Jump to content

East Coast Integrated Depot: Difference between revisions

Coordinates: 1°19′38″N 103°57′26″E / 1.32736°N 103.95734°E / 1.32736; 103.95734
From Wikipedia, the free encyclopedia
Content deleted Content added
History: Fixed typo errors of
Tags: Manual revert Mobile edit Mobile web edit
SMB8027G (talk | contribs)
No edit summary
Tags: Mobile edit Mobile web edit Advanced mobile edit
Line 22: Line 22:
The '''East Coast Integrated Depot''' ([[Chinese Language|Chinese]]: 东海岸综合车厂; [[Malay language|Malay]]: Depot Bersepadu East Coast), is a future integrated bus and train depot located in [[Changi]] that will serve the [[East West MRT Line|East West Line]], [[Downtown MRT Line|Downtown Line]] and [[Thomson-East Coast MRT Line|Thomson-East Coast Line]] of the [[Mass Rapid Transit (Singapore)|Mass Rapid Transit]] (MRT) in [[Singapore]].
The '''East Coast Integrated Depot''' ([[Chinese Language|Chinese]]: 东海岸综合车厂; [[Malay language|Malay]]: Depot Bersepadu East Coast), is a future integrated bus and train depot located in [[Changi]] that will serve the [[East West MRT Line|East West Line]], [[Downtown MRT Line|Downtown Line]] and [[Thomson-East Coast MRT Line|Thomson-East Coast Line]] of the [[Mass Rapid Transit (Singapore)|Mass Rapid Transit]] (MRT) in [[Singapore]].


The depot, with an expected completion date of 2025,<ref>{{cite web|title=LTA AWARDS CONTRACT TO BUILD WORLD’S FIRST FOUR-IN-ONE DEPOT|url=https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=b725b21d-2459-475c-a1bf-229ae7a41c23|website=Land Transport Authority|access-date=7 February 2017}}</ref> will be located beside the current site of [[Changi Depot]], which will be demolished. It will be the first MRT depot in Singapore to serve 3 MRT lines and also the second to be integrated with a bus depot in Singapore after the [[Tuas West Depot]] on the [[East West MRT Line|East West Line]]. With this design, it is estimated that there will be a saving of 44 hectares of land, equivalent to approximately 60 football fields, considering that Singapore is a land-scarce country. The depot will be able to house approximately 200 trains of varying sizes and lengths and 550 buses within the site.<ref>{{cite web|title=THOMSON-EAST COAST LINE (EAST COAST STRETCH) BREAKS GROUND TODAY|url=https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=ae36d64e-7713-4f5b-ad13-390bbdf97083|website=Land Transport Authority|access-date=7 February 2017}}</ref>
The depot, with an expected completion date of 2025,<ref>{{cite web|title=LTA AWARDS CONTRACT TO BUILD WORLD’S FIRST FOUR-IN-ONE DEPOT|url=https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=b725b21d-2459-475c-a1bf-229ae7a41c23|website=Land Transport Authority|access-date=7 February 2017}}</ref> will be located beside the current site of [[Changi Depot]], which will be demolished. It will be the first MRT depot in Singapore to serve 3 MRT lines and also the third to be integrated with a bus depot in Singapore after the [[Tuas West Depot]] on the [[East West MRT Line|East West Line]] and [[Gali Batu Depot]] on the [[Downtown MRT Line|Downtown Line]]. With this design, it is estimated that there will be a saving of 44 hectares of land, equivalent to approximately 60 football fields, considering that Singapore is a land-scarce country. The depot will be able to house approximately 200 trains of varying sizes and lengths and 550 buses within the site.<ref>{{cite web|title=THOMSON-EAST COAST LINE (EAST COAST STRETCH) BREAKS GROUND TODAY|url=https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=ae36d64e-7713-4f5b-ad13-390bbdf97083|website=Land Transport Authority|access-date=7 February 2017}}</ref>


==History==
==History==

Revision as of 03:12, 29 June 2021

East Coast Integrated Depot
Location
LocationUpper Changi Road East, Singapore
Coordinates1°19′38″N 103°57′26″E / 1.32736°N 103.95734°E / 1.32736; 103.95734
Characteristics
OperatorSMRT Trains (SMRT Corporation) (EWL & TEL)
SBS Transit DTL (ComfortDelGro Corporation) (DTL)
TypeElevated (EWL)
At-grade (TEL)
Underground (DTL)
RoadsUpper Changi Road East
Routes served EWL  East West Line (2025)
 DTL  Downtown Line (2025)
 TEL  Thomson-East Coast Line (2025)
History
Opened2025 (Under construction)

The East Coast Integrated Depot (Chinese: 东海岸综合车厂; Malay: Depot Bersepadu East Coast), is a future integrated bus and train depot located in Changi that will serve the East West Line, Downtown Line and Thomson-East Coast Line of the Mass Rapid Transit (MRT) in Singapore.

The depot, with an expected completion date of 2025,[1] will be located beside the current site of Changi Depot, which will be demolished. It will be the first MRT depot in Singapore to serve 3 MRT lines and also the third to be integrated with a bus depot in Singapore after the Tuas West Depot on the East West Line and Gali Batu Depot on the Downtown Line. With this design, it is estimated that there will be a saving of 44 hectares of land, equivalent to approximately 60 football fields, considering that Singapore is a land-scarce country. The depot will be able to house approximately 200 trains of varying sizes and lengths and 550 buses within the site.[2]

History

The Contract T301 for the construction of East Coast Integrated Depot, reception tunnels and its associated facilities was awarded to GS Engineering & Construction Corporation at a sum of S$1.99 billion in March 2016. Construction began in 2016, with completion in 2025.[3][4]

Description

The East Coast Integrated Depot consists of a multi-level train depot and a multi-level bus depot.

Train depot

The train depot will have three levels containing three separate depots for three different MRT lines. The underground portion will house a 66-track depot for the Downtown Line, and will be brought into use following the opening of Stage 3e of the line. The at-grade portion will house a 62-track depot for the future Thomson-East Coast Line, to be used following the completion of Stage 5 of the line. Finally, the elevated portion will house a 72-track depot for the East West Line, which will replace the existing Changi Depot. All three depots will operate independently of each other, a first for Singapore, and will be designed to be able to handle trains of different lengths, of 3, 4 and 6 respectively of the lines they operate on. [5]

The facility will be located between Expo station and Tanah Merah station on the East West Line, between Xilin station and Sungei Bedok station on the Downtown Line, and off Sungei Bedok station on the Thomson-East Coast Line.

Bus Depot

The bus depot is a separate three-storey structure situated next to the train depot on the same site. Similar to Soon Lee Bus Park and Woodlands Bus Depot, it will contain workshops on the ground level, while the upper two levels will contain parking spaces.

References

  1. ^ "LTA AWARDS CONTRACT TO BUILD WORLD'S FIRST FOUR-IN-ONE DEPOT". Land Transport Authority. Retrieved 7 February 2017.
  2. ^ "THOMSON-EAST COAST LINE (EAST COAST STRETCH) BREAKS GROUND TODAY". Land Transport Authority. Retrieved 7 February 2017.
  3. ^ "LTA | News Room | News Releases | LTA Awards Contract to Build World's First Four-In-One Depot". 2020-02-13. Archived from the original on 2020-02-13. Retrieved 2020-02-13.
  4. ^ "LTA awards S$1.99b contract to build world's first four-in-one depot, Transport - THE BUSINESS TIMES". 2020-02-13. Archived from the original on 2020-02-13. Retrieved 2020-02-13.
  5. ^ "East Coast Integrated Depot". Land Transport Guru. Retrieved 7 February 2017.