Railways in Sydney: Difference between revisions
Willthorpe (talk | contribs) |
Willthorpe (talk | contribs) No edit summary |
||
Line 28: | Line 28: | ||
[[File:Australian Census 2011 demographic map - Inner Sydney by SA1 - BCP field 7837 One method Train Persons.svg|thumb|right|400px|Distribution map showing the percentage of the employed population who travel to work by train only, according to the [[Census in Australia#2011|2011 census]]]] |
[[File:Australian Census 2011 demographic map - Inner Sydney by SA1 - BCP field 7837 One method Train Persons.svg|thumb|right|400px|Distribution map showing the percentage of the employed population who travel to work by train only, according to the [[Census in Australia#2011|2011 census]]]] |
||
[[File:Sydney Trains Network Map.svg|alt=|thumb|330x330px|The Sydney Trains passenger rail network.]] |
[[File:Sydney Trains Network Map.svg|alt=|thumb|330x330px|The Sydney Trains passenger rail network.]] |
||
[[Commuter rail|Suburban rail]] services in Sydney have been operated since 2013 by [[Sydney Trains]]. Over 1 million weekday passenger journeys are made on 2,365 daily services over {{Cvt|2080|km}} of track and through 306 stations (including interurban lines).<ref>{{cite web | url=http://www.arhs.com.au/ | title=CityRail timetabling – a look inside the covers. | publisher=Railway Digest, October 2006. ARHS NSW Division | access-date=15 February 2007 | archive-date=16 September 2006 | archive-url=https://web.archive.org/web/20060916014028/http://www.arhs.com.au/ | url-status=live }}</ref> Most trains do not operate between midnight and 4.30am.<ref>{{Cite web|url=https://transportnsw.info/travel-info/using-public-transport/late-night-services|title=Late Night Services|website=Transport for NSW|language=en|access-date=8 June 2018|archive-date=13 April 2018|archive-url=https://web.archive.org/web/20180413190501/https://transportnsw.info/travel-info/using-public-transport/late-night-services|url-status=live}}</ref> Suburban services operate along the portions of the main lines from Sydney to the north, west, south and south-west, and also along several dedicated suburban lines. All of these lines are electrified at overhead 1500 V DC, starting in 1926. Some of the suburban stations are also served by the intercity and regional trains operated by NSW TrainLink. |
[[Commuter rail|Suburban rail]] services in Sydney have been operated since 2013 by [[Sydney Trains]]. Over 1 million weekday passenger journeys are made on 2,365 daily services over {{Cvt|2080|km}} of track and through 306 stations (including interurban lines).<ref>{{cite web | url=http://www.arhs.com.au/ | title=CityRail timetabling – a look inside the covers. | publisher=Railway Digest, October 2006. ARHS NSW Division | access-date=15 February 2007 | archive-date=16 September 2006 | archive-url=https://web.archive.org/web/20060916014028/http://www.arhs.com.au/ | url-status=live }}</ref> Most trains do not operate between midnight and 4.30am.<ref>{{Cite web|url=https://transportnsw.info/travel-info/using-public-transport/late-night-services|title=Late Night Services|website=Transport for NSW|language=en|access-date=8 June 2018|archive-date=13 April 2018|archive-url=https://web.archive.org/web/20180413190501/https://transportnsw.info/travel-info/using-public-transport/late-night-services|url-status=live}}</ref> Suburban services operate along the portions of the main lines from Sydney to the north, west, south and south-west, and also along several dedicated suburban lines. All of these lines are electrified at overhead 1500 V DC, starting in 1926.<ref name=":0" /><ref name=":1" />{{rp|79f}} Some of the suburban stations are also served by the intercity and regional trains operated by NSW TrainLink. |
||
Most suburban services operate through central Sydney via the underground [[City Circle]] (not a true circle line but a two-way loop extending under the CBD from Central station), the [[Eastern Suburbs railway line|Eastern Suburbs line]], or over the [[Sydney Harbour Bridge|Harbour Bridge]]. There have been long-term plans for a further underground line passing beneath [[Pitt Street]] to a new harbour crossing. This is currently under construction as part of the [[Sydney Metro City & Southwest]] and expected to be completed in 2024. |
Most suburban services operate through central Sydney via the underground [[City Circle]] (not a true circle line but a two-way loop extending under the CBD from Central station), the [[Eastern Suburbs railway line|Eastern Suburbs line]], or over the [[Sydney Harbour Bridge|Harbour Bridge]]. There have been long-term plans for a further underground line passing beneath [[Pitt Street]] to a new harbour crossing. This is currently under construction as part of the [[Sydney Metro City & Southwest]] and expected to be completed in 2024. |
||
Line 46: | Line 46: | ||
