and announced it to be the "beginning" of the MRT system.[15]
Nine more stations from Novena station to Outram Park station via Raffles Place opened on 12 December that year.[16] The line was extended northward to Yishun station on 20 December 1988 as part of phase 2B[17] and it began independent operations on 4 November 1989 as the North–South Line when the extension to Marina Bay station was opened.[18][19]
Woodlands extension
[edit]The growth of the Mass Rapid Transit (MRT) system demonstrates the Government's commitment to develop a top-rate public transport system for the benefit of our people. Now [the Woodlands residents] too can enjoy the high quality service provided by the MRT... Achieving a world class land transport system takes time. Whether we can do so or not does not depend on the Government alone. It depends on all of us. If the people and the Government continue to work together, as we have done in the past, we will produce the economic growth and budget surpluses to build, not just a world-class transport system, but also the most attractive Singapore for our children to grow up in the 21st Century.
After the Branch line (from the Jurong East to Choa Chu Kang stations) opened in 1990, the Woodlands MRT line was envisioned so as to close the gap between Yishun and Choa Chu Kang stations.[21][22][23] Numerous changes were made to the number of stations for the extension mainly to accommodate the 1991 Concept Plan by the Urban Redevelopment Authority,[24] which aimed to make Woodlands a regional centre for northern Singapore.[25]
During the initial planning of the line, Sembawang station was only intended as a provisional station, to be built at a later date due to the underdevelopment of Sembawang, and construction began on 19 November 1992.[26] Sembawang station[27] and Kranji station[28] were later included in the construction after the second round of planning (construction began at the same time on 19 November 1992) and Sungei Kadut station was then omitted. Sungei Kadut will be built later if the town's population justifies the necessity for the station.[29]
During the construction, a total of 19 new trains were purchased for almost S$259 million for the new MRT line, designed by German company Siemens Aktiengesellschaft, to complement the 66 first-generation C151 trains. There was also a need to level the land covered in thick vegetation in Kadut, Woodlands and Sembawang for the MRT line.[30]
With the official opening of the Woodlands extension on 10 February 1996 by then Prime Minister Goh Chok Tong, the Branch line was incorporated into the North–South Line.[22] The extension was built at a cost of $1.2 billion.[31]
Subsequent developments
[edit]The NSL platforms of the Bishan station underwent major alterations to increase the passenger capacity of the station from 1,250 to 2,020. A new air-conditioned platform to serve southbound trains then to Marina Bay was constructed and opened for service on 27 July 2008, connected to Junction 8 via Exit E. The station was expanded to handle increased passenger traffic when the CCL station opens.[32] As the original platform, now serving northbound trains to Jurong East, remained in service, upgrading works for the platform (Platform A) was hindered and took about a year to complete. While the re-tiling of the platform was done during the day, the Platform Screen Doors (PSDs) were installed in sections through the night. An air-conditioning system was also installed as part of the upgrade. Upgrading works for the platform were fully completed on 23 May 2009.[33]
Under the Land Transport Master Plan 2008, the Jurong East Modification Project entailed the construction of a new platform and the addition of a fourth track to Jurong East station to reduce waiting times and crowding at the station during peak hours.[34] The modification project was completed on 27 May 2011.[35] The track and platform was initially opened during morning peak hours only, but since December 2011, they also operate during the evening peak hours.[36]
In the 2008 Land Transport Master Plan, the 1-kilometre (0.6 mi) North–South Line extension was announced as one of the upcoming projects rolled out by the Land Transport Authority to expand Singapore's rail network.[37] The one kilometre extension from Marina Bay to Marina South Pier station was opened on 23 November 2014.[38][39] This extension serves the Marina South Pier, the Marina Bay Cruise Centre Singapore, and future developments in the Marina Bay Downtown area.[40]
On 17 January 2013, the Land Transport Authority (LTA) announced that a feasibility study was conducted to construct Canberra MRT station.[41][42] The feasibility study was completed in 2014 and LTA announced Canberra as a new station.[43] Construction of Canberra station commenced on 26 March 2016.[44] The station, which is an infill station with side platforms, was built along an operational section of the line between Sembawang and Yishun. The station cost S$90 million to build,[45] and is meant to serve upcoming developments at the vicinity. Canberra station opened on 2 November 2019.[46]
Incidents
[edit]On 3 March 2003, a 23-year-old man lost control of his vehicle along Lentor Avenue, crashed through the fence, and landed on a stretch of track between Yio Chu Kang and Khatib stations. The incident forced a train carrying hundreds of commuters to come to a screeching halt, but not before flattening the front of the car. The accident disrupted train services for more than three hours and cost SMRT between S$100,000 and $150,000 in damages and lost revenue.[47]
On 15 December 2011, train services between Bishan and Marina Bay stations were disrupted due to damage sustained on the power rail between City Hall and Dhoby Ghaut. Trains along this stretch were stalled and caused a service disruption until 11:40 pm on that day.[48][49] Two days later, a similar problem caused a seven-hour disruption between Ang Mo Kio and Marina Bay.[50][51] According to SMRT, the disruption was caused by damage to the third rail and the trains' collector shoes. Seven trains were damaged in this incident.[52] These two service disruptions on the North–South line were both related to damaged rail, and became one of the worst disruption since SMRT's inception in 1987.[53]
On 7 July 2015, train services on the North–South and East–West lines were temporarily disrupted due to massive power trips detected along both lines. A cause of the disruption was due to damaged insulators which caused a failure to properly supply power.[54][55][56][57] For this disruption that brought inconvenience to 413,000 commuters, LTA imposed a 'record' fine of S$5.4 million on SMRT.[58]
