Jump to content

Edmonton LRT: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Undid revision 1008001361 by 2603:8000:2D01:EDAB:B920:53A1:6687:C83 (talk)
Line 359: Line 359:
[[Category:Electric railways in Canada]]
[[Category:Electric railways in Canada]]
[[Category:Standard gauge railways in Canada]]
[[Category:Standard gauge railways in Canada]]
[[Category:1978 establishments in Alberta]]

Revision as of 09:54, 22 February 2021

Edmonton Light Rail Transit
Overview
LocaleEdmonton, Alberta, Canada
Transit typeLight rail
Number of lines2 (& 2 under construction)
Number of stations18 (& 14 under construction)
Daily ridership110,786 (2018)[1]
Annual ridership87,121,534 (2018)[2]
WebsiteEdmonton Transit Service
Operation
Began operationApril 22, 1978
Operator(s)Edmonton Transit Service
Technical
System length24.3 km (15.1 mi)[3][4]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationOverhead lines, 600 volts DC[5]
System map

Edmonton Light Rail Transit, commonly referred to as the LRT, is a light rail system in Edmonton, Alberta. Part of the Edmonton Transit Service (ETS), the system has 18 stations on two lines and 24.3 km (15.1 mi) of track. As of 2018, it is one of the busiest light rail transit systems in North America, with over 110,000 daily weekday riders, and has been growing steadily in recent years.[citation needed]

The ETS started operation of the original LRT line in 1978, expanded by 2010 into the Capital Line, running between Clareview in Edmonton's northeast and Century Park in Edmonton's south end.[3] The first phase of the newer Metro Line started service between the University of Alberta campus and hospital in Edmonton's southcentral and the Northern Alberta Institute of Technology northwest of downtown Edmonton in 2015, with further expansion to north Edmonton and neighbouring city of St. Albert planned into the future.[4] Construction of the first phase of the 27 kilometres (17 mi) Valley Line, from downtown Edmonton to Mill Woods in southeast Edmonton, began in spring 2016, and there are future plans to extend into west Edmonton.[6][7]

History

The above-ground LRT station at the University of Alberta's South Campus, near the Neil Crawford Centre and Foote Field

In 1962, Canadian Bechtel Ltd. was commissioned to develop a plan for Edmonton's rapid transit system. Construction began in 1974 with a budget of $65 million.[8] Edmonton became the first city in North America with a metropolitan population of less than one million to build a modern light rail system.[9] The population was just over 445,000 when construction started on the route in 1974.[10] It also became the first city in Western Canada to operate a rapid transit system. Testing of the new line started in 1977 with regular service starting April 22, 1978, in time for the 1978 Commonwealth Games. The line followed a CN right-of-way from Belvedere Station to Stadium Station (near Commonwealth Stadium), via an intermediate stop at Coliseum Station (near Northlands Coliseum), and then continued in a tunnel under 99 Street to Central Station, at Jasper Avenue and 100 Street, including an intermediate stop at Churchill Station. The original line was 6.9 km long.[11]

Planning influences included the rail systems of Toronto (for dimensions), Montreal (underground environment), Cleveland (reuse of existing rail right of way), as well as Netherlands and Germany (feeder bus routes with timed-transfers, and choice of rolling stock). Operating practices were influenced by the MBTA Green Line, British trams, and the Canadian National Railway.[12]

When the line opened, fare collection was modelled on traditional rapid transit lines, with booth attendants. Low volumes of activity at some entrances led to weekend closures of alternate station entrances. In November 1980, Edmonton Transit (as it was then named) switched to a modified European-style "proof of payment" system, retaining the old turnstiles to issue the new receipts.[13] Fares were now collected by automated ticket vending machines with irregular proof of payment inspectors, which permitted keeping all entrances open and required fewer staff.

Every station on the line built since 1983 has been built with full accessibility for persons with disabilities. The 1998 and 2001 upgrades to the Belvedere and Clareview stations involved installation of roofs and lengthening of platforms to accommodate five-car trains.[11]

The LRT system had an estimated 18,220 weekday passenger boardings in 1978.[11] Six stations and 24 years after the University extensions, boardings more than doubled to 39,550 in 2002.[11] The LRT system continues to expand, and operated with 18 stations, 24.3 km (15.1 mi) of double track and ridership of 110,786 average weekday boardings in 2018.[14] Extensions of the LRT system has resulted in significant increases in ridership; ridership increased nearly 78% in the first full year of the South Campus and Century Park extensions (2011 versus 2008), and increased 15% in the first full year of the NAIT extension (2016 versus 2014).[15]

Network

The system has two lines. The Capital Line, runs from northeast Edmonton to south Edmonton via Downtown. A second line, the Metro Line, connecting Downtown with northwest Edmonton, began limited operations in September 2015. There are further projects to create a new 27-kilometre line that will extend to Mill Woods Town Centre in the southeast part of the city and to Lewis Farms in the west end of the city.