Suburban trains are maintained at depots at [[Hornsby Maintenance Depot|Hornsby]] in the northern suburbs, [[Mortdale Maintenance Depot|Mortdale]] in the southern suburbs, and [[Flemington Maintenance Depot|Flemington]] in the western suburbs. A depot at [[Punchbowl Maintenance Depot|Punchbowl]] in the southwest closed in 1994 and has since been demolished. These four depots were all built and opened with the opening of electrified services in the 1920s. |
Suburban trains are maintained at depots at [[Hornsby Maintenance Depot|Hornsby]] in the northern suburbs, [[Mortdale Maintenance Depot|Mortdale]] in the southern suburbs, and [[Flemington Maintenance Depot|Flemington]] in the western suburbs. A depot at [[Punchbowl Maintenance Depot|Punchbowl]] in the southwest closed in 1994 and has since been demolished. These four depots were all built and opened with the opening of electrified services in the 1920s. |
||
Heavy maintenance of passenger cars was carried out at the [[Electric Carriage Workshops]], [[Chullora]] and [[Eveleigh Carriage Workshops|Suburban Car Workshops]], [[Redfern railway station|Redfern]]. Heavy maintenance is now contracted out to Maintrain, a [[UGL Rail]] subsidiary, with workshops at [[Clyde, New South Wales|Clyde]]. |
Heavy maintenance of passenger cars was carried out at the [[Electric Carriage Workshops]], [[Chullora]] and [[Eveleigh Carriage Workshops|Suburban Car Workshops]], [[Redfern railway station|Redfern]]. Heavy maintenance is now contracted out to Maintrain, a [[UGL Rail]] subsidiary, with workshops at [[Clyde, New South Wales|Clyde]].<ref>"Goninan's Maintrain Centre Officially Opened" ''Railway Digest'' May 1994 page 9</ref><ref>[https://web.archive.org/web/20190701031051/https://www.cimic.com.au/en/case-studies/ugl/current/ugl-unipart UGL Unipart] CIMIC Group</ref> |
||
==Freight services== |
==Freight services== |
||
Line 70: | Line 70: | ||
|archive-url = https://web.archive.org/web/20130411120539/http://www.ssfl.artc.com.au/ |
|archive-url = https://web.archive.org/web/20130411120539/http://www.ssfl.artc.com.au/ |
||
|archive-date = 11 April 2013 |
|archive-date = 11 April 2013 |
||
}}</ref> The [[Northern Sydney Freight Corridor]] |
}}</ref> The [[Northern Sydney Freight Corridor]] project along the Main Northern line between Sydney and Newcastle aimed at increasing the number of freight trains operating along the route, by separating passenger and freight traffic. |
||
The main traffic is [[Containerization|containerised freight]]. The main intermodal terminal are at Sydney Freight Terminal Chullora. [[Leightonfield, New South Wales|Leightonfield]], [[Yennora, New South Wales|Yennora]] and [[Minto, New South Wales|Minto]].<ref>{{cite web |
The main traffic is [[Containerization|containerised freight]]. The main intermodal terminal are at Sydney Freight Terminal Chullora. [[Leightonfield, New South Wales|Leightonfield]], [[Yennora, New South Wales|Yennora]] and [[Minto, New South Wales|Minto]].<ref>{{cite web |
||
Line 108: | Line 108: | ||
===Electrification=== |
===Electrification=== |
||
[[File:Bradfield Scheme Sydney CBD Railways alt.png|thumb|The original railway network for Sydney CBD planned by [[John Bradfield (engineer)|John Bradfield]].]] |
[[File:Bradfield Scheme Sydney CBD Railways alt.png|thumb|The original railway network for Sydney CBD planned by [[John Bradfield (engineer)|John Bradfield]].]] |
||
New South Wales uses an overhead electrification system at 1,500 [[volt]]s [[direct current]].<ref>{{cite web|url=http://extranet.artc.com.au/docs/eng/comms/procedures/CDS03.pdf|title=Modification to Specs|publisher=ARTC|access-date=9 September 2011|archive-date=18 March 2012|archive-url=https://web.archive.org/web/20120318193813/http://extranet.artc.com.au/docs/eng/comms/procedures/CDS03.pdf|url-status=live}}</ref> Whilst inferior to and more expensive than modern single phase alternating current equipment, it was in vogue during the 1920s, having been used in Melbourne since 1919 and is generally sufficient for the operation of electric multiple unit trains. However, the introduction of powerful electric locomotives in the 1950s, followed by the [[Sydney Trains M set|Millennium train]] in 2002, revealed drawbacks in this antiquated system of electrification. As the voltage is relatively low, high currents are required to supply a given amount of power, which necessitates the use of very heavy duty cabling and substation equipment. Until the retirement of electric locomotives from freight service in the 1990s, it was often necessary to observe a "power margin" to ensure that substations were not overloaded. This situation was similar to that which applied to [[The Milwaukee Road]]'s 3,000 VDC electrification. Plans to electrify the Hunter Valley at 25 kV alternating current were abandoned in the 1990s. |