On 7 October 2017, a 20-hour long disruption started due to flooding in the tunnels between Braddell station and Bishan station due to a faulty drainage system, resulting in disruption of train services between Ang Mo Kio and Marina South Pier stations in both directions for several hours. A trackside fire between Raffles Place and Marina Bay stations further exacerbated the disruption. Train services between Marina South Pier and Newton resumed at about 9:20 pm on the same day, followed by Newton and Ang Mo Kio at around 2 pm the following day.[59] Although no injuries or casualties were reported, SMRT fired a total of eight employees from the maintenance crew, and incurred a S$2 million fine, following the incident.[60]
On 14 October 2020, train services from Jurong East to Woodlands stations were disrupted for more than three and a half hours, owing to a faulty power cable, which affected the East–West Line and Circle Line too. The power fault began at 7 pm and by 7:30 pm, commuters were stuck in the trains. Free bus bridging services were activated at all affected stations, and bus operators increased the frequency of regular services serving these areas. Service resumed at all stations along the North–South and East–West Lines at 10:35 pm.[61] A total of 36 stations were affected by the power fault.[62] The incident led to a replacement of 150km of power cables for the Tuas West Extension and two SMRT staff being suspended.[62]
On 27 October 2023, trains skipped Novena MRT station for about 2 hours during the evening travel peak, after an air-conditioning unit filled the underground station with smoke. Free bus bridging services were provided between Newton MRT station and Toa Payoh MRT station, and ended shortly after the station was reopened at around 7:30pm.[63]
On 3 June 2024, around 5.50pm, a lightning strike caused traction power to trip, as well as a small fire breaking out in a power control box next to the train track located about 20 meters from the platform of Kranji MRT station. No injuries were reported. This resulted in train services to be suspended between Choa Chu Kang and Woodlands stations for more than two hours. According to the Singapore Civil Defence Force, the fire had burned itself out before its officers arrived. Train services were progressively restored at 8.10pm.[64]
Future plans
[edit]In the Land Transport Master Plan 2040 (LTMP2040), two new infill stations are projected to be built along the existing North–South Line. Brickland station will be built between Bukit Gombak and Choa Chu Kang stations, while Sungei Kadut station will be built between Yew Tee and Kranji stations and provide an additional interchange with the Downtown Line. Both stations are expected to be completed by around mid-2030s.[65][66][67][68]
Network and operations
[edit]Services
[edit]Train services on the North–South Line operates from approximately 5:30 am to around midnight daily. In general, during peak hours, train frequency is 2 to 3 minutes while during non-peak hours the frequency is reduced to 5 minutes throughout the entire route.[69] Each day, the first train begins service at the following timings:
- 4:59 am (5:19 am on Sundays and public holidays) from Jurong East to Yew Tee stations, which will reach one loop at 5:27 am.
- 5:00 am (5:22 am on Sundays and public holidays) from Ang Mo Kio to Yew Tee stations, which will reach Yew Tee at 5:33 am.
- 5:05 am (5:25 am on Sundays and public holidays) from Jurong East to Ang Mo Kio stations, which will reach Ang Mo Kio at 5:48 am.
- 5:10 am (5:30 am on Sundays and public holidays) from Ang Mo Kio as downroute to start at Bishan station, which will reach Bishan at 5:45 am.
Extra downroute trips were added to start from Newton, Bishan and Kranji to cater to the demand. From 11pm onwards, selected trains from Jurong East station will terminate at either Ang Mo Kio, Toa Payoh or Yew Tee stations.[70] Selected trains departing from Marina South Pier station will also terminate at Kranji, Yishun or Ang Mo Kio stations in the late evenings. There are no express services.[71] Additionally, short-working trips do run from Yishun to Marina South Pier, which only operate during peak hours.
In the late 2010s, services on the North–South Line were also subjected to maintenance and renewal works, usually on selected Fridays, Saturdays or Sundays, with shuttle bus services occasionally provided throughout the duration of the early closures and late openings for affected commuters.[72] Operations of the North–South Line were affected by the COVID-19 pandemic, leading to the drop in ridership.[73][74]
Route
[edit]The North–South line forms an incomplete loop from Jurong East in the West Region of Singapore, north to Woodlands and Sembawang, and south to the Central Area.[75] It is 45 kilometres (28 mi) long and is predominantly double-tracked, but certain short sections at the Woodlands, Yishun and Ang Mo Kio stations widen to three tracks,[76][77][78] and four tracks at Jurong East station.[79] The line begins above ground at Jurong East station[80][81] from where it continues north on a set of elevated viaducts, with the exception of a short tunnel between the Bukit Batok and Bukit Gombak stations,[82] and a surface section of track between the Bukit Gombak and Choa Chu Kang stations.[83] The line curves from the Yew Tee to Kranji stations and continues eastwards, paralleling Woodlands Avenue 3 (which the line briefly cuts underneath between Kranji and Marsiling stations)[84] and Avenue 7 main roads.[85]
After Sembawang station, the line follows the route of Canberra Link and Yishun Avenue 2, curving southwards. Between Khatib and Yio Chu Kang stations parallel to Lentor Avenue, the line continues at surface level; this section is the longest distance between any two MRT stations in Singapore.[86] The line continues above ground for the Yio Chu Kang and Ang Mo Kio stations, then it goes back to surface level for Bishan station, the MRT system's only at-grade station. A branch line to Bishan Depot exists between the Ang Mo Kio and Bishan stations.[87] After Bishan, the line goes underground through the Central Area. The North–South Line runs parallel to the East–West Line at the City Hall and Raffles Place stations, which are also cross-platform interchanges to the East–West Line. The line ends at Marina South Pier station.[81]
Stations
[edit]The line serves 27 MRT stations across 45 kilometres (28 mi) of track, and station codes for the line are red, corresponding to the line's colour on the system map.[75][88] 11 stations, from Braddell to Marina South Pier are underground, with the rest being ground-level or elevated.[89] With the exception of Bishan, Braddell and Canberra stations, the other stations have island platforms.
