Jump to content

4D (train): Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
ordinals not normally used with dates (WP:DATESNO)
Line 1: Line 1:
{{Use dmy dates|date=October 2013}}
{{Use Australian English|date=October 2013}}
{{About|the train used in [[Melbourne]], [[Australia]]||4D (disambiguation){{!}}4D}}
{{About|the train used in [[Melbourne]], [[Australia]]||4D (disambiguation){{!}}4D}}
{{Infobox Train
{{Infobox Train
Line 61: Line 63:
Throughout its 10 years in Melbourne, the 4D continued to be plagued by reliability issues that saw it constantly in and out of service. After its disappointing entry to service, the train saw little use and was in storage by 1999. It was revived in June 2000, but lasted only a year.
Throughout its 10 years in Melbourne, the 4D continued to be plagued by reliability issues that saw it constantly in and out of service. After its disappointing entry to service, the train saw little use and was in storage by 1999. It was revived in June 2000, but lasted only a year.


A final attempt was made in February 2002 to return the set to service, but after three days it again failed and was placed back in storage, never to run revenue service again.<ref>[http://www.vicsig.net/photo.php?filename=20020222_4d_laburnam-gl.jpg Vicsig.net photo: "The 4D lasted 3 days in service during 2002. It is shown here on a Blackburn to Flinders St service at Laburnum" - Friday, 22nd February 2002]</ref><ref>[http://www.vicsig.net/photo.php?filename=20020324-rwd-hitachi-4d.jpg Vicsig.net photo: "The 4D withdrawn and stored at Ringwood" - Sunday, 24th March 2002]</ref>
A final attempt was made in February 2002 to return the set to service, but after three days it again failed and was placed back in storage, never to run revenue service again.<ref>[http://www.vicsig.net/photo.php?filename=20020222_4d_laburnam-gl.jpg Vicsig.net photo: "The 4D lasted 3 days in service during 2002. It is shown here on a Blackburn to Flinders St service at Laburnum" - Friday, 22 February 2002]</ref><ref>[http://www.vicsig.net/photo.php?filename=20020324-rwd-hitachi-4d.jpg Vicsig.net photo: "The 4D withdrawn and stored at Ringwood" - Sunday, 24 March 2002]</ref>


==Disposal==
==Disposal==
[[File:4D Cutter.jpg|The 4D being cut up in March 2006|thumb|left]]
[[File:4D Cutter.jpg|The 4D being cut up in March 2006|thumb|left]]


Ownership of the 4D was transferred back to the [[Victorian Government]] Department of Infrastructure, and the set was railed, ironically under its own power, to [[Newport Railway Workshops]] in December 2002 for long-term storage.<ref>[http://www.vicsig.net/photo.php?filename=20021214-nps-4d.jpg Vicsig.net photo: "The 4D in storage at Newport Workshops" - Saturday, 14th December 2002]</ref>
Ownership of the 4D was transferred back to the [[Victorian Government]] Department of Infrastructure, and the set was railed, ironically under its own power, to [[Newport Railway Workshops]] in December 2002 for long-term storage.<ref>[http://www.vicsig.net/photo.php?filename=20021214-nps-4d.jpg Vicsig.net photo: "The 4D in storage at Newport Workshops" - Saturday, 14 December 2002]</ref>


In 2006 the 4D was purchased by [[Rail Corporation New South Wales|RailCorp]] and stripped of parts compatible with the [[CityRail T set|Tangaras]].<ref>[http://www.vicsig.net/photo.php?filename=20060325-nps-4d-stripping.jpg Vicsig.net photo: "The 4D train being stripped of usable parts prior to scrapping at Newport Workshops" - Saturday, 25th March 2006]</ref> On 29 March 2006 the 4D was transferred by [[El Zorro (railway)|El Zorro]] to metal recyclers [[Sims Metal Management|Sims Metal]], [[Brooklyn, Victoria|Brooklyn]] for scrapping.<ref>[http://railgallery.wongm.com/4d-scrapping/ 4Ds last run] Wongm's Rail Gallery</ref>
In 2006 the 4D was purchased by [[Rail Corporation New South Wales|RailCorp]] and stripped of parts compatible with the [[CityRail T set|Tangaras]].<ref>[http://www.vicsig.net/photo.php?filename=20060325-nps-4d-stripping.jpg Vicsig.net photo: "The 4D train being stripped of usable parts prior to scrapping at Newport Workshops" - Saturday, 25 March 2006]</ref> On 29 March 2006 the 4D was transferred by [[El Zorro (railway)|El Zorro]] to metal recyclers [[Sims Metal Management|Sims Metal]], [[Brooklyn, Victoria|Brooklyn]] for scrapping.<ref>[http://railgallery.wongm.com/4d-scrapping/ 4Ds last run] Wongm's Rail Gallery</ref>