New South Wales uses an overhead electrification system at 1,500 [[volt]]s [[direct current]].<ref name=":0">{{cite web|url=http://extranet.artc.com.au/docs/eng/comms/procedures/CDS03.pdf|title=Modification to Specs|publisher=ARTC|access-date=9 September 2011|archive-date=18 March 2012|archive-url=https://web.archive.org/web/20120318193813/http://extranet.artc.com.au/docs/eng/comms/procedures/CDS03.pdf|url-status=live}}</ref> Whilst inferior to and more expensive than modern single phase alternating current equipment, it was in vogue during the 1920s, having been used in Melbourne since 1919 and is generally sufficient for the operation of electric multiple unit trains. However, the introduction of powerful electric locomotives in the 1950s, followed by the [[Sydney Trains M set|Millennium train]] in 2002, revealed drawbacks in this antiquated system of electrification. As the voltage is relatively low, high currents are required to supply a given amount of power, which necessitates the use of very heavy duty cabling and substation equipment. Until the retirement of electric locomotives from freight service in the 1990s, it was often necessary to observe a "power margin" to ensure that substations were not overloaded. This situation was similar to that which applied to [[The Milwaukee Road]]'s 3,000 VDC electrification. Plans to electrify the Hunter Valley at 25 kV alternating current were abandoned in the 1990s. |
||
Electrification came to Sydney's suburbs on 9 December 1926 with the first suburban electric service running between Central station and [[Oatley railway station|Oatley]] on the [[Illawarra railway line|Illawarra line]].<ref>{{Cite book |last=Churchman |first=Geoffrey B. |url=https://www.worldcat.org/oclc/38320988 |title=Railway electrification in Australia and New Zealand |date=1995 |publisher=[[IPL Books]] |isbn=0-908876-79-3 |location=Sydney, N.S.W. |oclc=38320988}}</ref>{{rp|79f}} In the same year, the first underground railway was constructed north from Central station to [[St James railway station, Sydney|St James]] in Sydney's central business district. Electric trains that had previously terminated at Central station continued north, diving underground at the [[Goulburn Street]] tunnel portal, stopping at [[Museum railway station, Sydney|Museum station]] and then terminating at St James.<ref>''Jubilee of Sydney's Electric Trains'' Brady, I.A. [[Australian Railway History|Australian Railway Historical Society Bulletin]], March 1976 pp41-66</ref> Other lines were soon electrified. Also, in conjunction with the construction of the Sydney Harbour Bridge which opened in 1932, an additional four-track underground line was constructed from Central station to [[Town Hall railway station, Sydney|Town Hall]] and [[Wynyard railway station, Sydney|Wynyard]]. Two of the tracks continued over the Harbour Bridge connecting to the [[North Shore railway line|North Shore line]]. |
Electrification came to Sydney's suburbs on 9 December 1926 with the first suburban electric service running between Central station and [[Oatley railway station|Oatley]] on the [[Illawarra railway line|Illawarra line]].<ref name=":1">{{Cite book |last=Churchman |first=Geoffrey B. |url=https://www.worldcat.org/oclc/38320988 |title=Railway electrification in Australia and New Zealand |date=1995 |publisher=[[IPL Books]] |isbn=0-908876-79-3 |location=Sydney, N.S.W. |oclc=38320988}}</ref>{{rp|79f}} In the same year, the first underground railway was constructed north from Central station to [[St James railway station, Sydney|St James]] in Sydney's central business district. Electric trains that had previously terminated at Central station continued north, diving underground at the [[Goulburn Street]] tunnel portal, stopping at [[Museum railway station, Sydney|Museum station]] and then terminating at St James.<ref>''Jubilee of Sydney's Electric Trains'' Brady, I.A. [[Australian Railway History|Australian Railway Historical Society Bulletin]], March 1976 pp41-66</ref> Other lines were soon electrified. Also, in conjunction with the construction of the Sydney Harbour Bridge which opened in 1932, an additional four-track underground line was constructed from Central station to [[Town Hall railway station, Sydney|Town Hall]] and [[Wynyard railway station, Sydney|Wynyard]]. Two of the tracks continued over the Harbour Bridge connecting to the [[North Shore railway line|North Shore line]]. |
||
[[File:SydneyMonorail1 gobeirne.jpg|thumb|The [[Sydney Monorail]]. The monorail was shut down in 2013.]] |
[[File:SydneyMonorail1 gobeirne.jpg|thumb|The [[Sydney Monorail]]. The monorail was shut down in 2013.]] |
||
It was only in 1956 that the two tracks terminating at Wynyard were linked to the line terminating at St James via the Circular Quay viaduct. This new arrangement, dubbed the [[City Circle]], allowed services to make a continuous run through the city and return to the suburbs without having to terminate. |
It was only in 1956 that the two tracks terminating at Wynyard were linked to the line terminating at St James via the Circular Quay viaduct. This new arrangement, dubbed the [[City Circle]], allowed services to make a continuous run through the city and return to the suburbs without having to terminate. |
Revision as of 07:32, 21 July 2024
Sydney, the largest city in Australia, has an extensive network of passenger and goods railways. The passenger system includes an extensive suburban railway network, operated by Sydney Trains, a metro network and a light rail network. A dedicated goods network also exists.