Date | Project | Description |
---|---|---|
7 November 1987 | Phase 1 | Yio Chu Kang – Toa Payoh |
12 December 1987 | Toa Payoh – Outram Park (Direct train service to Outram Park via Raffles Place) | |
12 March 1988 | Phase 1A | Outram Park – Clementi (Now part of the East–West Line) |
5 November 1988 | Phase 2B | Clementi – Lakeside (Now part of the East–West Line) |
20 December 1988 | Yio Chu Kang – Yishun | |
4 November 1989 | Phase 2A | Raffles Place – Marina Bay (Separation of the North–South Line & East–West Line) |
10 March 1990 | Phase 2B | Jurong East – Choa Chu Kang (Operates as a branch line from Jurong East) |
10 February 1996 | Woodlands Extension | Choa Chu Kang – Yishun |
23 November 2014 | North–South Line Extension | Marina Bay – Marina South Pier |
2 November 2019 | Canberra Station | Canberra station between Sembawang and Yishun |
2034 | Future infill stations between existing stations | Brickland station between Bukit Gombak and Choa Chu Kang |
2035 | Sungei Kadut station between Yew Tee and Kranji |
Legend
Elevated |
Line terminus |
Transfer outside paid area |
Ground-level |
Wheelchair accessible |
Bus interchange |
Underground |
Civil Defence Shelter |
Other transportation modes |
List
Station code | Station name | Images | Interchange; Adjacent transportation |
Opening | Cost |
---|---|---|---|---|---|
NS1 EW24 JE5 |
Jurong East | East–West Line JRL East Branch (2028) ― Jurong East |
5 November 1988; 36 years ago |
S$5 billion | |
NS2 |
Bukit Batok | Bukit Batok | 10 March 1990;
34 years ago | ||
NS3 |
Bukit Gombak | — | |||
NS3A Infill station |
Brickland | 2034; 9 years' time |
TBA | ||
NS4 BP1 JS1 |
Choa Chu Kang | Bukit Panjang LRT Jurong Region Line (2027) ― Choa Chu Kang |
10 March 1990; 34 years ago |
S$5 billion | |
NS5 |
Yew Tee | — | 10 February 1996; 28 years ago |
S$1.2 billion[90] | |
NS6 DE2 Infill station |
Sungei Kadut | Downtown Line (2035) | 2035; 10 years' time |
TBA | |
NS7 |
Kranji | — | 10 February 1996; 28 years ago |
S$1.2 billion[91] | |
NS8 |
Marsiling | ||||
NS9 TE2 |
Woodlands | Thomson–East Coast Line ― Woodlands Woodlands Temporary | |||
NS10 |
Admiralty | — | |||
NS11 |
Sembawang | Sembawang | |||
NS12 |
Canberra | — | 2 November 2019; 5 years ago |
S$274 million[92] | |
NS13 |
Yishun | Yishun | 20 December 1988; 36 years ago |
S$5 billion | |
NS14 |
Khatib | — | |||
NS15 |
Yio Chu Kang | Yio Chu Kang | 7 November 1987;
37 years ago | ||
NS16 CR11 |
Ang Mo Kio | Cross Island Line (2030) ― Ang Mo Kio | |||
NS17 CC15 |
Bishan | Circle Line ― Bishan | |||
NS18 |
Braddell | — | |||
NS19 |
Toa Payoh | Toa Payoh | |||
NS20 |
Novena | — | 12 December 1987;
37 years ago | ||
NS21 – DT11 |
Newton | Downtown Line | |||
NS22 TE14 |
Orchard | Thomson–East Coast Line | |||
NS23 |
Somerset | — | |||
NS24 NE6 CC1 |
Dhoby Ghaut | North East Line Circle Line | |||
NS25 EW13 |
City Hall | East–West Line | |||
NS26 EW14 |
Raffles Place | East–West Line | |||
NS27 CE2 TE20 |
Marina Bay | Circle Line Extension Thomson–East Coast Line |
4 November 1989;
35 years ago | ||
NS28 |
Marina South Pier | Marina South Pier Marina Bay Cruise Centre |
23 November 2014; 10 years ago |
S$357.5 million[93] |
Depots
[edit]Number | Depot name; Lines |
Location | Images | Line-specific stabling capacity |
Cost | Opening |
---|---|---|---|---|---|---|
1 |
Bishan | Bishan | 59 trains | S$300 million | 7 November 1987;
37 years ago | |
2 |
Ulu Pandan EWL |
Jurong East | 45 trains | S$130 million | 12 March 1988;
36 years ago |
Infrastructure
[edit]Rolling stock
[edit]Electric Multiple Unit (EMU) trains on the North–South Line operate in a six-car formation, based out of Bishan Depot and Ulu Pandan Depot, which provide train maintenance, inspection and overhaul facilities.[94][95][96] This rolling stock is shared with the East–West Line, with an electrification of 750 V DC powered by a third rail. With the exception of the C651 and R151 trains, the current rolling stock was manufactured by Kawasaki Heavy Industries, in a joint venture with CRRC Qingdao Sifang for the subsequent rolling stocks of the C151A, C151B and C151C trains.[97] When the initial line opened, the rolling stock of the North–South Line consisted of 66 first-generation C151 trains only. The 19 second-generation C651 trains were introduced during the Woodlands extension to complement the existing 66 first-generation C151 trains.[98] The 21 third-generation C751B trains were introduced during the Changi Airport extension to complement the existing 66 first-generation C151 trains and 19 second-generation C651 trains.[99][100] In 2011, the fourth-generation C151A trains were introduced, increasing the passenger capacity of both the North–South and East–West lines by 15%.[101][102][103] The C151A trains were the first successful joint venture between Kawasaki Heavy Industries and CSR Qingdao Sifang in the international market.[104]
As part of efforts to further increase passenger capacity on the line, newer C151B and C151C trains were subsequently delivered in 2017 and 2018 respectively.[105][106] The introduction of the C151B trains saw the introduction of STARiS 2.0, which is also seen in subsequent rolling stocks.[107] The C151C trains are also the first MRT rolling stock on the NSEWL to be fitted with tip-up seats, in addition to the current features of the C151B trains.[108][109]
