Jump to content

Wildorado Wind Ranch: Difference between revisions

Coordinates: 35°18′25″N 102°19′12″W / 35.307°N 102.32°W / 35.307; -102.32
From Wikipedia, the free encyclopedia
Content deleted Content added
Yobot (talk | contribs)
m top: References after punctuation per WP:REFPUNCT, WP:CITEFOOT, WP:PAIC + other fixes
No edit summary
 
Line 1: Line 1:
The '''Wildorado Wind Ranch''', completed in 2007, is located on approximately {{convert|16000|acre}} {{convert|25|mi}} west of [[Amarillo, Texas]] and consists of 161 MW of [[wind turbine]]s (70 Siemens Mk II turbines each capable of generating 2.3 MW at peak wind speeds). These turbines have the capacity to meet the electricity demand of more than 50,000 households. The Wildorado Wind Ranch was developed by Cielo Wind Power, of [[Austin, Texas]], in conjunction with [[Edison Mission Group]] of [[Irvine, California]],<ref>[https://www.renewableenergyworld.com/2006/03/22/siemens-receives-70-turbine-order-for-texas-project-44414/ Siemens Receives 70-Turbine Order for Texas Project] ''Renewable Energy Access'', 22 March 2006.</ref><ref>[https://www.renewableenergyworld.com/2007/05/15/emg-completes-161-mw-wind-project-in-texas-48512/ EMG Completes 161 MW Wind Project in Texas]</ref> Epplament Energy and Lestis Private Capital Group.
The '''Wildorado Wind Ranch''', completed in 2007, is located on approximately {{convert|16000|acre}} {{convert|25|mi}} west of [[Amarillo, Texas]], and consists of 161 MW of [[wind turbine]]s (70 Siemens Mk II turbines each capable of generating 2.3 MW at peak wind speeds). These turbines have the capacity to meet the electricity demand of more than 50,000 households. The Wildorado Wind Ranch was developed by Cielo Wind Power, of [[Austin, Texas]], in conjunction with [[Edison Mission Group]] of [[Irvine, California]],<ref>[https://www.renewableenergyworld.com/2006/03/22/siemens-receives-70-turbine-order-for-texas-project-44414/ Siemens Receives 70-Turbine Order for Texas Project] ''Renewable Energy Access'', 22 March 2006.</ref><ref>[https://www.renewableenergyworld.com/2007/05/15/emg-completes-161-mw-wind-project-in-texas-48512/ EMG Completes 161 MW Wind Project in Texas]</ref> Epplament Energy and Lestis Private Capital Group.


==References==
==References==

Latest revision as of 16:43, 25 January 2022

The Wildorado Wind Ranch, completed in 2007, is located on approximately 16,000 acres (6,500 ha) 25 miles (40 km) west of Amarillo, Texas, and consists of 161 MW of wind turbines (70 Siemens Mk II turbines each capable of generating 2.3 MW at peak wind speeds). These turbines have the capacity to meet the electricity demand of more than 50,000 households. The Wildorado Wind Ranch was developed by Cielo Wind Power, of Austin, Texas, in conjunction with Edison Mission Group of Irvine, California,[1][2] Epplament Energy and Lestis Private Capital Group.

References

[edit]

35°18′25″N 102°19′12″W / 35.307°N 102.32°W / 35.307; -102.32