Jump to content

Ampang and Sri Petaling lines: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Tags: Mobile edit Mobile web edit
Line 121: Line 121:
| '''Interchange/Notes'''
| '''Interchange/Notes'''
|-
|-
|{{KLRT color code|SP|1}} {{KLRT color code|AG|1}}
|{{KLRT color code|SP|1}}
|{{lrts|Sentul Timur}}
|{{lrts|Sentul Timur}}
|[[Terminal station|Terminal side]]
|[[Terminal station|Terminal side]]
|
|
|-
|-
|{{KLRT color code|SP|2}} {{KLRT color code|AG|2}}
|{{KLRT color code|SP|2}}
|{{lrts|Sentul}}
|{{lrts|Sentul}}
|[[Side platform|Side]]
|[[Side platform|Side]]
|Not interchangeable with {{KLRT color code|KC|01}} [[Sentul Komuter station|Sentul]] on the {{KLRT lines|2}} despite their similar name.
|Not interchangeable with {{KLRT color code|KC|01}} [[Sentul Komuter station|Sentul]] on the {{KLRT lines|2}} despite their similar name.
|-
|-
|{{KLRT color code|SP|3}} {{KLRT color code|AG|3}} {{KLRT color code|MR|11}}
|{{KLRT color code|SP|3}} {{KLRT color code|MR|11}}
|{{STN|Titiwangsa}}
|{{STN|Titiwangsa}}
|[[Side platform|Side]]
|[[Side platform|Side]]
|Interchange station to {{KLRT lines|KL Monorail}} and upcoming {{KLRT lines|12}}
|Interchange station to {{KLRT lines|KL Monorail}} and upcoming {{KLRT lines|12}}
|-
|-
|{{KLRT color code|SP|4}} {{KLRT color code|AG|4}}
|{{KLRT color code|SP|4}}
|{{lrts|PWTC}}
|{{lrts|PWTC}}
|[[Side platform|Side]]
|[[Side platform|Side]]
|Connecting station to {{KLRT lines|1}} and {{KLRT lines|2}}
|Connecting station to {{KLRT lines|1}} and {{KLRT lines|2}}
|-
|-
|{{KLRT color code|SP|5}} {{KLRT color code|AG|5}} {{KLRT color code|MR|9}}
|{{KLRT color code|SP|5}} {{KLRT color code|MR|9}}
|{{lrts|Sultan Ismail}}
|{{lrts|Sultan Ismail}}
|[[Side platform|Side]]
|[[Side platform|Side]]
|Connecting station to {{KLRT lines|8}}.
|Connecting station to {{KLRT lines|8}}.
|-
|-
|{{KLRT color code|SP|6}} {{KLRT color code|AG|6}}
|{{KLRT color code|SP|6}}
|{{lrts|Bandaraya}}
|{{lrts|Bandaraya}}
|[[Side platform|Side]]
|[[Side platform|Side]]
Line 152: Line 152:
|
|
|-
|-
|{{KLRT color code|SP|7}} {{KLRT color code|AG|7}} {{KLRT color code|KJ|13}}
|{{KLRT color code|SP|7}} {{KLRT color code|KJ|13}}
|{{lrts|Masjid Jamek}}
|{{lrts|Masjid Jamek}}
|[[Side platform|Side]]
|[[Side platform|Side]]
|Interchange station to {{KLRT lines|5}}.
|Interchange station to {{KLRT lines|5}}.
|-
|-
|{{KLRT color code|SP|8}} {{KLRT color code|AG|8}}
|{{KLRT color code|SP|8}}
|{{lrts|Plaza Rakyat}}
|{{lrts|Plaza Rakyat}}
|[[Side platform|Side]]
|[[Side platform|Side]]
|Connecting station to {{KLRT lines|9}} via linkway to {{KLRT color code|SBK|17}}[[Merdeka station]]
|Connecting station to {{KLRT lines|9}} via linkway to {{KLRT color code|SBK|17}}[[Merdeka station]]
|-
|-
|{{KLRT color code|SP|9}} {{KLRT color code|AG|9}} {{KLRT color code|MR|4}}
|{{KLRT color code|SP|9}} {{KLRT color code|MR|4}}
|{{stn|Hang Tuah}}
|{{stn|Hang Tuah}}
|[[Side platform|Side]]
|[[Side platform|Side]]
|Interchange to {{KLRT lines|8}}.
|Interchange to {{KLRT lines|8}}.
|-
|-
|{{KLRT color code|SP|10}} {{KLRT color code|AG|10}}
|{{KLRT color code|SP|10}}
|{{lrts|Pudu}}
|{{lrts|Pudu}}
|[[Side platform|Side]]
|[[Side platform|Side]]
|
|
|-
|-
|{{KLRT color code|SP|11}} {{KLRT color code|AG|11}} {{KLRT color code|SSP|20}}
|{{KLRT color code|SP|11}} {{KLRT color code|AG|1}} {{KLRT color code|SSP|20}}
|{{lrts|Chan Sow Lin}}
|{{lrts|Chan Sow Lin}}
|[[Island platform|Island]]
|[[Island platform|Island]]

