Jump to content

Sistema Interconectado del Norte Grande: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
clean up, typos fixed: december → December using AWB
Line 2: Line 2:
The '''Sistema Interconectado del Norte Grande''' ([[Spanish language|Spanish]] for ''Interconnected System of Norte Grande'') or '''SING''' is a [[alternating current]] [[power grid]] serving the [[Norte Grande]] zone of [[Chile]], it produces 19% of the national power generation. The SING covers the three northernmost regions of Chile including [[Arica y Parinacota Region|Arica y Parinacota]], [[Tarapacá Region|Tarapacá]] and [[Antofagasta Region]].
The '''Sistema Interconectado del Norte Grande''' ([[Spanish language|Spanish]] for ''Interconnected System of Norte Grande'') or '''SING''' is a [[alternating current]] [[power grid]] serving the [[Norte Grande]] zone of [[Chile]], it produces 19% of the national power generation. The SING covers the three northernmost regions of Chile including [[Arica y Parinacota Region|Arica y Parinacota]], [[Tarapacá Region|Tarapacá]] and [[Antofagasta Region]].


As of december, 2011, it has a total installed capacity of 4,550 [[Watt#Megawatt|MW]] (gross) <ref>[http://www.centralenergia.cl/en/power-plants-chile/sing-installed-capacity/ SING installed capacity]. Central Energía. Retrieved: 15-05-2012</ref>
As of December, 2011, it has a total installed capacity of 4,550 [[Watt#Megawatt|MW]] (gross) <ref>[http://www.centralenergia.cl/en/power-plants-chile/sing-installed-capacity/ SING installed capacity]. Central Energía. Retrieved: 15-05-2012</ref>

==References==
==References==
{{reflist}}
{{reflist}}
Line 12: Line 13:
* [http://www.cdec-sing.cl Centro de Despacho Económico de Carga del Sistema Interconectado del Norte Grande (CDEC-SING) - Economic Load Dispatch Center of the Big North Interconnected System]
* [http://www.cdec-sing.cl Centro de Despacho Económico de Carga del Sistema Interconectado del Norte Grande (CDEC-SING) - Economic Load Dispatch Center of the Big North Interconnected System]


{{Chile-stub}}
{{Energy in Chile}}
{{Energy in Chile}}


[[Category:Wide area synchronous grids]]
[[Category:Wide area synchronous grids]]
[[Category:Electric power transmission systems in Chile]]
[[Category:Electric power transmission systems in Chile]]


{{Chile-stub}}

Revision as of 21:56, 5 August 2012

"SING" redirects here. If you are looking for "sing", the act of singing, or a number of other topics, please see sing.

The Sistema Interconectado del Norte Grande (Spanish for Interconnected System of Norte Grande) or SING is a alternating current power grid serving the Norte Grande zone of Chile, it produces 19% of the national power generation. The SING covers the three northernmost regions of Chile including Arica y Parinacota, Tarapacá and Antofagasta Region.

As of December, 2011, it has a total installed capacity of 4,550 MW (gross) [1]

References

  1. ^ SING installed capacity. Central Energía. Retrieved: 15-05-2012

Sources