During construction, surface area was preserved (although costs increased) by tunnelling under the downtown core and the University of Alberta main campus. The underground portions of the LRT connect to the Edmonton Pedway system with links to many buildings. The LRT crosses the North Saskatchewan River between the Grandin and University stations on the Dudley B. Menzies Bridge,[16] a dedicated LRT and pedestrian bridge.

Storage, maintenance and operations of the LRT are controlled from the D.L. MacDonald Yard.

The LRT operates approximately between 5:00 a.m. and 1:00 a.m. daily. During peak-times, trains departing Clareview to Downtown run approximately every five to ten minutes, and run every 15 minutes during off-peak hours. Trains from Century Park to Downtown run on a five-minute frequency during peak-times and run every five to ten minutes during off-peak times. After 10 p.m. trains run every 15 minutes. Before the opening of the Metro Line, the city held a naming contest, to determine the names of the five current and future LRT lines.[17] On January 31, 2013, the city announced the names: Capital Line, Metro Line, Valley Line, Energy Line, and Festival Line.[18][19]

Edmonton LRT lines
Line Termini Stations Length
501 Capital Line Clareview Century Park 15[3] 21 km (13 mi)[3]
502 Metro Line (nights and Sundays) NAIT Health Sciences/Jubilee 10 8 km (5 mi)
Metro Line (Monday to Saturday) NAIT Century Park 14 16 km (10 mi)

Stations

The Capital Line has 15 stations: Clareview, Belvedere, Coliseum, Stadium, Churchill, Central, Bay/Enterprise Square, Corona, Grandin/Government Centre, University, Health Sciences/Jubilee, McKernan/Belgravia, South Campus/Fort Edmonton Park, Southgate, and Century Park stations. Of these, Churchill, Central, Bay/Enterprise Square, Corona, Grandin/Government Centre, and University are underground. The three newest stations opened in September 2015 for the Metro Line: MacEwan, Kingsway/Royal Alex, and NAIT.

Another 12 stations will be built for the first phase of the Valley Line, which is planned to open in 2021.[20]

All existing stations have a centre platform.

Rolling stock

Edmonton Transit Service LRVs
Image Mfr Model Qty Dates Notes Refs
Ordered Service Retired
Siemens-Duewag U2 (RTE 1) 1001–1014 37 1977 1978 Largely similar to the U2 cars designed for Frankfurt; Edmonton model (designated RTE 1) is modified with extra heating, double-glazed windows, and continuous-level floor. Refurbishment completed in 2013 to extend life by 15–20 years. [21][22][23]
1015–1017 1980
1018–1037 1983
Siemens SD-160 1038–1074 57 2005 2008 Initial 37-car order to accommodate southern extension to Century Park, delivered starting in 2008. 20-car expansion for Metro Line service delivered 2012–13. [23][24][25][26]
1075–1094 2010 2012
Bombardier Flexity Freedom 1001–1026 26 2018 2021 First low-floor LRVs for Edmonton, intended for Valley Line service. Seven articulated segments; 137 ft (42 m) long over couplers, 82 seats / 275 passengers. [27][28]

The rolling stock of the Capital Line is composed of trains of either Siemens-Duewag U2 or Siemens SD-160 cars. ETS operates 37 U2 cars, some of which have been in operation since the system opened in 1978. ETS also operates 57 SD-160 cars, of which 37 were ordered between 2005 and 2007, with the first cars entering revenue service on January 27, 2009.[24] An additional 20 cars were purchased in 2010 and 2011 for use in the Metro Line[29][30] and were delivered from March 2012 to April 2013.[23]

The Capital Line uses five-car trains during peak hours, and three-car trains are occasionally used for late night service. The Metro Line will operate three-car trains until the permanent NAIT station is opened, as the temporary NAIT station can only accommodate three-car trains. The permanent station will be 125 metres long to accommodate a five-car train. All other extensions to the Capital and Metro lines will have five-car platforms.[31]

The future Valley Line (currently under construction) will use new low-floor Bombardier Flexity Freedom vehicles.[32]

Safety and security

All LRT stations are monitored by CCTV cameras. All trains are equipped with operator alert systems which will allow passengers to contact the train operator in the event of an emergency. Likewise, all stations are equipped with blue emergency help phones which will connect with ETS Security. The stations are patrolled by Transit Peace Officers.[33]

Despite the security measures put in place, there have been several incidents on the Edmonton LRT or at the LRT stations. In 2008, there were 328 crimes against persons reported on transport property.[34] Some of the most serious incidents include:

  • In 1988, a woman was strangled to death in a Churchill Station washroom.[34]
  • In 2010, a woman was shot and killed at Stadium Station.[34]
  • In 2012, a man was beaten to death on board the LRT between Stadium and Belvedere Station.[35]
  • in 2018 a man was stabbed while waiting for a train at South Campus/Fort Edmonton Park station [36]

Fares

The cash fare for passengers using Edmonton Transit Service buses and the LRT, since 1 February 2019, is $3.50 for adults, seniors and youth. Children below 6 ride free with fare-paying rider; limit is 3.[37]

Fare type Price[37]
Cash fare $3.50
Children 12 and under Free
Day pass (family) $9.50
Month adult pass $97.00

Passengers can also purchase books of transit tickets or monthly transit passes. Seniors can purchase an annual transit pass at a discounted rate.