Another generation of rolling stock, the R151 trains, will be delivered from 2022 to 2026, to replace all 66 first-generation C151 trains which will be retired by 2025, as well as all 19 second-generation C651 and 21 third-generation C751B trains which were fully phased out by 2024. The R151 trains will be the first rolling stock on the North–South Line to be manufactured by Bombardier Transportation (Bought by Alstom in 2021), which has also supplied trains for the Downtown Line.[110][111][112]
Signalling
[edit]Initially, the North–South line used a semi-automatic signalling system consisting of the Westinghouse fixed block signalling system with automatic train control under automatic train operation Grades of Automation (GoA) 2.[113][114] However, the ageing system had undermined the rail reliability on the line, requiring the NSL to upgrade its signalling system.[115] Since 2019, the North–South Line is fully equipped with Thales SelTrac Communications-based train control moving block signalling system with automatic train control under automatic train operation (ATO) GoA 3.[116][117] The subsystems consist of automatic train protection to govern train speed, NetTrac MT Automatic Train Supervision (ATS) to track and schedule trains and a Computer-based interlocking system that prevents incorrect signal and track points to be set.[118]
A new moving-block signalling system, supplied by Thales, replaced the ageing fixed-block signalling system on the North–South Line. The upgrading works were completed in phases from 2016. With the upgraded signalling system, trains are now able to run closer to each other.[119][120] The new system was tested on the evening of 28 March 2017. Train services were paused for ten minutes as the old signalling system was being changed to the new system.[121] From 16 April 2017, the new system commenced full-day testing on Sundays for two months. The new C151B rolling stock were first introduced to the line on these testing days.[122] Since 28 May 2017, the new signalling system has been operating full-day on the North–South Line.[123] The old signalling system then ceased operations on 2 January 2019.[96]
Platform screen doors
[edit]When the line was first opened, full-height platform screen doors supplied by Westinghouse were installed at underground stations. These doors serve to prevent suicides, enable climate control within the station, better security control by restricting access to the tunnels and tracks and for overall passenger safety considerations.[124] The authorities initially rejected calls for platform screen doors to be installed at elevated stations by casting doubts over functionality and concerns about the high installation costs.[125] Nevertheless, the LTA reversed its decision and made plans to install half-height platform screen doors on elevated stations on 25 January 2008.[126][127] The first platform screen doors by ST Electronics were installed at Pasir Ris, Jurong East and Yishun stations in 2009 as trial runs.[128] Subsequently, installation began in May 2011 at Ang Mo Kio station. On 14 March 2012, platform screen doors became operational at all elevated stations on the North–South Line.[129]
Rail
[edit]The NSL was built with wooden sleepers, which needed to be replaced when they neared the end of their lifespan of 15 to 25 years. The replacement sleepers, made out of concrete, have a significantly longer lifespan and enable smoother and safer rides.[130] Since 2014, train services on the line have ended earlier for critical maintenance works, with the exception of a break between September 2016 and December 2016.[131]
Trains on the NSL are powered via a third rail. However, constant contact between the train's Current Collector Devices (CCD) and the line saw the need for replacement works on the third rail, which were completed in August 2017.[130][132] The new third rail replaced its 30-year-old predecessor, which was used since the opening of the line. The new electrical system is expected to make train services more reliable.[133]
References
[edit]- ^ "Land Transport DataMall". mytransport.sg. Archived from the original on 21 August 2020. Retrieved 20 August 2020.
- ^ "LTA | North–South Line". www.lta.gov.sg. Archived from the original on 1 November 2019. Retrieved 16 October 2022.
- ^ "'Unique nation State' plan". The Straits Times. 20 September 1967. p. 6. Archived from the original on 15 November 2019. Retrieved 14 April 2020 – via National Library Board.
- ^ Seah C. M. (1981). Southeast Asian Affairs. Singapore: Institute of Southeast Asian Studies. p. 293. Archived from the original on 19 September 2020. Retrieved 14 April 2020.
- ^ Sharp, Ilsa (2005). The Journey — Singapore's Land Transport Story. SNP:Editions. ISBN 978-981-248-101-6.
- ^ Fwa Tien Fang (4 September 2004). Sustainable Urban Transportation Planning and Development — Issues and Challenges for Singapore (Report). Department of Civil Engineering, National University of Singapore. CiteSeerX 10.1.1.119.9246.
- ^ "1982 – The Year Work Began". Land Transport Authority. Archived from the original on 29 September 2013. Retrieved 16 November 2013.