Revision as of 14:04, 30 December 2016

LRT Ampang Line
LRT Sri Petaling Line
Overview
Native nameLRT Laluan Ampang & LRT Laluan Sri Petaling
StatusOperational
OwnerPrasarana Malaysia
Line number3 & 4
LocaleKlang Valley
Termini
Stations36 & 2 reserve [1]
WebsiteRapid Rail
Service
TypeLight rail transit
SystemLRT KL System 1 (LRT1)
3 Ampang Line - SelTrac CBTC
4 Sri Petaling Line - SelTrac CBTC
Servicesi) Sentul Timur - Ampang
ii) Sentul Timur - Putra Heights
Operator(s)Rapid Rail
Depot(s)Ampang Depot &
Kuala Sungai Baru Depot
Rolling stock35 [2] six-car trains of CSR Zhuzhou LRV
Rolling stocks formation
Ridership62.089 million (2015)[3]
(Decrease 1.8%)
History
Opened16 December 1996 (1996-12-16)
Last extension30 June 2016 (2016-06-30)
Technical
Line length45.1 km (28.0 mi)
CharacterElevated and at-grade
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed60 km/h (37 mph)
Route map
Greater KL / Klang Valley Integrated Transit Map
Source: SPAD as at September 2016

Template:LRT Ampang Line

The LRT Ampang Line and LRT Sri Petaling Line are the third and fourth rail transit lines and the first semi automated rail system in the Klang Valley area. They are a part of the Greater KL/Klang Valley Integrated Transit System, under the Land Public Transport Commission of Malaysia (SPAD). The lines are numbered 3 and 4 and coloured orange & maroon respectively on the official transit map. The entire network is the first standard gauge rail transit system in Malaysia that commenced its service in 1996.

Prior to July 2016, both rail transit lines were collectively known as Ampang Line. Effective from 17 July 2016, following the completion of the extension of Sri Petaling Line towards Putra Heights, Prasarana Malaysia has introduced two new modes of operation via its operator subsidiary, Rapid Rail. The LRT system is currently distinguished into two main lines namely:

These rail transit lines share a similar train system at Ampang Operational and Control Centre with different depots located at Ampang and Kampung Kuala Sungai Baru at Putra Heights.

Lines information

A dynamic route map display on CSR Zhuzhou LRV trainset.

Network Extensions and Services

Line Stations Length Began operation Station Extensions Services
3 Ampang Line
36 + 2 reserved
[4]
45.1 km
[4][5]
16 December 1996  AG18  Ampang  SP5   AG5  Sultan Ismail Ampang ↔ Sultan Ismail
main line service
6 December 1998  SP5   AG5 Sultan Ismail  SP1  AG1  Sentul Timur Ampang ↔ Sentul Timur
main line service
17 July 2016  AG11   SP11  Chan Sow Lin  AG18  Ampang Ampang ↔ Chan Sow Lin
branch line service
1 December 2016  AG1 

