Euro Quebec Hydro Hydrogen Project: Difference between revisions
Appearance
Content deleted Content added
Rescuing 0 sources and tagging 1 as dead.) #IABot (v2.0.9.5) (Eastmain - 18002 |
Wikipedia:Articles for deletion/Euro Quebec Hydro Hydrogen Project closed as no consensus (XFDcloser) |
||
Line 1: | Line 1: | ||
{{short description|Former Canadian hydropower project}} |
{{short description|Former Canadian hydropower project}} |
||
<!-- Please do not remove or change this AfD message until the discussion has been closed. --> |
|||
{{Article for deletion/dated|page=Euro Quebec Hydro Hydrogen Project|timestamp=20240305071944|year=2024|month=March|day=5|substed=yes|help=off}} |
|||
<!-- Once discussion is closed, please place on talk page: {{Old AfD multi|page=Euro Quebec Hydro Hydrogen Project|date=5 March 2024|result='''keep'''}} --> |
|||
<!-- End of AfD message, feel free to edit beyond this point --> |
|||
{{Refimprove|date=August 2011}} |
{{Refimprove|date=August 2011}} |
||
Latest revision as of 06:23, 26 March 2024
This article needs additional citations for verification. (August 2011) |
The Euro Quebec Hydro Hydrogen Project or EQHHP (also known as Euro Quebec Hydro Hydrogen Pilot Project or EQHHPP) was a 100 MW pilot project to study the shipping of Canadian hydropower converted via electrolysis into hydrogen and the shipping of the hydrogen to Hamburg, Germany.[1][2] The time frame of phase B was 1992 to 1997.[3]
The method of transport is a hydrogen tanker that carries smaller highly insulated hydrogen tanks filled with liquid hydrogen.
See also
[edit]References
[edit]External links
[edit]- The Euro-Quebec Hydro-Hydrogen Project at the Wayback Machine (archived August 31, 2014)