The '''Sistema Interconectado del Norte Grande''' ([[Spanish language|Spanish]] for ''Interconnected System of Norte Grande'') or '''SING''' is a [[alternating current]] [[power grid]] serving the [[Norte Grande]] zone of [[Chile]], it produces 19% of the national power generation. The SING covers the three northernmost regions of Chile including [[Arica y Parinacota Region|Arica y Parinacota]], [[Tarapacá Region|Tarapacá]] and [[Antofagasta Region]]. |
The '''Sistema Interconectado del Norte Grande''' ([[Spanish language|Spanish]] for ''Interconnected System of Norte Grande'') or '''SING''' is a [[alternating current]] [[power grid]] serving the [[Norte Grande]] zone of [[Chile]], it produces 19% of the national power generation. The SING covers the three northernmost regions of Chile including [[Arica y Parinacota Region|Arica y Parinacota]], [[Tarapacá Region|Tarapacá]] and [[Antofagasta Region]]. |
||
As of |
As of December, 2011, it has a total installed capacity of 4,550 [[Watt#Megawatt|MW]] (gross) <ref>[http://www.centralenergia.cl/en/power-plants-chile/sing-installed-capacity/ SING installed capacity]. Central Energía. Retrieved: 15-05-2012</ref> |
||
==References== |
==References== |
||
{{reflist}} |
{{reflist}} |
||
Line 12: | Line 13: | ||
* [http://www.cdec-sing.cl Centro de Despacho Económico de Carga del Sistema Interconectado del Norte Grande (CDEC-SING) - Economic Load Dispatch Center of the Big North Interconnected System] |
* [http://www.cdec-sing.cl Centro de Despacho Económico de Carga del Sistema Interconectado del Norte Grande (CDEC-SING) - Economic Load Dispatch Center of the Big North Interconnected System] |
||
⚫ | |||
{{Energy in Chile}} |
{{Energy in Chile}} |
||
[[Category:Wide area synchronous grids]] |
[[Category:Wide area synchronous grids]] |
||
[[Category:Electric power transmission systems in Chile]] |
[[Category:Electric power transmission systems in Chile]] |
||
⚫ |
Revision as of 21:56, 5 August 2012
- "SING" redirects here. If you are looking for "sing", the act of singing, or a number of other topics, please see sing.
The Sistema Interconectado del Norte Grande (Spanish for Interconnected System of Norte Grande) or SING is a alternating current power grid serving the Norte Grande zone of Chile, it produces 19% of the national power generation. The SING covers the three northernmost regions of Chile including Arica y Parinacota, Tarapacá and Antofagasta Region.
As of December, 2011, it has a total installed capacity of 4,550 MW (gross) [1]
References
- ^ SING installed capacity. Central Energía. Retrieved: 15-05-2012
Sources
External links