Jump to content

Larut Rail Tunnel: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
m History: Cleanup/Typo fixing, typo(s) fixed: comissioned → commissioned using AWB
Line 4: Line 4:


==History==
==History==
Construction of the tunnel was started in 2008 by a [[joint venture]] of [[MMC Corporation Berhad]] and [[Gamuda Berhad]] as part of their [[railway electrification in Malaysia|electrified double tracking project]] between [[Ipoh]] and [[Padang Besar, Malaysia|Padang Besar]] and is expected to complete by 2013. And now, it has been comissioned and is in operation.
Construction of the tunnel was started in 2008 by a [[joint venture]] of [[MMC Corporation Berhad]] and [[Gamuda Berhad]] as part of their [[railway electrification in Malaysia|electrified double tracking project]] between [[Ipoh]] and [[Padang Besar, Malaysia|Padang Besar]] and is expected to complete by 2013. And now, it has been commissioned and is in operation.


==References==
==References==

Revision as of 18:39, 5 February 2014

The Larut Rail Tunnel is the rail tunnel being constructed in Malaysia. It is located in Bukit Berapit near Bukit Gantang, Perak, Malaysia. It is made as part of the Ipoh-Padang Besar Electrified Double Tracking Project

History

Construction of the tunnel was started in 2008 by a joint venture of MMC Corporation Berhad and Gamuda Berhad as part of their electrified double tracking project between Ipoh and Padang Besar and is expected to complete by 2013. And now, it has been commissioned and is in operation.

References