 SP1  Sentul Timur

 AG18  Ampang Ampang ↔ Sentul Timur
branch line service
4 Sri Petaling Line 11 July 1998  SP11   AG1  Chan Sow Lin  SP18  Sri Petaling Sri Petaling ↔ Sultan Ismail
main line service
6 December 1998  SP5  Sultan Ismail  SP1  Sentul Timur Sri Petaling ↔ Sentul Timur
main line service
31 October 2015  SP18  Sri Petaling  SP23  Kinrara BK5 Sri Petaling ↔ Kinrara BK5
shuttle service
31 March 2016  SP23  Kinrara BK5  SP27  Bandar Puteri Sri Petaling ↔ Bandar Puteri
shuttle service
30 June 2016  SP27  Bandar Puteri  KJ37   SP31  Putra Heights Sri Petaling ↔ Putra Heights
shuttle service
17 July 2016  SP31   KJ37  Putra Heights  SP1  Sentul Timur Putra Heights ↔ Sentul Timur
main line service

Stations

Route map and fare information at Masjid Jamek station

The Ampang Line system network consists of two main service lines with a total length of 34.4 kilometres that begin at two different stations to the south and east of the city, meeting at an interchange station, continuing through the city centre and ending at the same station at the north. The LRT Ampang Line begins at Ampang, while the LRT Sri Petaling Line currently begins at Putra Heights . Both lines converge at Chan Sow Lin; the line leads to the north, both terminating at Sentul Timur. The Ampang to Sultan Ismail section was the first phase of the LRT system to open, on 16 December 1995, with the second stretch from Chan Sow Lin to Sri Petaling operational on 11 July 1998, primarily for accessibility to the National Sports Complex during the 1998 Commonwealth Games via the Bukit Jalil station. The section between Sultan Ismail and Sentul Timur opened on 6 December 1998.The passenger seating capacity is 168 seats per train (without wheelchair).

The route between Plaza Rakyat and Sentul Timur is an elevated railway, running along the Gombak River between Bandaraya and Titiwangsa. The Chan Sow Lin-Ampang route is primarily at surface level, using a previously disused railway formation, while the Chan Sow Lin-Plaza Rakyat route and the Sri Petaling-Chan Sow Lin route use a combination of surface-level and elevated tracks. There are no underground sections.

The system network includes 29 stations: eleven along the Sentul Timur as a common stations, and seven each along the LRT Ampang Line and the LRT Sri Petaling Line. The service depot and primary train depot is currently at Ampang. There is a temporary secondary train depot at Sri Petaling station. New depot at Kuala Sungai Baru has been build to support Ampang depot due to limited area for development and to cater new CSR Zhuzhou train.

Unlike previous railway system in Malaysia, which were built to metre gauge, the Ampang Line network system was the first railway system in the country to adopt standard gauge. Between Ampang and Plaza Rakyat and between Chan Sow Lin and Salak Selatan, the line uses the trackbed of previously disused lines that were part of the Malayan Railway network (Ampang/Sultan Street branch), closed in the 1960s (between the present Chan Sow Lin station and the present Plaza Rakyat) and the early 1990s (the remaining portion of the line). The Ampang depot stands on the site of the former Ampang railway station.

Ridership on the line has been far below expectations. Built with a capacity of 500,000 passengers per day[6] and a breakeven point of 170,000 passengers per day,[7] in 1998, two years after launch, the line was averaging only 53,000 passengers per day, in part because of fares perceived as too high.[7] In 2002, STAR-LRT was taken over by the government-owned Syarikat Prasarana Negara Berhad. By 2003, the ridership had increased to 110,000, still insufficient for profitability.[6]

LRT Sri Petaling Line stations

Chan Sow Lin is the interchange station between the two routes. The route that runs to Ampang station consists of seven stations running into East of Klang Valley. Passengers to Sri Petaling should disembark at Chan Sow Lin station. But on July 17, 2016, commuters no longer have to switch trains to Putra Heights, instead, they have to switch trains if they wishes to go to Ampang. Passengers will also have to disembark at Chown Sow Lin from Sentul Timur to continue their journey to Ampang.

