Jump to content

Batasan station: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Address cleanup; omitted ubiquitous transport connections
230125 updates
Tags: Mobile edit Mobile web edit
Line 19: Line 19:
| pass_year=
| pass_year=
| pass_percent=
| pass_percent=
| opened= 2022
| opened=
| rebuilt =
| rebuilt =
| status= Under construction
| status= Under construction
Line 31: Line 31:


'''Batasan station''' is an under-construction [[Manila Metro Rail Transit System|Manila Metro Rail Transit]] (MRT) station situated on [[MRT Line 7|Line 7]] located in [[Batasan Hills]], [[Quezon City]], [[Philippines]]. It is near the [[Sandiganbayan|Sandiganbayan Centennial Building]], Public Attorneys Office Building, Batasan TODA Terminal, the [[Commission on Audit (Philippines)|Commission on Audit Complex]] and the [[Batasan Pambansa|Batasan Pambansa Complex]]. It is the ninth station for trains headed towards the [[North Avenue Grand Central Station|North Triangle Common Station]] and the sixth station for trains headed to [[San Jose del Monte station|San Jose del Monte]].
'''Batasan station''' is an under-construction [[Manila Metro Rail Transit System|Manila Metro Rail Transit]] (MRT) station situated on [[MRT Line 7|Line 7]] located in [[Batasan Hills]], [[Quezon City]], [[Philippines]]. It is near the [[Sandiganbayan|Sandiganbayan Centennial Building]], Public Attorneys Office Building, Batasan TODA Terminal, the [[Commission on Audit (Philippines)|Commission on Audit Complex]] and the [[Batasan Pambansa|Batasan Pambansa Complex]]. It is the ninth station for trains headed towards the [[North Avenue Grand Central Station|North Triangle Common Station]] and the sixth station for trains headed to [[San Jose del Monte station|San Jose del Monte]].

{{as of|2023|1|25}}, the project is 60.35% complete; the station's construction is to be finished by June of the same year.<ref>{{Cite news|last=Balinbin|first=Arjay L.|date=25 January 2023|title=Full MRT-7 operations seen by 2nd quarter 2025|url=https://www.bworldonline.com/top-stories/2023/01/25/500680/full-mrt-7-operations-seen-by-2nd-quarter-2025/|work=[[BusinessWorld]]|publisher=[[The Philippine Star|The Philippine STAR]]|location=Philippines|access-date=25 January 2023}}</ref>


==History==
==History==

Revision as of 11:52, 25 January 2023

Batasan
Manila Metro Rail Transit System
Under construction in April 2022
General information
LocationCommonwealth Avenue,
Batasan Hills
Quezon City, Metro Manila
Philippines
Owned bySMC-Mass Rail Transit 7 Incorporated
Line(s)     MRT Line 7
Tracks2
Construction
Structure typeElevated
AccessibleYes
Other information
StatusUnder construction
Station codeBA
Services
Preceding station Manila MRT Following station
Manggahan
towards North EDSA
MRT Line 7 Don Antonio

Batasan station is an under-construction Manila Metro Rail Transit (MRT) station situated on Line 7 located in Batasan Hills, Quezon City, Philippines. It is near the Sandiganbayan Centennial Building, Public Attorneys Office Building, Batasan TODA Terminal, the Commission on Audit Complex and the Batasan Pambansa Complex. It is the ninth station for trains headed towards the North Triangle Common Station and the sixth station for trains headed to San Jose del Monte.

As of 25 January 2023, the project is 60.35% complete; the station's construction is to be finished by June of the same year.[1]

History

Construction progress of Batasan station as of March 23, 2019.

Batasan station is part of the MRT Line 7, which was proposed initially in 2004. The line was supposed to begin its construction in 2005 with a target opening date in 2007. However, construction did not start until 2017, a decade after its target opening date. Groundbreaking of the station began on October 7, 2017, with a simple ceremony being held before the concrete pouring for the station's bored pile foundations.[2]

The official working name of the station during the design phase is Station 6. It is also known by another previous working name: South Batasan. It was named so because it is located at the southern end of Batasan Road while Manggahan station was previously called as North Batasan.

Services

Batasan station is a part of the MRT Line 7, which runs from San Jose del Monte, Bulacan up to North Avenue, Quezon City. It is the sixth northbound station from the North Triangle Common Station in Quezon City and the ninth southbound station from San Jose del Monte. The station is served by jeepneys and bus lines, and the nearby Batasan TODA Station improves its access throughout Batasan Hills and nearby places.

References

  1. ^ Balinbin, Arjay L. (25 January 2023). "Full MRT-7 operations seen by 2nd quarter 2025". BusinessWorld. Philippines: The Philippine STAR. Retrieved 25 January 2023.
  2. ^ Cordero, Ted (October 7, 2017). "Concrete pouring at MRT-7 Batasan Station in QC begins". GMA News Online. Retrieved October 28, 2017.