Downtown MRT line: Difference between revisions
C151 lover (talk | contribs) No edit summary |
|||
(444 intermediate revisions by more than 100 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Mass Rapid Transit line in Singapore}} |
|||
{{hatnote|Not to be confused with the [[Downtown MRT station]], which the Downtown line trains call at.}} |
|||
{{distinguish|text=one of the stations on this line, [[Downtown MRT station]]}} |
|||
{{Use dmy dates|date=August 2017}} |
|||
{{Use dmy dates|date=February 2022}} |
|||
{{Infobox rail line |
{{Infobox rail line |
||
| name |
| name = [[File:MRT Singapore Destination 11.svg|25px]] [[File:MRT Singapore Destination 12.svg|25px]]<br />Downtown Line |
||
| native_name |
| native_name = {{langx|ms|Laluan MRT Pusat Bandar}}<br />{{lang-zh|滨海市区地铁线}}<br />{{langx|ta|டவுன்டவுன் எம்ஆர்டி வழி}} |
||
| color |
| color = {{rcr|SMRT|Downtown}} |
||
| logo |
| logo = Downtown Line logo.svg |
||
| logo_width |
| logo_width = 250px |
||
| image |
| image = DT17 Downtown MRT Platform B 20201201 153449.jpg |
||
| image_width |
| image_width = 300px |
||
| caption |
| caption = A [[Bombardier Movia C951/C951A|C951]] train at [[Downtown MRT station|Downtown station]] |
||
| type |
| type = [[Rapid transit]] |
||
| system |
| system = [[Mass Rapid Transit (Singapore)]] |
||
| status |
| status = Operational (Stages 1, 2 & 3)<br />Under construction ([[Hume MRT station|Hume]], Stage 3 extension) |
||
<br />Under planning (Stage 2 extension) |
|||
| start = [[Bukit Panjang MRT/LRT station|Bukit Panjang]] |
|||
| |
| start = [[Sungei Kadut MRT station|Sungei Kadut]] (2035)<br />[[Bukit Panjang MRT/LRT station|Bukit Panjang]] |
||
| end = [[Expo MRT station|Expo]]<br />[[Sungei Bedok MRT station|Sungei Bedok]] (2026) |
|||
| stations = 34 (Operational) <ref name="DTL-Stages" /><br/>3 (''Under construction'') |
|||
| stations = 34 (Operational)<ref name="DTL-Stages" /><br />3 (''Under construction'')<br />2 (''Under planning'') |
|||
| routes = 1 |
|||
| |
| routes = 2 |
||
| daily_ridership = 251,556 (July 2020)<ref>{{cite web |title=Land Transport DataMall |url=https://www.mytransport.sg/content/mytransport/home/dataMall.html |website=mytransport.sg |access-date=20 August 2020 |archive-date=21 August 2020 |archive-url=https://web.archive.org/web/20200821123230/https://www.mytransport.sg/content/mytransport/home/dataMall.html |url-status=dead}}</ref> |
|||
| open = {{start date and age|df=yes|2013|12|22}} (Stage 1)<br />{{start date and age|df=yes|2015|12|27}} (Stage 2)<br />{{start date and age|df=yes|2017|10|21}} (Stage 3)<br />{{start date and age|df=yes|2024}} (Stage 3e) |
|||
| open = {{start date and age|df=yes|2013|12|22}} (Stage 1)<br />{{start date and age|df=yes|2015|12|27}} (Stage 2)<br />{{start date and age|df=yes|2017|10|21}} (Stage 3) |
|||
| close = |
|||
| planopen = {{start date and age|df=yes|2025}} ([[Hume MRT station|Hume]])<br />{{start date and age|df=yes|2026}} (Stage 3 extension)<br />{{start date and age|df=yes|2035}} (Stage 2 extension) |
|||
| owner = [[Land Transport Authority]] |
|||
| close = |
|||
| operator = [[SBS Transit]] DTL<ref name="sbstransit.com.sg">{{cite web | url = http://www.sbstransit.com.sg/download/annDTL.pdf | title = Company Announcement – Incorporation of a {{sic|hide=y|Wholly|-Owned}} Subsidiary}}</ref><br> |
|||
| |
| locale = [[Singapore]] |
||
| |
| owner = [[Land Transport Authority]] |
||
| operator = [[SBS Transit|SBS Transit DTL Pte Ltd]] ([[ComfortDelGro|ComfortDelGro Corporation]])<ref name="sbstransit.com.sg">{{cite web| url=http://www.sbstransit.com.sg/download/annDTL.pdf| title=Company Announcement – Incorporation of a {{sic|hide=y|Wholly|-Owned}} Subsidiary| access-date=5 September 2012| archive-url=https://web.archive.org/web/20150610225504/http://www.sbstransit.com.sg/download/annDTL.pdf| archive-date=10 June 2015| url-status=dead}}</ref> |
|||
<!-- | signalling = [[Siemens Mobility|Siemens]] Trainguard SIRIUS [[CBTC]] -->| linelength = {{convert|41.9|km|mi|abbr=on}} (Operational)<ref name="DTL-Stages" /><br /> |
|||
| character = Fully underground |
|||
{{convert|2.2|km|mi|abbr=on}} (''Under construction'') |
|||
| |
| stock = [[Bombardier Movia C951/C951A|Bombardier Movia C951(A)]] |
||
| linelength = {{convert|41.9|km|mi|abbr=on}} (Operational)<ref name="DTL-Stages" /><br />{{convert|2.2|km|mi|abbr=on}} (''Under construction'')<br />{{convert|4|km|mi|abbr=on}} (''Under planning'') |
|||
| tracks = |
|||
| |
| tracklength = |
||
| tracks = |
|||
| gauge = {{track gauge|sg|allk=on}} |
|||
| electrification |
| electrification = {{750 V DC|conductor=y}} |
||
| speed |
| speed = limit of {{convert|80|km/h|mph|abbr=on}} |
||
| elevation |
| elevation = |
||
| map |
| map = {{Downtown MRT line|inline=yes}} |
||
| map_state |
| map_state = hide |
||
| depot |
| depot = [[Gali Batu Depot|Gali Batu]]<br />[[Tai Seng Facility Building|Tai Seng]]<br />[[East Coast Integrated Depot|East Coast]] (Future) |
||
}} |
}} |
||
The '''Downtown |
The '''Downtown Line''' ('''DTL''') is a medium-capacity [[Mass Rapid Transit (Singapore)|Mass Rapid Transit]] (MRT) line in [[Singapore]]. It runs from [[Bukit Panjang MRT/LRT station|Bukit Panjang]] station in the north-west of the country towards [[Expo MRT station|Expo]] station in the east via a loop around the [[Central Area, Singapore|city-centre]]. Coloured blue on the rail map, the line serves 34 stations, all of which are underground.<ref name="sbstransit.com.sg"/> The DTL is the fifth MRT line on the network to be opened and the third line to be entirely underground. It is the second MRT line to be operated by [[ComfortDelGro]]'s [[SBS Transit]] after the [[North East MRT line|North East Line]]. It also serves as an alternative to the [[East–West MRT line|East–West Line]] where it runs roughly geographically parallel from [[Bugis MRT station|Bugis]] to [[Expo MRT station|Expo]] station. |
||
Originally planned as three separate lines, the lines merged into the Downtown Line in 2007 and construction began in three stages. Stage 1, from [[Bugis MRT station|Bugis]] to [[Chinatown MRT station|Chinatown]] stations{{efn|Formerly the Downtown Extension of the [[Circle MRT line|Circle Line]].}} opened in December 2013, followed by Stage 2 from [[Bukit Panjang MRT/LRT station|Bukit Panjang]] to [[Rochor MRT station|Rochor]] stations{{efn|Formerly the Bukit Timah Line.}} opening in December 2015. The third and final stage, from [[Fort Canning MRT station|Fort Canning]] to [[Expo MRT station|Expo]] stations,{{efn|Formerly the northern stretch of the [[Thomson–East Coast MRT line#Eastern Region Line|Eastern Region Line]].}} opened in October 2017. At {{convert|41.9|km|mi}}, the DTL is the longest underground and [[Automatic train operation|automated]] [[rapid transit]] line in Singapore {{as of|2017|lc=y}}.<ref name="DTL-Stages">{{cite web| url=http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line/stages.html |title=Projects – Downtown Line – Stages |publisher=Land Transport Authority of Singapore |date=17 December 2013 |access-date=23 June 2014 |url-status=dead |archive-url=https://web.archive.org/web/20140703122517/http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line/stages.html |archive-date=3 July 2014 }}</ref> It utilises the [[Bombardier Movia C951/C951A|Bombardier Movia C951]] [[electric multiple unit]] (EMU) and runs in a three-car formation. |
|||
The original line was built in 3 stages, which opened in 2013, 2015 and 2017 respectively.<ref>{{cite web | url=http://www.lta.gov.sg/apps/news/page.aspx?c=2&id=38d69635-0cb4-4b81-aa01-4182756bc58e | title=The Rail Report: 12 stations of Downtown Line 2 to Open on 27 December | publisher=Land Transport Authority | date=6 August 2015}}</ref><ref name="Stage 2">{{cite web | url=http://www.channelnewsasia.com/news/singapore/downtown-line-2-to-open/1945760.html | title=Downtown Line 2 to open ahead of schedule in December: Transport Minister Lui | publisher=Channel NewsAsia | date=28 June 2015}}</ref><ref>{{cite web | url = https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=a3eeda54-6d2e-451e-8aa2-a7e3acef0e48 | title = Joint News Release by the Land Transport Authority (LTA) & SBS Transit – Train Services on Downtown Line to Start Later at 7.30am on Sundays to Facilitate Systems Integration Testing | publisher = Land Transport Authority | date = 26 April 2017}}</ref><ref>{{cite web | url = https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=5c4e424c-1a46-44cb-92d0-212e37a2b6df | title = Factsheet: Downtown Line 3 to Open on 21 October 2017 | publisher = Land Transport Authority | date = 31 May 2017}}</ref> Stage 3e, an extension of the line to [[Sungei Bedok MRT station|Sungei Bedok]], is under construction and will be completed in 2024.<ref>{{cite web | url = https://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line-3-extension.html | title = Downtown Line 3 Extension | publisher = Land Transport Authority | accessdate = 28 April 2017}}</ref> The line connects the North-Western and Central-Eastern regions to [[Central Area, Singapore|downtown]] Singapore. |
|||
The line is set to have new stations and extensions in the 2020s and 2030s. An [[infill station]] initially constructed as part of Stage 2, [[Hume MRT station|Hume]], is planned to begin operations in 2025.<ref name=":0" /> Stage 3e, a two-station extension consisting of [[Xilin MRT station|Xilin]] and [[Sungei Bedok MRT station|Sungei Bedok]], is under construction and is scheduled to begin operations in 2026.<ref>{{cite web| url=https://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line-3-extension.html| title=Downtown Line 3 Extension| publisher=Land Transport Authority| access-date=28 April 2017| archive-url=https://web.archive.org/web/20190406131955/https://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line-3-extension.html| archive-date=6 April 2019| url-status=dead}}</ref> By 2026, it will be about {{convert|45|km|mi}} long with 37 stations, and will serve more than half a million commuters daily.<ref name="LTA Downtown Features">{{cite web| url=http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line/features.html| url-status=dead| title=More Trains, More Capacity, More Often| archive-url=https://web.archive.org/web/20130929160610/http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line/features.html| archive-date=29 September 2013| website=Land Transport Authority}}</ref> A two-station extension to connect with the [[North South MRT Line|North South Line]] at [[Sungei Kadut MRT station|Sungei Kadut]] is also being planned and set to open in 2035.<ref name=":1">{{Cite web| url=https://www.todayonline.com/singapore/new-mrt-stations-tel-extension-and-possible-new-rail-line-lta-2040-blueprint| title=New MRT stations, line extensions and a possible new rail line: LTA's 2040 blueprint| date=25 May 2019| website=TODAYonline| language=en| first=Daryl| last=Choo| access-date=29 May 2019| archive-url=https://web.archive.org/web/20190525081451/https://www.todayonline.com/singapore/new-mrt-stations-tel-extension-and-possible-new-rail-line-lta-2040-blueprint| archive-date=25 May 2019| url-status=live}}</ref> |
|||
==Overview== |
|||
<mapframe text="Location of Downtown MRT line" width=500 height=500 zoom=12 latitude=1.3545 longitude=103.8636> |
|||
{ |
|||
"type": "ExternalData", |
|||
"service": "geoline", |
|||
"ids": "Q2313458", |
|||
"properties": { |
|||
"stroke": "#005ec4", |
|||
"stroke-width": 6 |
|||
} |
|||
} |
|||
</mapframe> |
|||
The line begins in [[Bukit Panjang]], and then goes through the ‘school district’ and food enclaves of [[Bukit Timah]] before entering the central area, passing through [[Little India MRT station|Little India]] before reaching the [[Central Business District]] via [[Bugis MRT station|Bugis]] and [[Chinatown MRT station|Chinatown]]. After this, it goes to [[Fort Canning MRT station|Fort Canning]], [[Geylang Bahru MRT station|Geylang Bahru]] and [[MacPherson MRT station|MacPherson]] after intersecting itself. |
|||
The line then goes eastwards through the industrial areas of [[Kampong Ubi]] and [[Kaki Bukit]], before continuing towards the Tampines Regional Centre and ending at [[Changi Business Park]]. |
|||
Connecting the Downtown line to the [[Thomson–East Coast MRT line|Thomson–East Coast line]], the DTL3 extension (DTL3e) improves public transport accessibility to the [[Changi Business Park]] and [[Expo MRT station|Expo]] area.<ref>{{cite web | url = https://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line/overview.html | title= Downtown Line Overview }}</ref> |
|||
==History== |
==History== |
||
===Background and inception=== |
|||
At the official opening of the [[Dover MRT station|Dover station]] on 23 October 2001, then-Minister for Communications and Information Technology [[Yeo Cheow Tong]] announced three MRT lines, two of which―the Bukit Timah Line and the northern part of the Eastern Region Line―are part of today's DTL. The Bukit Timah Line aimed to alleviate the traffic problems along the Bukit Timah and Dunearn Road corridor, and provide a direct link to the city area for residents in [[Choa Chu Kang]] and [[Bukit Panjang]]. The proposed Eastern Region Line, slated to be a loop in the eastern regions, aimed to relieve the passenger load on the often-congested [[East–West MRT line|East–West Line]] and benefiting those living in [[Tampines]], [[Bedok]] and [[Marine Parade]].<ref name="The DTL book">{{Cite book| title=The Downtown Line: Soaring to new heights| publisher=The Straits Times| year=2017}}</ref>{{rp|16―17}}<ref>{{cite web| title=Speech by Mr Yeo Cheow Tong at the Official Opening of Dover Station on 23 Oct 2001| url=https://www.mot.gov.sg/news-centre/news/Detail/Speech%20by%20Mr%20Yeo%20Cheow%20Tong%20at%20the%20Official%20Opening%20of%20Dover%20Station%20on%2023%20Oct%202001/| publisher=MOT| access-date=11 July 2019| archive-date=5 September 2020| archive-url=https://web.archive.org/web/20200905044651/https://www.mot.gov.sg/news-centre/news/Detail/Speech%20by%20Mr%20Yeo%20Cheow%20Tong%20at%20the%20Official%20Opening%20of%20Dover%20Station%20on%2023%20Oct%202001/| url-status=live}}</ref><ref name=stcirclelineart>{{cite news| title=Circle Line Linking All Lines| author=Land Transport Authority| date=24 January 2014| work=The Straits Times| page=50}}</ref> |
|||
On 14 June 2005, the [[Land Transport Authority]] (LTA) announced the Downtown Extension (renamed to "Downtown Line Stage 1"), which would serve the New Downtown at [[Marina Bay, Singapore|Marina Bay]] area, where an [[integrated resort]] ([[Marina Bay Sands]]) and Singapore's second botanical garden ([[Gardens by the Bay]]) were to be located. The {{convert|3.4|km|miles|adj=on}} extension, estimated to cost S$1.4 billion, was initially announced to be part of the Circle line.<ref>{{cite web| title=Expanding The Rail Network With Downtown Extension| url=http://app.lta.gov.sg/corp_press_content.asp?start=1268| website=LTA| access-date=30 August 2019| url-status=dead| archive-url=https://web.archive.org/web/20070927182445/http://app.lta.gov.sg/corp_press_content.asp?start=1268| archive-date=27 September 2007| date=14 June 2005}}</ref> On 27 April 2007, then Transport Minister [[Raymond Lim]] announced that the Downtown Line would be built in three stages stretching {{convert|40|km|miles}} with 33 stations.<ref>{{cite web| title=Speech By Mr Raymond Lim At The LTA Workplan Seminar on 27 April 2007| url=https://www.mot.gov.sg/news-centre/news/Detail/Speech%20By%20Mr%20Raymond%20Lim%20At%20The%20LTA%20Workplan%20Seminar%20on%2027%20April%202007/| website=MOT| access-date=11 July 2019 |archive-date=3 September 2020 |archive-url=https://web.archive.org/web/20200903130606/https://www.mot.gov.sg/news-centre/news/Detail/Speech%20By%20Mr%20Raymond%20Lim%20At%20The%20LTA%20Workplan%20Seminar%20on%2027%20April%202007/ |url-status=live }}</ref><ref>{{cite web| url=http://www.channelnewsasia.com/stories/singaporelocalnews/view/272864/1/.html |archive-url=https://archive.today/20121209113025/http://www.channelnewsasia.com/stories/singaporelocalnews/view/272864/1/.html |url-status=dead |archive-date=9 December 2012| title=Govt approves S$12b MRT Downtown Line to be built by 2018}}</ref><ref>{{cite web |title=Government Approves Building Of The Downtown Line |url=http://app.lta.gov.sg/corp_press_content.asp?start=1763 |website=LTA |access-date=6 September 2019 |archive-url=https://web.archive.org/web/20120302082551/http://app.lta.gov.sg/corp_press_content.asp?start=1763 |archive-date=2 March 2012 |date=27 April 2007 |url-status=dead }}</ref><ref>{{cite web |title=33-station Downtown line gets go-ahead, will be ready by 2018 |url=http://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes20070428-1.2.2 |website=The Straits Times| via=NLB| access-date=8 October 2019 |date=28 April 2007 |archive-url=https://web.archive.org/web/20191008033517/http://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes20070428-1.2.2 |archive-date=8 October 2019 |url-status=live }}</ref> |