Central station is the major interchange for Sydney Trains suburban services, also serving NSW TrainLink regional and intercity services and Sydney's light rail network. Journey Beyond's Indian Pacific to Perth also departs from Central.[1]
Sydney's suburban rail network is the busiest in Australia, with over 359 million journeys made in the 2017–18 financial year.[2]
Passenger services
Suburban rail services in Sydney have been operated since 2013 by Sydney Trains. Over 1 million weekday passenger journeys are made on 2,365 daily services over 2,080 km (1,290 mi) of track and through 306 stations (including interurban lines).[3] Most trains do not operate between midnight and 4.30am.[4] Suburban services operate along the portions of the main lines from Sydney to the north, west, south and south-west, and also along several dedicated suburban lines. All of these lines are electrified at overhead 1500 V DC, starting in 1926.[5][6]: 79f Some of the suburban stations are also served by the intercity and regional trains operated by NSW TrainLink.
Most suburban services operate through central Sydney via the underground City Circle (not a true circle line but a two-way loop extending under the CBD from Central station), the Eastern Suburbs line, or over the Harbour Bridge. There have been long-term plans for a further underground line passing beneath Pitt Street to a new harbour crossing. This is currently under construction as part of the Sydney Metro City & Southwest and expected to be completed in 2024.
Timetables are published for all lines, and most lines run on minimum frequencies of every 15 minutes from early morning to midnight, 7 days a week. Frequencies are higher during peak periods and over shared routes.[7]
Rolling stock
All suburban passenger trains in Sydney are electric multiple units.
Upon electrification in the 1920s Sydney operated single-deck multiple units, but these were progressively withdrawn from the 1960s until their demise in 1993. Single-deck automatic trains are utilised by the Sydney Metro, which opened in May 2019.
Double-deck trailer carriages were delivered to the NSW Government Railways in the 1960s, and incorporated into sets with single-deck power cars. When coupled with the double decker trailer carriages, they formed the world's first fully double decker electric multiple unit trains.[8]
Depots
Suburban trains are maintained at depots at Hornsby in the northern suburbs, Mortdale in the southern suburbs, and Flemington in the western suburbs. A depot at Punchbowl in the southwest closed in 1994 and has since been demolished. These four depots were all built and opened with the opening of electrified services in the 1920s.
Heavy maintenance of passenger cars was carried out at the Electric Carriage Workshops, Chullora and Suburban Car Workshops, Redfern. Heavy maintenance is now contracted out to Maintrain, a UGL Rail subsidiary, with workshops at Clyde.[9][10]
Freight services
Freight services operate over most of the suburban railway lines in Sydney, however due to the high frequency of passenger services and the lack of freight only tracks, there is a curfew on freight movements during peak hours.[11]
The major interstate freight routes are the Main Southern and Main North lines, with the Illawarra and Main Western lines serving lineside industries and as alternate interstate routes. In the inner city area the Metropolitan Goods lines connects major freight terminals to the main passenger lines and the Southern Sydney Freight Line which runs parallel to the Main South line from the western end of the Metropolitan Goods lines to a point beyond the end of suburban services.[12] The Northern Sydney Freight Corridor project along the Main Northern line between Sydney and Newcastle aimed at increasing the number of freight trains operating along the route, by separating passenger and freight traffic.
The main traffic is containerised freight. The main intermodal terminal are at Sydney Freight Terminal Chullora. Leightonfield, Yennora and Minto.[13] Interstate trains to Sydney terminals are up to 1,500 metres (4,900 ft) long, while short-haul container trains from the terminals to the Port Botany seaport are around 600 metres (2,000 ft) long.[11] Coal services to Port Kembla are another major traffic. Freight operators include Crawfords Freightlines, Independent Rail, Pacific National, Qube Holdings and SCT Logistics.[14]
History
The first railway in Sydney was opened in 1855 between Sydney and Granville, now a suburb of Sydney but then a major agricultural centre. The railway formed the basis of the New South Wales Government Railways. Passenger and freight services were operated from the beginning.[15] By 1880, there was half hourly service to Homebush.
In 1884, the railway opened from Strathfield to Hornsby. The North Shore line opened in 1893 to a harbour side station at Milson's Point, and was originally built because parliament thought it would be a shorter route for country produce from the north to Sydney Harbour (a role it has never fulfilled).[citation needed] Sydney's first deliberately suburban railway was a line to Belmore which opened in 1896 and was soon extended to Bankstown.
Sydney's suburban passenger service was severely hampered by the inconvenient location of its city terminus, at a site south of Devonshire Street. Most of Sydney's population was well served by trams, and the suburban railways had a relatively small initial role to play. This was to change in the 1920s.