Passengers paying a cash fare at a fare machine at an LRT station are issued a transit ticket, which is validated as an LRT ticket after being time-stamped. This ticket is valid both as proof of payment and as a transfer. Transfers allow the passenger to transfer from the LRT to a bus, from a bus to the LRT and between buses, and is valid for 90 minutes from the time it was stamped. Passengers paying a cash fare or validating a ticket on a bus obtain a transfer at the time the fare is paid. Transfers also serve as proof of payment for 90 minutes.[38]

Passengers in an LRT proof of payment area must present proof of payment upon request by a Transit Peace Officer. Proof of payment includes LRT tickets, transfers, validated transit tickets and transit passes. Failure to provide proof of payment can result in a $250 fine. Proof of payment areas include all LRT trains and LRT station platforms, unless the ticket vending machines are located on the platform itself.

In 2007, Edmonton Transit Service, the University of Alberta (U of A), and MacEwan University partnered to provide students with a universal transit pass (U-Pass), which is valid on the LRT and all ETS buses as well as on Strathcona County and St. Albert Transit Systems.[39][40] NAIT students voted to join the program in 2010.[41] The U-Pass allows unlimited LRT and bus use to valid pass holders. This service was temporarily suspended in the Fall of 2020 due to the COVID-19 Pandemic.

Expansion

Edmonton LRT
North St. Albert
Boudreau
Downtown St. Albert
Herbert
proposed extension to
St. Albert
Campbell Road
137 Street
127 Street
Castle Downs
145 Avenue
137 Avenue
132 Avenue
planned
Blatchford Gate
Lewis Farms
NAIT/Blatchford Market
Kingsway/​Royal Alex
Kingsway/Royal Alex Transit Centre
Aldergrove/Belmead
(182 Street)
MacEwan
West Edmonton Mall
Misericordia
proposed extension to
Energy & Tech Park
Meadowlark
Gorman
Glenwood/Sherwood
(95 Avenue)
planned
Jasper Place (156 Street)
Clareview
Parking Clareview Transit Centre
Stony Plain Rd/149 Street
Grovenor/142 Street
137 Avenue
Glenora
Belvedere
Parking Belvedere Transit Centre
124 Street
Brewery/120 Street
The Yards/116 Street
Coliseum
Coliseum Transit Centre
MacEwan Arts/112 Street
NorQuest (107 Street)
Stadium
Parking Stadium Transit Centre
Alex Decoteau
(106/105 Street)
102 Street
Churchill
Central
Quarters
Bay/Enterprise Square
Corona
Government Centre Transit Centre
Government Centre
Muttart
Strathearn
University Transit Centre
University
Holyrood
Health Sciences/Jubilee
Bonnie Doon
McKernan/​Belgravia
Avonmore
South Campus/Fort Edmonton Park Transit Centre
South Campus/
Fort Edmonton Park
Davies
Parking Davies Transit Centre
Southgate Transit Centre
Southgate
Alberta Highway 2.svg
Highway 2
Whitemud Drive
Alberta Highway 14.svg
Highway 14
Whitemud Drive
Century Park Transit Centre
Century Park
Millbourne/​Woodvale
Twin Brooks
Grey Nuns
Llew Lawrence OMF
Mill Woods
Mill Woods Transit Centre
Heritage Valley North
Provincial Lands
Heritage Valley Town Center
Desrochers/Allard
Key
Capital Line
Metro Line
Valley Line

Handicapped/disabled access All stations are accessible

Overview of future plans

The City of Edmonton prioritized completion of the Metro Line to NAIT for 2014, followed by expanding the system to the southeast and west.[42] City council approved funding to begin preliminary engineering on the Valley Line from Mill Woods to Lewis Farms in June 2011.[43]

Approved future lines
Line Status Termini Additional
stations
Additional
length
Projected opening
Valley Line Southeast[44] Construction[45] 102 Street (Downtown) Mill Woods +11 +13 km 2021[46]
Valley Line West[47] Procurement 102 Street (Downtown) Lewis Farms +16 +14 km 2026[48]
Metro Line Northwest[49] Construction[49] NAIT Blatchford +1 +11 km 2024/25[49]
Preliminary design Blatchford Campbell Road +7[50] before 2040
Capital Line South[51] Design complete Century Park Ellerslie +1 +4.5 km before 2040
Design complete Ellerslie Desrochers +3 before 2040
Capital Line Northeast[52] Approved Clareview Gorman +1[3] +2.9 km before 2040
Proposed future lines
Line Termini Additional
stations
Metro Line Campbell Road Neil Ross Road 4[53]
Energy Line Lewis Farms Strathearn (via Stony Plain, downtown, University of Alberta, Old Strathcona and Bonnie Doon. Potential to extend to Sherwood Park)
Festival Line Strathearn (potential to extend to Sherwood Park) Mill Woods (via downtown, University of Alberta, Old Strathcona and Bonnie Doon)

Capital Line expansion

Future plans call for expanding the Capital Line to Gorman in the northeast and Heritage Valley in the south.