|||
On 14 June 2005, the [[Land Transport Authority]] announced the Downtown extension of the [[Circle MRT line|Circle line]] to serve the Downtown at [[Marina Bay, Singapore|Marina Bay]] area, where an [[integrated resort]] ([[Marina Bay Sands]]) and Singapore's second botanical garden ([[Gardens by the Bay]]) was to be located. The 3.4-kilometre fully underground line was estimated to cost S$1.4 billion. Construction of the extension began in January 2008. During the construction of the [[North East MRT line|North East line]] at [[Chinatown MRT station|Chinatown station]], platform provisions were built to facilitate an interchange station. In August 2011, [[SBS Transit]] won the bid and was appointed the operator of the Downtown line, under a new framework which would see the authority remaining the owner of the line.<ref>[http://app.lta.gov.sg/corp_press_content.asp?start=659z82u5jocnrr4j4it759812yw2etknbsr66ucn2jd67avxjm LTA Appoints SBS Transit Limited to Operate Downtown Line under New Rail Financing Framework] {{webarchive|url=https://web.archive.org/web/20111121205729/http://app.lta.gov.sg/corp_press_content.asp?start=659z82u5jocnrr4j4it759812yw2etknbsr66ucn2jd67avxjm |date=21 November 2011 }} Land Transport Authority – 29 August 2011</ref> |
|||
===Construction and opening=== |
|||
The original line was built in 3 stages, as follows: |
|||
[[File:Construction of the Downtown Line opposite Clarke Quay, Singapore - 20121006-01.jpg|thumb|left|The construction of DTL tunnels near Clarke Quay. The diversion of the [[Singapore River]] for construction works for the tunnels between the [[Chinatown MRT station|Chinatown]] and [[Fort Canning MRT station|Fort Canning]] stations was considered an engineering feat at the time.<ref>{{cite news| title=Downtown Line Stage 3 to be opened| url=http://www.straitstimes.com/singapore/transport/where-to-go-and-what-to-see-on-downtown-line-3| access-date=31 May 2017| website=The Straits Times| first=Zhaki| last=Abdullah| date=20 October 2017| archive-url=https://web.archive.org/web/20170531234810/http://www.straitstimes.com/singapore/transport/where-to-go-and-what-to-see-on-downtown-line-3| archive-date=31 May 2017| url-status=live}}</ref><ref>{{Cite press release| url=https://www.lta.gov.sg/content/ltagov/en/newsroom/2016/11/2/lta-wins-top-accolade-at-international-tunnelling-awards.html| author=LTA| title=LTA Wins Top Accolade at International Tunnelling Awards| website=Land Transport Authority| date=12 November 2016| access-date=24 April 2020| archive-date=19 September 2020| archive-url=https://web.archive.org/web/20200919193145/https://www.lta.gov.sg/content/ltagov/en/newsroom/2016/11/2/lta-wins-top-accolade-at-international-tunnelling-awards.html| url-status=live}}</ref><ref>{{Cite web| url=https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=5c4e424c-1a46-44cb-92d0-212e37a2b6df| title=Factsheet: Downtown Line 3 to Open on 21 October 2017| website=Land Transport Authority| language=en| access-date=3 June 2017| archive-url=https://web.archive.org/web/20170703204503/https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=5c4e424c-1a46-44cb-92d0-212e37a2b6df| archive-date=3 July 2017| url-status=dead}}</ref>]] |
|||
[[File:Exit D TAM.jpg|thumb|left|A separate entrance for the DTL platforms for Tampines MRT station, which is not directly connected to the EWL platforms of the station.]] |
|||
The line was built in 3 stages: |
|||
Stage 1 of the Downtown line, stretching {{convert|4.3|km|mi|adj=on}}, began service on 22 December 2013,<ref>{{cite web|url=http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line/stages.html |title=Downtown Line |work=Land Transport Authority |accessdate=22 December 2013 |deadurl=yes |archiveurl=https://web.archive.org/web/20140703122517/http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line/stages.html |archivedate=3 July 2014 |df= }}</ref> with its official inauguration made on the day before by Prime Minister [[Lee Hsien Loong]].<ref>{{cite web | url=http://www.straitstimes.com/breaking-news/singapore/story/downtown-line-stage-1-officially-opened-pm-lee-20131221 | title=Downtown Line Stage 1 officially opened by PM Lee | publisher=The Straits Times | date=21 December 2013 | accessdate=22 December 2013}}</ref> |
|||
Stage 1 of the Downtown line, stretching {{convert|4.3|km|mi|adj=on}}, started construction in January 2008 at [[Chinatown MRT station|Chinatown station]],<ref name="The DTL book"/>{{rp|30}} where platform provisions were built to facilitate an interchange station during the construction of the [[North East MRT line|North East line]]. It began service on 22 December 2013,<ref>{{cite web| url=http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line/stages.html |title=Downtown Line |work=Land Transport Authority |access-date=22 December 2013 |url-status=dead |archive-url=https://web.archive.org/web/20140703122517/http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line/stages.html |archive-date=3 July 2014 }}</ref> with its official inauguration made on the day before by Prime Minister [[Lee Hsien Loong]].<ref>{{cite web| url=http://www.straitstimes.com/breaking-news/singapore/story/downtown-line-stage-1-officially-opened-pm-lee-20131221| title=Downtown Line Stage 1 officially opened by PM Lee| website=The Straits Times| first=Royston| last=Sim| date=21 December 2013| access-date=22 December 2013| archive-url=https://web.archive.org/web/20131222001447/http://www.straitstimes.com/breaking-news/singapore/story/downtown-line-stage-1-officially-opened-pm-lee-20131221| archive-date=22 December 2013| url-status=live}}</ref> |
|||
Stage 2, first conceptualized and announced as the Bukit Timah line on 23 October 2001, is {{convert|16.6|km|mi}} long with 12 stations connecting [[Bukit Panjang MRT/LRT station|Bukit Panjang]] and [[Rochor MRT station|Rochor]] stations, including four interchange stations. Construction for Stage 2 began on 3 July 2009 with a groundbreaking ceremony at [[Beauty World MRT station|Beauty World station]].<ref>{{cite news| url=http://www.straitstimes.com/Latest%2BNews/Singapore/STIStory_257916.html| title=LTA unveils locations of DTL stage 2 stations| archive-url=https://web.archive.org/web/20080813151257/http://www.straitstimes.com/Latest%2BNews/Singapore/STIStory_257916.html| archive-date=13 August 2008| url-status=dead| first=Christopher| last=Tan| work=The Straits Times| date=15 July 2008}}</ref><ref>{{Cite news| url=http://www.channelnewsasia.com/stories/singaporelocalnews/view/440220/1/.html| title=Work on MRT Downtown Line Phase 2 Starts| last=Thia| first=Tyler| work=Channel NewsAsia| date=3 July 2009| access-date=21 August 2009| archive-url=https://web.archive.org/web/20090906074542/http://www.channelnewsasia.com/stories/singaporelocalnews/view/440220/1/.html| archive-date=6 September 2009| url-status=dead}}</ref> The line inaugurated on 27 December 2015, with free travel for all 18 stations from 27 December 2015 to 1 January 2016.<ref>{{cite web| url=http://www.lta.gov.sg/apps/news/page.aspx?c=2&id=38d69635-0cb4-4b81-aa01-4182756bc58e| title=The Rail Report: 12 stations of Downtown Line 2 to Open on 27 December| website=Land Transport Authority| date=6 August 2015| access-date=6 August 2015| archive-url=https://web.archive.org/web/20151003063454/http://www.lta.gov.sg/apps/news/page.aspx?c=2&id=38d69635-0cb4-4b81-aa01-4182756bc58e| archive-date=3 October 2015| url-status=dead}}</ref><ref name="Stage 2">{{cite web| url=http://www.channelnewsasia.com/news/singapore/downtown-line-2-to-open/1945760.html| title=Downtown Line 2 to open ahead of schedule in December: Transport Minister Lui| website=Channel NewsAsia| date=28 June 2015| access-date=28 June 2015| archive-url=https://web.archive.org/web/20150630171358/http://www.channelnewsasia.com/news/singapore/downtown-line-2-to-open/1945760.html| archive-date=30 June 2015| url-status=dead}}</ref><ref>{{Cite web |title=LTA {{!}} Downtown Line 2 is Coming to Town….this December |url=https://www.lta.gov.sg/content/ltagov/en/newsroom/2015/11/2/downtown-line-2-is-coming-to-townthis-december.html |access-date=2022-09-19 |website=www.lta.gov.sg |archive-date=4 September 2020 |archive-url=https://web.archive.org/web/20200904124826/https://www.lta.gov.sg/content/ltagov/en/newsroom/2015/11/2/downtown-line-2-is-coming-to-townthis-december.html |url-status=live }}</ref> |
|||
Stage 2 of the Downtown line was first conceptualized and announced as the Bukit Timah line. It was supposedly a 20-kilometre line that would connect the new downtown with the Bukit Panjang, Upper Bukit Timah and Bukit Timah corridor, alleviating the heavy traffic travelling along the sector, but a full route was released. Provisions were provided at [[Nicoll Highway MRT station|Nicoll Highway station]] which would have seen the line terminating there and interchanging with the [[Circle MRT line|Circle line]].<ref name=stcirclelineart>{{cite news |title=Circle Line Linking All Lines |author=Land Transport Authority |date=24 January 2014 |work=The Straits Times |page=50}}</ref> However, the [[Nicoll Highway collapse]] and subsequent feasibility works and deemed the old station unusable.<ref>{{cite web|url=http://www.channelnewsasia.com/stories/singaporelocalnews/view/272864/1/.html |archive-url=https://archive.is/20121209113025/http://www.channelnewsasia.com/stories/singaporelocalnews/view/272864/1/.html |dead-url=yes |archive-date=9 December 2012 | title= Govt approves S$12b MRT Downtown Line to be built by 2018 }}</ref> The stage is {{convert|16.6|km|mi|adj=on}} long with 12 stations connecting [[Bukit Panjang MRT/LRT station|Bukit Panjang]] and [[Rochor MRT station|Rochor]] stations, including four interchange stations. Construction for Stage 2 began on 3 July 2009 with a groundbreaking ceremony at [[Beauty World MRT station|Beauty World station]].<ref>"Groundwork begins for new MRT lines", Christopher Tan, [[The Straits Times]], 13 March 2006</ref><ref>[http://www.straitstimes.com/Latest%2BNews/Singapore/STIStory_257916.html "LTA unveils locations of DTL stage 2 stations"] {{webarchive|url=https://web.archive.org/web/20080813151257/http://www.straitstimes.com/Latest%2BNews/Singapore/STIStory_257916.html |date=13 August 2008 }}, Christopher Tan, [[The Straits Times]], 15 July 2008</ref><ref>[http://www.channelnewsasia.com/stories/singaporelocalnews/view/440220/1/.html "Work on MRT Downtown Line Phase 2 Starts"], Tyler Thia, [[Channel NewsAsia]], 3 July 2009</ref> |
|||
Stage 3 goes from [[Chinatown MRT station|Chinatown]] to [[Expo MRT station|Expo]]. The station locations and finalised route were unveiled on 20 August 2010.<ref>{{Cite web| url=http://www.mot.gov.sg/news-centre/highlights/detail/downtown-line-3-(dtl3)-stations-unveiled| website=MOT Singapore| title=Downtown Line 3 (DTL3) Stations Unveiled| date=20 August 2020| language=en| access-date=24 April 2020| archive-date=21 August 2020| archive-url=https://web.archive.org/web/20200821064834/https://www.mot.gov.sg/news-centre/highlights/detail/downtown-line-3-%28dtl3%29-stations-unveiled| url-status=live}}</ref><ref>{{cite press release| url=http://app.lta.gov.sg/corp_press_content.asp?start=yivww86x9i5t4jpf9s4plkdid6mc74swzo97f0f0x8o4a616g1| title=Downtown Line 3 station Locations Unveiled| archive-url=https://web.archive.org/web/20110621220847/http://app.lta.gov.sg/corp_press_content.asp?start=yivww86x9i5t4jpf9s4plkdid6mc74swzo97f0f0x8o4a616g1| archive-date=21 June 2011| url-status=dead| author=Land Transport Authority| date=20 August 2010}}</ref> Stage 3 of the Downtown line is {{convert|21|km|mi}} long and serve 16 stations.<ref name="DTL-Stages" /><ref>{{cite press release| url=https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=a3eeda54-6d2e-451e-8aa2-a7e3acef0e48| author1=Land Transport Authority| author2=SBS Transit| title=Train Services on Downtown Line to Start Later at 7.30am on Sundays to Facilitate Systems Integration Testing| website=Land Transport Authority| date=26 April 2017| access-date=28 April 2017| archive-url=https://web.archive.org/web/20170428235948/https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=a3eeda54-6d2e-451e-8aa2-a7e3acef0e48| archive-date=28 April 2017| url-status=dead}}</ref> The route opened on 21 October 2017,<ref>{{cite web| url=https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=5c4e424c-1a46-44cb-92d0-212e37a2b6df| title=Factsheet: Downtown Line 3 to Open on 21 October 2017| website=Land Transport Authority| date=31 May 2017| access-date=31 May 2017| archive-url=https://web.archive.org/web/20170703204503/https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=5c4e424c-1a46-44cb-92d0-212e37a2b6df| archive-date=3 July 2017| url-status=dead}}</ref> with free travel for all DTL stations on the first two days of the line completion.<ref>{{Cite press release| url=https://www.lta.gov.sg/content/ltagov/en/newsroom/2017/9/2/opening-of-downtown-line-3-free-travel-on-entire-downtown-line-on-21-and-22-october-2017.html| website=LTA| title=Opening of Downtown Line 3: Free Travel on Entire Downtown Line on 21 and 22 October 2017| author=Land Transport Authority| access-date=24 April 2020| archive-date=19 September 2020| archive-url=https://web.archive.org/web/20200919193143/https://www.lta.gov.sg/content/ltagov/en/newsroom/2017/9/2/opening-of-downtown-line-3-free-travel-on-entire-downtown-line-on-21-and-22-october-2017.html| url-status=dead}}</ref><ref>{{Cite web| url=https://www.channelnewsasia.com/news/singapore/doors-open-on-downtown-line-3-for-preview-ahead-of-oct-21-launch-9312452| title=Doors open on Downtown line 3 for preview ahead of Oct 21 launch| first=Elizabeth| last=Neo| date=15 November 2017| access-date=3 March 2018| archive-url=https://web.archive.org/web/20180303110338/https://www.channelnewsasia.com/news/singapore/doors-open-on-downtown-line-3-for-preview-ahead-of-oct-21-launch-9312452| archive-date=3 March 2018| url-status=dead}}</ref> |
|||
In October 2014, it was announced that Stage 2's opening would be pushed back to the first quarter of 2016. It had to be delayed when main contractor Alpine Bau went bankrupt in mid-2013.<ref>{{cite web|url=http://www.todayonline.com/singapore/stage-2-downtown-line-open-first-quarter-2016|title=Stage 2 of Downtown Line to open in first quarter 2016|website=TODAYonline|access-date=16 May 2016}}</ref> On 28 June 2015, [[Ministry of Transport (Singapore)|Transport Minister]] [[Lui Tuck Yew]] announced that the delay was "completely resolved" by the authorities and Stage 2's opening date was reverted to 27 December 2015.<ref>{{cite web|url=http://www.straitstimes.com/news/singapore/more-singapore-stories/story/thumbs-downtown-lines-earlier-opening-20141003|title=Thumbs Up For Downtown Line's Earlier Opening|website=The Straits Times}}</ref> |