The railway system as it exists today is really the result of the vision and foresight of John Bradfield, one of Australia's most respected and famous civil engineers. He was involved in the design and construction of Sydney underground railways in the 1920s and 1930s, but he is more famous for the associated design and construction of the Sydney Harbour Bridge.[16] Bradfield's vision for metro-style subways in Sydney was inspired by the subways he observed in Paris, London and New York City.
Electrification
New South Wales uses an overhead electrification system at 1,500 volts direct current.[5] Whilst inferior to and more expensive than modern single phase alternating current equipment, it was in vogue during the 1920s, having been used in Melbourne since 1919 and is generally sufficient for the operation of electric multiple unit trains. However, the introduction of powerful electric locomotives in the 1950s, followed by the Millennium train in 2002, revealed drawbacks in this antiquated system of electrification. As the voltage is relatively low, high currents are required to supply a given amount of power, which necessitates the use of very heavy duty cabling and substation equipment. Until the retirement of electric locomotives from freight service in the 1990s, it was often necessary to observe a "power margin" to ensure that substations were not overloaded. This situation was similar to that which applied to The Milwaukee Road's 3,000 VDC electrification. Plans to electrify the Hunter Valley at 25 kV alternating current were abandoned in the 1990s.
Electrification came to Sydney's suburbs on 9 December 1926 with the first suburban electric service running between Central station and Oatley on the Illawarra line.[6]: 79f In the same year, the first underground railway was constructed north from Central station to St James in Sydney's central business district. Electric trains that had previously terminated at Central station continued north, diving underground at the Goulburn Street tunnel portal, stopping at Museum station and then terminating at St James.[17] Other lines were soon electrified. Also, in conjunction with the construction of the Sydney Harbour Bridge which opened in 1932, an additional four-track underground line was constructed from Central station to Town Hall and Wynyard. Two of the tracks continued over the Harbour Bridge connecting to the North Shore line.
It was only in 1956 that the two tracks terminating at Wynyard were linked to the line terminating at St James via the Circular Quay viaduct. This new arrangement, dubbed the City Circle, allowed services to make a continuous run through the city and return to the suburbs without having to terminate.
Electrification timeline
Electrification of heavy rail lines proceeded as follows:
- 1926 – Illawarra line to Royal National Park, Bankstown line, City Circle
- 1927 – North Shore line
- 1929 – Western line to Parramatta
- 1929 – Northern line (Strathfield to Hornsby)
- 1929 – South line to Liverpool
- 1936 – Carlingford line from Clyde to Rosehill
- 1955 – Parramatta to Penrith
- 1957 – Penrith to Lithgow
- 1959 – Rosehill to Carlingford
- 1959 – Hornsby to Cowan
- 1960 – Cowan to Gosford
- 1968 – Liverpool to Campbelltown
- 1975 – Blacktown to Riverstone
- 1980 – Loftus to Waterfall
- 1982 – Gosford to Wyong
- 1984 – Wyong to Newcastle
- 1985 – Waterfall to Port Kembla.
- 1985 – Macarthur station opened
- 1991 – Riverstone to Richmond
- 1996 – Coniston to Dapto
- 2002 – Dapto to Kiama[18]
New electrified suburban and metro lines were built:
- 1926 – line from Central to St James station and Museum opened
- 1931 – line opened to East Hills
- 1932 – line from Central to Town Hall, Wynyard, the Sydney Harbour Bridge, Milsons Point station and North Sydney station opened
- 1939 – Line to Cronulla built and connected with the Illawarra line at Sutherland
- 1956 – Circular Quay station opened completing the City Circle
- 1979 – Eastern Suburbs railway completed to Bondi Junction
- 1987 – East Hills – Glenfield line opened
- 1996 – Y-link built between Harris Park and Merrylands allowing the introduction of Cumberland Line services from Campbelltown to Blacktown
- 1998 – line from Flemington and Lidcombe to Olympic Park.
- 2000 – line to Sydney Airport and Wolli Creek built as a public-private partnership by the Airport Link Company
- 2009 – Epping to Chatswood railway line opened
- 2015 – South West Rail Link opened
- 2019 – Sydney Metro Northwest opened
21st century
The 2010s saw substantial investment in Sydney's railways. New suburban, metro and light rail lines have been constructed in the 2010s and 2020s, and a new focus emerged on urban rail in Australia.[19][20] Parts of the suburban network, namely the Carlingford line and the Epping to Chatswood Rail Link, were subsumed by the Parramatta Light Rail and Metro North West Line respectively.[21][22] Conversely, the Sydney Monorail was closed in 2013.[23] In 2020, transport minister Andrew Constance stated that Sydney had become a “train city, it wouldn’t matter if it was light rail, metro or the inter-city trains.”[24]
Organisation
The rail network in the metropolitan area of Sydney is owned, maintained and operated by Transport Asset Holding Entity, a NSW State Government owned corporation. Third party access to their tracks by other freight operators is allowed under an open-access arrangement. Track outside the Sydney metropolitan area is operated and maintained by the Australian Rail Track Corporation. Suburban passenger trains within Sydney are operated by Sydney Trains and long-distance trains that run through Sydney are operated by NSW TrainLink.