- ^ Lee Siew Hoon & Chandra Mohan. "In Memoriam — Ong Teng Cheong: A Profile". Channel NewsAsia. Singapore. Archived from the original on 23 February 2002. Retrieved 26 November 2007.
- ^ "Project to go on line in three stages". The Straits Times. 8 July 1986. p. 8. Archived from the original on 12 April 2022. Retrieved 8 March 2021.
- ^ Annual report / Provisional Mass Rapid Transit Authority, Republic of Singapore. Singapore: Provisional Mass Rapid Transit Authority. 1983. p. 5.
- ^ "North–south line off first". The Straits Times. 29 August 1982. Archived from the original on 19 December 2020. Retrieved 19 December 2020.
- ^ "Work begins on the first part of MRT system". The Straits Times. 29 October 1983. Archived from the original on 19 December 2020. Retrieved 19 December 2020.
- ^ "All aboard for the Subway Age". The Straits Times. 8 November 1987. Archived from the original on 12 September 2017. Retrieved 3 February 2020.
- ^ "MRT system begins operations – Singapore History". eresources.nlb.gov.sg. Archived from the original on 12 February 2020. Retrieved 8 April 2020.
- ^ "Speech by Dr Yeo Ning Hong, Minister For Communications and Information And Second Minister For Defence (Policy), at the inauguration of public service of the MRT system at the Toa Payoh Station on Saturday, 7 November 1987 at 9.00 am" (PDF). nas.gov.sg. 7 November 1987. Archived (PDF) from the original on 19 July 2019. Retrieved 19 December 2020.
- ^ Rav, Dhaliwal (12 December 1987). "Shopping for Xmas the MRT way..." Straits Times. Archived from the original on 24 January 2018. Retrieved 19 September 2017 – via eResources.
- ^ "MRT Yishun opens, two-thirds of system now complete". NewspaperSG: The New Paper. 20 December 1988. p. 8. Archived from the original on 7 October 2017. Retrieved 3 February 2020.
- ^ "New names for eight stations". Singapore Monitor. 30 November 1982.
- ^ Dhaliwal, Rav. "East-enders get ticket to ride as MRT opens line". The Straits Times. Archived from the original on 19 September 2020. Retrieved 21 April 2020.
- ^ Goh, Chok Tong (10 February 1996). "Speech by Prime Minister Goh Chok Tong at the Opening of Woodlands MRT Line on Saturday, 10 February 1996 at 10.00 AM" (PDF). National Archives of Singapore. Archived (PDF) from the original on 14 July 2019. Retrieved 3 February 2020.
- ^ "MRTC considering extending line to Woodlands". The Straits Times. 11 March 1988. Archived from the original on 19 September 2020.
- ^ a b "Woodlands MRT line | Infopedia". eresources.nlb.gov.sg. National Library Board. Archived from the original on 1 January 2018. Retrieved 19 September 2017.
- ^ Leong, C. T. (26 February 1991). "Work on Woodlands MRT line to begin later this year". The Straits Times.
- ^ "Past Concept Plans". www.ura.gov.sg. Archived from the original on 30 January 2020. Retrieved 30 January 2020.
- ^ Living the next lap: towards a tropical city of excellence. Urban Redevelopment Authority. 1991. p. 14.
- ^ "Better layouts for six new MRT stations". The Straits Times. 19 November 1992.
- ^ "Another station added to Woodlands MRT line". The Straits Times. 19 November 1992.
- ^ Thulaja, Naidu Ratnala (11 November 2003). "Kranji MRT station". National Library Board Singapore. Archived from the original on 31 December 2013. Retrieved 3 February 2012.
- ^ "Station names for Woodlands line have ties to surroundings". The Straits Times. 20 November 1991. p. 3.
Sembawang will be in the proposed town centre of Sembawang New Town, while Kadut station will be in Sungei Kadut Industrial Estate, earmarked for redevelopment into a new town
- ^ "Woodlands MRT closer". The Straits Times. 4 October 1994.
- ^ "Speech by Prime Minister Goh Chok Tong at the opening of Woodlands MRT line on Saturday, 10 February 1996 at 10.00 am" (PDF). 10 February 1996. Archived (PDF) from the original on 14 July 2019.
- ^ "New Platform at Bishan Station ready". The Straits Times. 26 July 2008.
- ^ "Bishan MRT station ready for Circle crowds". The Straits Times. 22 May 2009. p. 49.
- ^ "Jurong East Modification Project". Archived from the original on 12 February 2012. Retrieved 31 January 2012.
- ^ "New Platform At Jurong East Station To Open On 27 May". Land Transport Authority of Singapore. 16 May 2011. Archived from the original on 20 December 2014. Retrieved 22 November 2014.
- ^ "New Platform At Jurong East Station To Open On 27 May | Press Room | Land Transport Authority". www.lta.gov.sg. Archived from the original on 23 September 2017. Retrieved 23 September 2017.
- ^ "Land Transport Master Plan 2008 (Pg 34)" (PDF). www.lta.gov.sg. February 2008. Archived (PDF) from the original on 11 November 2012. Retrieved 8 November 2019.
- ^ "Marina South Pier MRT Station on North–South Line to open on Sunday". The Straits Times. 22 November 2014. Archived from the original on 24 February 2018. Retrieved 8 November 2019.
- ^ "Marina South Pier Station to Open on 23 November". lta.gov.sg. 17 November 2014. Archived from the original on 7 March 2015. Retrieved 8 November 2019.
- ^ "North–South Line Extension | Projects | Public Transport | Land Transport Authority". www.lta.gov.sg. Archived from the original on 30 September 2012. Retrieved 19 September 2017.
