'''Moorabool Wind Farm''' is a [[wind farm]] under construction between [[Ballarat]] and [[Geelong]] in [[Victoria (Australia)|Victoria]], Australia. It is expected to commence operation early in 2020. The wind farm is in two parts. The northern part has 50 turbines under construction and the southern part has 54. It is being developed by [[Goldwind Australia]].<ref>{{cite web |url=https://mooraboolwindfarm.com/ |title=Moorabool Wind Farm |publisher=[[Goldwind Australia]] |accessdate=5 October 2019}}</ref> When complete, Moorabool will be one of three wind farms in [[Moorabool Shire]]. The others are [[Yaloak South Wind Farm]] and [[Lal Lal Wind Farm]].<ref>{{cite web |url=https://www.moorabool.vic.gov.au/residents/community/windfarms-in-moorabool |title=Windfarms in Moorabool |publisher=[[Shire of Moorabool]] |accessdate=5 October 2019}}</ref> |
|||
| image = [[File:Moorabool Wind Farm logo.png|thumb|Moorabool Wind Farm logo]] |
|||
| coordinates = {{Coord|00|00|00|N|00|00|00|E|type:landmark|display=inline,title}} |
|||
}} |
|||
'''Moorabool Wind Farm''' is a [[wind farm]] consisting of 104 wind turbines located approximately 25km south east of [[Ballarat]] in [[Victoria (Australia)|Victoria]]. |
|||
By 30 August 2019, all 54 foundations were completed in the southern section,<ref>{{cite web |url=https://mooraboolwindfarm.com/wp-content/uploads/2019/09/Moorabool-South-Progress-Map-August-30th-2019.pdf |title=South Wind Farm Construction Progress |date=30 August 2019 |publisher=[[Goldwind Australia]] |accessdate=5 October 2019}}</ref> and all the bases and 11 turbines were erected but not yet commissioned in the northern section.<ref>{{cite web |url=https://mooraboolwindfarm.com/wp-content/uploads/2019/09/Moorabool-North-Progress-Map-18th-September-2019.pdf |title=Moorabool North Wind Farm Construction Progress |date=18 September 2019 |publisher=[[Goldwind Australia]] |accessdate=5 October 2019}}</ref> The components for the southern section were to be delivered from the [[Port of Geelong]] in a total of 594 oversized loads at a rate of approximately 33 per week from September 2019 to February 2020.<ref>{{cite web |url=https://mooraboolwindfarm.com/wp-content/uploads/2019/08/MSWF-Oversize-Deliveries-Electronic.pdf |title=Turbine Component deliveries |publisher=[[Goldwind Australia]] |accessdate=5 October 2019}}</ref> |
|||
The project will produce up to 312 MW, approximately 1,050,000 MWh of electricity annually. This is enough renewable energy to power the equivalent of 228,000 average Victorian homes every year, representing approximately 10% of Victorian homes. |
|||
The project is divided into two sections, north and south. Fifty wind turbines are constructed in the northern section and 54 turbines are currently under construction in the southern section. All turbines stand 169m tall to the tip of the blade. |
|||
Construction began in July 2018 and the wind farm commenced partial operation in late 2020. |
|||
==References== |
==References== |
Revision as of 18:16, 4 October 2021
Moorabool Wind Farm | |
---|---|
Country |
|
Location | |
Coordinates | 37°42′S 144°12′E / 37.7°S 144.2°E |
Status | Under construction |
Construction began |
|
Owner | |
Wind farm | |
Type | |
Power generation | |
Nameplate capacity |
|
External links | |
Website | mooraboolwindfarm |
Moorabool Wind Farm is a wind farm under construction between Ballarat and Geelong in Victoria, Australia. It is expected to commence operation early in 2020. The wind farm is in two parts. The northern part has 50 turbines under construction and the southern part has 54. It is being developed by Goldwind Australia.[1] When complete, Moorabool will be one of three wind farms in Moorabool Shire. The others are Yaloak South Wind Farm and Lal Lal Wind Farm.[2]
By 30 August 2019, all 54 foundations were completed in the southern section,[3] and all the bases and 11 turbines were erected but not yet commissioned in the northern section.[4] The components for the southern section were to be delivered from the Port of Geelong in a total of 594 oversized loads at a rate of approximately 33 per week from September 2019 to February 2020.[5]
References
- ^ "Moorabool Wind Farm". Goldwind Australia. Retrieved 5 October 2019.
- ^ "Windfarms in Moorabool". Shire of Moorabool. Retrieved 5 October 2019.
- ^ "South Wind Farm Construction Progress" (PDF). Goldwind Australia. 30 August 2019. Retrieved 5 October 2019.
- ^ "Moorabool North Wind Farm Construction Progress" (PDF). Goldwind Australia. 18 September 2019. Retrieved 5 October 2019.
- ^ "Turbine Component deliveries" (PDF). Goldwind Australia. Retrieved 5 October 2019.