On 29 August 2006, Deputy Prime Minister Mohd Najib Abdul Razak announced that the southern end of the LRT Sri Petaling Line would be extended from its existing terminus at Sri Petaling station to the suburbs of Puchong and Putra Heights, south-west of Kuala Lumpur. The first phase of the line extension work, a 7.4 km four-station phase from Sri Petaling to Bandar Kinrara (with four new stations: Awan Besar, Muhibbah, Alam Sutera and Kinrara BK5) opened on 31 October 2015 and IOI Puchong Jaya, Pusat Bandar Puchong, Taman Perindustrian Puchong and Bandar Puteri opened on 28 March 2016.[8] Full service for the remaining stations to Putra Heights started on 30 June 2016.

Station Number Station Name Platform type Interchange/Notes
 SP1  Sentul Timur Terminal side
 SP2  Sentul Side Not interchangeable with  KC01  Sentul on the Template:KLRT lines despite their similar name.
 SP3   MR11  Titiwangsa Side Interchange station to Template:KLRT lines and upcoming Template:KLRT lines
 SP4  PWTC Side Connecting station to Template:KLRT lines and Template:KLRT lines
 SP5   MR9  Sultan Ismail Side Connecting station to Template:KLRT lines.
 SP6  Bandaraya Side Connecting station to Template:KLRT lines and Template:KLRT lines
 SP7   KJ13  Masjid Jamek Side Interchange station to Template:KLRT lines.
 SP8  Plaza Rakyat Side Connecting station to Template:KLRT lines via linkway to  SBK17 Merdeka station
 SP9   MR4  Hang Tuah Side Interchange to Template:KLRT lines.
 SP10  Pudu Side
 SP11   AG1   SSP20  Chan Sow Lin Island Interchange to Template:KLRT lines platform 2A towards  AG18  Ampang and upcoming Template:KLRT lines
 SP12  Cheras Side
 SP13  Salak Selatan Side The  KB03  Salak Selatan on the Template:KLRT lines is not interchangeable with this station despite their similar name. The KTM station is about 500 metres away.
 SP14  Bandar Tun Razak Side
 SP15   KB04   KT2  Bandar Tasik Selatan Island Exit paid area station to the Template:KLRT lines, KLIA Transit & walking distance to Terminal Bersepadu Selatan Terminal Bersepadu Selatan.
 SP16  Sungai Besi Side Interchange to upcoming Template:KLRT lines.
 SP17  Bukit Jalil Side
 SP18  Sri Petaling Side
 SP19  Awan Besar Island
 SP20  Muhibbah Side
 SP21  Alam Sutera Side
 SP22  Kinrara BK5 Side
 SP23  Kinrara BK3 future station Side Currently on hold, the station will be built at a later date.
 SP24  IOI Puchong Jaya Side
 SP25  Pusat Bandar Puchong Side
 SP26  Taman Perindustrian Puchong Side
 SP27  Bandar Puteri Island .
 SP28  Puchong Perdana Side
 SP29  Puchong Prima Side
 SP30  Kampung Sri Aman future station Side Currently on hold, the station will be built at a later date.
 SP31  KJ37  Putra Heights Terminal (Island & Side) Cross-platform interchange to Template:KLRT lines towards Gombak

LRT Ampang Line stations

Chan Sow Lin is an interchange station between the two lines. The line that runs to Ampang station consists of seven stations running into East of Klang Valley. From 17 July 2016 to 30 November 2016, passengers to Ampang were required to disembark and switch trains at Chan Sow Lin station, as the main line only served the trains from Sentul Timur to Putra Heights while signalling system upgrades were taking place.

Beginning from 1 December 2016, the new six-car AMY trains finally served the direct service from Ampang to Sentul Timur. This is possible due to the upgrading of the signalling system (Communication-Based Train Control), for the entire Ampang and Sri Petaling Line.