|||
The line, with an estimated cost of S$12 billion, was considered the government's most ambitious rail project. The cost exceeded those of the Circle Line (at $6.7 billion) and the North East Line (at $4.6 billion). Final costs of building the line may reach an estimated about S$20.7 billion, up more than 70% from the initial estimation, due to sharp rises in construction costs and a number of changes in plans.<ref>{{Cite news| url=http://www.straitstimes.com/breaking-news/singapore/story/downtown-line-costs-soar-more-70-20121030| title=Downtown Line costs soar by more than 70%| last=Tan| first=Christopher| date=30 October 2012| work=The Straits Times| url-status=dead| archive-url=https://web.archive.org/web/20121029221849/http://www.straitstimes.com/breaking-news/singapore/story/downtown-line-costs-soar-more-70-20121030| archive-date=29 October 2012}}</ref><ref name="The DTL book"/>{{rp|19}} |
|||
Stage 3 of the Downtown line goes from [[Chinatown MRT station|Chinatown]] to [[Expo MRT station|Expo]]. The station locations and finalized route were unveiled on 20 August 2010.<ref>[http://app.lta.gov.sg/corp_press_content.asp?start=yivww86x9i5t4jpf9s4plkdid6mc74swzo97f0f0x8o4a616g1 Downtown Line 3 station Locations Unveiled] {{webarchive|url=https://web.archive.org/web/20110621220847/http://app.lta.gov.sg/corp_press_content.asp?start=yivww86x9i5t4jpf9s4plkdid6mc74swzo97f0f0x8o4a616g1 |date=21 June 2011 }}. [[Land Transport Authority]], 20 August 2010</ref> Stage 3 of the Downtown line is {{convert|21|km|mi|adj=on}} long and serve 16 stations.<ref name="DTL-Stages" /> It started operations on 21 October 2017, officially opened by the Transport Minister [[Khaw Boon Wan]].<ref>{{Cite news|url=http://www.straitstimes.com/singapore/transport/downtown-line-3-officially-opened-khaw-announces-plans-to-make-transfers-between|title=Downtown Line 3 officially opens; Khaw Boon Wan announces review of fares incurred when switching between stations|last=Tan|first=Christopher|date=20 October 2017|work=The Straits Times|access-date=|archive-url=|archive-date=|dead-url=}}</ref> |
|||
In October 2014, it was announced that Stage 2's opening would be pushed back to the first quarter of 2016. This was because one of the main contractors for the DTL2, Alpine Bau (which was building [[King Albert Park MRT station|King Albert Park]], [[Sixth Avenue MRT station|Sixth Avenue]] and [[Tan Kah Kee MRT station|Tan Kah Kee]]), went bankrupt in mid-2013.<ref>{{cite web| url=http://www.todayonline.com/singapore/stage-2-downtown-line-open-first-quarter-2016| title=Stage 2 of Downtown Line to open in first quarter 2016| first=Kelly| last=Ng| date=29 September 2014| website=TODAYonline| access-date=16 May 2016| archive-url=https://web.archive.org/web/20161011101931/http://www.todayonline.com/singapore/stage-2-downtown-line-open-first-quarter-2016| archive-date=11 October 2016| url-status=live}}</ref> On 28 June 2015, [[Ministry of Transport (Singapore)|Transport Minister]] [[Lui Tuck Yew]] announced that the delay was "completely resolved" by the authorities and Stage 2's opening date was brought forward to 27 December 2015.<ref>{{cite web| url=http://www.straitstimes.com/news/singapore/more-singapore-stories/story/thumbs-downtown-lines-earlier-opening-20141003| title=Thumbs Up For Downtown Line's Earlier Opening| first=Chang May| last=Choon| date=3 October 2014| website=The Straits Times| access-date=28 February 2015| archive-url=https://web.archive.org/web/20150403023227/http://www.straitstimes.com/news/singapore/more-singapore-stories/story/thumbs-downtown-lines-earlier-opening-20141003| archive-date=3 April 2015| url-status=live}}</ref><ref>{{Cite press release| url=https://www.lta.gov.sg/content/ltagov/en/newsroom/2015/11/2/downtown-line-2-is-coming-to-townthis-december.html| author=Land Transport Authority| title=Downtown Line 2 is Coming to Town....this December| date=4 November 2015| website=LTA| access-date=24 April 2020| archive-date=4 September 2020|archive-url=https://web.archive.org/web/20200904124826/https://www.lta.gov.sg/content/ltagov/en/newsroom/2015/11/2/downtown-line-2-is-coming-to-townthis-december.html| url-status=live}}</ref> The DTL 3 started operations on 21 October 2017, officially opened by Transport Minister [[Khaw Boon Wan]].<ref>{{Cite news| url=http://www.straitstimes.com/singapore/transport/downtown-line-3-officially-opened-khaw-announces-plans-to-make-transfers-between| title=Downtown Line 3 officially opens; Khaw Boon Wan announces review of fares incurred when switching between stations| last=Tan| first=Christopher| date=20 October 2017| work=The Straits Times| access-date=21 October 2017| archive-url=https://web.archive.org/web/20171021005252/http://www.straitstimes.com/singapore/transport/downtown-line-3-officially-opened-khaw-announces-plans-to-make-transfers-between| archive-date=21 October 2017| url-status=live}}</ref><ref>{{Cite press release| url=http://www.mynewsdesk.com/sg/pressreleases/lta-awards-contracts-for-tampines-west-and-bedok-reservoir-stations-658632| title=LTA Awards Contracts for Tampines West and Bedok Reservoir Stations| date=5 July 2011| website=Mynewsdesk| language=en| access-date=7 March 2020| archive-url=https://web.archive.org/web/20140808032555/http://www.mynewsdesk.com/sg/pressreleases/lta-awards-contracts-for-tampines-west-and-bedok-reservoir-stations-658632| archive-date=8 August 2014| url-status=live}}</ref><ref>{{cite news| url=http://www.channelnewsasia.com/news/singapore/downtown-line-3-to-open-on-oct-21-8898410| access-date=31 May 2017| first=Elizabeth| last=Neo| title=Downtown Line 3 to open on Oct 21| website=Channel NewsAsia| date=31 May 2017| archive-url=https://web.archive.org/web/20170531083132/http://www.channelnewsasia.com/news/singapore/downtown-line-3-to-open-on-oct-21-8898410| archive-date=31 May 2017| url-status=dead}}</ref> |
|||
To serve the line, the [[Gali Batu Depot]] was opened in December 2015 to stable 42 trains. It is situated at part of the former Kwong Hou Sua Teochew Cemetery off Woodlands Road.<ref name="channelnewsasia.com">[http://www.channelnewsasia.com/stories/singaporelocalnews/view/331241/1/.html "Downtown Line depot to be located off Woodlands Road"], Margaret Perry, [[Channel NewsAsia]], 26 February 2008</ref> Also in February that year, the Land Transport Authority announced that the capacity of the depot will be expanded to stable 81 trains by 2019.<ref>{{Cite Web|url=https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=2a085a5d-6d2f-46e1-bafc-39cf5340898b|title=Gali Batu Depot|author=Land Transport Authority|date=17 Feb 2015|access-date=1 March 2018}}</ref> |
|||
To serve the line, the [[Gali Batu Depot]] was opened in December 2015 to stable 42 trains. It is situated at part of the former Kwong Hou Sua Teochew Cemetery off Woodlands Road.<ref name="channelnewsasia.com">{{cite news| url=http://www.channelnewsasia.com/stories/singaporelocalnews/view/331241/1/.html| url-status=dead| title=Downtown Line depot to be located off Woodlands Road| archive-url=https://web.archive.org/web/20080301215135/http://www.channelnewsasia.com/stories/singaporelocalnews/view/331241/1/.html| archive-date=1 March 2008| first=Margaret| last=Perry| website=Channel NewsAsia| date=26 February 2008}}</ref> Also in February that year, the Land Transport Authority announced that the capacity of the depot will be expanded to stable 81 trains by 2019.<ref>{{Cite web| url=https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=2a085a5d-6d2f-46e1-bafc-39cf5340898b| title=Gali Batu Depot|author=Land Transport Authority| date=17 February 2015| access-date=1 March 2018| archive-url=https://web.archive.org/web/20180301164551/https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=2a085a5d-6d2f-46e1-bafc-39cf5340898b| archive-date=1 March 2018| url-status=dead}}</ref> |
|||
Final costs of building the line may reach an estimated about S$20.7 billion, up more than 70% from an initial estimation of S$12 billion.<ref>[http://www.straitstimes.com/breaking-news/singapore/story/downtown-line-costs-soar-more-70-20121030 "Downtown Line costs soar by more than 70%"], Christopher Tan, [[The Straits Times]], 30 October 2012</ref> In January 2013, plans for a southern extension which will run from [[Expo MRT station|Expo]] through the East Coast area, interchanging with the [[Thomson-East Coast MRT line|Thomson–East Coast line]] were announced for completion by 2025.<ref>{{cite web|url=http://app.lta.gov.sg/apps/news/page.aspx?c=2&id=38dc4ca3-5e70-4bf8-97bc-87f78e6303e7 | title= Two New Rail Lines and Three New Extensions to Expand Rail Network by 2030 |publisher=Land Transport Authority |date=17 January 2013 |deadurl=yes |archiveurl=https://web.archive.org/web/20140706170425/http://app.lta.gov.sg/apps/news/page.aspx?c=2&id=38dc4ca3-5e70-4bf8-97bc-87f78e6303e7 |archivedate=6 July 2014 |df= }}</ref> On 31 May 2017, LTA announced that Stage 3 of the Downtown line will commence operations on 21 October 2017.<ref>{{cite news|url=http://www.channelnewsasia.com/news/singapore/downtown-line-3-to-open-on-oct-21-8898410|accessdate=31 May 2017|work=Elizabeth Neo|issue=Downtown Line 3 to open on 21 Oct | title=Downtown Line 3 |publisher=Channel NewsAsia|date=1 June 2017}}</ref> |
|||
===Future=== |
|||
DTL3e was announced on 15 August 2014, in conjunction with the announcement of the [[Thomson–East Coast MRT line]].<ref name="TEL">[http://www.channelnewsasia.com/news/singapore/thomson-east-coast-line/1313898.html "Thomson–East Coast Line, connecting North and East, ready by 2024"] {{webarchive|url=https://web.archive.org/web/20140816071435/http://www.channelnewsasia.com/news/singapore/thomson-east-coast-line/1313898.html |date=16 August 2014 }}, Saifulbahri Ismail, [[Channel NewsAsia]], 15 August 2014</ref> Two stations, [[Xilin MRT station]] and [[Sungei Bedok MRT station]] will be added to the Downtown Line, with Sungei Bedok as an interchange station with the [[Thomson–East Coast MRT line|Thomson–East Coast line]]. It will add an additional {{convert|2.2|km|abbr=on}} to the line with the extension.<ref name="TEL" /> Due in 2024, Stage 3e will join the current [[East West MRT line|East West]] and future [[Thomson–East Coast MRT line|Thomson–East Coast]] lines that runs through Marine Parade.<ref>{{cite web | url=http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line-extension.html | title=Downtown Line 3 Extension | publisher=Land Transport Authority | date=15 August 2014}}</ref> |
|||
On 17 January 2013, plans were announced for a southern extension extending from [[Expo MRT station|Expo]] to connect with the [[Thomson–East Coast MRT line#East Coast stretch|Eastern Region line]] (ERL); the ERL has since been subsumed into the Thomson-East Coast line. The extension was to provide more travel options and enhance connectivity for the residents along the East Coast.<ref>{{cite web| url=https://www.mot.gov.sg/news-centre/news/Detail/Speech%20by%20Mr%20Lui%20Tuck%20Yew%20at%20visit%20to%20DTL1%20Chinatown%20Station%20on%2017%20January%202013/ |title=Speech by Mr Lui Tuck Yew at visit to DTL1 Chinatown Station on 17 January 2013 |website=MOT |access-date=19 September 2019 |date=17 January 2013 |archive-url=https://web.archive.org/web/20200226205104/https://www.mot.gov.sg/news-centre/news/Detail/Speech%20by%20Mr%20Lui%20Tuck%20Yew%20at%20visit%20to%20DTL1%20Chinatown%20Station%20on%2017%20January%202013/ |archive-date=26 February 2020 |url-status=live }}</ref><ref>{{cite web| url=http://app.lta.gov.sg/apps/news/page.aspx?c=2&id=38dc4ca3-5e70-4bf8-97bc-87f78e6303e7 | title=Two New Rail Lines and Three New Extensions to Expand Rail Network by 2030 |publisher=Land Transport Authority |date=17 January 2013 |url-status=dead |archive-url=https://web.archive.org/web/20140706170425/http://app.lta.gov.sg/apps/news/page.aspx?c=2&id=38dc4ca3-5e70-4bf8-97bc-87f78e6303e7 |archive-date=6 July 2014}}</ref> The Downtown Line 3 extension (DTL3e) was finalised and announced on 15 August 2014, in conjunction with the announcement of the Thomson–East Coast line.<ref name="TEL">{{cite news| url=http://www.channelnewsasia.com/news/singapore/thomson-east-coast-line/1313898.html| title=Thomson–East Coast Line, connecting North and East, ready by 2024| url-status=dead| archive-url=https://web.archive.org/web/20140816071435/http://www.channelnewsasia.com/news/singapore/thomson-east-coast-line/1313898.html| archive-date=16 August 2014| first=Saifulbahri| last=Ismail| work=Channel NewsAsia| date=15 August 2014}}</ref> Two stations, [[Xilin MRT station]] and [[Sungei Bedok MRT station]], will be added to the Downtown Line, with Sungei Bedok as an interchange station with the Thomson–East Coast line. It will lengthen the line by {{convert|2.2|km|abbr=on}}.<ref name="TEL" /> Expected to be completed in 2026, Stage 3e will connect the current [[East–West MRT line|East–West Line]] at Expo station and the future TEL at [[Sungei Bedok MRT station|Sungei Bedok station]].<ref>{{cite web| url=http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line-extension.html| title=Downtown Line 3 Extension| website=Land Transport Authority| date=15 August 2014| access-date=15 August 2014| archive-url=https://web.archive.org/web/20141015130001/http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line-extension.html| archive-date=15 October 2014| url-status=dead}}</ref> |
|||
On 7 March 2019, [[Hume MRT station|Hume station]] was announced to be opened by 2025 to better serve Hillview residents.<ref name=":0">{{Cite web| url=https://www.zaobao.com.sg/realtime/singapore/story20190307-937898| title=滨海市区线谦道站料2025年启用| trans-title=Hume Station on Downtown Line is expected to open in 2025| date=7 March 2019| website=早报 (Zaobao)| language=zh| access-date=7 March 2019| archive-url=https://web.archive.org/web/20190307145021/https://www.zaobao.com.sg/realtime/singapore/story20190307-937898| archive-date=7 March 2019| url-status=dead}}</ref><ref name="Tan 2020">{{cite web| last=Tan| first=Christopher| title=Work on Hume MRT station on Downtown Line to start in the fourth quarter| website=The Straits Times| date=30 June 2020| url=https://www.straitstimes.com/singapore/transport/work-to-complete-hume-mrt-station-slated-for-fourth-quarter| access-date=21 August 2020| archive-date=19 September 2020| archive-url=https://web.archive.org/web/20200919193143/https://www.straitstimes.com/singapore/transport/work-to-complete-hume-mrt-station-slated-for-fourth-quarter| url-status=live}}</ref> An additional extension to the Downtown Line to [[Sungei Kadut MRT station|Sungei Kadut]] station from [[Bukit Panjang MRT/LRT station|Bukit Panjang]] station was announced on 25 May 2019 by the LTA. The extension is set to cut down travel time to the downtown area by up to 30 minutes for those living in the northwestern area of Singapore. The extension is expected to be completed by the mid-2030s. A study will also be conducted to determine the stops to be added between the Sungei Kadut and the existing Bukit Panjang stations.<ref name=":1" /> |
|||
On 7 March 2019, Hume station was announced to be opened by 2025 to better serve Hillview residents. <ref>{{Cite web|url=https://www.zaobao.com.sg/realtime/singapore/story20190307-937898|title=滨海市区线谦道站料2025年启用|date=2019-03-07|website=早报|language=en|access-date=2019-03-07}}</ref> |
|||