RailCorp was formed on 1 January 2004 by the merger of the State Rail Authority (SRA) and the metropolitan functions of the Rail Infrastructure Corporation (RIC). Until 1972, railways in NSW were operated by the Department of Railways New South Wales until this department was replaced by the Public Transport Commission (PTC), which was also responsible for bus and ferry services. In 1980 the PTC was broken up into the SRA, responsible for rail services, and the Urban Transit Authority (UTA), responsible for bus and ferry services. The UTA later became the State Transit Authority in 1989.
In 2001, the SRA had its 'above track' operations separated from its track ownership and maintenance operations. The track maintenance operations and track ownership were moved to the new RIC. However this separation into a horizontally operated rail system was criticised for the passing of blame for rail delays and accidents between authorities, and in 2004 railways in Sydney became a vertically operated system again with the creation of RailCorp, a fusion of the SRA and the urban sections of the RIC.
In July 2013, RailCorp was reduced to become the owner of the infrastructure and rolling stock, with the service provision that it operated under the CityRail and CountryLink brands transferred to Sydney Trains and NSW TrainLink.[25][26][27][28]
Gauge
With limited exceptions, all outside of Sydney, trains in New South Wales use standard gauge, with a distance of 1,435 mm (4 ft 8+1⁄2 in) between the rails.[29]
Terminology
The railways in Sydney generally use British-derived terminology.
- Points refers to what in American English are known as railroad switches, or crossovers.
- Up refers to the direction "towards Sydney", where 'Sydney' is generally defined as Central station.
- Down refers to the direction "away from Sydney", or "towards the country".
- Signal box refers to the signal control installation (tower in American terminology).
Railway lines
Mainlines
Four main 'trunk' lines radiate from Sydney to the north, south, west, and southwest:
- The Main Southern railway line from Lidcombe to Albury.
- The South Coast railway line from Illawarra Junction to Bomaderry.
- The Main Western railway line from Granville to Dubbo.
- The Main North railway line from Strathfield to Armidale.
Other suburban lines
Other passenger lines branch from or interconnect with the four main lines:
- The Main Suburban railway line, from Redfern to Granville.
- The Airport Link, an underground line linking the airport to the city.
- The Bankstown railway line, from Sydenham to Lidcombe.
- The City Circle, a mostly underground loop in central Sydney
- The Cronulla railway line, from Sutherland to Cronulla
- The East Hills railway line, from Tempe to Glenfield via East Hills.
- The Eastern Suburbs railway line, a mostly underground line from Central to Bondi Junction
- The North Shore railway line, from Central to Hornsby via the Harbour Bridge
- The Old Main South railway line, from Granville to Cabramatta.
- The Olympic Park railway line, a balloon loop line between Lidcombe and Olympic Park
- The Richmond railway line, from Blacktown to Richmond
- The South West Rail Link, from Glenfield to Leppington.
Rapid transit lines
- The Sydney Metro Northwest, from Tallawong to Chatswood.
- Includes the converted Epping to Chatswood rail link, an underground line connecting the North Shore and Main Northern lines, and serving the Macquarie Park employment area.
Light rail lines
Lines with light rail specifications:
- The Inner West Light Rail, from Central to Dulwich Hill. Mostly runs along the former Rozelle–Darling Harbour Goods Line.
- CBD and South East Light Rail, from Circular Quay to Randwick and Kingsford.
- The Parramatta Light Rail, from Westmead to Carlingford and in future to Sydney Olympic Park, reutilising the Carlingford and Sandown railway lines.
- The Royal National Park line, operated by the Sydney Tramway Museum, terminating at Royal National Park railway station. Previously operated as part of the South Coast railway line.
Goods lines
Several railway lines carry goods only:
- The Metropolitan Goods Railway from Flemington/Sefton to Port Botany
- The Southern Sydney Freight Line between Macarthur and Sefton, where it connects with the Metropolitan Goods Line.
- Northern Freight Pass between Thornleigh and Epping turning onto Strathfield line.
Closed lines
There are several closed lines in Sydney:
- The Camden railway line, from Campbelltown to Camden.
- The Carlingford railway line, from Clyde to Carlingford.
- The Potts Hill railway line in Potts Hill.
- The Richmond-Kurrajong railway line from Richmond to Kurrajong.
- The Rogans Hill railway line from Westmead to Rogans Hill.
- The Rookwood Cemetery railway line serving Rookwood Cemetery.
- The Ropes Creek railway line from St Marys to Ropes Creek.
- The Sandown railway line from Rosehill to Sandown.
- The Warwick Farm Racecourse line from Warwick Farm to Warwick Farm Racecourse.
Some former heavy rail lines, as mentioned above, have been converted to light rail.