Metro Line expansion

NAIT to St. Albert

Beyond NAIT, the Metro Line will travel through Blatchford (the sustainable neighbourhood being developed on the grounds of the former City Centre Airport), go over the CN railway yard north of Yellowhead Trail, and continue north along 113A Street, and west along 153 Avenue. The City of St. Albert has also begun preliminary plans to extend the LRT line into their borders.[53]

On May 19, 2010, the transportation department announced its recommendation for an extension of the Metro Line from NAIT station to St. Albert. This extension is expected to eventually serve 42,000 to 45,000 passengers daily.[54]

Valley Line

The Valley Line is a proposed 27 km (17 mi), low-floor urban line running southeast to west from Mill Woods to Lewis Farms, crossing through downtown. The line will be constructed in phases, with phase 1 being the 13.1 km (8.1 mi), 12-station portion between Mill Woods and 102 Street (downtown) allowing passengers to connect with the Capital Line and Metro Line at Churchill. Construction started in 2016 with completion in 2020.[55][56]

Mill Woods to Downtown

Davies Station in October 2020

In December 2009, Edmonton city council approved a new low-floor train route that would leave a new ground-level station at Churchill Square on 102 Avenue between 100 and 99 streets before stopping in The Quarters redevelopment on 102 Avenue between 97 street and 96 street. From here the route enters a tunnel and travels beneath 95 street descending into the river valley to cross the North Saskatchewan River on the new Tawatinâ Bridge,[57] which will be constructed east of Louise McKinney Park. The route then proceeds to climb the hill adjacent to Connors Road then proceed east along 95 Avenue and southbound at 85 Street. The route will travel southbound along 85 Street crossing the traffic circle and shifting to 83 Street, continuing south and east towards Wagner Road. Finally the line will proceed south along 75/66 Street until it reaches Mill Woods Town Centre. Within this line the proposed stations are: Quarters, Muttart, Strathearn, Holyrood, Bonnie Doon, Avonmore, Davies (to include a bus terminal and park & ride),[58] Millbourne/Woodvale, Grey Nuns, and Mill Woods Town Centre. The maintenance and storage of vehicles for the line will be at the new Gerry Wright Operations and Maintenance Facility, at Whitemud Drive and 75 Street.[59]

On February 15, 2012, city council approved the Downtown LRT concept plan. The Downtown LRT Project became part of the Southeast to West LRT project.[60] The city hoped to have money in place by the end of 2013 for the $1.8-billion LRT line from downtown to Mill Woods to start construction in 2016. City council committed $800 million, the federal government invested $250 million, and $235 million would come from the provincial government, leaving a $515 million funding gap delaying the project.[61] On March 11, 2014, it was announced that the project would be completely funded[62][63] with an additional $150 million from the federal government and $365 million from the provincial government.[64][65]

Downtown to Lewis Farms

A planned expansion to Lewis Farms, with the West Edmonton Mall en route, is in the engineering phase as part of the 27-kilometre Valley Line.

The option approved by Council in 2010 was to have the west LRT extension run from downtown, along 104 Avenue and Stony Plain Road before diverting south on 156 Street towards Meadowlark Health And Shopping Centre, then along an 87 Avenue alignment to West Edmonton Mall and beyond. Proponents of this route cited opportunities for transit-oriented development.[66][67]

On November 1, 2018, the Government of Alberta announced a contribution of $1.04 billion towards the second phase of the Valley Line, extending it west to Lewis Farms with an estimated completion date of 2027-28.[68]

Controversy

The Valley LRT to Mill Woods generated opponents particularly on the location of the route. The Edmonton Chinese community opposed the city's plan to lay the tracks on 102 Avenue as it is directly in front of a Chinese elderly care facility. Despite demands to relocate the route to 102a Avenue, the city council voted for the original proposal.[69] Another group opposed the route saying that the new LRT bridge crossing the North Saskatchewan River will have a negative impact on the river valley and the removal of the existing footbridge during construction (to be replaced by pedestrian space on the LRT bridge) would temporarily displace an existing river crossing. The city states that impact is minimal, no other alternative routes were suitable, and has proceeded with construction.[70][71]

Concerns in 2008 and 2009 over community impacts[72] along the proposed west leg of the Valley Line[73] and north leg of the Metro Line[74] led to a larger debate over the vision guiding the various expansion plans, and the criteria used to select the routes.[75][76]

The adoption of a new signalling system (see below) for the Metro Line pushed back the start date from April 2014 to September 2015, when the line finally began operation at a frequency of 15 minutes, rather than 5. Trains only ran at a maximum of 25 km/h (16 mph) between the Churchill and NAIT stations, creating passenger delays and traffic congestion.[77] An independent safety auditor cleared trains to run at their full 50 km/h (31 mph) as of February 19, 2017.[78]