Station Number Station Name Platform type Interchange/Notes
 SP1  Sentul Timur Terminal side
 SP2  Sentul Side Not interchangeable with  KC01  Sentul on the Template:KLRT lines despite their similar name.
 SP3  MR11  Titiwangsa Side Interchange station to Template:KLRT lines and upcoming Template:KLRT lines
 SP4  PWTC Side Connecting station to Template:KLRT lines and Template:KLRT lines
 SP5  MR9  Sultan Ismail Side Connecting station to Template:KLRT lines.
 SP6  Bandaraya Side Connecting station to Template:KLRT lines and Template:KLRT lines
 SP7  KJ13  Masjid Jamek Side Interchange station to Template:KLRT lines.
 SP8  Plaza Rakyat Side Connecting station to Template:KLRT lines via linkway to  SBK17 Merdeka station
 SP9  MR4  Hang Tuah Side Interchange to Template:KLRT lines.
 SP10  Pudu Side
 AG1  SP11  Chan Sow Lin Island Interchange to Template:KLRT lines Platform 2A towards  SP31  Putra Heights and upcoming Template:KLRT lines
 AG2  Miharja Side
 AG3  Maluri Side Interchange to Template:KLRT lines.
 AG4  Pandan Jaya Side
 AG5  Pandan Indah Side
 AG6  Cempaka Side
 AG7  Cahaya Side
 AG8  Ampang Terminal, Side

LRT1 Extension Project

On 29 August 2006, Malaysian Deputy Prime Minister Mohd Najib Abdul Razak announced that the southern end of the Sri Petaling Line, which now ended at Sri Petaling station, would be extended to the suburbs of Puchong and Putra Heights, located to the south-west of Kuala Lumpur. The extension will be part of a 10bil ringgit plan to expand Kuala Lumpur's public transport network.

In September 2009, Syarikat Prasarana Negara began a public viewing for the details of the alignment for the Ampang Line and Kelana Jaya Line at various locations. After a number of amendments and public viewings, the new LRT extension will add 11 new stations and 18.1 km of new track. The Ampang Line Extension Project starts from Sri Petaling Station and passes through Kinrara, Puchong and ends at the new terminus of Putra Heights where the line will meet the Kelana Jaya Line to provide a suburban interchange.[9] Construction works on the Kelana Jaya Line Extension Project and the Ampang Line Extension Project escalated at the end of March 2011, with commencement of structural works, subject to approval from state government and local authorities.[10] Thales Group were selected to provide SelTrac Communications-Based Train Control (CBTC) for the extension.[11]

The first phase of the line extension work, a 7.4 km four-station phase from Sri Petaling to Bandar Kinrara (with four new stations: Awan Besar, Muhibbah, Alam Sutera and Kinrara BK5) opened on 31 October 2015, while the full service on the remaining stations to Putra Heights was commenced on 30 June 2016.[12] The extension project is slated to double the ridership on the Ampang Line system network to more than 400,000 passengers per day.[9][13]

Interchanges

When the STAR-LRT, current name is Ampang Line system network was launched in 1996, the Bandaraya LRT station became the first LRT station to be designated as an interchange station, with a footbridge connecting to the Bank Negara Komuter station, a commuter rail station of Seremban Line & Port Klang Line, a few hundred metres away. With the completion of the Sri Petaling-Chan Sow Lin route, the Bandar Tasik Selatan station was opened as another integrated interchange station for the Seremban Line service and KLIA Transit. The line includes interconnectivity with Kelana Jaya Line, KLIA Transit, KL Monorail services, Sungai Buloh-Kajang MRT Line & Sungai Buloh-Serdang-Putrajaya Line service in the future. With the extension from Sri Petaling LRT Station to Putra Heights LRT Station, there will be an interchange at the Putra Heights station with Kelana Jaya Line, along with the current Masjid Jamek LRT Station on the main line. The system currently has a total of six stations linked to other railway systems.

The Ampang Line system network is the only rail system in the Kuala Lumpur that, though it passes through the city centre, does not stop within or near Kuala Lumpur Sentral. This is because KL Sentral, despite its name, is not in fact in the centre of KL.

Rolling stock

The rolling stock of the Ampang Line currently consists of a fleet of 90 Adtranz standard-gauge light rail vehicle (LRV) manufactured by Walkers Limited of Australia. These trains are electric multiple units (EMU), which draw power from the underside of a third rail alongside the track. All cars in each train are powered. The trains are manned, with driver cabs occupying the ends of the train.