- ^ "Speech by Mr Lui Tuck Yew at visit to DTL1 Chinatown Station on 17 January 2013". MOT. 17 January 2013. Archived from the original on 26 February 2020. Retrieved 19 September 2019.
- ^ "Two New Rail Lines And Three New Extensions To Expand Rail Network By 2030". Land Transport Authority. 17 January 2013. Archived from the original on 6 July 2014. Retrieved 1 August 2014.
- ^ "New MRT station for North–South Line: Canberra". The Straits Times. 27 June 2014. Archived from the original on 8 August 2014. Retrieved 1 August 2014.
- ^ "Work Starts for Canberra MRT Station on North–South Line". LTA. 26 March 2016. Archived from the original on 11 October 2017. Retrieved 11 October 2017.
- ^ "Work starts on Canberra MRT station". Channel NewsAsia. Archived from the original on 6 March 2016. Retrieved 3 March 2016.
- ^ "Canberra MRT station to open on Nov 2". CNA. 20 May 2019. Archived from the original on 20 May 2019. Retrieved 20 May 2019.
- ^ "Car accident on the MRT track". RIMAS. March 2003. Archived from the original on 8 February 2012. Retrieved 3 February 2020.
- ^ "North–South MRT line breakdown hits thousands". Channel News Asia. 15 December 2011. Archived from the original on 29 March 2012. Retrieved 17 March 2012.
- ^ "2nd Update – SMRT statement: Service disruption on North–South Line (Northbound): Marina Bay Station to Bishan Station" (PDF). Archived from the original (PDF) on 14 April 2012.
- ^ "MRT breaks down again". Channel NewsAsia. 17 December 2011. Archived from the original on 7 January 2012. Retrieved 17 December 2011.
- ^ "North–South Line service resumes after 7-hour disruption". Channel NewsAsia. 17 December 2011. Archived from the original on 7 January 2012. Retrieved 17 December 2011.
- ^ "Service disruption on North–South Line on 17 Dec 2011" (PDF). Archived from the original (PDF) on 14 April 2012.
- ^ "Minister Updates Parliament on MRT Disruptions". Ministry Of Transport. 9 January 2012. Archived from the original on 2 July 2012.
- ^ LTA. "Power trip on MRT network due to power fault on NSEWL". Archived from the original on 27 April 2016.
- ^ Tan, Christopher (7 July 2015). "Full train service resumes; no suspension of North–South line at 11am". The Straits Times. Archived from the original on 23 August 2020. Retrieved 23 August 2020.
- ^ Tang, Louisa (7 July 2015). "MRT breakdown: North–South, East–West lines down for hours". Today. Singapore: Mediacorp. Archived from the original on 23 August 2020. Retrieved 23 August 2020.
- ^ Malinda, Kyle (22 August 2015). "Cause of massive NSEWL train disruption in July identified, says SMRT". CNA. Singapore: Mediacorp. Archived from the original on 6 March 2016. Retrieved 3 March 2016.
- ^ "SMRT to be fined a record S$5.4m for July 7 MRT breakdown". Channel NewsAsia. Singapore. 23 September 2015. Archived from the original on 17 January 2016. Retrieved 3 March 2016.
- ^ "NSL disruption: No train services between Ang Mo Kio, Newton 'till further notice', says SMRT". Channel NewsAsia. Archived from the original on 8 October 2017. Retrieved 8 October 2017.
- ^ "NSL disruption: Malfunctioning water pumping system resulted in flooded MRT tunnel, says LTA". Channel NewsAsia. Archived from the original on 8 October 2017. Retrieved 8 October 2017.
- ^ hermesauto (14 October 2020). "Train services restored on North–South, East–West, Circle lines after disruption due to power fault". The Straits Times. Archived from the original on 15 October 2020. Retrieved 15 October 2020.
- ^ a b "Oct 14 MRT breakdown: Manufacturer to replace power cables along Tuas West Extension, 2 SMRT staff suspended". TODAY. Archived from the original on 1 April 2022. Retrieved 1 April 2022.
- ^ Hamzah, Aqil (27 October 2023). "Novena MRT station reopens after closure caused by smoke from air-con unit". The Straits Times. ISSN 0585-3923. Retrieved 16 November 2023.
- ^ Ang, Qing (3 June 2024). "Lightning strike sparks power trip that disrupted MRT services on NSL for over 2 hours". The Straits Times. ISSN 0585-3923. Retrieved 3 June 2024.
- ^ "New Sungei Kadut MRT station linking North–South and Downtown lines could shorten trips by 30 mins". The Straits Times. 25 May 2019. Archived from the original on 25 May 2019. Retrieved 25 May 2019.
- ^ "Land Transport Master Plan 2040". www.mot.gov.sg. Archived from the original on 13 July 2019. Retrieved 11 December 2019.
- ^ "Land Transport Master Plan 2040: Bringing Singapore Together | Press Room | Land Transport Authority". Land Transport Authority. Archived from the original on 23 August 2019. Retrieved 26 May 2019.
- ^ "At a glance: Key updates to MRT, bus network and more for 2040 master plan". TODAYonline. 25 May 2019. Archived from the original on 25 May 2019. Retrieved 28 May 2019.
- ^ "LTA | Getting Around | Public Transport | Rail Network". www.lta.gov.sg. Archived from the original on 1 November 2019. Retrieved 5 April 2020.
- ^ "SMRT Journeys". journey.smrt.com.sg. Archived from the original on 4 September 2019. Retrieved 5 April 2020.
- ^ "SMRT Journeys". journey.smrt.com.sg. Archived from the original on 19 September 2020. Retrieved 5 April 2020.