On 6 December 2024, it was announced that Hume station will be opening in Q2 2025 and Stage 3e will commence operation in the second half of 2026.<ref>{{Cite news |last=Kok |first=Yufeng |date=6 December 2024 |title=Hume MRT station to open in Q2 2025; Circle Line Stage 6 to be ready in first half of 2026 |url=https://www.straitstimes.com/singapore/transport/hume-mrt-station-to-open-in-q2-2025-circle-line-stage-6-to-be-completed-in-first-half-of-2026-chee |access-date=6 December 2024 |work=[[The Straits Times]] |archive-date=6 December 2024 |archive-url=https://web.archive.org/web/20241206111213/https://www.straitstimes.com/singapore/transport/hume-mrt-station-to-open-in-q2-2025-circle-line-stage-6-to-be-completed-in-first-half-of-2026-chee |url-status=live }}</ref> On 6 January 2025, a {{convert|4|km|abbr=on}} extension to the future Sungei Kadut station was announced, including an additional unnamed station between Sungei Kadut station and Bukit Panjang station, slated to begin operation in 2035.<ref>{{cite AV media |url=https://www.youtube.com/watch?v=ClPT0SRxtXM |title=🚇🌟 3 new stations will connect the Downtown Line (#DTL) to the North-South Line (#NSL)! |date=6 January 2025 |last=@LTAsingapore |author-link=Land Transport Authority |access-date=6 January 2025 |via=[[YouTube]]}}</ref><ref>{{cite news|url=https://www.straitstimes.com/singapore/transport/dtl-extension-to-sungei-kadut-to-open-in-2035-including-new-mrt-station-near-yew-tee-village|last=Kok|first=Yufeng|title=DTL extension to Sungei Kadut to open in 2035, including new MRT station near Yew Tee Village|work=[[The Straits Times]]|date=6 January 2025|access-date=6 January 2025}}</ref> |
|||
===Notable incidents=== |
===Notable incidents=== |
||
A fire occurred on a maintenance locomotive which was carrying out works at [[Mattar MRT station|Mattar]] station on 24 May 2024 at around 1:00 am. This resulted in the section between [[Fort Canning MRT station|Fort Canning]] and Mattar stations to be closed as the locomotive could not be moved until heat from its body dissipated. The fire was put out by [[Singapore Civil Defence Force|SCDF]] and one staff member was conveyed to the hospital for smoke inhalation. Train services at the affected MRT stations resumed at 7:26 am after more than an hour since the start of train service.<ref>{{Cite news |last=William |first=Whitney |date=2024-05-24 |title=Train service disrupted at six Downtown Line stations after maintenance locomotive catches fire |url=https://www.straitstimes.com/singapore/train-service-disrupted-at-six-dtl-stations-due-to-maintenance-locomotive-that-caught-fire |access-date=2024-05-24 |work=The Straits Times |language=en |issn=0585-3923}}</ref> |
|||
A malfunction in the platform screen doors at [[Botanic Gardens MRT station|Botanic Gardens]] MRT station resulted in trains bypassing the station and a seven-hour disruption on Wednesday, 3rd May 2017. Downtown line operator SBS Transit said that the doors malfunctioned at 5.45am due to a signalling-related fault, and could not open automatically. The fault was rectified at 12.54pm and the platform opened for passenger service, with the affected door remaining closed for repairs.<ref>{{cite web| title= Platform doors at Botanic Gardens MRT station malfunction, causing 7-hour disruption | url= http://www.channelnewsasia.com/news/singapore/platform-doors-at-botanic-gardens-mrt-station-malfunction-8813298 |website=Channel NewsAsia}}</ref> |
|||
==Network and operations== |
|||
==Stations== |
|||
===Route=== |
|||
{{main|List of Downtown MRT line station names}} |
|||
[[File:MRT Route Map DT.svg|right|thumb|300px|Geographically accurate map of the Downtown MRT line.<ref>{{Cite web |date=2017-06-01 |title=Oct 21 debut for Downtown Line 3 |url=https://www.tnp.sg/news/singapore/oct-21-debut-downtown-line-3 |access-date=2023-08-02 |website=The New Paper |language=en}}</ref>]] |
|||
{{MRT route/Downtown|navbar=1|legend=0|collapse=no}} |
|||
The Downtown line generally goes in an east–west direction from [[Bukit Panjang]] in the [[West Region, Singapore|northwestern side]] of Singapore, through the [[Central Area, Singapore|downtown area of Singapore]], to [[Tampines]] and the [[Singapore Expo]] in the [[East Region, Singapore|east]]. It is {{convert|41.9|km|mi}} long and is entirely underground. Before [[Bukit Panjang MRT/LRT station|Bukit Panjang station]], there exists a brief northwards extension to the line's depot [[Gali Batu Depot]]. The line begins at the Bukit Panjang station and then goes in the southeast direction, running parallel to Upper Bukit Timah Road and along the Bukit Timah Canal through [[Bukit Timah]]. The line then enters the [[Central Area, Singapore|central area]], passing through [[Little India MRT station|Little India]] station before reaching the [[Central Business District]] via [[Bugis MRT station|Bugis]] station. The Downtown line runs parallel to the [[Circle MRT line|Circle line]] at the [[Promenade MRT station|Promenade]] and [[Bayfront MRT station|Bayfront]] stations. Passing through the [[Downtown Core]], the line interchanges with the [[North East MRT line|North East line]] at [[Chinatown MRT station|Chinatown]] station. |
|||
After Chinatown station, the line goes in a northeast direction and under the Singapore River. Between the [[Bencoolen MRT station|Bencoolen]] and [[Jalan Besar MRT station|Jalan Besar]] stations, the line intersects itself, the first MRT line to do so. After [[Geylang Bahru MRT station|Geylang Bahru station]], the line continues in a general eastwards direction, through the industrial areas of [[Kampong Ubi]] and [[Kaki Bukit]] (briefly paralleling Ubi Avenue 2 and Kaki Bukit Avenue 1), before continuing towards the [[Tampines|Tampines Regional Centre]] and goes southwards, ending at [[Changi Business Park]]. The DTL3 extension (DTL3e) from [[Expo MRT station|Expo]] station will extend the line further towards the [[Thomson–East Coast MRT line|Thomson–East Coast line]] at [[Sungei Bedok MRT station|Sungei Bedok]] station.<ref>{{cite web| url=https://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line/overview.html| title=Downtown Line Overview| access-date=28 May 2017| website=Land Transport Authority| archive-url=https://web.archive.org/web/20170331210746/https://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line/overview.html| archive-date=31 March 2017| url-status=dead}}</ref> |
|||
[[File:Active Route Map Information System of Downtown Line in Singapore.jpg|thumb|Active route map information system of Downtown line]] |
|||
===Stations=== |
|||
{| class="wikitable" style="margin-left:1em; margin-bottom:1em; color:black; font-size:95%;" |
|||
Station codes for the line are blue, corresponding to the line's colour on the system map. Most stations have island platforms, with the exception of [[Downtown MRT station|Downtown]], [[Telok Ayer MRT station|Telok Ayer]], [[Chinatown MRT station|Chinatown]] and [[MacPherson MRT station|MacPherson]] stations having side platforms whilst [[Stevens MRT station|Stevens]] and [[Promenade MRT station|Promenade]] stations having stacked side platforms.{{multiple image|perrow=1|total_width=250 |
|||
|- align="center" bgcolor="#{{SMRT color|Downtown}}" style="color:white" |
|||
|image1=Active Route Map Information System of Downtown Line in Singapore.jpg |
|||
|'''Station number''' |
|||
|image2=Singapore Downtown Line Dynamic Route Map Display.jpg |
|||
|'''Station name''' |
|||
|footer=The initial [[LED]] Dynamic Route Map Display (DRMD) system on DTL trains that was in use from 2013 to 2024 (top), and the current [[LCD]] DRMD which has since replaced the former (bottom).}} |
|||
|'''Image''' |
|||
{| class="wikitable" |
|||
|'''Interchange and notes''' |
|||
|+ Downtown Line stations timeline |
|||
|Distance (km) |
|||
! Date !! Project !! Description |
|||
between stations |
|||
|Total |
|||
Distance (km) |
|||
|- |
|- |
||
| 22 December 2013 || Stage 1 || [[Bugis MRT station|Bugis]] – [[Chinatown MRT station|Chinatown]] |
|||
|{{SMRT-SLRT code 2I/C|DT|1|BP|6}}||[[Bukit Panjang MRT/LRT station|Bukit Panjang]]||[[File:Bukitpanjangmrtplatform.jpg|100px]]||Connected to the [[Bukit Panjang LRT line|'''{{fontcolor|#748477|Bukit Panjang LRT}}''']] |
|||
|0.0 |
|||
|0.0 |
|||
|- |
|- |
||
| |
| 27 December 2015 || Stage 2 || [[Bugis MRT station|Bugis]] – [[Bukit Panjang MRT/LRT station|Bukit Panjang]] |
||
|1.2 |
|||
|1.2 |
|||
|- |
|- |
||
| |
| 21 October 2017 || Stage 3 || [[Chinatown MRT station|Chinatown]] – [[Expo MRT station|Expo]] |
||
|0.9 |
|||
|2.1 |
|||
|- |
|- |
||
| 2025 || Hume Station || [[Hume MRT station|Hume station]] between [[Hillview MRT station|Hillview]] and [[Beauty World MRT station|Beauty World]] |
|||
|{{SMRT code|DT|4}}||Hume||||Opening in 2025 |
|||
| |
|||
| |
|||
|- |
|- |
||
| |
| 2026 || Stage 3 Extension || [[Expo MRT station|Expo]] – [[Sungei Bedok MRT station|Sungei Bedok]] |
||
|2.6 |
|||
|4.7 |
|||
|- |
|- |
||
| 2035 || Stage 2 Extension || ''[[DE1 MRT station|DE1]]'' – [[Sungei Kadut MRT station|Sungei Kadut]] |
|||
|{{SMRT code|DT|6}}||[[King Albert Park MRT station|King Albert Park]]||[[File:DT6 King Albert Park Platform A.jpg|100px]]|| |
|||
|1.2 |
|||
|5.9 |
|||
|- |
|- |
||
|} |
|||
|{{SMRT code|DT|7}}||[[Sixth Avenue MRT station|Sixth Avenue]]||[[File:DT7 Sixth Avenue Platform Basement.jpg|100px]]|| |
|||
|1.6 |
|||
'''Legend''' |
|||
|7.5 |
|||
{| class="wikitable" |
|||
|- |
|- |
||
| align=center | [[File:Aiga escalator up.svg|15px|link=]]<br />Elevated || align=center | [[File:MRT Singapore Destination 1.svg|15px|link=]] [[File:MRT Singapore Destination 14.svg|15px|link=]]<br />Line [[Train station#Terminus|terminus]] || align=center | [[File:Barrier turnstile icon.svg|12px|link=]]<br />Transfer outside [[paid area]] |
|||
|{{SMRT code|DT|8}}||[[Tan Kah Kee MRT station|Tan Kah Kee]]||[[File:Tankahkeemrt.jpg|100px]]|| |
|||
|1.3 |
|||
|8.8 |
|||
|- |
|- |
||
| align=center | [[File:Aiga escalator.svg|15px|link=]]<br />Ground-level |
|||
|{{SMRT code 2I/C|DT|9|CC|19}}||[[Botanic Gardens MRT station|Botanic Gardens]]||[[File:Botanic Gardens MRT Station (DTL) - Platform B.jpg|100px]]||Interchange with the [[Circle MRT line|'''{{fontcolor|#ff9a00|Circle line}}''']] |
|||
| style='border-style: none none none none;text-align:center;' |[[File:MUTCD D9-6.svg|15px|link=]]<br />Wheelchair accessible |
|||
|1.1 |
|||
| align=center | [[File:Bus-logo.svg|15px|link=]]<br />Bus interchange |
|||
|9.9 |
|||
|- |
|- |
||
| align=center | [[File:Aiga escalator down.svg|15px|link=]]<br />Underground || align=center | [[File:ISO 7010 W003.svg|15px|link=]]<br />[[Singapore Civil Defence Force|Civil Defence]] [[Air raid shelter|Shelter]] |
|||
|{{SMRT code 2I/C|DT|10|TE|11}}||[[Stevens MRT station|Stevens]]||[[File:DT10 Stevens MRT Exit A.jpg|100px]]||Interchange with the [[Thomson-East Coast MRT line|'''{{fontcolor|#734538|Thomson–East Coast line}}''']] <small> (2021) |
|||
| align=center | [[File:Aiga carrental cropped.svg|10px|link=]] [[File:BSicon Mono-CHN.svg|10px|link=]] [[File:BSicon AETRAM.svg|10px|link=]] [[File:Aiga watertransportation.svg|10px|link=]] [[File:20 airtransportation.svg|10px|link=]] [[File:Aiga immigration.svg|10px|link=]]<br />Other transportation modes |
|||
|1.1 |
|||
| |
|} |
||
'''List''' |
|||
{| class="wikitable" style="color: black; border-collapse: collapse; font-size: 95%" |
|||
|- |
|- |
||
! scope="col" style="color: white; background:#{{rcr|SMRT|Downtown}}" | Station code |
|||
|{{SMRT code 2I/C|DT|11|NS|21}}||[[Newton MRT station|Newton]]||[[File:Art in transit Newton downtown.jpg|100px]]||Connected to the [[North South MRT line|'''{{fontcolor|#dc241f|North South line}}''']] |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|Downtown}}" | Station name |
|||
|1.6 |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|Downtown}}" | Images |
|||
|12.6 |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|Downtown}}" | Interchange;<br /><small>Adjacent transportation</small> |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|Downtown}}" | Opening |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|Downtown}}" | Cost |
|||
|- |
|- |
||
|scope="row" |[[File:MRT Singapore Destination 11.svg|15px|link=]]<br />{{SMRT code|DT|1}}–{{SLRT code|BP|6}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Bukit Panjang MRT/LRT station|Bukit Panjang]]||[[File:DT1 Bukit Panjang MRT Platforms 20220503 130818.jpg|100px]]||[[File:Aiga escalator up.svg|15px|link=]] {{rbox|Bukit Panjang LRT|Bukit Panjang LRT line|#{{rcr|SLRT|Bukit Panjang}}|White}} [[File:Barrier turnstile icon.svg|12px|link=]]<br />―<br />[[File:Bus-logo.svg|15px|link=]] <small>[[Bukit Panjang Bus Interchange|Bukit Panjang]]</small> || rowspan="3" align=center | 27 December 2015;<br />{{Years or months ago|2015|12}} || S$452.4 million{{efn|DTL2 Contract 912}} |
|||
|{{SMRT code 2I/C|DT|12|NE|7}}||[[Little India MRT station|Little India]]||[[File:2016-04-03 Little India MRT Station 05.jpg|100px]]||Interchange with the [[North East MRT line|'''{{fontcolor|#9016b2|North East line}}''']] |
|||
|1.4 |
|||
|14 |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|DT|2}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Cashew MRT station|Cashew]]||[[File:DT2 Cashew Feb 2020.jpg|frameless|100x100px]]|| rowspan="3" {{sdash}} || rowspan="2" | S$431 million{{efn|DTL2 Contract 913}} |
|||
|{{SMRT code|DT|13}}||[[Rochor MRT station|Rochor]]||[[File:Rochor-mrt-station-platform.jpg|100px]]|| |
|||
|0.5 |
|||
|14.5 |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|DT|3}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Hillview MRT station|Hillview]]||[[File:DT3 Hillview Sep 2020.jpg|frameless|100x100px]] |
|||
|{{SMRT code 2I/C|DT|14|EW|12}}||[[Bugis MRT station|Bugis]]||[[File:Bugis MRT Station.JPG|100px]]||Interchange with the [[East West MRT line|'''{{fontcolor|#009530|East West line}}''']] |
|||
|0.8 |
|||
|15.3 |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|DT|4}}<br /><small>''[[Infill station]]''</small><br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||''[[Hume MRT station|Hume]]''||[[File:DT4 Hume shell station tunnel.jpg|100px]] || align=center | 2025;<br />{{Years or months ago|2025}} || S$259.538 million{{efn|S$225.2 for DTL2 Contract 915, S$34.338 million for Contract 915A for completion works}} |
|||
|{{SMRT code 2I/C|DT|15|CC|4}}||[[Promenade MRT station|Promenade]]||[[File:Platform C Promenade MRT (2).jpg|100px]]||Interchange with the [[Circle MRT line|'''{{fontcolor|#ff9a00|Circle line}}''']] |
|||
|0.9 |
|||
|16.2 |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|DT|5}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Beauty World MRT station|Beauty World]]||[[File:DT5 Beauty World MRT Platforms 20210118 134028.jpg|100px]]||[[File:Bus-logo.svg|15px|link=]] <small>Beauty World</small> || rowspan="9" align=center | 27 December 2015;<br />{{Years or months ago|2015|12}} || S$339.88 million{{efn|DTL2 Contract 916}} |
|||
|{{SMRT code 2I/C|DT|16|CE|1}}||[[Bayfront MRT station|Bayfront]]||[[File:Bayfront MRT Station (DTL) - Platform A.jpg|100px]]||Cross-platform interchange with the [[Circle MRT line|'''{{fontcolor|#ff9a00|Circle line}}''']] extension |
|||
|1.3 |
|||
|18.4 |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|DT|6|CR|15}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[King Albert Park MRT station|King Albert Park]]||[[File:DT6 King Albert Park Platform B.jpg|100px]]|| [[File:Aiga escalator down.svg|15px|link=]] {{rbox|Cross Island Line|Cross Island MRT line|#{{rcr|SMRT|CR}}|Black}} <small>''(2032)''</small> || rowspan="2" | S$574.7 million{{efn|S$320.7 million for DTL2 Contract 917, S$254 million for DTL2 Contract 917A for completion of works after insolvency of first contractor}} |
|||
|{{SMRT code|DT|17}}||[[Downtown MRT station|Downtown]]||[[File:Exit C of Downtown MRT Station.jpg|100px]]|| |
|||
|0.9 |
|||
|19.3 |
|||
|- |
|- |
||
|{{SMRT code|DT| |