Completed extensions

Capital line

On April 26, 1981, ETS opened a northeastern-bound extension of 2.2 km on the CN right-of-way to Clareview Station. In June 1983, the light rail tunnel downtown was extended by 0.8 km to Bay and Corona stations. The D.L. MacDonald Yard, between Belvedere and Clareview, opened in December 1983 to store and service the vehicles. The line was extended in September 1989 by 0.8 km to Grandin Station (close to the Alberta Legislature). On August 23, 1992, the next extension opened from Grandin to University Station, partially via the Dudley B. Menzies Bridge, crossing the North Saskatchewan River with a lower level for pedestrians and cyclists, and partially via a tunnel into the station. Major upgrades to the Belvedere and Clareview stations were made in 1998 and 2001 respectively.[11]

On January 1, 2006, the line was extended 0.6 km south through the University Campus to Health Sciences Station, which is located at street level. On April 25, 2009, McKernan/Belgravia and South Campus stations were opened as part of the south LRT expansion, with Southgate and Century Park opening on April 24, 2010. The first of the new Siemens SD-160 light rail vehicle train cars for the new extension were shipped by rail from Florin, California, on April 24, 2008, arriving in Edmonton on May 9, 2008 (37 vehicles in total).[79]

The LRT expansion was developed entirely at surface level with several underpasses after 2006, one at Belgravia Road and the other under 111 Street south of 61 Avenue. A short busway has been constructed from the South Campus station[82] roughly parallel to Belgravia Road in conjunction with the South LRT expansion.

Metro line

On April 27, 2007, the city began detailed planning of a new LRT line that will run north from Churchill Station, to the Northern Alberta Institute of Technology (NAIT), and eventually beyond to north-end neighbourhoods with a terminal station south of St. Albert.

Kingsway/Royal Alex station construction in August 2013

The Metro line branches off the Capital Line at Churchill Station, runs west along 105 Avenue to the MacEwan University City Centre Campus, then north along 105 Street, Kingsway (Avenue), and 106 Street, to Kingsway Mall and NAIT.

In April 2008, Edmonton City Council approved $45 million in funding to build a tunnel under the Epcor Tower site immediately, while it was still under construction, with the aim of saving $140 million more than would have been required to dig under the tower once it was completed. This step was taken even though the rest of the project had not yet been approved, because of the time constraint posed by the construction of the new tower.[83] Construction on the tunnel began in August 2009 and was completed by approximately September 2010.[84]

On July 2, 2009, the federal and provincial governments approved the reallocation of funding from the proposed Gorman Station extension to the Metro line as the city felt that NAIT was a higher priority.[85]

The expansion added three stations to the system; MacEwan station at MacEwan University, Kingsway/Royal Alex station near Kingsway Mall and the Royal Alexandra Hospital, and NAIT station at the Northern Alberta Institute of Technology. MacEwan Station is located just east of the downtown MacEwan University campus, and west of the proposed downtown hockey arena, at 104 Street and 105 Avenue. The Kingsway/Royal Alex Station is located on the north side of Kingsway, to the south of the hospital. As part of the plan, the Kingsway Transit Centre was relocated to the southeast corner of 111 Avenue and 106 Street, to provide service to both Kingsway Mall and the LRT station.[81] The NAIT Station is located north of Princess Elizabeth Avenue, on the south side of NAIT's swimming pool and hockey arena.[84][86][87][88]

The Metro Line was completed at a cost $90 million under its estimated $755 million budget, with a total project cost of $665 million.[89]

Signalling system

The Metro Line uses Communications-based train control (CBTC) or moving block while the Capital Line uses fixed block signalling. The new Metro Line was built to use only CBTC.[90]

Both types of signalling system controls train traffic to keep it safely spaced and on schedule, shares train location information publicly (e.g., digital and audio announcements at LRT stations), and manages intersections by triggering traffic signals and crossing warning systems (warning bells, flashing lights and gates).[90]

The older fixed block system divides the track into sections called blocks protected by signals that maintain at least one empty fixed block between trains. The new CBTC system instead maintains a fixed distance of empty space (a moving block) between trains. This allows trains to operate closer together, which increases the frequency of trains arriving at stations and increases an LRT system's overall capacity for ridership.[90]

The CBTC uses computers on trains that report into a central controller to pinpoint the exact location of each train and constantly adjust the speed, spacing and routing of trains to keep trains safe and on schedule. It safely tightens up the spacing between trains so that Metro Line and Capital Line trains can share the same tracks between Health Sciences/Jubilee station and Churchill station. Edmonton Transit runs peak-time trains every 5 minutes through downtown, but this frequency could be increased to every 2.5 minutes when the Metro Line is fully operational.[90]

Thales Rail Signalling Solutions is the signalling contractor that installed the system. They have completed systems in many cities including Vancouver (Canada Line) and are also working on Ottawa’s Confederation Line.[90]

