Awhitu Wind Farm: Difference between revisions
m Robot - Moving category Future wind farms in New Zealand to Proposed wind farms in New Zealand per CFD at Wikipedia:Categories for discussion/Log/2010 June 1. |
m Translate parameters per Template talk:Infobox power station |
||
Line 1: | Line 1: | ||
{{coord|-37.2667|174.6667|type:landmark_region:NZ|display=title}} |
{{coord|-37.2667|174.6667|type:landmark_region:NZ|display=title}} |
||
{{Infobox power station |
|||
{{Infobox_Power_Station |
|||
| |
|name= Awhitu Wind Farm |
||
|image= |
|image= |
||
| |
|locale=near [[Waiuku]], [[New Zealand]] |
||
|owner=[[Genesis Power Limited|Genesis Energy]] |
|owner=[[Genesis Power Limited|Genesis Energy]] |
||
|status=proposed |
|status=proposed |
||
| |
|primary_fuel=[[Wind]] |
||
|mine_type= |
|||
|conveyance= |
|conveyance= |
||
|cooling_water= |
|||
|technology= |
|||
|combined_cycle= |
|combined_cycle= |
||
|turbines=18 |
|turbines=18 |
||
|reciprocating_engines= |
|||
|pumped_storage= |
|pumped_storage= |
||
| |
|max_planned_cap=25MW |
||
|commissioned= |
|commissioned= |
||
|decommissioned= |
|decommissioned= |
Revision as of 01:41, 8 November 2010
37°16′00″S 174°40′00″E / 37.2667°S 174.6667°E
Awhitu Wind Farm | |
---|---|
Country |
|
Coordinates | 37°16′S 174°40′E / 37.27°S 174.67°E{{#coordinates:}}: cannot have more than one primary tag per page |
Status | proposed |
Owner | Genesis Energy |
The Awhitu Wind Farm is a renewable energy project in New Zealand planned by Genesis Energy. This development is proposed to be located on the Awhitu Peninsula near Waiuku on the west coast south of Auckland.
It is planned for up to 18 wind turbines with a capacity of up to 25 MW [1]. Maximum height to the tip of the blades is 90m.
In 2004, the wind farm received carbon credits from the New Zealand government[2], under a scheme to promote renewable energy for electricity generation. However, local councils denied the application for resource consents. This project is notable in being one of the few power projects to be denied resource consents.
Genesis Energy appealed to the Environment Court, which, in 2005, granted the resource consents, overturning the decision of the local councils. This decision is considered to be important is setting a precedent in how the benefits of the use and development of renewable energy should be considered in an RMA context. For example, this was cited in the decision on the Makara Wind Farm in 2005[3].
Currently, Genesis Energy considers the project is uneconomic[1], and has placed this project on hold until market conditions improve.