- ^ "Early Closure of Selected North–South Line Stations from January to March 2020". www.smrt.com.sg. Archived from the original on 29 December 2019. Retrieved 5 April 2020.
- ^ "Last train services for MRT and LRT (Annex B)" (PDF). LTA. Archived (PDF) from the original on 17 April 2020. Retrieved 15 April 2020.
- ^ "Changes to Public Bus and Train Operating Hours and Frequency". www.lta.gov.sg. Archived from the original on 17 April 2020. Retrieved 15 April 2020.
- ^ a b "North–South Line". Land Transport Authority. Archived from the original on 7 January 2017. Retrieved 24 December 2015.
- ^ OpenStreetMap contributors (28 March 2020). "Woodlands MRT station" (Map). OpenStreetMap. Retrieved 28 March 2020.
{{cite map}}
:|author=
has generic name (help) - ^ OpenStreetMap contributors (28 March 2020). "Yishun MRT station" (Map). OpenStreetMap. Retrieved 28 March 2020.
{{cite map}}
:|author=
has generic name (help) - ^ OpenStreetMap contributors (28 March 2020). "Ang Mo Kio MRT station" (Map). OpenStreetMap. Retrieved 28 March 2020.
{{cite map}}
:|author=
has generic name (help) - ^ OpenStreetMap contributors (28 March 2020). "Jurong East MRT station" (Map). OpenStreetMap. Retrieved 28 March 2020.
{{cite map}}
:|author=
has generic name (help) - ^ "OneMap". OneMap. Archived from the original on 18 April 2020. Retrieved 24 April 2020.
- ^ a b "MRT System Map" (PDF). LTA. Archived (PDF) from the original on 21 August 2020.
- ^ OpenStreetMap contributors (28 March 2020). "Tunnel between Bukit Batok and Bukit Gombak" (Map). OpenStreetMap. Retrieved 28 March 2020.
{{cite map}}
:|author=
has generic name (help) - ^ OpenStreetMap contributors (28 March 2020). "Surface section of track between Bukit Gombak and Choa Chu Kang" (Map). OpenStreetMap. Retrieved 28 March 2020.
{{cite map}}
:|author=
has generic name (help) - ^ OpenStreetMap contributors (28 March 2020). "Tunnel underneath Woodlands Avenue 3" (Map). OpenStreetMap. Retrieved 28 March 2020.
{{cite map}}
:|author=
has generic name (help) - ^ OpenStreetMap contributors (31 March 2020). "NSL along Avenue 7" (Map). OpenStreetMap. Retrieved 28 March 2020.
{{cite map}}
:|author=
has generic name (help) - ^ OpenStreetMap contributors (28 March 2020). "Surface section of track between Khatib and Yio Chu Kang" (Map). OpenStreetMap. Retrieved 28 March 2020.
{{cite map}}
:|author=
has generic name (help) - ^ OpenStreetMap contributors (31 March 2020). "Bishan Depot" (Map). OpenStreetMap. Retrieved 28 March 2020.
{{cite map}}
:|author=
has generic name (help) - ^ "North–South Line Extension". LTA. Archived from the original on 30 September 2012. Retrieved 11 October 2017.
- ^ Singapore Bilingual Street Directory. Mighty Minds Publishing Pte Ltd. 2017. p. fold out map. ISBN 9789812501189.
- ^ "Woodlands MRT line". Archived from the original on 1 January 2018. Retrieved 10 October 2019.
- ^ "Woodlands MRT line". Archived from the original on 1 January 2018. Retrieved 10 October 2019.
- ^ "Revenue & Expenditure Estimates". www.singaporebudget.gov.sg. Archived from the original on 18 April 2018. Retrieved 17 April 2018.
- ^ "Projects". Land Transport Authority. 3 May 2010. Archived from the original on 5 June 2011. Retrieved 14 June 2022.
- ^ "10 shortlisted for Bishan Depot deal". The Straits Times. 10 June 1984. Archived from the original on 11 October 2017. Retrieved 11 October 2017.
- ^ "Building the MRT's third depot". The Straits Times. 17 October 1986. Archived from the original on 11 October 2017. Retrieved 11 October 2017.
- ^ a b "North–South Line signalling system to take up to 6 months to stabilise". Channel NewsAsia. Archived from the original on 19 November 2017. Retrieved 11 October 2017.
- ^ "海外向け車両 | 鉄道車両". 川崎重工業株式会社 (in Japanese). Archived from the original on 22 September 2019. Retrieved 8 April 2020.
- ^ "$290 million contracts for Woodlands MRT line". The Straits Times. 16 August 1992.
- ^ "EMU Trains for the Singapore Land Transport Authority". Kawasaki Heavy Industries. Archived from the original on 31 December 2012. Retrieved 5 November 2012.
- ^ "Rapid Transit | Kawasaki Heavy Industries". global.kawasaki.com. Archived from the original on 8 April 2020. Retrieved 8 April 2020.
- ^ "Extra metro trains for Singapore". Railway Gazette International. 7 May 2009. Archived from the original on 13 November 2009.
- ^ "Five new trains added to boost capacity of North–South and East–West Lines" (PDF). SMRT Corporation. 16 May 2011. Archived from the original (PDF) on 27 September 2011.
- ^ "Train capacity to rise by up to 50% in 4 years". Archived from the original on 29 February 2012. Retrieved 8 April 2020.
- ^ "CSR Sifang and Kawasaki Heavy Industries Won the Bid in the Subway Vehicle Project of Singapore". 13 May 2009. Archived from the original on 23 July 2012. Retrieved 8 February 2012.
