Jump to content

Tanjung Malim railway station: Difference between revisions

Coordinates: 3°41′04″N 101°31′05″E / 3.68444°N 101.518°E / 3.68444; 101.518
From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
Tag: Reverted
Rv IP edits, broke markup
Line 28: Line 28:
|line1=Port Klang|left1=|right1=Kuala Kubu Bharu
|line1=Port Klang|left1=|right1=Kuala Kubu Bharu
|system2=KTM ETS
|system2=KTM ETS
|line2= KTM ETS|left2=Slim River|right2=Kuala Kubu Bharu
|line2=KL Sentral–Ipoh|left2=Slim River|right2=Kuala Kubu Bharu
|line3= KTM ETS|left3=Tapah Road|right3=Rawang
|line3=Padang Besar–Gemas|left3=Tapah Road|right3=Rawang
}}
}}
| mpassengers =
| mpassengers =

Revision as of 19:19, 6 November 2021

Tanjung Malim
General information
Other names丹绒马林 (Chinese)
தஞ்சோங் மாலிம் (Tamil)
LocationKampung Stesen Tanjong Malim, 35900 Tanjung Malim, Perak, Malaysia
Owned byKeretapi Tanah Melayu
Line(s)West Coast Line
Platforms1 side platform & 1 island platform
Tracks3
Construction
ParkingAvailable, free.
AccessibleYes
History
Opened1900
Rebuilt2007
Electrified2007
Services
Lua error in Module:Adjacent_stations at line 237: Unknown line "KL Sentral–Ipoh".

The Tanjung Malim railway station is a Malaysian train station stationed at the north eastern side of and named after the town of Tanjung Malim, Perak. The station provides both Komuter and ETS services.

The station was first constructed in 1900 and at the time, served as the halt for the intercity trains. As part of the Rawang-Ipoh double tracking and electrification project, it was rebuilt in 2007 and reopened two years later, on June 1, 2009, as the final stop in the Rawang-Tanjung Malim shuttle service (formerly known as the Rawang-Kuala Kubu Bharu shuttle service). The service has since 2016 been merged with the Port Klang Line, making Tanjung Malim the northern terminus of the line.

The station, unlike the four other stations along the shuttle route, is situated along three railways with three platforms. Its only similarity with the other stations on the shuttle route is that it also contains facilities normally reserved for medium-to-large stations along three or more lines. In addition to ticketing facilities and basic amenities, the station contains spaces for administrative occupants, as well as a kiosk and an additional foot bridge (fused with a foot bridge exclusively for Komuter users) for pedestrians that simply intend to cross the railway lines. The station also includes low-tech support for disabled passengers. The station exits northeast into a branch road that leads west into the town centre of Tanjung Malim.

The Tanjung Malim station's one side platform and one island platform are designated as Platform 1 (adjoining the main station building at the west, intended for northbound trains), Platform 2 (at the east, intended for southbound trains), and Platform 3.

Train services

  • ETS Train No. EG9022/EG9032: KL Sentral–Ipoh
  • ETS Train No. ES9051/EG9031: Ipoh–KL Sentral
  • ETS Train No. EG9420/EG9425: Padang Besar–Gemas
  • Port Klang Line services

References

  • "KTM Komuter Services For Rawang - Rasa Sector Launched". Official Keretapi Tanah Melayu website. April 21, 2007. Archived from the original on 2007-08-10. Retrieved 2007-05-03.
  • "KTM Komuter New Route : Rawang - Kuala Kubu Bharu". Official Keretapi Tanah Melayu website. January 2, 2008. Archived from the original on 2007-12-23. Retrieved 2008-01-02.
  • "KTM Komuter service to Tanjung Malim, Perak (Perkhidmatan KTM Komuter Ke Tanjung Malim, Perak)". Official Keretapi Tanah Melayu website. June 1, 2008. Retrieved 2008-06-03.



3°41′04″N 101°31′05″E / 3.68444°N 101.518°E / 3.68444; 101.518