Sistema Interconectado del Norte Grande: Difference between revisions
Appearance
Content deleted Content added
→Sources: Merged into 'External links' |
→External links: {{Portal|Chile|Energy}} |
||
Line 7: | Line 7: | ||
==External links== |
==External links== |
||
{{Portal|Chile|Energy}} |
|||
* [http://www.geni.org/globalenergy/library/national_energy_grid/chile/index.shtml Global Energy Network Institute] |
* [http://www.geni.org/globalenergy/library/national_energy_grid/chile/index.shtml Global Energy Network Institute] |
||
* [http://www.cdec-sing.cl Centro de Despacho Económico de Carga del Sistema Interconectado del Norte Grande (CDEC-SING) - Economic Load Dispatch Center of the Big North Interconnected System] |
* [http://www.cdec-sing.cl Centro de Despacho Económico de Carga del Sistema Interconectado del Norte Grande (CDEC-SING) - Economic Load Dispatch Center of the Big North Interconnected System] |
Revision as of 11:11, 9 April 2017
The Sistema Interconectado del Norte Grande (Spanish for Interconnected System of Norte Grande) or SING is an alternating current power grid serving the Norte Grande zone of Chile, it produces 19% of the national power generation. The SING covers the three northernmost regions of Chile including Arica y Parinacota, Tarapacá and Antofagasta Region.
As of December, 2011, it has a total installed capacity of 4,550 MW (gross) [1]
References
- ^ SING installed capacity. Central Energía. Retrieved: 15-05-2012
External links
- Global Energy Network Institute
- Centro de Despacho Económico de Carga del Sistema Interconectado del Norte Grande (CDEC-SING) - Economic Load Dispatch Center of the Big North Interconnected System