References

  1. ^ "2018 LRT Passenger Count Report" (pdf). City of Edmonton. Edmonton Transit Service. March 2019. Archived (PDF) from the original on May 31, 2019. Retrieved May 31, 2019.
  2. ^ "ETS Statistics for 2017-2019". www.edmonton.ca. City of Edmonton. 25 October 2019. Archived from the original on October 26, 2019. Retrieved October 25, 2019.
  3. ^ a b c d e "The Way We Move LRT for Everyone" (PDF). Edmonton Transit Service and City of Edmonton. pp. 4–5. Archived from the original (pdf) on 2015-09-10. Retrieved 2015-09-08.
  4. ^ a b "Metro Line (North LRT to NAIT)". City of Edmonton. September 7, 2015. Archived from the original on September 7, 2015. Retrieved September 8, 2015.
  5. ^ "Edmonton Datasheet - SD160 Light Rail Vehicle" (PDF). Siemens. Archived from the original (PDF) on October 26, 2010. Retrieved March 9, 2011.
  6. ^ Kent, Gordon (February 11, 2016). "'There's no hidden surprises,' city says, as it signs contract for Edmonton Valley Line LRT". Edmonton Journal. Postmedia Network. Retrieved February 13, 2016.
  7. ^ "Bechtel Team Awarded Edmonton Valley Line Light Rail Project in Canada". Bechtel. February 11, 2016. Retrieved February 13, 2016.
  8. ^ "History of ETS". City of Edmonton. June 2016. Archived from the original on June 1, 2013. Retrieved July 11, 2013.
  9. ^ "LRT Brochure" (PDF). November 15, 2004. Archived from the original (PDF) on January 4, 2007. Retrieved December 2, 2011.
  10. ^ "Historical City of Edmonton Population" (PDF). City of Edmonton. August 2008. Archived from the original (PDF) on 2012-05-08. Retrieved 2010-04-24.
  11. ^ a b c d e f Colin Hatcher (2003). Edmonton's Light Rail Transit – The First 25 Years. Edmonton Transit Service.
  12. ^ https://pedestrianobservations.com/2018/07/03/why-are-canadian-construction-costs-so-high/
  13. ^ Tingley, Kenneth W. (2011). Ride of the Century: The Story of the Edmonton Transit Service. City of Edmonton. p. 239. ISBN 978-0-9809275-0-4.
  14. ^ "2018 LRT Passenger Count Report" (PDF). City of Edmonton. March 2019. Archived from the original (PDF) on May 31, 2019. Retrieved May 31, 2019.
  15. ^ "2016 LRT Passenger Count Report" (pdf). City of Edmonton. Edmonton Transit Service. December 2016. Archived (PDF) from the original on October 23, 2017. Retrieved June 24, 2018.
  16. ^ "Dudley Menzies Bridge - Light Rail Transit Bridge Over The North Saskatchewan River". PCL. 2005. Archived from the original on July 16, 2011. Retrieved April 24, 2010.
  17. ^ City of Edmonton. "Help Name Edmonton's LRT Lines". Archived from the original on October 7, 2012. Retrieved June 25, 2012.
  18. ^ "City names LRT lines, grumbling follows". Archived from the original on February 3, 2013.
  19. ^ "Approved LRT Line Names" (PDF). City of Edmonton. Archived from the original (PDF) on September 4, 2013. Retrieved January 31, 2013.
  20. ^ "Edmonton's west Valley Line LRT project gets 'final step' of approval from province". Global News. Retrieved 2020-10-10.
  21. ^ MacDonald, D. L.; Bakker, J. J. (1978). "Edmonton's Northeast Light-Rail Rapid Transit Line". Special Report No. 182, Light Rail Transit: Planning and Technology (Report). Transportation Research Board. Retrieved 3 June 2019.
  22. ^ McLachlan, Larry (November 1995). Edmonton Light Rail Transit Experience (PDF). Seventh National Conference on Light Rail Transit. Baltimore, Maryland: Transportation Research Board. Retrieved 3 June 2019.
  23. ^ a b c "Annual Review of 2010-2013 Council Initiatives Status Update" (PDF). City of Edmonton. July 4, 2012. Archived from the original (PDF) on November 1, 2013. Retrieved October 30, 2013.
  24. ^ a b "New LRT Cars Start in Regular Service". City of Edmonton. 2009-01-26. Archived from the original on November 22, 2010. Retrieved 2010-04-24.
  25. ^ "SD160 Light Rail Vehicle: Edmonton, Canada" (PDF). Siemens Transportation Systems. May 2007. Retrieved 6 June 2019.
  26. ^ "Sleek, modern and ready for riders: First Light Rail Transit vehicle unveiled in Edmonton" (Press release). Siemens. 27 June 2008. Retrieved 6 June 2019.
  27. ^ "First Flexity low-floor in Edmonton". Railway Age. August 10, 2018. Retrieved 3 June 2019.
  28. ^ Stolte, Elise (July 10, 2017). "Bombardier tour to reassure Edmonton train commitments on track". Edmonton Journal. Retrieved 3 June 2019.
  29. ^ Ho, Clara (July 9, 2010). "City transportation wants more LRT cars". Edmonton Sun. Retrieved October 30, 2013.
