King Mountain Wind Farm: Difference between revisions
Gene Nygaard (talk | contribs) No edit summary |
template |
||
Line 16: | Line 16: | ||
*[http://www.awea.org/projects/texas.html Texas Wind Energy Projects] |
*[http://www.awea.org/projects/texas.html Texas Wind Energy Projects] |
||
{{Wind power in the United States}} |
|||
[[Category:Wind farms in the United States]] |
[[Category:Wind farms in the United States]] |
||
[[Category:Energy resource facilities in Texas]] |
[[Category:Energy resource facilities in Texas]] |
Revision as of 03:47, 8 February 2009
The King Mountain Wind Farm is a 278.2 megawatt (MW) wind farm in Upton County, Texas, United States. 214 Siemens 1.3 MW wind turbines are sited in rows along the south-eastern and north-western edges of a mesa surrounded by deep ravines. The project was completed in December 2001. Annual electricity production is more than 0.75 TW·h.[1] The wind farm is owned by FPL Energy and the customers for the electricity generated are Reliant Energy (198.9 MW), Austin Energy (76.7 MW) and Texas-New Mexico Power Company (2.6 MW).
Dust, sand and high temperatures place extraordinary demands on the wind turbines. Consequently, the design was modified for the desert-like conditions, providing additional cooling and protection against wind-blown sand.[1]
See also
References
External links