Autovía A-65: Difference between revisions
Appearance
Content deleted Content added
stub |
Tom.Reding (talk | contribs) m WP:STUBSPACING followup |
||
(10 intermediate revisions by 9 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Road in Spain}} |
|||
{{Unreferenced|date=November 2006}} |
|||
{{Expand Spanish|Autovía de Tierra de Campos|date=November 2019|topic=transp}} |
|||
{{Use dmy dates|date=July 2023}} |
|||
{{Infobox road |
{{Infobox road |
||
|country = ESP |
|country = ESP |
||
| |
|province= P |
||
| |
|type = Autovia |
||
|route = A-65 |
|||
|alternate_name = Autovía |
|alternate_name = Autovía de Tierra de Campos |
||
|length_km= |
|length_km= 11.20 |
||
⚫ | |||
|length_ref=<ref>{{cite web |title=Catálogo Oficial de Carreteras. Tramificación |url=https://www.mitma.gob.es/recursos_mfom/catalogo_2021_def_1.zip |publisher=[[Ministry of Transport and Sustainable Mobility]] |access-date=27 March 2024 |language=es |date=31 December 2021}}</ref> |
|||
⚫ | |||
|junction= |
|junction= |
||
|terminus_b= |
|terminus_b=[[Grijota]] |
||
}} |
}} |
||
The '''Autovía A-65'''<ref name="boeFund">{{cite journal|publisher=Agencia Estatal Boletín Oficial del Estado|journal=Boletín Oficial del Estado|issue=234|date=30 September 2015|language=es|title=Ley 37/2015, de 29 de septiembre, de carreteras|url=https://www.boe.es/boe/dias/2015/09/30/pdfs/BOE-A-2015-10439.pdf|issn=0212-033X|page=88524}}</ref> is a proposed upgrade of the {{ill|N-610 road (Spain)|es|N-610|lt=N-610 road}} in Spain. If completed, it would link [[Benavente, Zamora|Benavente]] with [[Palencia]],<ref>{{cite news |title=El PP recuerda a Puente las deudas del Ministerio con Palencia |url=https://www.diariopalentino.es/noticia/z81e0dfee-c719-1d9f-544c3d2656614fee/202311/el-pp-recuerda-a-puente-las-deudas-del-ministerio-con-palencia |access-date=27 March 2024 |work=Diario Palentino |date=22 November 2023 |language=es}}</ref> both in [[Castille and León]]. Of a proposed length of {{convert|84|km}}, only a short section near Palencia has been built.<ref>{{cite news |title=Palencia pedirá al Gobierno que retome las obras de las autovías A-73 y A-65 |url=https://www.lavanguardia.com/economia/20150730/54434244220/palencia-pedira-al-gobierno-que-retome-las-obras-de-las-autovias-a-73-y-a-65.html |access-date=27 March 2024 |work=[[La Vanguardia]] |date=30 July 2015 |language=es}}</ref> The existing section serves as the northern [[ring road]] of Palencia, and as of 2021 there were no plans to complete the road.<ref>{{cite news |last1=Díaz |first1=José María |title=La inversión en la Alta Velocidad devora la previsión de gasto del Estado en Palencia |url=https://www.elnortedecastilla.es/palencia/inversion-alta-velocidad-20211013221532-nt_amp.html |access-date=27 March 2024 |work=[[El Norte de Castilla]] |date=13 October 2021 |language=es}}</ref> |
|||
The '''Autovía A-65''' is a proposed upgrade of the '''N-610 (Carretera)''' is a highway in central [[Spain]]. It connects [[Benavente, Zamora|Benavente]] with [[Palencia]]. |
|||
It starts at junction 257 km on the [[Autovía A-6]] north of Madrid in the Tierra de Campos. It heads east and after 39 km reaches Becilla de Valeraduey and a junction with the [[N-601 (Carretera)|N-601]]. The road continues east over an undulating plain and after 61 km reaches [[Palencia]] overlooked by the Mirador de Tierra de Campos. The road crosses the Rio Pisuerga the [[Autovía A-62]] and the [[Autovía A-67|N-611 / A-67]]. |
|||
==References== |
|||
{{Reflist}} |
|||
{{Motorways in Spain}} |
{{Motorways in Spain}} |
||
Line 21: | Line 25: | ||
[[Category:Autopistas and autovías in Spain|A-65]] |
[[Category:Autopistas and autovías in Spain|A-65]] |
||
{{Spain-road- |
{{Spain-road-stub}} |
Latest revision as of 12:34, 23 September 2024
You can help expand this article with text translated from the corresponding article in Spanish. (November 2019) Click [show] for important translation instructions.
|
Autovía A-65 | |
---|---|
Autovía de Tierra de Campos | |
Route information | |
Length | 11.20 km[1] (6.96 mi) |
Major junctions | |
From | Palencia |
To | Grijota |
Location | |
Country | Spain |
Autonomous community | Castile and Leon |
Province | Palencia |
Highway system | |
|
The Autovía A-65[2] is a proposed upgrade of the N-610 road in Spain. If completed, it would link Benavente with Palencia,[3] both in Castille and León. Of a proposed length of 84 kilometres (52 mi), only a short section near Palencia has been built.[4] The existing section serves as the northern ring road of Palencia, and as of 2021 there were no plans to complete the road.[5]
References
[edit]- ^ "Catálogo Oficial de Carreteras. Tramificación" (in Spanish). Ministry of Transport and Sustainable Mobility. 31 December 2021. Retrieved 27 March 2024.
- ^ "Ley 37/2015, de 29 de septiembre, de carreteras" (PDF). Boletín Oficial del Estado (in Spanish) (234). Agencia Estatal Boletín Oficial del Estado: 88524. 30 September 2015. ISSN 0212-033X.
- ^ "El PP recuerda a Puente las deudas del Ministerio con Palencia". Diario Palentino (in Spanish). 22 November 2023. Retrieved 27 March 2024.
- ^ "Palencia pedirá al Gobierno que retome las obras de las autovías A-73 y A-65". La Vanguardia (in Spanish). 30 July 2015. Retrieved 27 March 2024.
- ^ Díaz, José María (13 October 2021). "La inversión en la Alta Velocidad devora la previsión de gasto del Estado en Palencia". El Norte de Castilla (in Spanish). Retrieved 27 March 2024.