Proposed and under construction
The following lines are under construction:
- Sydney Metro City & Southwest, the second stage of Sydney Metro network, between Chatswood and Bankstown scheduled to open in 2024.
- Western Sydney Airport line, between St Marys and Western Sydney Airport.
- Sydney Metro West, between the Sydney CBD and Westmead via Inner West suburbs.
Underground sections
Sydney has four underground lines. These sections of railway are extensions of suburban main line commuter services and are not a completely segregated true metro system. The underground sections, especially the City Circle, typically have frequent services. Sydney Metro forms the largest part of Sydney's underground railways and the first subway system in an Australian city.[30]
- The oldest is the main city loop, the City Circle, which runs between Central, Town Hall, Wynyard, Circular Quay, St James station and Museum stations. Central and Circular Quay are above-ground stations (Circular Quay is elevated, directly underneath the Cahill Expressway), while the remainder are below ground. The line to St. James station and Museum was opened in 1926, but Circular Quay was a "missing link" until 1956. The "western limb" of the City Circle through Town Hall and Wynyard to Sydney Harbour Bridge opened in 1932, in conjunction with the opening of the Sydney Harbour Bridge.
- The second, the Eastern Suburbs line, opened in 1979. It runs between Redfern, Central, Town Hall, Martin Place, Kings Cross, Edgecliff, Woollahra (Unused Platforms) and Bondi Junction stations. All these are underground, but there are three above-ground sections, two on viaduct and one in cutting. Most of the platforms at Redfern and Central stations are above ground, including the platforms for the City Circle, but the Eastern Suburbs line is underground. At the time of its construction, the line had been intended to finish at Kingsford but it was curtailed at Bondi Junction for political and financial reasons. In the late 1990s, there were plans to extend the line to Bondi Beach, but these have since fallen through.
- The third underground line is the Airport Line, which opened in 2000, prior to the Sydney Olympics. This serves Central, Green Square, Mascot, Domestic Airport (underneath the Domestic terminals), International Airport (underneath International terminal at Sydney Airport), and Wolli Creek. After Wolli Creek it joins the above-ground East Hills line at Turrella.
- The fourth underground line is the Epping to Chatswood rail link, opened in 2009. It links Chatswood to Epping, with new underground platforms at Epping and new underground stations at Macquarie University, Macquarie Park and North Ryde. The line was intended to continue from Epping to Parramatta, incorporating the existing Carlingford line, but this section was postponed during the railway's construction because of financial reasons. A stub tunnel was constructed at the northern end of Epping station in the event that work on the remainder of the line ever resumed. In 2019, the Epping to Chatswood railway was incorporated into the new Northwest Metro, which involved converting the line's commuter rail configuration to a rapid transit system. This ended the possibility of extending the railway to Parramatta as a commuter rail line.
Disused tunnels
Sydney has several disused tunnels. The best known of these are those leading out of St James station. There are also several disused tunnels and platforms on the Eastern Suburbs line, which like St James station provided for the possibility of four tunnels even though only two are in use. There is a stub tunnel at North Sydney railway station, north of platform 2, for a never constructed Manly to Mona Vale line.[31][32]
From the top of the northern stairs to platform 10 at Redfern station it is possible to view the unfinished structure for the low-level "up" (toward Central) Southern Suburbs platforms. The associated never-used tunnels are quite complex. Immediately to the left is the (surface level) stub tunnel for the "down" Southern Suburbs track. This short tunnel exits on the northern side of Lawson Street road bridge. There are at least nine railway tunnels under the suburb of Redfern: some in use, some never used.
Platforms 26 and 27 at Central lie above the Eastern Suburbs Railway platforms and have never been used for trains.[33] Like St James station, these stations have stub tunnels, although they are much shorter.
There are several tunnels on the old Rozelle–Darling Harbour Goods Line, most of which are now used by the Inner West Light Rail. One runs underneath Railway Square, near the Central station railway yards. For a time, this section of the line was used to service the Powerhouse Museum.[34] The corridor adjacent to the tunnel is now a pedestrian pathway, the tunnel itself is disused. A pair of tunnels run underneath Pyrmont and Glebe and are now part of the light rail line.[35] The third tunnel was created in 2000 when an extension to the City West Link Road through Leichhardt was built on top of a cutting. This is also now used by the light rail.
See also
References
- ^ "Stations and Terminals". Great Southern Rail. Archived from the original on 9 October 2017. Retrieved 28 September 2017.
- ^ "Sydney Trains Annual Report 2017–18" (PDF). Sydney Trains. p. 4. Archived (PDF) from the original on 2 December 2018. Retrieved 16 February 2019.
- ^ "CityRail timetabling – a look inside the covers". Railway Digest, October 2006. ARHS NSW Division. Archived from the original on 16 September 2006. Retrieved 15 February 2007.
- ^ "Late Night Services". Transport for NSW. Archived from the original on 13 April 2018. Retrieved 8 June 2018.