  30. ^ "More dollars coming for LRT". CBC News. February 8, 2011. Retrieved October 30, 2013.
  31. ^ "LRT Design Guideline For ETS Edmonton Transit Service" (PDF). City of Edmonton. 2011. Archived from the original (PDF) on June 1, 2012. Retrieved August 28, 2014.
  32. ^ "Bombardier Wins Order to Supply Light Rail Transit System for City of Edmonton's Valley Line in Canada". Bombardier Transportation (Press release). February 12, 2016. Retrieved September 13, 2017.
  33. ^ "Safety and Security". City of Edmonton. Archived from the original on March 25, 2014. Retrieved February 20, 2014.
  34. ^ a b c Drake, Laura; Warnica, Richard; Sumamo, Yonathan (May 23, 2010). "Woman's murder rattles LRT riders". Edmonton Journal. Canada.com. Archived from the original on 2014-02-25. Retrieved February 20, 2014.
  35. ^ "Man dies after beating on Edmonton transit train". CBC News. December 31, 2012. Retrieved February 20, 2014.
  36. ^ Parsons, Page (18 September 2018). "'Plunged a knife a couple times': Witnesses treat stabbing victim at South Campus LRT station platform". Edmonton Journal. Postmedia. Retrieved 18 September 2018.
  37. ^ a b "Fares". City of Edmonton. February 1, 2014. Archived from the original on March 25, 2014. Retrieved March 4, 2014.
  38. ^ "Transfer Policy". City of Edmonton. 2010. Archived from the original on 2011-06-16. Retrieved 2010-10-20.
  39. ^ "Edmonton university students say yes to U-Pass". CBC News. 2007-03-09. Archived from the original on March 14, 2007. Retrieved 2010-10-20.
  40. ^ Edmonton Journal (2007-03-27). "MacEwan students approve transit pass". Canada.com. Archived from the original on 2016-01-16. Retrieved 2010-10-20.
  41. ^ Jarvis, Kristina (2010-03-27). "NAIT students approve U-Pass". St. Albert Gazette. Archived from the original on 2011-07-23. Retrieved 2010-10-20.
  42. ^ "10-Year Capital Investment Agenda 2012-2021" (PDF). City of Edmonton. June 18, 2012. Archived from the original (PDF) on September 4, 2013. Retrieved November 20, 2012.
  43. ^ "City Council Minutes". City of Edmonton. June 1, 2011. Retrieved May 27, 2012.
  44. ^ "Valley Line – Southeast". City of Edmonton. Retrieved 23 May 2019.
  45. ^ "TransEd LRT".
  46. ^ Dubois, Stephanie. "Valley Line LRT to Mill Woods delayed 6 months, documents say". CBC News. Retrieved 14 December 2019.
  47. ^ "Valley Line – West". City of Edmonton. Retrieved 23 May 2019.
  48. ^ "Alberta government pledges $1 billion for Edmonton's Valley Line West LRT project". The Star Edmonton. November 1, 2018.
  49. ^ a b c "Metro Line – Northwest". City of Edmonton. Retrieved 23 May 2019.
  50. ^ "Northwest LRT to City Limits". The City of Edmonton. Archived from the original on September 3, 2013. Retrieved August 20, 2013.
  51. ^ "Capital Line – South". City of Edmonton. Retrieved 23 May 2019.
  52. ^ "Capital Line – Northeast". City of Edmonton. Retrieved 23 May 2019.
  53. ^ a b "St. Alberta LRT" (PDF). City of St. Albert. February 23, 2013. Archived from the original (PDF) on May 20, 2013. Retrieved September 10, 2013.
  54. ^ Ho, Clara (May 19, 2010). "City announces planned LRT route to St. Albert". Edmonton Sun. Retrieved October 20, 2010.
  55. ^ "Valley Line (SE to West LRT): Mill Woods to Lewis Farms". Edmonton Transit Service. 2015. Archived from the original on 2015-05-15. Retrieved 2015-06-16.
  56. ^ "Valley Line LRT Animation". City of Edmonton. 2013-12-03. Retrieved 2015-06-16.
  57. ^ "Southeast LRT (Valley Line) Names Approved". City of Edmonton Naming Committee. Archived from the original on November 14, 2013. Retrieved November 14, 2013.
  58. ^ "Southeast to West LRT - Approved Concept Plan Amendment" (PDF). City of Edmonton. Archived from the original (PDF) on September 4, 2013. Retrieved November 19, 2012.
  59. ^ "Operations and Maintenance Facility" (PDF). City of Edmonton. Archived from the original (PDF) on March 26, 2014. Retrieved August 28, 2014.
  60. ^ "Southeast to West LRT: Mill Woods to Lewis Farms". City of Edmonton. Archived from the original on May 8, 2012. Retrieved May 27, 2012.
  61. ^ Dykstra, Matt (November 13, 2013). "Federal government projects a $3.7 billion budget surplus which could help Edmonton LRT line". Edmonton Sun. Retrieved November 14, 2013.
  62. ^ Tumilty, Ryan (March 11, 2014). "Southeast LRT funding includes $200 million interest-free provincial loan". Metro News. Archived from the original on 23 January 2015. Retrieved March 12, 2014.