==External links==
==External links==

Revision as of 18:55, 20 October 2013

Double-deck Prototype
In service1992 - 2002
ManufacturerA Goninan & Co
Built atBroadmeadow
Constructed1991
Entered service10 March 1992
Scrapped2006
Number under construction4 cars
Number built4 cars
Number scrapped4 cars
Formation4-car set (driving trailer-motor-motor-driving trailer)
Fleet numbers6000T-5000M-5002M-6002T
CapacityT car: 76 seated, 149 standing
M car: 97 seated, 165 standing
4 car set: 974 total
(346 seated, 628 standing)
OperatorsPublic Transport Corporation
Connex
Lines servedBelgrave, Lilydale
Specifications
Car body constructionStainless steel
Car length20.320 m
Width2,890 mm
Height4,270 mm
Doors4 x twin-leaf plug doors per car
Articulated sections3 per set, enclosed gangway
Maximum speed130 km/h
Weight186 tonnes
Traction system8 x 170 kW, chopper control
Acceleration0.75 m/s/s
Power supply1500 V DC Overhead lines
Track gauge1600

The 4D was a prototype double deck electric multiple unit train built for the Public Transport Corporation, Victoria, for operation on the Melbourne railway system. It remains the only double deck train ever to have run in Melbourne.

Design

Interior of the 4D train

Built by A Goninan & Co, Broadmeadow it was delivered by rail in December 1991.[1]

The train's design was based on the Tangara train being built by A Goninan & Co for CityRail in Sydney, however it was similar only in terms of interior and exterior bodywork; the train's electrical system was much closer to that of the Comeng sets. The design was further modified for use on Melbourne's broad gauge track, and its control system was designed specifically to allow in-service coupling and operation with Comeng sets.[2]

It was manufactured from stainless steel, fitted with air-conditioning, tinted windows, and inter-car doors allowing passengers to access all carriages of the train. It had a total passenger capacity of 974 passengers: 346 seated and 628 standing.

As part of the trial, the Belgrave and Lilydale lines were selected as main testing grounds for the unit and necessary works were performed to accommodate the train's somewhat unconventional dimensions. It was known that the train was physically too large for the Jolimont tunnel between Jolimont and West Richmond railway stations on the Hurstbridge and Epping lines. Given that the train was a demonstrator, it was likely that production designs or future infrastructure plans would have dealt with this.

By early 1993 the Victorian Government had decided not to proceed with the acquisition of any further double deck trains deciding infrastructure changes required to accommodate the larger trains were too expensive.[3]

Service

The unit broke from Melbourne tradition by being configured as Driving Trailer-Motor-Motor-Driving Trailer (D-TM-TM-D); all other sets in service at the time were (and are still) configured as Driving Motor-Trailer-Driving Motor (M-T-M). In a further break from tradition, the 4D did not use the 'D' code for a driving trailer, instead it was coded simply as T-M-M-T. The car numbers were also placed far outside the usual range; the 4D was numbered as 6000T-5000M-5002M-6002T for its whole service life.

Most of the time the 4D was on the rails it was parked in the stabling facilities at Bayswater on the Belgrave line.

It entered revenue service on 10 March 1992 after testing and a subsequent media launch.[2] Eight trips were scheduled for its first day in service, the first being the 08:36 service from Flinders Street to Box Hill, followed by the 09:08 return, on which the train suffered the first of its many failures. This required the train to be removed from service at Camberwell and the cancellation of the remaining trips.

Initially the 4D was run coupled to a 3-car Comeng set until 1996 when, after a troubled conversion to driver-only operation, it was permitted to operate on its own. Often as not, though, it was towed or pushed by a 3 or 6-car Comeng set following a failure.

When the suburban system was split into two in 1998 in preparation for privatisation, it was allocated to Hillside Trains (which became Connex).

Throughout its 10 years in Melbourne, the 4D continued to be plagued by reliability issues that saw it constantly in and out of service. After its disappointing entry to service, the train saw little use and was in storage by 1999. It was revived in June 2000, but lasted only a year.

A final attempt was made in February 2002 to return the set to service, but after three days it again failed and was placed back in storage, never to run revenue service again.[4][5]

Disposal

The 4D being cut up in March 2006

Ownership of the 4D was transferred back to the Victorian Government Department of Infrastructure, and the set was railed, ironically under its own power, to Newport Railway Workshops in December 2002 for long-term storage.[6]

In 2006 the 4D was purchased by RailCorp and stripped of parts compatible with the Tangaras.[7] On 29 March 2006 the 4D was transferred by El Zorro to metal recyclers Sims Metal, Brooklyn for scrapping.[8]

References