Jump to content

Taiwan Railways Administration: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
LesterKao (talk | contribs)
No edit summary
LesterKao (talk | contribs)
No edit summary
Line 26: Line 26:
The '''Taiwan Railway Administration''' (台灣鐵路管理局, a.k.a 台鐵 or TRA) is the government agency responsible for managing, maintaining, and running passenger and freight service on 1097 km of conventional [[railroad]] lines in [[Taiwan]] ([[Rail gauge|gauge]]: 1067 mm). As Taiwan is heavily urbanized with a high population density, railways have always played an important part in domestic transportation. Most of the main lines are fully electrified and service is generally efficient and reliable.
The '''Taiwan Railway Administration''' (台灣鐵路管理局, a.k.a 台鐵 or TRA) is the government agency responsible for managing, maintaining, and running passenger and freight service on 1097 km of conventional [[railroad]] lines in [[Taiwan]] ([[Rail gauge|gauge]]: 1067 mm). As Taiwan is heavily urbanized with a high population density, railways have always played an important part in domestic transportation. Most of the main lines are fully electrified and service is generally efficient and reliable.


Recent growth in the [[Highway System in Taiwan|highway system]] and increased competition from bus companies and airlines has led to a decline in long distance rail travel (except during major holidays such as [[Chinese New Year]]), though short and intermediate distance travel is still heavily utilized by commuters and students. A [[high-speed rail|Taiwan High Speed Rail]] line currently under construction and scheduled for completion in [[2005]] is not run by TRA, and is also expected to be a major source of competition. To offset this TRA has begun placing an emphasis on [[tourism]], this has led to several special tourist trains running to scenic areas and hot springs, the addition of dining cars (originally deemed unnecessary due to Taiwan's relatively small size), and converting several smaller branch lines to attract tourists.
Recent growth in the [[Highway System in Taiwan|highway system]] and increased competition from bus companies and airlines has led to a decline in long distance rail travel (except during major holidays such as [[Chinese New Year]]), though short and intermediate distance travel is still heavily utilized by commuters and students. A [[Taiwan High Speed Rail|high-speed rail]] line currently under construction and scheduled for completion in [[2005]] is not run by TRA, and is also expected to be a major source of competition. To offset this TRA has begun placing an emphasis on [[tourism]], this has led to several special tourist trains running to scenic areas and hot springs, the addition of dining cars (originally deemed unnecessary due to Taiwan's relatively small size), and converting several smaller branch lines to attract tourists.


Like several other state owned enterprises in Taiwan, the Taiwan Railway Adminsitration is currently in the process of privatization, which has led to some conflict between employee unions and management with the occasional threat of strikes.
Like several other state owned enterprises in Taiwan, the Taiwan Railway Adminsitration is currently in the process of privatization, which has led to some conflict between employee unions and management with the occasional threat of strikes.

Revision as of 04:26, 15 November 2005

Taiwan Railway Administration
80px TRA logo
80px
TRA logo
Headquarters Taipei Main Station, Taipei
Network 1097 km
Service Type Inter-City, Commuter
Foundation 1887 — present
Track gauge Narrow (1067 mm)
Website http://www.railway.gov.tw

The Taiwan Railway Administration (台灣鐵路管理局, a.k.a 台鐵 or TRA) is the government agency responsible for managing, maintaining, and running passenger and freight service on 1097 km of conventional railroad lines in Taiwan (gauge: 1067 mm). As Taiwan is heavily urbanized with a high population density, railways have always played an important part in domestic transportation. Most of the main lines are fully electrified and service is generally efficient and reliable.

Recent growth in the highway system and increased competition from bus companies and airlines has led to a decline in long distance rail travel (except during major holidays such as Chinese New Year), though short and intermediate distance travel is still heavily utilized by commuters and students. A high-speed rail line currently under construction and scheduled for completion in 2005 is not run by TRA, and is also expected to be a major source of competition. To offset this TRA has begun placing an emphasis on tourism, this has led to several special tourist trains running to scenic areas and hot springs, the addition of dining cars (originally deemed unnecessary due to Taiwan's relatively small size), and converting several smaller branch lines to attract tourists.

Like several other state owned enterprises in Taiwan, the Taiwan Railway Adminsitration is currently in the process of privatization, which has led to some conflict between employee unions and management with the occasional threat of strikes.

Shihfen Station on the Pingsi branch line

Routes

Train passing through the rural Sandiaoling Station

TRA runs the four main rail lines forming a closed loop around the main island of Taiwan, and three smaller branch lines.

Main Lines

Branch Lines

Passenger service

File:Xu 2003 001 Hualian.jpg
Tze-Chiang express train pulling into Taipei Main Station

Freight only

  • Shenao Line (深澳線): Rueifang, Taipei County - Shenao, Taipei County

Defunct

Service

Trains are divided into five classes, higher classes generally stop at fewer stations resulting in faster service. The classes are:

  • Tzu-Chiang (Tsu-chiang / 自強): The fastest (and most expensive). Assigned seating. Non-reserved (standing) tickets are also sold at full price. There are 3 types of Tsz-chiang: EMU electric multiple unit (brown), push-pull (orange/silver) and diesel (yellow/silver). Tickets for all 3 types of Tsz-chiang are the same price.
  • Chu-Kuang (Chu-kwang / 莒光): Second fastest. Assigned seating. Non-reserved tickets are sold at 80% of original price.
  • Fu-hsing (Fu-shing / 復興): Third fastest. Assigned seating. Non-reserved tickets are sold at 80% of original price.
  • EMU (Electric multiple unit / 電車) and DRC (Diesel railcar / 柴客): Short to medium distance commuter train, stops at all stations. No assigned seating.
  • Express / Ordinary (普通): Stops at all stations, no air conditioning, most inexpensive. No assigned seating. Some Express trains (the light blue ones running on West Trunk Line) are air-conditioned while others (dark blue ones) are not equipped with air conditioners.
  • Diesel Express: Only available on East Trunk Line and South Link Line. Mainly serve as commuter trains. No air conditioning. Tickets are the same price as Express and Ordinary.

With the exception of the Ordinary trains, all trains are modern and air conditioned. Many of the Ordinary train cars, on the other hand, are almost 40 to 50 years old, and provide an interesting experience for the more historically minded.

History

Old Japanese style train station at Jingtong on the Pingsi line

(Provided from official TRA pages: ChineseEnglish)

  • 1887: Construction begins on first railway in Taiwan between Keelung and Taipei by Ching Dynasty governor Liu Min-Chuan
  • 1891: First rail line completed
  • 1895: Taiwan ceded to Japan by China following the end of the Sino-Japanese War. Ministry of Taiwan Railway established by the Japanese Government.
  • 1908: The Japanese colonial government extends the railways to Kaohsiung.
  • 1922: Coastal Line (Jhunan - Changhua) completed.
  • 1924: Yilan Line (Badu - Suao) completed.
  • 1926: Huatung Line (Hualien - Taitung) completed.
  • 1941: Pingtung Line (Kaohsiung - Fangliao) completed.
  • 1940-1945: The railways are repeatedly bombed by the Allies during World War II.
  • 1945: Taiwan is handed over to the ROC, Taiwan Railway Administration established.
  • 1979: Western Line fully electrified. North-link line completed.
  • 1989: Rail lines running through downtown Taipei moved underground. New Taipei Main Station completed.
  • 1991: South-link Line completed, completing the rail loop around Taiwan.
  • 1997: Online reservations become available.
  • 2000: Yilan Line electrified.
  • 2001: Various special trains targeting tourists are offered.
  • 2003: North-link Line electrified.

See also