Chiswick Road station: Difference between revisions
update plans |
LuckyBirdie (talk | contribs) mNo edit summary |
||
Line 36: | Line 36: | ||
*[https://mbta.com/stops/place-chswk MBTA - Chiswick Road] |
*[https://mbta.com/stops/place-chswk MBTA - Chiswick Road] |
||
*[https://www.google.com/maps/@42.3408058,-71.1505203,3a,75y,260.32h,80.04t/data=!3m6!1e1!3m4!1sfczogiv6r7G9bgs6RRPrvQ!2e0!7i13312!8i6656 Station from Google Maps Street View] |
*[https://www.google.com/maps/@42.3408058,-71.1505203,3a,75y,260.32h,80.04t/data=!3m6!1e1!3m4!1sfczogiv6r7G9bgs6RRPrvQ!2e0!7i13312!8i6656 Station from Google Maps Street View] |
||
{{MBTA Subway Stations}} |
|||
[[Category:Brighton, Boston]] |
[[Category:Brighton, Boston]] |
Revision as of 18:11, 18 August 2022
Chiswick Road | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | Commonwealth Avenue at Chiswick Road Brighton, Boston, Massachusetts | ||||||||||
Coordinates | 42°20′27″N 71°09′02″W / 42.340839°N 71.150459°W | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Passengers | |||||||||||
2011 daily | 615[1] | ||||||||||
Services | |||||||||||
|
Chiswick Road station is a light rail station on the MBTA's Green Line B branch, located in the median of Commonwealth Avenue north of Chiswick Road in the Brighton neighborhood of Boston, Massachusetts. Chiswick Road consists of two side platforms, which serve the B branch's two tracks.
History
In 2003, Chiswick Road was one of five stops on the B branch proposed for closure, due to having a low average daily ridership and being located quite close to nearby, better-used stops.[2] Chiswick Road was dropped from the proposal shortly after it was announced due to opposition from residents of a local housing project for the elderly served by the stop.[2] The other four stops (Fordham Road, Summit Avenue, Mount Hood Road, and Greycliff Road) were provisionally closed on April 20, 2004, which was made permanent on March 15, 2005.[2][3]
Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops. As of May 2021[update], the MBTA expects construction at Chiswick Road and four other B Branch stops to begin in 2023–24.[4]
References
- ^ "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
- ^ a b c Daniel, Mac (16 March 2005). "T drops 4 Green Line stops after results of rider survey". Boston Globe. Archived from the original on 18 March 2005. Retrieved 6 June 2016.
- ^ "Green Line B Branch Service Enhancements" (PDF). TRANSreport. Boston Regional Metropolitan Planning Organization. May 2004. Archived from the original (PDF) on 26 November 2010. Retrieved 6 February 2014.
- ^ Brelsford, Laura (May 24, 2021). "System-Wide Accessibility Initiatives—May 2021" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. p. 4.
External links
Media related to Chiswick Road station at Wikimedia Commons