Jump to content

Petronas Tower 3: Difference between revisions

Coordinates: 3°09′24″N 101°42′40″E / 3.15667°N 101.71111°E / 3.15667; 101.71111
From Wikipedia, the free encyclopedia
Content deleted Content added
mNo edit summary
No edit summary
Tags: Reverted Mobile edit Mobile web edit
Line 1: Line 1:
{{short description|Skyscraper in Kuala Lumpur, Malaysia}}
{{short description|Skyscraper in Kuala Lumpur, Malaysia}}
{{EngvarB|date=September 2014}}
{{Alifsamad30|date=September 2014}}
{{Use dmy dates|date=September 2014}}
{{Use dmy dates|date=September 2075}}
{{Infobox building
{{Infobox building
| mapframe-zoom = 16
| mapframe-zoom = 16
| name = Petronas Tower 3
| name = Petronas Tower 3
| former_names = Carigali Tower (''Menara Carigali'')
| former_names = (''Menara'')
| image = KL - Menara Carigali, KLCC.JPG
| image = KL - Menara Carigali, KLCC.JPG
| image_size =
| image_size =
Line 24: Line 24:
| cost = [[Malaysian ringgit|MYR]] 665 million for superstructure
| cost = [[Malaysian ringgit|MYR]] 665 million for superstructure
| floor_area = {{convert|900000|sqft|m2|sing=on}}
| floor_area = {{convert|900000|sqft|m2|sing=on}}
| architect = Pelli Clarke Pelli Architects
| architect =
| structural_engineer =
| structural_engineer =
| main_contractor = [[Daewoo]] Engineering And Construction
| main_contractor = [[Daewoo]] Engineering And Construction
Line 34: Line 34:


The 60-storey '''Petronas Tower 3''', previously known as '''Carigali Tower''', is a [[skyscraper]] located within [[Kuala Lumpur City Centre|KLCC]] in [[Kuala Lumpur]], [[Malaysia]]. The building features a 6-level extension to the [[Suria KLCC]] shopping mall, while the rest of the floors above are solely made up of office spaces. It is the headquarters of Petronas Carigali, the E&P subsidiary of PETRONAS and some of the local subsidiaries of Multinational Corporations such as Microsoft Malaysia. Along with the [[Kuala Lumpur Convention Centre]] and the Binjai On The Park condominiums, the development of Lot C falls under Phase 2 of the KLCC project. Its development cost is reported at RM1 billion.<ref>{{cite news| title=KLCC Masterplan| url=http://www.klcc.com.my/KLCCWeb/klccp.nsf/F76B777F465FA6E748256D9E00267526/5A7BB0AC7F3DFC14482570C8003488A7?OpenDocument| publisher=KLCC| url-status=dead| archiveurl=https://web.archive.org/web/20090917063639/http://www.klcc.com.my/KLCCWeb/klccp.nsf/F76B777F465FA6E748256D9E00267526/5A7BB0AC7F3DFC14482570C8003488A7?OpenDocument| archivedate=17 September 2009| df=dmy-all}}</ref><ref>{{cite news| title=KLCCP gets strong interest for Lot C project| url=http://biz.thestar.com.my/news/story.asp?file=/2010/7/14/business/6658758&sec=business| work=The Star| date=14 July 2010}}</ref>
The 60-storey '''Petronas Tower 3''', previously known as '''Carigali Tower''', is a [[skyscraper]] located within [[Kuala Lumpur City Centre|KLCC]] in [[Kuala Lumpur]], [[Malaysia]]. The building features a 6-level extension to the [[Suria KLCC]] shopping mall, while the rest of the floors above are solely made up of office spaces. It is the headquarters of Petronas Carigali, the E&P subsidiary of PETRONAS and some of the local subsidiaries of Multinational Corporations such as Microsoft Malaysia. Along with the [[Kuala Lumpur Convention Centre]] and the Binjai On The Park condominiums, the development of Lot C falls under Phase 2 of the KLCC project. Its development cost is reported at RM1 billion.<ref>{{cite news| title=KLCC Masterplan| url=http://www.klcc.com.my/KLCCWeb/klccp.nsf/F76B777F465FA6E748256D9E00267526/5A7BB0AC7F3DFC14482570C8003488A7?OpenDocument| publisher=KLCC| url-status=dead| archiveurl=https://web.archive.org/web/20090917063639/http://www.klcc.com.my/KLCCWeb/klccp.nsf/F76B777F465FA6E748256D9E00267526/5A7BB0AC7F3DFC14482570C8003488A7?OpenDocument| archivedate=17 September 2009| df=dmy-all}}</ref><ref>{{cite news| title=KLCCP gets strong interest for Lot C project| url=http://biz.thestar.com.my/news/story.asp?file=/2010/7/14/business/6658758&sec=business| work=The Star| date=14 July 2010}}</ref>

The [[Marini's on 57|Marini’s on 57]] is located on the 57th floor of the building. It has a dedicated private lift that takes visitors directly to the rooftop bar and restaurant.


==Construction==
==Construction==

Revision as of 13:59, 12 March 2022

Template:Alifsamad30

Petronas Tower 3
View from the KLCC Park
Map
Former names(Menara)
General information
StatusCompleted
TypeOffice and retail
LocationKuala Lumpur City Centre, Kuala Lumpur, Malaysia
Construction startedLate 2006
Completed2011
CostMYR 665 million for superstructure
OwnerKLCC Properties
ManagementKLCC Properties
Height
Roof267 m (876 ft)
Technical details
Floor count60
Floor area900,000-square-foot (84,000 m2)
Design and construction
DeveloperKLCC Property Holdings (KLCCP)
Main contractorDaewoo Engineering And Construction

The 60-storey Petronas Tower 3, previously known as Carigali Tower, is a skyscraper located within KLCC in Kuala Lumpur, Malaysia. The building features a 6-level extension to the Suria KLCC shopping mall, while the rest of the floors above are solely made up of office spaces. It is the headquarters of Petronas Carigali, the E&P subsidiary of PETRONAS and some of the local subsidiaries of Multinational Corporations such as Microsoft Malaysia. Along with the Kuala Lumpur Convention Centre and the Binjai On The Park condominiums, the development of Lot C falls under Phase 2 of the KLCC project. Its development cost is reported at RM1 billion.[1][2]

Construction

Groundbreaking started in late 2006 and finished in February 2009. In January 2009, KLCC Properties Holdings Berhad (KLCCP) awarded an RM665mil contract for the superstructure to Daewoo Engineering and Construction, which began building the top structure in March 2009.[3] The retail mall section is expected to be ready by 2010, followed by the office block component by October 2011.[4][5] The office tower will house 840,000 square feet (78,000 m2) net lettable office space, while the retail portion of the building will measure 140,000 square feet (13,000 m2). The development will also feature a tunnel link to the adjacent Lot D1, KLCC for future development.[6]

See also

References

  1. ^ "KLCC Masterplan". KLCC. Archived from the original on 17 September 2009.
  2. ^ "KLCCP gets strong interest for Lot C project". The Star. 14 July 2010.
  3. ^ "Daewoo gets RM665m job from KLCCP". The Star. 7 January 2009.
  4. ^ "KLCCP 2009 Annual Report - Chairman's Statement". KLCCP. Archived from the original on 17 September 2009.
  5. ^ "KLCC Property expects office rental income to boost profit". Business Times. 1 July 2009.[permanent dead link]
  6. ^ "KLCCP 2009 Annual Report - The Year In Review – New Developments" (PDF). KLCCP.[permanent dead link]

3°09′24″N 101°42′40″E / 3.15667°N 101.71111°E / 3.15667; 101.71111