|scope="row"|{{SMRT code|DT|7}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Sixth Avenue MRT station|Sixth Avenue]]||[[File:DT7 Sixth Avenue Platform level.jpg|100px]] || rowspan="2" {{sdash}} |
||
|0.6 |
|||
|19.9 |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|DT|8}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Tan Kah Kee MRT station|Tan Kah Kee]]||[[File:DT8 Tan Kah Kee MRT Platforms 20210118 144732.jpg|100px]] || S$572 million{{efn|S$350 million for DTL2 Contract 918, S$222 million for DTL2 Contract 918A for completion of works after insolvency of first contractor}} |
|||
|{{SMRT code 2I/C|DT|19|NE|4}}||[[Chinatown MRT station|Chinatown]]||[[File:Chinatown Station Downtown Line Platform 201401.jpg|100px]]||Interchange with the [[North East MRT line|'''{{fontcolor|#9016b2|North East line}}''']] |
|||
|0.6 |
|||
|20.5 |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|DT|9|CC|19}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Botanic Gardens MRT station|Botanic Gardens]]||[[File:DT9 Botanic Gardens MRT Platforms 20201011 164633.jpg|100px]]||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|Circle Line|Circle MRT line|#{{rcr|SMRT|CC}}|Black}} || rowspan="2" | S$378.2 million{{efn|DTL2 Contract 919}} |
|||
|{{SMRT code|DT|20}}||[[Fort Canning MRT station|Fort Canning]]||[[File:DT20 Fort Canning station.jpg|100px]]|| |
|||
|1.0 |
|||
|21.5 |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|DT|10|TE|11}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Stevens MRT station|Stevens]]||[[File:DT10 Stevens MRT Platform B 20220414 183115 (1).jpg|100px]]||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|Thomson–East Coast Line|Thomson–East Coast MRT line|#{{rcr|SMRT|TE}}|White}} |
|||
|{{SMRT code|DT|21}}||[[Bencoolen MRT station|Bencoolen]]||[[File:DT21 Bencoolen station.jpg|100px]]|| |
|||
|1.0 |
|||
|22.5 |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|DT|11}}–{{SMRT code|NS|21}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Newton MRT station|Newton]]||[[File:DT11 Newton MRT platforms 20201209 134913.jpg|100px]]||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|North–South Line|North South MRT line|#{{rcr|SMRT|NS}}|White}} [[File:Barrier turnstile icon.svg|12px|link=]] || S$356 million{{efn|DTL2 Contract 920}} |
|||
|{{SMRT code|DT|22}}||[[Jalan Besar MRT station|Jalan Besar]]||[[File:DT22 Jalan Besar station.jpg|100px]]|| |
|||
|0.9 |
|||
|23.4 |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|DT|12|NE|7}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Little India MRT station|Little India]]||[[File:2016-04-03 Little India MRT Station 05.jpg|100px]]||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|North East Line|North East MRT line|#{{rcr|SMRT|NE}}|White}} || rowspan="2" | S$803.3 million{{efn|DTL2 Contract 921}} |
|||
|{{SMRT code|DT|23}}||[[Bendemeer MRT station|Bendemeer]]||[[File:DT23 Bendemeer station.jpg|100px]]|| |
|||
|1.3 |
|||
|24.7 |
|||
|- |
|- |
||
|{{SMRT code|DT| |
|scope="row"|{{SMRT code|DT|13}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Rochor MRT station|Rochor]]||[[File:DT13 Rochor MRT platforms 20211229 105710.jpg|100px]]||{{sdash}} |
||
|1.4 |
|||
|26.1 |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|DT|14|EW|12}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Bugis MRT station|Bugis]]||[[File:DT14 Bugis Platform B with escalator.jpg|100px]]||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|East–West Line|East–West MRT line|#{{rcr|SMRT|EW}}|White}} || rowspan="6" align="center" | 22 December 2013;<br />{{Years or months ago|2013|12}} || S$582 million{{efn|DTL1 Contract 903}} |
|||
|{{SMRT code|DT|25}}||[[Mattar MRT station|Mattar]]||[[File:DT25 Mattar station.jpg|100px]]|| |
|||
|1.5 |
|||
|27.6 |
|||
|- |
|- |
||
|{{SMRT code |
|scope="row"|{{SMRT code|DT|15|CC|4}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Promenade MRT station|Promenade]]||[[File:DT15 Promenade MRT Platform C 20200902 142627.jpg|100px]]||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|Circle Line|Circle MRT line|#{{rcr|SMRT|CC}}|Black}} <br />―<br />[[File:Bus-logo.svg|15px|link=]] <small>Marina Centre</small> |
||
|| S$231 million{{efn|DTL1 Contract 902}} |
|||
|0.8 |
|||
|28.4 |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|DT|16|CE|1}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Bayfront MRT station|Bayfront]]||[[File:DT16 Bayfront MRT Platform A 20201201 151306.jpg|100px]]||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|Circle Line ''Extension''|Circle MRT line|#{{rcr|SMRT|CC}}|Black}} || S$463 million{{efn|DTL1 Contract 906}} |
|||
|{{SMRT code|DT|27}}||[[Ubi MRT station|Ubi]]||[[File:DT27 Ubi station.jpg|100px]]|| |
|||
|1.1 |
|||
|29.5 |
|||
|- |
|- |
||
|{{SMRT code|DT| |
|scope="row"|{{SMRT code|DT|17}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Downtown MRT station|Downtown]]||[[File:DT17 Downtown MRT Platform B 20201201 160246.jpg|100px]]|| rowspan="2" {{sdash}} || S$230.3 million{{efn|DTL1 Contract 907}} |
||
|1.2 |
|||
|30.7 |
|||
|- |
|- |
||
|{{SMRT code|DT| |
|scope="row"|{{SMRT code|DT|18}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Telok Ayer MRT station|Telok Ayer]]||[[File:DT18 Telok Ayer MRT Platform A 20210310 153836.jpg|100px]] || S$224.9 million{{efn|DTL1 Contract 908}} |
||
|1.1 |
|||
|31.8 |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|DT|19|NE|4}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Chinatown MRT station|Chinatown]]||[[File:DT19 Chinatown MRT Platform C 20201017 150017.jpg|100px]]||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|North East Line|North East MRT line|#{{rcr|SMRT|NE}}|White}} || S$160.3 million{{efn|DTL1 Contract 909}} |
|||
|{{SMRT code|DT|30}}||[[Bedok Reservoir MRT station|Bedok Reservoir]]||[[File:DT30 Bedok Reservoir station.jpg|100px]]|| |
|||
|1.8 |
|||
|33.6 |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|DT|20}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Fort Canning MRT station|Fort Canning]]||[[File:DT20 Fort Canning station.jpg|100px]]|| rowspan="6" {{sdash}} || rowspan="16" align=center | 21 October 2017;<br />{{Years or months ago|2017|10}} || S$255.05 million{{efn|DTL3 Contract 937}} |
|||
|{{SMRT code|DT|31}}||[[Tampines West MRT station|Tampines West]]||[[File:DT31 Tampines West station.jpg|100px]]|| |
|||
|1.7 |
|||
|35.3 |
|||
|- |
|- |
||
|{{SMRT code |
|scope="row"|{{SMRT code|DT|21}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Bencoolen MRT station|Bencoolen]]||[[File:DT21 Bencoolen station.jpg|100px]] || S$177.58 million{{efn|DTL3 Contract 936}} |
||
|1.3 |
|||
|36.6 |
|||
|- |
|- |
||
|{{SMRT code|DT| |
|scope="row"|{{SMRT code|DT|22}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Jalan Besar MRT station|Jalan Besar]]||[[File:DT22 Jalan Besar station.jpg|100px]] || S$171.46 million{{efn|DTL3 Contract 935}} |
||
|1.4 |
|||
|38 |
|||
|- |
|- |
||
|{{SMRT code|DT| |
|scope="row"|{{SMRT code|DT|23}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Bendemeer MRT station|Bendemeer]]||[[File:DT23 Bendemeer station.jpg|100px]] || S$215.24 million{{efn|DTL3 Contract 933}} |
||
|2.6 |
|||
|40.6 |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|DT|24}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Geylang Bahru MRT station|Geylang Bahru]]||[[File:DT24 Geylang Bahru Platform.jpg|100px]] || S$123 million{{efn|DTL3 Contract 932A}} |
|||
|{{SMRT code 2I/C|DT|35|CG|1}}||[[Expo MRT station|Expo]]||[[File:DT35 Expo station.jpg|100px]]||Interchange with the [[East West MRT line|'''{{fontcolor|#009530|East West line}}''']]'s Changi Airport branch line |
|||
|0.9 |
|||
|41.5 |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|DT|25}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Mattar MRT station|Mattar]]||[[File:DT25 Mattar station.jpg|100px]] || S$199.85 million{{efn|DTL3 Contract 932}} |
|||
!colspan=4|Downtown line extension <small>''(under construction, to be ready by 2024)''</small> |
|||
! |
|||
! |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|DT|26|CC|10}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[MacPherson MRT station|MacPherson]]||[[File:DT26 MacPherson station Platform C 20200911 171940.jpg|100px]]||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|Circle Line|Circle MRT line|#{{rcr|SMRT|CC}}|Black}} || S$188 million{{efn|DTL3 Contract 931}} |
|||
|{{SMRT code|DT|36}}||[[Xilin MRT station|Xilin]]|| |
|||
| |
|||
| |
|||
|- |
|- |
||
|scope="row"|{{SMRT code|DT|27}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Ubi MRT station|Ubi]]||[[File:DT27 Ubi station.jpg|100px]]|| rowspan="5" {{sdash}} || S$161.71 million{{efn|DTL3 Contract 930}} |
|||
|{{SMRT code 2I/C|DT|37|TE|31}}|||[[Sungei Bedok MRT station|Sungei Bedok]]|||||Interchange with the [[Thomson–East Coast MRT line|'''{{fontcolor|#734538|Thomson–East Coast line}}''']] <small> (2024) |
|||
|- |
|||
|From Expo |
|||
|scope="row"|{{SMRT code|DT|28}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Kaki Bukit MRT station|Kaki Bukit]]||[[File:DT28 Kaki Bukit station.jpg|100px]] || S$93.8 million{{efn|DTL3 Contract 929}} |
|||
2.2 |
|||
|- |
|||
|44.1 |
|||
|scope="row"|{{SMRT code|DT|29}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Bedok North MRT station|Bedok North]]||[[File:DT29 Bedok North station.jpg|100px]] || S$480.38 million{{efn|S$268.68 million for DTL3 Contract 928 for Bedok North station, S$211.7 million for DTL3 Contract C929A for reception tunnels to Tai Seng Facility Building}} |
|||
|- |
|||
|scope="row"|{{SMRT code|DT|30}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Bedok Reservoir MRT station|Bedok Reservoir]]||[[File:DT30 Bedok Reservoir station.jpg|100px]] || S$196.46 million{{efn|DTL3 Contract 927}} |
|||
|- |
|||
|scope="row"|{{SMRT code|DT|31}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Tampines West MRT station|Tampines West]]||[[File:DT31 Tampines West station.jpg|100px]] || S$226.92 million{{efn|DTL3 Contract 926}} |
|||
|- |
|||
|scope="row"|{{SMRT code|DT|32}}–{{SMRT code|EW|2}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Tampines MRT station|Tampines]]||[[File:DT32 Tampines MRT Platform A 20200919 171156.jpg|100px]]||[[File:Aiga escalator up.svg|15px|link=]] {{rbox|East–West Line|East–West MRT line|#{{rcr|SMRT|EW}}|White}} [[File:Barrier turnstile icon.svg|12px|link=]]<br />―<br />[[File:Bus-logo.svg|15px|link=]] <small>[[Tampines Bus Interchange|Tampines]]</small><br />[[File:Bus-logo.svg|15px|link=]] <small>[[Tampines Concourse Bus Interchange|Tampines Concourse]]</small> || S$118.5 million{{efn|DTL3 Contract 925A}} |
|||
|- |
|||
|scope="row"|{{SMRT code|DT|33}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Tampines East MRT station|Tampines East]]||[[File:DT33 Tampines East station.jpg|100px]]|| rowspan="2" {{sdash}} || S$208.52 million{{efn|DTL3 Contract 925}} |
|||
|- |
|||
|scope="row"|{{SMRT code|DT|34}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Upper Changi MRT station|Upper Changi]]||[[File:DT34 Upper Changi station.jpg|100px]] || S$256.98 million{{efn|DTL3 Contract 923}} |
|||
|- |
|||
|scope="row"|{{SMRT code|DT|35|CG|1}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]||[[Expo MRT station|Expo]]||[[File:DT35 Expo station.jpg|100px]]||[[File:Aiga escalator up.svg|15px|link=]] {{rbox|EWL ''Changi Airport Branch Line''|East–West MRT line|#{{rcr|SMRT|CG}}|White}} <small>''(until 2040)''</small><br />[[File:Aiga escalator up.svg|15px|link=]] {{rbox|Thomson–East Coast Line|Thomson–East Coast MRT line|#{{rcr|SMRT|TE}}|White}} <small>''(after 2040)''</small> || S$211.35 million{{efn|DTL3 Contract 922}} |
|||
|- |
|||
!colspan=6|Stage 3 Extension <small>''(under construction, to be ready by 2026)''</small> |
|||
|- |
|||
|scope="row"|{{SMRT code|DT|36}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||[[Xilin MRT station|Xilin]]||[[File:DT36_Xilin_MRT_station_construction_20210410_172220.jpg|100px]]||{{sdash}} || rowspan="2" align=center | 2026;<br />{{Years or months ago|2026}} || S$833.6 million{{efn|DTL3e Contract T313}} |
|||
|- |
|||
|scope="row" |[[File:MRT Singapore Destination 12.svg|15px|link=]] [[File:MRT Singapore Destination 14.svg|15px|link=]]<br />{{SMRT code|DT|37|TE|31}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]] [[File:ISO 7010 W003.svg|15px|link=]]|||[[Sungei Bedok MRT station|Sungei Bedok]]||[[File:DT37 TE31 Sungei Bedok under construction 20201114 190055.jpg|100px]]|||[[File:Aiga escalator down.svg|15px|link=]] {{rbox|Thomson–East Coast Line|Thomson–East Coast MRT line|#{{rcr|SMRT|TE}}|White}} <small>''(2026)''</small> || S$418 million{{efn|Contract T312; cost shared with Thomson–East Coast Line}} |
|||
|- |
|||
!colspan=6|Stage 2 Extension <small>''(under planning, to be ready by 2035)''</small> |
|||
|- |
|||
|scope="row"|{{SMRT code|DE|1}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]||''[[DE1 MRT station|DE1]]''|| {{CNone}} ||{{sdash}} || rowspan="2" align=center | 2035;<br />{{Years or months ago|2035}} || rowspan="2" {{TBA}} |
|||
|- |
|||
|scope="row" |{{SMRT code|DE|2|NS|6}}<br />[[File:Aiga escalator down.svg|15px|link=]] [[File:MUTCD D9-6.svg|15px|link=]]|||[[Sungei Kadut MRT station|Sungei Kadut]]|| {{CNone}} |||[[File:Aiga escalator up.svg|15px|link=]] {{rbox|North–South Line|North–South MRT line|#{{rcr|SMRT|NS}}|White}} <small>''(2035)''</small> |
|||
|} |
|||
===Depots=== |
|||
{| class="wikitable" style="color: black; border-collapse: collapse; font-size: 95%" |
|||
|- |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|Downtown}}" | Number |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|Downtown}}" | Depot name;<br />Lines |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|Downtown}}" | Location |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|Downtown}}" | Images |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|Downtown}}" | Line-specific<br />stabling capacity |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|Downtown}}" | Cost |
|||
! scope="col" style="color: white; background:#{{rcr|SMRT|Downtown}}" | Opening |
|||
|- |
|||
| {{center|1}} || [[File:Aiga escalator.svg|15px|link=]] {{rbox|Gali Batu|Gali Batu Depot|#{{rcr|SMRT|DT}}|White}} || [[Sungei Kadut]] || [[File:DTL Gali Batu MRT Depot (1).jpg|100px]] || 81 trains || S$410 million || align=center | 27 December 2015;<br />{{Years or months ago|2015|12}} |
|||
|- |
|||
| {{center|2}} || [[File:Aiga escalator down.svg|15px|link=]] {{rbox|Tai Seng|Tai Seng Facility Building|#{{rcr|SMRT|DT}}|White}} || [[Hougang]] || {{CNone}} || 18 trains || S$81.5 million || align=center | 21 October 2017;<br />{{Years or months ago|2017|10}} |
|||
|- |
|||
| {{center|3}} || [[File:Aiga escalator down.svg|15px|link=]] {{rbox|East Coast|East Coast Integrated Depot|#{{rcr|SMRT|DT}}|White}}<br />[[File:Aiga escalator up.svg|15px|link=]] {{rint|sg|ew}}<br />[[File:Aiga escalator.svg|15px|link=]] {{rint|sg|te}} || [[Changi]] || {{CNone}} || 66 trains || S$1.99 billion<ref name="LTA 2016">{{Cite web|url=https://www.lta.gov.sg/content/ltagov/en/newsroom/2016/3/2/lta-awards-contract-to-build-worlds-first-four-in-one-depot.html|archive-url=https://web.archive.org/web/20200213095243/https://www.lta.gov.sg/content/ltagov/en/newsroom/2016/3/2/lta-awards-contract-to-build-worlds-first-four-in-one-depot.html|url-status=dead|archive-date=13 February 2020|title=LTA Awards Contract to Build World's First Four-In-One Depot|website=Land Transport Authority|date=21 March 2016|access-date=13 February 2020}}</ref><ref>{{Cite web|last1=Gabriel|first1=Anita|url=https://www.businesstimes.com.sg/transport/lta-awards-s199b-contract-to-build-worlds-first-four-in-one-depot|archive-url=https://web.archive.org/web/20200213100352/https://www.businesstimes.com.sg/transport/lta-awards-s199b-contract-to-build-worlds-first-four-in-one-depot|url-status=dead|archive-date=13 February 2020|title=LTA awards S$1.99b contract to build world's first four-in-one depot|website=The Business Times|date=21 March 2016|access-date=13 February 2020}}</ref><ref>{{cite web | last=Lim | first=Adrian | title=Korea-based construction firm to build four-in-one train and bus depot for $1.99 billion | website=The Straits Times | date=21 March 2016 | url=https://www.straitstimes.com/singapore/transport/korea-based-construction-firm-to-build-four-in-one-train-and-bus-depot-for-199 | access-date=14 November 2020 | archive-date=1 February 2022 | archive-url=https://web.archive.org/web/20220201090233/https://www.straitstimes.com/singapore/transport/korea-based-construction-firm-to-build-four-in-one-train-and-bus-depot-for-199 | url-status=live }}</ref> || align=center | 2026;<br />{{Years or months ago|2026}} |
