Fuzhou–Pingtan railway: Difference between revisions
Appearance
Content deleted Content added
fill in ref |
AlgaeGraphix (talk | contribs) ce following move |
||
Line 60: | Line 60: | ||
<references /> |
<references /> |
||
{{Beijing–Hong Kong (Taipei) |
{{Beijing–Hong Kong (Taipei) corridor}} |
||
[[Category:Railway lines in China]] |
[[Category:Railway lines in China]] |
||
[[Category:Railway lines opened in 2020]] |
[[Category:Railway lines opened in 2020]] |
Revision as of 21:39, 21 March 2021
Fuzhou–Pingtan railway | |
---|---|
Overview | |
Status | Operating |
Termini | |
Stations | 6 |
Service | |
Type | Heavy rail |
History | |
Opened | 26 December 2020 |
Technical | |
Line length | 83.43 km (52 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | Yes |
Operating speed | 160 km/h (99 mph) (Fuzhou to Fuzhou South) 200 km/h (124 mph) (Fuzhou South to Pingtan) |
The Fuzhou–Pingtan railway is a railway line in China. It opened on 26 December 2020.[1][2]
The railway is the first to serve Pingtan Island, which it accesses via the Pingtan Strait Road-Rail Bridge. It is part of Beijing–Taipei high-speed rail corridor.[3]
History
Construction began on 31 October 2013.[4]
Stations
The line has the following stations:
References
- ^ "福平铁路有望年底开通 晋江至平潭全程1.5小时_晋江新闻网". news.ijjnews.com. Retrieved 2020-10-19.
- ^ "福州至平潭铁路26日开通运营 最快35分钟可达_【高铁网】" [Fuzhou to Pingtan Railway opened on the 26th operation of the fastest 35 minutes]. 高铁网 (in Chinese). 2020-12-26. Retrieved 2020-12-26.
{{cite web}}
: CS1 maint: url-status (link) - ^ "福平铁路正式进入铺轨架梁阶段 预计2020年10月正式通车-中新网". www.chinanews.com. Retrieved 2020-10-02.
- ^ "福平铁路昨日开工". Weibo.
{{cite web}}
: CS1 maint: url-status (link)