- ^ "New signalling system trials extended to full day every Sunday: SMRT, LTA". Channel NewsAsia. 12 April 2017. Archived from the original on 15 April 2017. Retrieved 8 April 2020.
- ^ "LTA Singapore Orders 12 MRT Trains (72 cars) for North–South/East–West Lines | Kawasaki Heavy Industries, Ltd". 29 April 2016. Archived from the original on 29 April 2016. Retrieved 8 June 2017.
- ^ "SMRT Boosts Service Excellence Efforts with first Customer Experience Innovation Conference". SMRT Corporation. 21 January 2016. Archived from the original on 19 September 2020. Retrieved 8 April 2020.
- ^ Tan, Christopher (14 August 2018). "SMRT adding 12 trains to two most heavily used lines". The Straits Times. Archived from the original on 8 April 2020.
- ^ "LTA | News Room | News Releases | 12 More Trains to Boost Capacity of North–South and East–West Lines". www.lta.gov.sg. Archived from the original on 27 December 2019. Retrieved 15 April 2020.
- ^ "LTA | News Room | News Releases | Bombardier to Supply 66 New Trains for North–South and East–West Lines". www.lta.gov.sg. Archived from the original on 15 November 2019. Retrieved 8 February 2020.
- ^ "New fleet to replace 66 oldest MRT trains from 2021". Channel NewsAsia. Archived from the original on 25 July 2018. Retrieved 25 July 2018.
- ^ hermesauto (25 July 2018). "Bombardier awarded $1.2 billion contract to replace 66 oldest MRT trains". The Straits Times. Archived from the original on 18 December 2019. Retrieved 25 July 2018.
- ^ Woodland, Daniel (August 2004). "Optimisation of Automatic Train Protection Systemstion Systems" (PDF). p. Appendix C Page 32 to Page 33. Archived (PDF) from the original on 15 June 2020. Retrieved 15 June 2020.
- ^ "Oral Reply by Minister for Transport Khaw Boon Wan to Parliamentary Question on North–South Line Resignalling". www.mot.gov.sg. Archived from the original on 16 June 2020. Retrieved 25 April 2020.
- ^ "Speech by Minister Khaw Boon Wan at the Fourth Joint Forum on Infrastructure Maintenance". www.mot.gov.sg. Archived from the original on 19 September 2020. Retrieved 25 April 2020.
- ^ "Thales awarded signalling contracts for Singapore North–South, East–West lines and Tuas West Extension". www.thalesgroup.com. Archived from the original on 20 August 2017. Retrieved 4 July 2017.
- ^ "Metro automation facts, figures and trends" (PDF). International Association of Public Transport. Archived (PDF) from the original on 1 May 2016.
- ^ "Thales awarded signalling contracts for Singapore North–South, East–West lines and Tuas West Extension". Thales Group. 6 February 2012. Archived from the original on 30 June 2015.
- ^ "THALES Urban Rail Signalling Singapore – North–South / East-West Lines" (PDF). Archived (PDF) from the original on 15 June 2020. Retrieved 16 June 2020.
- ^ LTA Website. "North–South Line Signal Upgrade". Land Transport Authority. Archived from the original on 17 June 2018. Retrieved 21 April 2017.
- ^ "Joint Media Release by the Land Transport Authority (LTA) & SMRT – New Signalling System Trial on North–South Line Begins on 28 March 2017". LTA. 28 March 2017. Archived from the original on 19 September 2020. Retrieved 22 April 2020.
- ^ "Factsheet by the Land Transport Authority (LTA) & SMRT: Full-day Sunday Trial of New Signalling System for North–South Line from 16 April 2017". LTA. 16 April 2017. Archived from the original on 19 September 2020. Retrieved 22 April 2020.
- ^ "7 Questions about SMRT Trains' New Signalling System – SMRT Blog". blog.smrt.com.sg. 6 June 2017. Archived from the original on 11 October 2017. Retrieved 11 October 2017.
- ^ Westinghouse Platform Screen Doors – Completed Projects Archived 13 February 2008 at the Wayback Machine
- ^ "Safety at MRT and LRT Stations — Respect The Yellow line" (Press release). Land Transport Authority. 20 November 2005. Archived from the original on 27 September 2007.
- ^ "Platform screen doors for all above-ground MRT stations by 2012". The Straits Times. 25 January 2008. Archived from the original on 28 January 2008.
- ^ "Speech by Mr Raymond Lim, Minister for Transport, at the Visit to Kim Chuan Depot, 25 January 2008, 9.00am" (Press release). Ministry of Transport. 25 January 2008. Archived from the original on 12 January 2015. Retrieved 11 January 2015.
- ^ Yeo Ghim Lay (3 September 2008). "Platform doors for elevated MRT stations". The Straits Times. p. 26. Archived from the original on 16 August 2009.
- ^ "LTA completes installing elevated MRT station screen doors early". Channel NewsAsia. Archived from the original on 24 September 2017. Retrieved 23 September 2017.
- ^ a b "SMRT Rail Improvements – Updates – SMRT Blog". blog.smrt.com.sg. 17 October 2016. Archived from the original on 23 September 2017. Retrieved 19 September 2017.
- ^ "Project to replace MRT sleepers done". The Straits Times. 25 December 2016. Archived from the original on 29 March 2017.
- ^ "Factsheet on Power Rail Replacement Programme for the North–South and East–West Lines (NSEWL)" (PDF). Archived from the original (PDF) on 23 September 2017.
- ^ "Third Rail Replacement on North South and East West Line". Archived from the original on 16 February 2017.