|||
|} |
|} |
||
The station code "DT4" is reserved for future use. |
|||
==Rolling stock== |
==Rolling stock== |
||
[[File:DTL Gali Batu MRT Depot (1).jpg|thumb|Gali Batu Depot which houses the Bombardier MOVIA C951(A) trains.]] |
|||
[[File:Mattar platform.jpg|thumbnail|The Bombardier MOVIA C951 at [[Mattar MRT station]]]] |
|||
{{as of|2011}}, the Downtown line has one type of rolling stock, the [[Bombardier Movia C951/C951A|Bombardier MOVIA C951(A)]] cars,<ref>{{cite press release| url=http://app.lta.gov.sg/corp_press_content.asp?start=2040| url-status=dead| title=LTA Awards 6 Downtown Line Contracts Totalling $1.13 Billion| archive-url=https://web.archive.org/web/20110527043536/http://app.lta.gov.sg/corp_press_content.asp?start=2040| archive-date=27 May 2011| date=11 July 2008| author=Land Transport Authority}}</ref> running in a three-car formation. They have been stabled at [[Gali Batu Depot]] since it opened with Stage 2 of the downtown line on 27 December 2015. For the period between the opening of Stage 1 and that of Stage 2, trains were stabled at a maintenance facility that was built at [[Marina Bay MRT station|Marina Bay]] as part of the [[Circle MRT line|Circle line]] project. [[Kim Chuan Depot]] housed the Operations Control Centre for the Downtown Line Stage 1 until [[Gali Batu Depot]] was ready.<ref>{{citation| title=Contract 901QP: Terms of Reference| author=Land Transport Authority| date=9 November 2007| via=www.gebiz.gov.sg}}</ref> |
|||
On 12 October 2012, the first of 11 trains for the |
On 12 October 2012, the first of 11 trains for the line arrived at [[Jurong Port]]. It was transported to [[Kim Chuan Depot]] to undergo testing by the [[Land Transport Authority|LTA]] before it was handed over to [[SBS Transit]].<ref>{{cite web |url=http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line/project-milestones.html |title=Downtown Line Train Arrives| date=12 October 2012| website=Land Transport Authority |access-date=16 November 2013 |archive-url=https://web.archive.org/web/20130929160044/http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line/project-milestones.html |archive-date=29 September 2013 |url-status=dead}}</ref> {{As of|2013|2|28}}, Bombardier had delivered five of the 11 trains for Downtown line stage 1.<ref>{{cite web |url=http://app.lta.gov.sg/apps/news/page.aspx?c=2&id=e09e1b35-7714-4701-a370-88699e32543c |title=Shorter Waiting Time With 15 More Trains For Downtown Line |website=Land Transport Authority |date=28 March 2013 |access-date=28 March 2013 |url-status=dead |archive-url=https://web.archive.org/web/20130411044401/http://app.lta.gov.sg/apps/news/page.aspx?c=2&id=e09e1b35-7714-4701-a370-88699e32543c |archive-date=11 April 2013 }}</ref> LTA together with the operator, SBS Transit, conducted the necessary tests to ensure safety standards, functional performance and systems compatibility requirements were met before revenue service began on 22 December 2013.<ref name="The Straits Times">{{cite news| url=http://www.straitstimes.com/the-big-story/land-transport-masterplan-2013/story/land-transport-masterplan-downtown-line-stage-1-o| title=Land Transport Masterplan: Downtown Line Stage 1 to open on Dec 22| website=The Straits Times| first=Royston| last=Sim| date=7 October 2013| access-date=16 November 2013| archive-url=https://web.archive.org/web/20131203044142/http://www.straitstimes.com/the-big-story/land-transport-masterplan-2013/story/land-transport-masterplan-downtown-line-stage-1-o| archive-date=3 December 2013| url-status=live}}</ref> |
||
Testing |
Testing for Stage 2 began on 25 October 2015 and rolling stock that was delivered to [[Gali Batu Depot]] commenced service in Stage 1 on 21 October 2015, while SBS Transit slowly moved the equipment managing the DTL trains to Gali Batu Depot during non-revenue hours.<ref name="The DTL book" /> [[Kim Chuan Depot]], together with the adjacent [[Tai Seng Facility Building]], operated in a minor capacity until Stage 3 opened. A new depot, named the [[East Coast Integrated Depot]], is planned to provide additional stabling capacity to the line in 2026.<ref>{{Cite news| url=https://www.channelnewsasia.com/news/singapore/4-in-1-rail-and-bus-depot-in-east-coast-saved-taxpayers-s-2-9984498| title=4-in-1 depot save taxpayers 2bn| access-date=3 March 2017| date=23 February 2018| archive-url=https://web.archive.org/web/20180223093129/https://www.channelnewsasia.com/news/singapore/4-in-1-rail-and-bus-depot-in-east-coast-saved-taxpayers-s-2-9984498| archive-date=23 February 2018| url-status=dead}}</ref> Testing on the integration of systems of Stage 3 and the rest of the line started from 14 May 2017 till 27 August 2017.<ref>{{Cite press release| url=https://www.lta.gov.sg/content/ltagov/en/newsroom/2017/4/2/joint-news-release-by-the-land-transport-authority-lta-sbs-transit---train-services-on-downtown-line-to-start-later-at-.html| author1=Land Transport Authority| author2=SBS Transit| title=Train Services on Downtown Line to Start Later at 7.30am on Sundays to Facilitate Systems Integration Testing| website=Land Transport Authority| date=26 April 2017| access-date=24 April 2020| archive-date=19 September 2020| archive-url=https://web.archive.org/web/20200919193148/https://www.lta.gov.sg/content/ltagov/en/newsroom/2017/4/2/joint-news-release-by-the-land-transport-authority-lta-sbs-transit---train-services-on-downtown-line-to-start-later-at-.html| url-status=live}}</ref> |
||
Testing on the Downtown line stage 3 began on 15 August 2017, after the late opening of Downtown line from 27 May 2017. <ref>{{Cite web|url=https://www.channelnewsasia.com/news/singapore/doors-open-on-downtown-line-3-for-preview-ahead-of-oct-21-launch-9312452|title=Doors open on Downtown line 3 for preview ahead of Oct 21 launch|author=Elizabeth Neo|date=15 November 2017|access-date=3 March 2018}}</ref> Most of the remaining rolling stock entered revenue service progressively from that date onwards. Testing on DTL Stage 3 was restricted from Fort Canning to Expo from 19 September 2017. |
|||
==Train control== |
==Train control== |
||
The Downtown line is equipped with [[Siemens Mobility|Siemens]] (previously [[Invensys Rail Group|Invensys]] before Siemens acquisition) Trainguard Sirius [[Communications-based train control]] (CBTC) [[moving block]] signalling system with [[Automatic train control]] (ATC) under [[Automatic train operation]] (ATO) GoA 4 (UTO).<ref>{{cite |
The Downtown line is equipped with [[Siemens Mobility|Siemens]] (previously [[Invensys Rail Group|Invensys]] before Siemens acquisition) Trainguard Sirius [[Communications-based train control]] (CBTC) [[moving block]] signalling system with [[Automatic train control]] (ATC) under [[Automatic train operation]] (ATO) GoA 4 (UTO).<ref>{{cite press release| url=http://www.siemens.asia/sg/en/Press/Press-Releases/Siemens-equipped_driverless_underground_metro_line_in_Singapore_starts_operations_for_Downtown_Line_1.aspx| title=Siemens-equipped driverless underground metro line in Singapore starts operations for Downtown Line 1| author=Siemens| date=11 February 2014| access-date=21 August 2016| archive-url=https://web.archive.org/web/20160304063525/http://www.siemens.asia/sg/en/Press/Press-Releases/Siemens-equipped_driverless_underground_metro_line_in_Singapore_starts_operations_for_Downtown_Line_1.aspx| archive-date=4 March 2016| url-status=dead}}</ref> The subsystems consist of [[Automatic train protection]] (ATP) to govern train speed, Controlguide Rail 9000 Automatic Train Supervision (ATS) to track and schedule trains and Trackguard Westrace MK2 [[Computer-based interlocking]] (CBI) system that prevents incorrect signal and track points to be set.<ref>{{Cite web| url=https://www.mobility.siemens.com/mobility/global/SiteCollectionDocuments/en/news/customer-magazines-and-newsletters/como/como-special-issue-en.pdf| title=como special issue| access-date=25 March 2017| archive-url=https://web.archive.org/web/20150919210839/http://www.mobility.siemens.com/mobility/global/SiteCollectionDocuments/en/news/customer-magazines-and-newsletters/como/como-special-issue-en.pdf| archive-date=19 September 2015| url-status=dead}}</ref><ref>{{Cite web| url=http://www.railjournal.com/index.php/signalling/cbtc-testing-starts-on-singapore-downtown-line.html| title=CBTC testing starts on Singapore Downtown Line| date=29 January 2013| first=Keith| last=Barrow| access-date=25 March 2017| archive-url=https://web.archive.org/web/20170325202828/http://www.railjournal.com/index.php/signalling/cbtc-testing-starts-on-singapore-downtown-line.html| archive-date=25 March 2017| url-status=live}}</ref><!--Note:Please do not delete any hidden content in the train control section--> |
||
A fall-back signalling system, relying on conventional track-circuit occupancy detection, is included to ensure fully automatic operation and train protection independent of the radio system. |
A fall-back signalling system, relying on conventional track-circuit occupancy detection, is included to ensure fully automatic operation and train protection independent of the radio system. |
||
[[Platform screen doors]] by [[Faiveley Transport|Faiveley]]<ref>{{cite web | url= https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=2040 |
[[Platform screen doors]] (PSDs) along the line were installed by Westinghouse Signal (Invensys Rail Group), supplied by [[Faiveley Transport|Faiveley]].<ref>{{cite web |title=Singapore Down Town Line "DTL": Another milestone achievement for Faiveley Transport's Platform Doors and Gates activity |url=http://www.faiveleytransport.com/news/singapore-down-town-line-%E2%80%9Cdtl%E2%80%9D-another-milestone-achievement-faiveley-transports-platform-doors |website=Faiveley Transport| url-status=dead| archive-url=https://web.archive.org/web/20160418045236/http://www.faiveleytransport.com/news/singapore-down-town-line-%E2%80%9Cdtl%E2%80%9D-another-milestone-achievement-faiveley-transports-platform-doors |archive-date=18 April 2016 |date=1 December 2009}}</ref> The PSDs provide safety for passengers, offering protection from arriving and departing trains.<ref>{{cite press release| url=https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=2040| title=LTA Awards 6 Downtown Line Contracts Totalling $1.13 Billion| author=Land Transport Authority| date=7 November 2008| access-date=7 September 2016| archive-url=https://web.archive.org/web/20160917231828/https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=2040| archive-date=17 September 2016| url-status=dead}}</ref><ref>{{cite web| url=http://rpsonline.com.sg/proceedings/9789810863968/html/978-981-08-6396-8_P240.php| title=The Challenges of Delivering the Downtown Line Signalling System| website=WUTC Singapore| access-date=4 April 2017| archive-url=https://web.archive.org/web/20170404215941/http://rpsonline.com.sg/proceedings/9789810863968/html/978-981-08-6396-8_P240.php| archive-date=4 April 2017| url-status=live}}</ref> |
||
== |
==Notes== |
||
{{Notelist}} |
|||
* [http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line.html Downtown Line] |
|||
{{Reflist|group=note}} |
|||
* [https://downtown-line.blogspot.sg/2014/01/dt4-sneak-peek.html Downtown Line Construction] |
|||
==References== |
==References== |
||
{{reflist| |
{{reflist|30em}} |
||
==External links== |
|||
{{commons category}} |
|||
* [https://www.lta.gov.sg/content/ltagov/en/getting_around/public_transport/rail_network/downtown_line.html Downtown Line] |
|||
*[https://www.lta.gov.sg/content/dam/ltagov/who_we_are/statistics_and_publications/books/pdf/The_Downtown_Line_book.pdf The Downtown Line - A commemorative book by LTA detailing the construction of the DTL] |
|||
{{ |
{{Singapore MRT stations|downtown=yes}} |
||
{{ |
{{Rail transport in Singapore}} |
||
{{Singapore railway lines}} |
|||
{{Singapore MRT stations}} |
|||
{{Future developments in Singapore}} |
{{Future developments in Singapore}} |
||
{{Urban Rail Transit in ASEAN}} |
{{Urban Rail Transit in ASEAN}} |
||
Line 291: | Line 267: | ||
{{DEFAULTSORT:Downtown MRT line}} |
{{DEFAULTSORT:Downtown MRT line}} |
||
[[Category:Mass Rapid Transit (Singapore) lines]] |
[[Category:Mass Rapid Transit (Singapore) lines]] |
||
[[Category:Proposed public transport in Singapore]] |
|||
[[Category:Buildings and structures under construction in Singapore]] |
|||
[[Category:Railway lines opened in 2013]] |
[[Category:Railway lines opened in 2013]] |
||
[[Category:2013 establishments in Singapore]] |
[[Category:2013 establishments in Singapore]] |
||
[[Category:Automated guideway transit]] |
Latest revision as of 05:19, 8 January 2025
Downtown Line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Native name | Malay: Laluan MRT Pusat Bandar Chinese: 滨海市区地铁线 Tamil: டவுன்டவுன் எம்ஆர்டி வழி | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational (Stages 1, 2 & 3) Under construction (Hume, Stage 3 extension) Under planning (Stage 2 extension) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Land Transport Authority | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Singapore | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 34 (Operational)[1] 3 (Under construction) 2 (Under planning) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Mass Rapid Transit (Singapore) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | 2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | SBS Transit DTL Pte Ltd (ComfortDelGro Corporation)[2] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Gali Batu Tai Seng East Coast (Future) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | Bombardier Movia C951(A) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 251,556 (July 2020)[3] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Planned opening | 2025Hume) 2026 (Stage 3 extension) 2035 (Stage 2 extension) | (|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 22 December 2013 27 December 2015 (Stage 2) 21 October 2017 (Stage 3) | (Stage 1)|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 41.9 km (26.0 mi) (Operational)[1] 2.2 km (1.4 mi) (Under construction) 4 km (2.5 mi) (Under planning) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Fully underground | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 750 V DC third rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | limit of 80 km/h (50 mph) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Downtown Line (DTL) is a medium-capacity Mass Rapid Transit (MRT) line in Singapore. It runs from Bukit Panjang station in the north-west of the country towards Expo station in the east via a loop around the city-centre. Coloured blue on the rail map, the line serves 34 stations, all of which are underground.[2] The DTL is the fifth MRT line on the network to be opened and the third line to be entirely underground. It is the second MRT line to be operated by ComfortDelGro's SBS Transit after the North East Line. It also serves as an alternative to the East–West Line where it runs roughly geographically parallel from Bugis to Expo station.