The trainsets come in two configurations. The first and most common variation is the six-car trainset, which consists of three sets of two EMUs (2+2+2) and occupies the maximum platform length of the stations. Each of the two EMU sets at the front and rear consist of one driving car and one trailer car, while the two EMUs between are trailer cars. Each two EMU sets are not connected to other EMU sets in the train. The second variation is a four-car trainset, a more obscure configuration that consists of only two EMU sets (2+2) of one driving car and one trailer car at both ends. These are only two-thirds the length and number of cars of the six-car variation. The 2+2 trainsets were used in full service until the widespread deployment of 2+2+2 trainsets.

Each car has 3 bogies: 2 power bogies and one articulated trailer for the centre bogie. The end cars, numbered 1101 to 1260, have driver cabs. Middle cars numbered 2201 to 2230 have a concealed driver control panel, enabling the car to be moved around the depot independently.

The train interiors are simple and basic. There are no individual seats, only longitudinal bench seating on either side of the train, surfaced in metal, while spaces near the connecting ends of the cars are provided for passengers who use wheelchairs and other assistive devices. There is a large amount of floorspace for standing passengers. The rolling stock has remained relatively unchanged since its introduction in 1996; new trains will be used on the line from October 2015.

50 new trains will be deployed to increase the capacity of the line and provide a better service. Each of the new trains is six cars long[9][14] and provided by CSR Zhuzhou of China, similar to on the design for İzmir Metro and Buenos Aires Underground 200 Series.[13] These trains are disabled-friendly and include safety features like closed-circuit TV, emergency breakable window, emergency ventilation fan, fire and smoke detection system and supervised automatic train operation system (SATO), and other elements such as interactive destination display inside the train, non-slipping seats, LCD infotainment, walk-through gangways, and a more spacious wheelchair space for the physically challenged.[15][16]

The Ampang Line system network fleet consisted of the following models:

  • 29 + 1 (out of service) 6-car Adtranz-Walkers LRV trainsets currently in operation since December 1996, to be gradually phased out and replaced by CSR Zhuzhou LRV trainsets.
  • 50 6-car CSR Zhuzhou LRV trainsets, given name as AMY, eight trainsets of which have been delivered since January 2015, the balance being still under construction.

Formation

Car No. 1 2 3 4 5 6
Seating capacity
Designation
Set Designation 1 2 3 4 5 6 Arrival Date Status Launch Date
AMY 1 Jan 10 In operation 31 October 2015
AMY 2 Feb 28 In operation 31 October 2015
AMY 3 Mar 2015 In operation 31 October 2015
AMY 4 Apr 2015 In operation 31 October 2015
AMY 5 May 2015 In operation 31 October 2015
AMY 6 Jun 2015 In operation 31 October 2015
AMY 7 July 2015 In operation 31 October 2015
AMY 8 End July 2015 In operation 31 October 2015
AMY 9 August 2015 In operation 31 October 2015

History

The system has assumed multiple names throughout its service. Initially known as STAR (Template:Lang-ms; Template:Lang-en), the STAR LRT or the STAR Line, the system was renamed in 2005 to refer to system's two service routes: the LRT Sri Petaling Line and LRT Ampang Line. In April 2007, the entire LRT system was renamed the Ampang Line system network as one common line, with no official names given to the service route. With refer to the new opening stations at Ampang Line Extension Project, the service route has been rename again to distinguish its own route.