- ^ a b "Modification to Specs" (PDF). ARTC. Archived (PDF) from the original on 18 March 2012. Retrieved 9 September 2011.
- ^ a b Churchman, Geoffrey B. (1995). Railway electrification in Australia and New Zealand. Sydney, N.S.W.: IPL Books. ISBN 0-908876-79-3. OCLC 38320988.
- ^ "Routes and timetables". Transport for NSW. Retrieved 3 July 2024.
- ^ transportnsw (17 August 2018). "Sydney's Transport History – Double Decker Trains". Transport NSW Blog. Archived from the original on 29 December 2021. Retrieved 8 February 2022.
- ^ "Goninan's Maintrain Centre Officially Opened" Railway Digest May 1994 page 9
- ^ UGL Unipart CIMIC Group
- ^ a b Ian Imrie (29 July 2008). "Sharing tracks in Sydney". Railway Gazette. railwaygazette.com. Archived from the original on 21 May 2014. Retrieved 16 August 2008.
- ^ "Southern Sydney Freight Line Project". ssfl.artc.com.au. Archived from the original on 11 April 2013. Retrieved 16 August 2008.
- ^ "Port Botany Rail Freight Strategy –". NSW Parliament: Questions Without Notice. parliament.nsw.gov.au. 31 May 2007. Archived from the original on 20 September 2008. Retrieved 16 August 2008.
- ^ "Sydney Ports – Rail Operations". sydneyports.com.au. Archived from the original on 22 July 2008. Retrieved 16 August 2008.
- ^ The Centenary of the Sydney–Parramatta Railway Singleton, C.C. Australian Railway Historical Society Bulletin, September, 1955 pp109-131
- ^ Spearritt, P. Sydney's Century: A History. Retrieved 9 September 2011
- ^ Jubilee of Sydney's Electric Trains Brady, I.A. Australian Railway Historical Society Bulletin, March 1976 pp41-66
- ^ "Kiama Railway Station Group and Turntable". NSW Environment & Heritage www.environment.nsw.gov.au/. February 2010. Archived from the original on 21 May 2014. Retrieved 21 May 2014.
- ^ Thorpe, Will (15 August 2023). "Labor's public transport legacy rides on Metro West". Honi Soit. Retrieved 17 July 2024.
- ^ Wiggins, Jenny (10 January 2020). "How trains are helping Australia rethink cities". Australian Financial Review. Retrieved 17 July 2024.
- ^ Bennett, David (5 January 2020). "Farewell Carlingford Line". Transport Heritage NSW. Retrieved 17 July 2024.
- ^ "Upgrade complete between Epping and Chatswood". Sydney Metri. Retrieved 17 July 2024.
- ^ "Transport for NSW Annual Report 2012-13" (PDF). Transpor for NSW. p. 38. Archived from the original (PDF) on 21 March 2016. Retrieved 14 July 2016.
- ^ Rabe, Tom (7 November 2020). "Four new trams promised for Sydney's crowded Inner West line". The Sydney Morning Herald. Retrieved 17 July 2024.
- ^ "RailCorp job cuts first of many: unions" Archived 27 February 2014 at the Wayback Machine Sydney Morning Herald 15 May 2012
- ^ "Ruthless RailCorp reforms planned as middle management axed" Daily Telegraph 15 May 2012
- ^ Corporate Plan 2012/13 Archived 25 March 2013 at the Wayback Machine RailCorp
- ^ 700 jobs to go as RailCorp gets the axe Daily Telegraph 16 November 2012
- ^ Bozier, Rolfe. "NSW Railway Lines Other Than Standard Gauge". NSWRail. Retrieved 17 July 2024.
- ^ "Funding secured: Sydney Metro to be a reality". Transport for NSW. 4 June 2015. Archived from the original on 23 June 2015.
- ^ Besser, Linton, "Ghost trains: the rail network that never was" Archived 3 May 2008 at the Wayback Machine, Sydney Morning Herald, 21 July 2007. Retrieved 21 July 2007.
- ^ "Aus Rail". Archived from the original on 29 September 2000. Retrieved 29 December 2017.
- ^ Besser, Linton, "On the rails to nowhere" Archived 4 August 2009 at the Wayback Machine, 21 July 2007. Retrieved 21 July 2007.
- ^ "Ultimo (Railway Square) Railway Overbridge". New South Wales Heritage Database. Office of Environment & Heritage. Retrieved 18 December 2018.
- ^ "Pyrmont and Glebe Railway Tunnels". New South Wales State Heritage Register. Department of Planning & Environment. H01225. Retrieved 13 October 2018. Text is licensed by State of New South Wales (Department of Planning and Environment) under CC BY 4.0 licence.
Further reading
- Churchman, Geoffrey B. (1995). Railway electrification in Australia and New Zealand. Sydney, N.S.W.: IPL Books. ISBN 0-908876-79-3. OCLC 38320988.