Originally planned as three separate lines, the lines merged into the Downtown Line in 2007 and construction began in three stages. Stage 1, from Bugis to Chinatown stations[a] opened in December 2013, followed by Stage 2 from Bukit Panjang to Rochor stations[b] opening in December 2015. The third and final stage, from Fort Canning to Expo stations,[c] opened in October 2017. At 41.9 kilometres (26.0 mi), the DTL is the longest underground and automated rapid transit line in Singapore as of 2017[update].[1] It utilises the Bombardier Movia C951 electric multiple unit (EMU) and runs in a three-car formation.
The line is set to have new stations and extensions in the 2020s and 2030s. An infill station initially constructed as part of Stage 2, Hume, is planned to begin operations in 2025.[4] Stage 3e, a two-station extension consisting of Xilin and Sungei Bedok, is under construction and is scheduled to begin operations in 2026.[5] By 2026, it will be about 45 kilometres (28 mi) long with 37 stations, and will serve more than half a million commuters daily.[6] A two-station extension to connect with the North South Line at Sungei Kadut is also being planned and set to open in 2035.[7]
History
[edit]Background and inception
[edit]At the official opening of the Dover station on 23 October 2001, then-Minister for Communications and Information Technology Yeo Cheow Tong announced three MRT lines, two of which―the Bukit Timah Line and the northern part of the Eastern Region Line―are part of today's DTL. The Bukit Timah Line aimed to alleviate the traffic problems along the Bukit Timah and Dunearn Road corridor, and provide a direct link to the city area for residents in Choa Chu Kang and Bukit Panjang. The proposed Eastern Region Line, slated to be a loop in the eastern regions, aimed to relieve the passenger load on the often-congested East–West Line and benefiting those living in Tampines, Bedok and Marine Parade.[8]: 16―17 [9][10]
On 14 June 2005, the Land Transport Authority (LTA) announced the Downtown Extension (renamed to "Downtown Line Stage 1"), which would serve the New Downtown at Marina Bay area, where an integrated resort (Marina Bay Sands) and Singapore's second botanical garden (Gardens by the Bay) were to be located. The 3.4-kilometre (2.1-mile) extension, estimated to cost S$1.4 billion, was initially announced to be part of the Circle line.[11] On 27 April 2007, then Transport Minister Raymond Lim announced that the Downtown Line would be built in three stages stretching 40 kilometres (25 miles) with 33 stations.[12][13][14][15]
Construction and opening
[edit]The line was built in 3 stages: Stage 1 of the Downtown line, stretching 4.3-kilometre (2.7 mi), started construction in January 2008 at Chinatown station,[8]: 30 where platform provisions were built to facilitate an interchange station during the construction of the North East line. It began service on 22 December 2013,[19] with its official inauguration made on the day before by Prime Minister Lee Hsien Loong.[20]
Stage 2, first conceptualized and announced as the Bukit Timah line on 23 October 2001, is 16.6 kilometres (10.3 mi) long with 12 stations connecting Bukit Panjang and Rochor stations, including four interchange stations. Construction for Stage 2 began on 3 July 2009 with a groundbreaking ceremony at Beauty World station.[21][22] The line inaugurated on 27 December 2015, with free travel for all 18 stations from 27 December 2015 to 1 January 2016.[23][24][25]
Stage 3 goes from Chinatown to Expo. The station locations and finalised route were unveiled on 20 August 2010.[26][27] Stage 3 of the Downtown line is 21 kilometres (13 mi) long and serve 16 stations.[1][28] The route opened on 21 October 2017,[29] with free travel for all DTL stations on the first two days of the line completion.[30][31]
The line, with an estimated cost of S$12 billion, was considered the government's most ambitious rail project. The cost exceeded those of the Circle Line (at $6.7 billion) and the North East Line (at $4.6 billion). Final costs of building the line may reach an estimated about S$20.7 billion, up more than 70% from the initial estimation, due to sharp rises in construction costs and a number of changes in plans.[32][8]: 19
In October 2014, it was announced that Stage 2's opening would be pushed back to the first quarter of 2016. This was because one of the main contractors for the DTL2, Alpine Bau (which was building King Albert Park, Sixth Avenue and Tan Kah Kee), went bankrupt in mid-2013.[33] On 28 June 2015, Transport Minister Lui Tuck Yew announced that the delay was "completely resolved" by the authorities and Stage 2's opening date was brought forward to 27 December 2015.[34][35] The DTL 3 started operations on 21 October 2017, officially opened by Transport Minister Khaw Boon Wan.[36][37][38]
To serve the line, the Gali Batu Depot was opened in December 2015 to stable 42 trains. It is situated at part of the former Kwong Hou Sua Teochew Cemetery off Woodlands Road.[39] Also in February that year, the Land Transport Authority announced that the capacity of the depot will be expanded to stable 81 trains by 2019.[40]
Future
[edit]On 17 January 2013, plans were announced for a southern extension extending from Expo to connect with the Eastern Region line (ERL); the ERL has since been subsumed into the Thomson-East Coast line. The extension was to provide more travel options and enhance connectivity for the residents along the East Coast.[41][42] The Downtown Line 3 extension (DTL3e) was finalised and announced on 15 August 2014, in conjunction with the announcement of the Thomson–East Coast line.[43] Two stations, Xilin MRT station and Sungei Bedok MRT station, will be added to the Downtown Line, with Sungei Bedok as an interchange station with the Thomson–East Coast line. It will lengthen the line by 2.2 km (1.4 mi).[43] Expected to be completed in 2026, Stage 3e will connect the current East–West Line at Expo station and the future TEL at Sungei Bedok station.[44]
On 7 March 2019, Hume station was announced to be opened by 2025 to better serve Hillview residents.[4][45] An additional extension to the Downtown Line to Sungei Kadut station from Bukit Panjang station was announced on 25 May 2019 by the LTA. The extension is set to cut down travel time to the downtown area by up to 30 minutes for those living in the northwestern area of Singapore. The extension is expected to be completed by the mid-2030s. A study will also be conducted to determine the stops to be added between the Sungei Kadut and the existing Bukit Panjang stations.[7]
On 6 December 2024, it was announced that Hume station will be opening in Q2 2025 and Stage 3e will commence operation in the second half of 2026.[46] On 6 January 2025, a 4 km (2.5 mi) extension to the future Sungei Kadut station was announced, including an additional unnamed station between Sungei Kadut station and Bukit Panjang station, slated to begin operation in 2035.[47][48]
Notable incidents
[edit]A fire occurred on a maintenance locomotive which was carrying out works at Mattar station on 24 May 2024 at around 1:00 am. This resulted in the section between Fort Canning and Mattar stations to be closed as the locomotive could not be moved until heat from its body dissipated. The fire was put out by SCDF and one staff member was conveyed to the hospital for smoke inhalation. Train services at the affected MRT stations resumed at 7:26 am after more than an hour since the start of train service.[49]
Network and operations
[edit]Route
[edit]The Downtown line generally goes in an east–west direction from Bukit Panjang in the northwestern side of Singapore, through the downtown area of Singapore, to Tampines and the Singapore Expo in the east. It is 41.9 kilometres (26.0 mi) long and is entirely underground. Before Bukit Panjang station, there exists a brief northwards extension to the line's depot Gali Batu Depot. The line begins at the Bukit Panjang station and then goes in the southeast direction, running parallel to Upper Bukit Timah Road and along the Bukit Timah Canal through Bukit Timah. The line then enters the central area, passing through Little India station before reaching the Central Business District via Bugis station. The Downtown line runs parallel to the Circle line at the Promenade and Bayfront stations. Passing through the Downtown Core, the line interchanges with the North East line at Chinatown station.
After Chinatown station, the line goes in a northeast direction and under the Singapore River. Between the Bencoolen and Jalan Besar stations, the line intersects itself, the first MRT line to do so. After Geylang Bahru station, the line continues in a general eastwards direction, through the industrial areas of Kampong Ubi and Kaki Bukit (briefly paralleling Ubi Avenue 2 and Kaki Bukit Avenue 1), before continuing towards the Tampines Regional Centre and goes southwards, ending at Changi Business Park. The DTL3 extension (DTL3e) from Expo station will extend the line further towards the Thomson–East Coast line at Sungei Bedok station.[51]
Stations
[edit]Station codes for the line are blue, corresponding to the line's colour on the system map. Most stations have island platforms, with the exception of Downtown, Telok Ayer, Chinatown and MacPherson stations having side platforms whilst Stevens and Promenade stations having stacked side platforms.
Date | Project | Description |
---|---|---|
22 December 2013 | Stage 1 | Bugis – Chinatown |
27 December 2015 | Stage 2 | Bugis – Bukit Panjang |
21 October 2017 | Stage 3 | Chinatown – Expo |
2025 | Hume Station | Hume station between Hillview and Beauty World |
2026 | Stage 3 Extension | Expo – Sungei Bedok |
2035 | Stage 2 Extension | DE1 – Sungei Kadut |
Legend
Elevated |
Line terminus |
Transfer outside paid area |
Ground-level |
Wheelchair accessible |
Bus interchange |
Underground |
Civil Defence Shelter |
Other transportation modes |
List
Station code | Station name | Images | Interchange; Adjacent transportation |
Opening | Cost |
---|---|---|---|---|---|
DT1 – BP6 |
Bukit Panjang | Bukit Panjang LRT ― Bukit Panjang |
27 December 2015; 9 years ago |
S$452.4 million[d] | |
DT2 |
Cashew | — | S$431 million[e] | ||
DT3 |
Hillview | ||||
DT4 Infill station |
Hume | 2025; 0 years ago |
S$259.538 million[f] | ||
DT5 |
Beauty World | Beauty World | 27 December 2015; 9 years ago |
S$339.88 million[g] | |
DT6 CR15 |
King Albert Park | Cross Island Line (2032) | S$574.7 million[h] | ||
DT7 |
Sixth Avenue | — | |||
DT8 |
Tan Kah Kee | S$572 million[i] | |||
DT9 CC19 |
Botanic Gardens | Circle Line | S$378.2 million[j] | ||
DT10 TE11 |
Stevens | Thomson–East Coast Line | |||
DT11 – NS21 |
Newton | North–South Line | S$356 million[k] | ||
DT12 NE7 |
Little India | North East Line | S$803.3 million[l] | ||
DT13 |
Rochor | — | |||
DT14 EW12 |
Bugis | East–West Line | 22 December 2013; 11 years ago |
S$582 million[m] | |
DT15 CC4 |
Promenade | Circle Line ― Marina Centre |
S$231 million[n] | ||
DT16 CE1 |
Bayfront | Circle Line Extension | S$463 million[o] | ||
DT17 |
Downtown | — | S$230.3 million[p] | ||
DT18 |
Telok Ayer | S$224.9 million[q] | |||
DT19 NE4 |
Chinatown | North East Line | S$160.3 million[r] | ||
DT20 |
Fort Canning | — | 21 October 2017; 7 years ago |
S$255.05 million[s] | |
DT21 |
Bencoolen | S$177.58 million[t] | |||
DT22 |
Jalan Besar | S$171.46 million[u] | |||
DT23 |
Bendemeer | S$215.24 million[v] | |||
DT24 |
Geylang Bahru | S$123 million[w] | |||
DT25 |
Mattar | S$199.85 million[x] | |||
DT26 CC10 |
MacPherson | Circle Line | S$188 million[y] | ||
DT27 |
Ubi | — | S$161.71 million[z] | ||
DT28 |
Kaki Bukit | S$93.8 million[aa] | |||
DT29 |
Bedok North | S$480.38 million[ab] | |||
DT30 |
Bedok Reservoir | S$196.46 million[ac] | |||
DT31 |
Tampines West | S$226.92 million[ad] | |||
DT32 – EW2 |
Tampines | East–West Line ― Tampines Tampines Concourse |
S$118.5 million[ae] | ||
DT33 |
Tampines East | — | S$208.52 million[af] | ||
DT34 |
Upper Changi | S$256.98 million[ag] | |||
DT35 CG1 |
Expo | EWL Changi Airport Branch Line (until 2040) Thomson–East Coast Line (after 2040) |
S$211.35 million[ah] | ||
Stage 3 Extension (under construction, to be ready by 2026) | |||||
DT36 |
Xilin | — | 2026; 1 year's time |
S$833.6 million[ai] | |
DT37 TE31 |
Sungei Bedok | Thomson–East Coast Line (2026) | S$418 million[aj] | ||
Stage 2 Extension (under planning, to be ready by 2035) | |||||
DE1 |
DE1 | — | 2035; 10 years' time |
TBA | |
DE2 NS6 |
Sungei Kadut | North–South Line (2035) |
Depots
[edit]Number | Depot name; Lines |
Location | Images | Line-specific stabling capacity |
Cost | Opening |
---|---|---|---|---|---|---|
1 |
Gali Batu | Sungei Kadut | 81 trains | S$410 million | 27 December 2015; 9 years ago | |
2 |
Tai Seng | Hougang | 18 trains | S$81.5 million | 21 October 2017; 7 years ago | |
3 |
East Coast EWL TEL |
Changi | 66 trains | S$1.99 billion[52][53][54] | 2026; 1 year's time |
Rolling stock
[edit]As of 2011[update], the Downtown line has one type of rolling stock, the Bombardier MOVIA C951(A) cars,[55] running in a three-car formation. They have been stabled at Gali Batu Depot since it opened with Stage 2 of the downtown line on 27 December 2015. For the period between the opening of Stage 1 and that of Stage 2, trains were stabled at a maintenance facility that was built at Marina Bay as part of the Circle line project. Kim Chuan Depot housed the Operations Control Centre for the Downtown Line Stage 1 until Gali Batu Depot was ready.[56]
On 12 October 2012, the first of 11 trains for the line arrived at Jurong Port. It was transported to Kim Chuan Depot to undergo testing by the LTA before it was handed over to SBS Transit.[57] As of 28 February 2013[update], Bombardier had delivered five of the 11 trains for Downtown line stage 1.[58] LTA together with the operator, SBS Transit, conducted the necessary tests to ensure safety standards, functional performance and systems compatibility requirements were met before revenue service began on 22 December 2013.[59]
Testing for Stage 2 began on 25 October 2015 and rolling stock that was delivered to Gali Batu Depot commenced service in Stage 1 on 21 October 2015, while SBS Transit slowly moved the equipment managing the DTL trains to Gali Batu Depot during non-revenue hours.[8] Kim Chuan Depot, together with the adjacent Tai Seng Facility Building, operated in a minor capacity until Stage 3 opened. A new depot, named the East Coast Integrated Depot, is planned to provide additional stabling capacity to the line in 2026.[60] Testing on the integration of systems of Stage 3 and the rest of the line started from 14 May 2017 till 27 August 2017.[61]
Train control
[edit]The Downtown line is equipped with Siemens (previously Invensys before Siemens acquisition) Trainguard Sirius Communications-based train control (CBTC) moving block signalling system with Automatic train control (ATC) under Automatic train operation (ATO) GoA 4 (UTO).[62] The subsystems consist of Automatic train protection (ATP) to govern train speed, Controlguide Rail 9000 Automatic Train Supervision (ATS) to track and schedule trains and Trackguard Westrace MK2 Computer-based interlocking (CBI) system that prevents incorrect signal and track points to be set.[63][64]
A fall-back signalling system, relying on conventional track-circuit occupancy detection, is included to ensure fully automatic operation and train protection independent of the radio system.