  • 13 November 1992: Sistem Transit Aliran Ringan Sdn Bhd (Star LRT) incorporated to implement Kuala Lumpur's first LRT project.
  • 22 December 1992: Franchise agreement between the Malaysian government and Star LRT signed for the development, ownership and operation of LRT system.
  • 30 August 1994: Work on the project officially commenced.
  • 16 December 1996: AmpangSultan Ismail begins operations.
  • 11 July 1998: Chan Sow LinSri Petaling begins operations. This branch forms part of the Sri Petaling Line.
  • 6 December 1998: PWTCSentul Timur begins operations.
  • 1 September 2002: Syarikat Prasarana Negara Berhad (Prasarana) takes over ownership and operations of Star LRT under the first phase of Kuala Lumpur's public transport restructuring exercise. Prasarana renames the system to Starline.
  • November 2004: Operations of Starline transferred to Rapid KL. Ownership of assets remain with Prasarana.
  • 19 July 2005: Rapid KL announces that Starline's two lines will be renamed the LRT Ampang Line and LRT Sri Petaling Line. All signage will be changed by 2006.
  • 28 November 2011: Kelana Jaya Line and Ampang Line system network integrated with a single ticketing system.[citation needed]
  • 31 October 2015: Awan BesarKinrara BK5 begins operations on Ampang Line Extension Project (LEP) Phase 1.
  • 31 March 2016: IOI Puchong JayaBandar Puteri
  • 30 June 2016: Puchong Perdana and Puchong Prima officially opened, and terminate at Putra Heights.
  • 1 December 2016: Direct services from Ampang to Sentul Timur begins. The Adtranz-Walkers trains are discontinued after 20 year service.

Accidents

  • 27 October 2006: A six-coach LRT train which came in from Ampang overshot the end of the elevated tracks at Sentul Timur station, resulting in the front half of the first coach dangling in the air about 25m above the ground.
  • 25 September 2008: Six people injured when a train hits another train near the Bukit Jalil station. It is believed that the first coach suddenly stopped 200 metres from the station before it was rammed by another train on the same track. LRT service was disrupted for the day before resuming the next day.[17]

References

  1. ^ "Ampang Line". RapidKL. Retrieved 2016-07-01.
  2. ^ http://www.myrapid.com.my/media-centre/media-releases/2016/perkhidmatan-rel-rapid-kl-catat-satu-lagi-kejayaan-hari-ini
  3. ^ "JADUAL 2.9 : BILANGAN PENUMPANG BAGI PERKHIDMATAN SISTEM ALIRAN RINGAN, SUKU KEEMPAT, 2015" (PDF) (in Malay and English). Ministry of Transport, Malaysia. Retrieved 31 March 2016. {{cite web}}: Unknown parameter |trans_title= ignored (|trans-title= suggested) (help)
  4. ^ a b "Ampang Line". Prasarana Malaysia. Retrieved 2014-06-12.
  5. ^ Empat stesen baharu LRT di Puchong beroperasi 31 Mac ini
  6. ^ a b Property Times Archived September 13, 2007, at the Wayback Machine
  7. ^ a b "TEMPORARY SUSPENSION OF RAPID KL LRT AMPANG AND SRI PETALING LINES ON 16 JULY". Rapid KL. 17 June 2016.
  8. ^ Prasarana announces partial opening of Sri Petaling LRT line
  9. ^ a b c "Prasarana: Ampang Line extension Phase 1 on track for October launch". Malay Mail. Kuala Lumpur. 7 March 2015. Retrieved 2015-03-17.
  10. ^ "Construction Works for LRT Extension Project to Commence". Rapid KL. 11 March 2011.
  11. ^ "Thales awarded the contract to upgrade Kuala Lumpur Ampang Line to fully automated CBTC signalling". Thales Group. 3 September 2012.
  12. ^ "Kuala Lumpur adds another 24km to rail network". Rail Journal. 30 June 2016.
  13. ^ a b "CSR unveils new trains for KL Ampang Line". International Railway Journal. London. 4 March 2014. Retrieved 2015-03-17.
  14. ^ "'Amy' to hit the tracks in October". The Star. Kuala Lumpur. 30 January 2015. Retrieved 2015-03-17.
  15. ^ Cheong, Sam (28 February 2014). "RapidKL gets 50 coaches for Ampang Line route". The Star. Kuala Lumpur. Retrieved 2015-03-17.
  16. ^ "Ampang Line to get new trains in 2015". The Star. Kuala Lumpur. 21 October 2014. Retrieved 2015-03-17.
  17. ^ Looi, Elizabeth (25 September 2008). "Six injured in LRT accident". The Star. Kuala Lumpur.

Route maps