  63. ^ Kent, Gordon (March 11, 2014). "Southeast LRT on track after province promises to fill $600 million funding gap (with video)". Edmonton Journal. Archived from the original on 2014-04-18. Retrieved March 12, 2014.
  64. ^ Simons, Paula (May 26, 2014). "Cash for Valley Line is fine, but transit funding must be consistent". Edmonton Journal. Archived from the original on 2014-06-20. Retrieved May 27, 2014.
  65. ^ Dykstra, Matthew (May 26, 2014). "Edmonton gets a final piece of funding for southeast portio of Valley LRT line". Edmonton Sun. Retrieved May 27, 2014.
  66. ^ Kent, Gordon (September 3, 2009). "Edmonton unveils west and south LRT plans". Archived from the original on November 7, 2009. Retrieved December 2, 2011.
  67. ^ "City Proposes Southeast and West LRT Routes". September 3, 2009. Archived from the original on June 16, 2011. Retrieved December 2, 2011.
  68. ^ Clancy, Clare (November 1, 2018). "Alberta commits $1.04 billion to Edmonton's west Valley Line LRT expansion". Edmonton Journal. Retrieved November 2, 2018.
  69. ^ "Edmonton approves Chinatown route for LRT". Cbcnews.ca. 2012-02-15. Retrieved 2012-02-15.
  70. ^ Ramsay, Caley (May 25, 2014). "City prepares for major changes to popular River Valley trails, footbridge". Global News. Retrieved May 11, 2016.
  71. ^ Hampshire, Gareth (April 22, 2016). "Group wants river valley protected against LRT development". CBC News. Retrieved May 11, 2016.
  72. ^ "West LRT opposition heats up". Edmonton Journal. 2008-04-12. Archived from the original on 2009-07-10. Retrieved 2010-04-24.
  73. ^ "Mandel slams city staff over LRT route". Edmonton Journal. 2008-04-30. Archived from the original on 2009-07-10. Retrieved 2010-04-24.
  74. ^ "Residents fume over LRT's 'path of destruction'". Edmonton Journal. 2008-05-15. Archived from the original on 2011-05-11. Retrieved 2010-04-24.
  75. ^ Jordan Schroder (June 26, 2008). "No, No, No: The LRT Needs To Go Here!". See Magazine. Archived from the original on May 26, 2011.
  76. ^ "Sparks fly as councillors delay LRT hearing". Edmonton Journal. 2009-05-06. Archived from the original on 2009-07-10. Retrieved 2010-04-24.
  77. ^ Querengesser, Tim (December 15, 2015). "Edmonton's Metro Line LRT still a troubled machine: Report". Metro News Edmonton. Archived from the original on 13 March 2018. Retrieved May 11, 2016.
  78. ^ Theobald, Claire (February 19, 2017). "Step on it: Metro Line finally starts operating at full speed". Edmonton Sun. Retrieved February 24, 2017.
  79. ^ a b "LRT Vehicle Arrival and Unveiling". City of Edmonton. May 2008. Archived from the original on June 16, 2011. Retrieved 2010-04-24.
  80. ^ "South LRT Fact Sheet" (PDF). City of Edmonton. 2010. Archived from the original (PDF) on September 24, 2015. Retrieved October 10, 2014.
  81. ^ a b "North LRT Stations". City of Edmonton. 2010. Archived from the original on 2011-06-16. Retrieved 2010-10-20.
  82. ^ "South LRT Extension". City of Edmonton. 2009. Archived from the original on June 16, 2011. Retrieved 2009-04-26.
  83. ^ "LRT line likely to go under Epcor". Edmonton Journal. 2008-04-09. Archived from the original on 2008-10-05. Retrieved 2008-04-12.
  84. ^ a b "Summer 2010 North LRT Newsletter" (PDF). 2010. Archived from the original (PDF) on June 16, 2011. Retrieved December 2, 2011.
  85. ^ "Alberta surges ahead with climate change action plan". Government of Alberta. 2008-07-08. Archived from the original on July 16, 2011. Retrieved 2010-04-24.
  86. ^ "North LRT Making Tracks Fall 2009" (PDF). City of Edmonton. October 2009. Retrieved 2009-12-23.[dead link]
  87. ^ Leduc County Growth Study (October 2008). "Section Five" (PDF). Recommended Growth Strategy. Leduc County. Archived from the original (PDF) on July 13, 2011. Retrieved January 14, 2011.
  88. ^ Mackenzie Sinclair (May 21, 2009). "Lovin' The LRT". See Magazine. Archived from the original on May 26, 2011.
  89. ^ Tumilty, Ryan (April 10, 2014). "NAIT LRT Line comes in $90 million under budget, money could be moved to south east". Metro News. Archived from the original on 3 May 2015. Retrieved 23 April 2015.
  90. ^ a b c d e "Metro Line: Delay FAQ" (PDF). City of Edmonton. 4 May 2015. Archived from the original (pdf) on June 30, 2015. Retrieved 2015-06-27. The City is replacing this traditional fixed block system with a modern CBTC (moving block) system