Platform screen doors (PSDs) along the line were installed by Westinghouse Signal (Invensys Rail Group), supplied by Faiveley.[65] The PSDs provide safety for passengers, offering protection from arriving and departing trains.[66][67]
Notes
[edit]- ^ Formerly the Downtown Extension of the Circle Line.
- ^ Formerly the Bukit Timah Line.
- ^ Formerly the northern stretch of the Eastern Region Line.
- ^ DTL2 Contract 912
- ^ DTL2 Contract 913
- ^ S$225.2 for DTL2 Contract 915, S$34.338 million for Contract 915A for completion works
- ^ DTL2 Contract 916
- ^ S$320.7 million for DTL2 Contract 917, S$254 million for DTL2 Contract 917A for completion of works after insolvency of first contractor
- ^ S$350 million for DTL2 Contract 918, S$222 million for DTL2 Contract 918A for completion of works after insolvency of first contractor
- ^ DTL2 Contract 919
- ^ DTL2 Contract 920
- ^ DTL2 Contract 921
- ^ DTL1 Contract 903
- ^ DTL1 Contract 902
- ^ DTL1 Contract 906
- ^ DTL1 Contract 907
- ^ DTL1 Contract 908
- ^ DTL1 Contract 909
- ^ DTL3 Contract 937
- ^ DTL3 Contract 936
- ^ DTL3 Contract 935
- ^ DTL3 Contract 933
- ^ DTL3 Contract 932A
- ^ DTL3 Contract 932
- ^ DTL3 Contract 931
- ^ DTL3 Contract 930
- ^ DTL3 Contract 929
- ^ S$268.68 million for DTL3 Contract 928 for Bedok North station, S$211.7 million for DTL3 Contract C929A for reception tunnels to Tai Seng Facility Building
- ^ DTL3 Contract 927
- ^ DTL3 Contract 926
- ^ DTL3 Contract 925A
- ^ DTL3 Contract 925
- ^ DTL3 Contract 923
- ^ DTL3 Contract 922
- ^ DTL3e Contract T313
- ^ Contract T312; cost shared with Thomson–East Coast Line
References
[edit]- ^ a b c d "Projects – Downtown Line – Stages". Land Transport Authority of Singapore. 17 December 2013. Archived from the original on 3 July 2014. Retrieved 23 June 2014.
- ^ a b "Company Announcement – Incorporation of a Wholly-Owned Subsidiary" (PDF). Archived from the original (PDF) on 10 June 2015. Retrieved 5 September 2012.
- ^ "Land Transport DataMall". mytransport.sg. Archived from the original on 21 August 2020. Retrieved 20 August 2020.
- ^ a b "滨海市区线谦道站料2025年启用" [Hume Station on Downtown Line is expected to open in 2025]. 早报 (Zaobao) (in Chinese). 7 March 2019. Archived from the original on 7 March 2019. Retrieved 7 March 2019.
- ^ "Downtown Line 3 Extension". Land Transport Authority. Archived from the original on 6 April 2019. Retrieved 28 April 2017.
- ^ "More Trains, More Capacity, More Often". Land Transport Authority. Archived from the original on 29 September 2013.
- ^ a b Choo, Daryl (25 May 2019). "New MRT stations, line extensions and a possible new rail line: LTA's 2040 blueprint". TODAYonline. Archived from the original on 25 May 2019. Retrieved 29 May 2019.
- ^ a b c d The Downtown Line: Soaring to new heights. The Straits Times. 2017.
- ^ "Speech by Mr Yeo Cheow Tong at the Official Opening of Dover Station on 23 Oct 2001". MOT. Archived from the original on 5 September 2020. Retrieved 11 July 2019.
- ^ Land Transport Authority (24 January 2014). "Circle Line Linking All Lines". The Straits Times. p. 50.
- ^ "Expanding The Rail Network With Downtown Extension". LTA. 14 June 2005. Archived from the original on 27 September 2007. Retrieved 30 August 2019.
- ^ "Speech By Mr Raymond Lim At The LTA Workplan Seminar on 27 April 2007". MOT. Archived from the original on 3 September 2020. Retrieved 11 July 2019.
- ^ "Govt approves S$12b MRT Downtown Line to be built by 2018". Archived from the original on 9 December 2012.
- ^ "Government Approves Building Of The Downtown Line". LTA. 27 April 2007. Archived from the original on 2 March 2012. Retrieved 6 September 2019.
- ^ "33-station Downtown line gets go-ahead, will be ready by 2018". The Straits Times. 28 April 2007. Archived from the original on 8 October 2019. Retrieved 8 October 2019 – via NLB.
- ^ Abdullah, Zhaki (20 October 2017). "Downtown Line Stage 3 to be opened". The Straits Times. Archived from the original on 31 May 2017. Retrieved 31 May 2017.
- ^ LTA (12 November 2016). "LTA Wins Top Accolade at International Tunnelling Awards". Land Transport Authority (Press release). Archived from the original on 19 September 2020. Retrieved 24 April 2020.
- ^ "Factsheet: Downtown Line 3 to Open on 21 October 2017". Land Transport Authority. Archived from the original on 3 July 2017. Retrieved 3 June 2017.
- ^ "Downtown Line". Land Transport Authority. Archived from the original on 3 July 2014. Retrieved 22 December 2013.
- ^ Sim, Royston (21 December 2013). "Downtown Line Stage 1 officially opened by PM Lee". The Straits Times. Archived from the original on 22 December 2013. Retrieved 22 December 2013.
- ^ Tan, Christopher (15 July 2008). "LTA unveils locations of DTL stage 2 stations". The Straits Times. Archived from the original on 13 August 2008.
- ^ Thia, Tyler (3 July 2009). "Work on MRT Downtown Line Phase 2 Starts". Channel NewsAsia. Archived from the original on 6 September 2009. Retrieved 21 August 2009.
- ^ "The Rail Report: 12 stations of Downtown Line 2 to Open on 27 December". Land Transport Authority. 6 August 2015. Archived from the original on 3 October 2015. Retrieved 6 August 2015.
- ^ "Downtown Line 2 to open ahead of schedule in December: Transport Minister Lui". Channel NewsAsia. 28 June 2015. Archived from the original on 30 June 2015. Retrieved 28 June 2015.
- ^ "LTA | Downtown Line 2 is Coming to Town….this December". www.lta.gov.sg. Archived from the original on 4 September 2020. Retrieved 19 September 2022.
- ^ "Downtown Line 3 (DTL3) Stations Unveiled". MOT Singapore. 20 August 2020. Archived from the original on 21 August 2020. Retrieved 24 April 2020.
- ^ Land Transport Authority (20 August 2010). "Downtown Line 3 station Locations Unveiled" (Press release). Archived from the original on 21 June 2011.
- ^ Land Transport Authority; SBS Transit (26 April 2017). "Train Services on Downtown Line to Start Later at 7.30am on Sundays to Facilitate Systems Integration Testing". Land Transport Authority (Press release). Archived from the original on 28 April 2017. Retrieved 28 April 2017.
- ^ "Factsheet: Downtown Line 3 to Open on 21 October 2017". Land Transport Authority. 31 May 2017. Archived from the original on 3 July 2017. Retrieved 31 May 2017.
- ^ Land Transport Authority. "Opening of Downtown Line 3: Free Travel on Entire Downtown Line on 21 and 22 October 2017". LTA (Press release). Archived from the original on 19 September 2020. Retrieved 24 April 2020.
- ^ Neo, Elizabeth (15 November 2017). "Doors open on Downtown line 3 for preview ahead of Oct 21 launch". Archived from the original on 3 March 2018. Retrieved 3 March 2018.
- ^ Tan, Christopher (30 October 2012). "Downtown Line costs soar by more than 70%". The Straits Times. Archived from the original on 29 October 2012.
- ^ Ng, Kelly (29 September 2014). "Stage 2 of Downtown Line to open in first quarter 2016". TODAYonline. Archived from the original on 11 October 2016. Retrieved 16 May 2016.
- ^ Choon, Chang May (3 October 2014). "Thumbs Up For Downtown Line's Earlier Opening". The Straits Times. Archived from the original on 3 April 2015. Retrieved 28 February 2015.
- ^ Land Transport Authority (4 November 2015). "Downtown Line 2 is Coming to Town....this December". LTA (Press release). Archived from the original on 4 September 2020. Retrieved 24 April 2020.
- ^ Tan, Christopher (20 October 2017). "Downtown Line 3 officially opens; Khaw Boon Wan announces review of fares incurred when switching between stations". The Straits Times. Archived from the original on 21 October 2017. Retrieved 21 October 2017.
- ^ "LTA Awards Contracts for Tampines West and Bedok Reservoir Stations". Mynewsdesk (Press release). 5 July 2011. Archived from the original on 8 August 2014. Retrieved 7 March 2020.
- ^ Neo, Elizabeth (31 May 2017). "Downtown Line 3 to open on Oct 21". Channel NewsAsia. Archived from the original on 31 May 2017. Retrieved 31 May 2017.
- ^ Perry, Margaret (26 February 2008). "Downtown Line depot to be located off Woodlands Road". Channel NewsAsia. Archived from the original on 1 March 2008.
- ^ Land Transport Authority (17 February 2015). "Gali Batu Depot". Archived from the original on 1 March 2018. Retrieved 1 March 2018.
- ^ "Speech by Mr Lui Tuck Yew at visit to DTL1 Chinatown Station on 17 January 2013". MOT. 17 January 2013. Archived from the original on 26 February 2020. Retrieved 19 September 2019.
- ^ "Two New Rail Lines and Three New Extensions to Expand Rail Network by 2030". Land Transport Authority. 17 January 2013. Archived from the original on 6 July 2014.
- ^ a b Ismail, Saifulbahri (15 August 2014). "Thomson–East Coast Line, connecting North and East, ready by 2024". Channel NewsAsia. Archived from the original on 16 August 2014.
- ^ "Downtown Line 3 Extension". Land Transport Authority. 15 August 2014. Archived from the original on 15 October 2014. Retrieved 15 August 2014.
- ^ Tan, Christopher (30 June 2020). "Work on Hume MRT station on Downtown Line to start in the fourth quarter". The Straits Times. Archived from the original on 19 September 2020. Retrieved 21 August 2020.
- ^ Kok, Yufeng (6 December 2024). "Hume MRT station to open in Q2 2025; Circle Line Stage 6 to be ready in first half of 2026". The Straits Times. Archived from the original on 6 December 2024. Retrieved 6 December 2024.
- ^ @LTAsingapore (6 January 2025). 🚇🌟 3 new stations will connect the Downtown Line (#DTL) to the North-South Line (#NSL)!. Retrieved 6 January 2025 – via YouTube.
- ^ Kok, Yufeng (6 January 2025). "DTL extension to Sungei Kadut to open in 2035, including new MRT station near Yew Tee Village". The Straits Times. Retrieved 6 January 2025.
- ^ William, Whitney (24 May 2024). "Train service disrupted at six Downtown Line stations after maintenance locomotive catches fire". The Straits Times. ISSN 0585-3923. Retrieved 24 May 2024.
- ^ "Oct 21 debut for Downtown Line 3". The New Paper. 1 June 2017. Retrieved 2 August 2023.
- ^ "Downtown Line Overview". Land Transport Authority. Archived from the original on 31 March 2017. Retrieved 28 May 2017.
- ^ "LTA Awards Contract to Build World's First Four-In-One Depot". Land Transport Authority. 21 March 2016. Archived from the original on 13 February 2020. Retrieved 13 February 2020.
- ^ Gabriel, Anita (21 March 2016). "LTA awards S$1.99b contract to build world's first four-in-one depot". The Business Times. Archived from the original on 13 February 2020. Retrieved 13 February 2020.
- ^ Lim, Adrian (21 March 2016). "Korea-based construction firm to build four-in-one train and bus depot for $1.99 billion". The Straits Times. Archived from the original on 1 February 2022. Retrieved 14 November 2020.
- ^ Land Transport Authority (11 July 2008). "LTA Awards 6 Downtown Line Contracts Totalling $1.13 Billion" (Press release). Archived from the original on 27 May 2011.
- ^ Land Transport Authority (9 November 2007), Contract 901QP: Terms of Reference – via www.gebiz.gov.sg
- ^ "Downtown Line Train Arrives". Land Transport Authority. 12 October 2012. Archived from the original on 29 September 2013. Retrieved 16 November 2013.
- ^ "Shorter Waiting Time With 15 More Trains For Downtown Line". Land Transport Authority. 28 March 2013. Archived from the original on 11 April 2013. Retrieved 28 March 2013.
- ^ Sim, Royston (7 October 2013). "Land Transport Masterplan: Downtown Line Stage 1 to open on Dec 22". The Straits Times. Archived from the original on 3 December 2013. Retrieved 16 November 2013.
- ^ "4-in-1 depot save taxpayers 2bn". 23 February 2018. Archived from the original on 23 February 2018. Retrieved 3 March 2017.
- ^ Land Transport Authority; SBS Transit (26 April 2017). "Train Services on Downtown Line to Start Later at 7.30am on Sundays to Facilitate Systems Integration Testing". Land Transport Authority (Press release). Archived from the original on 19 September 2020. Retrieved 24 April 2020.
- ^ Siemens (11 February 2014). "Siemens-equipped driverless underground metro line in Singapore starts operations for Downtown Line 1" (Press release). Archived from the original on 4 March 2016. Retrieved 21 August 2016.
- ^ "como special issue" (PDF). Archived from the original (PDF) on 19 September 2015. Retrieved 25 March 2017.
- ^ Barrow, Keith (29 January 2013). "CBTC testing starts on Singapore Downtown Line". Archived from the original on 25 March 2017. Retrieved 25 March 2017.
- ^ "Singapore Down Town Line "DTL": Another milestone achievement for Faiveley Transport's Platform Doors and Gates activity". Faiveley Transport. 1 December 2009. Archived from the original on 18 April 2016.
- ^ Land Transport Authority (7 November 2008). "LTA Awards 6 Downtown Line Contracts Totalling $1.13 Billion" (Press release). Archived from the original on 17 September 2016. Retrieved 7 September 2016.
- ^ "The Challenges of Delivering the Downtown Line Signalling System". WUTC Singapore. Archived from the original on 4 April 2017. Retrieved 4 April 2017.