Talk:Qinghai–Tibet railway: Difference between revisions
Appearance
Content deleted Content added
question |
No edit summary |
||
Line 1: | Line 1: | ||
''When the railway construction that started on June 29, 2001 is complete (expected in 2005; signalling and track testing require another 6 to 12 months), it will be possible to travel from Lhasa to Beijing in 48 hours'' |
''When the railway construction that started on June 29, 2001 is complete (expected in 2005; signalling and track testing require another 6 to 12 months), it will be possible to travel from Lhasa to Beijing in 48 hours'' |
||
: What was the travel time like before the railway? [[User:Alex.tan|Alex.tan]] June 30, 2005 07:12 (UTC) |
: What was the travel time like before the railway? [[User:Alex.tan|Alex.tan]] June 30, 2005 07:12 (UTC) |
||
What's the length of the railway platforms? [[User:68.23.224.34|68.23.224.34]] 17:51, 24 August 2005 (UTC) |
Revision as of 17:51, 24 August 2005
When the railway construction that started on June 29, 2001 is complete (expected in 2005; signalling and track testing require another 6 to 12 months), it will be possible to travel from Lhasa to Beijing in 48 hours
- What was the travel time like before the railway? Alex.tan June 30, 2005 07:12 (UTC)
What's the length of the railway platforms? 68.23.224.34 17:51, 24 August 2005 (UTC)