Indian locomotive class WAG-9: Difference between revisions
No edit summary Tags: Reverted Mobile edit Mobile web edit |
Undid revision 1066633129 by 2409:4041:2D18:B7E0:0:0:2149:4009 (talk) |
||
Line 3: | Line 3: | ||
{{Infobox locomotive |
{{Infobox locomotive |
||
| name = WAG-9 |
| name = WAG-9 |
||
| image = |
| image = File:WAG9 LGD 130418.jpg |
||
| caption = |
| caption = Lallaguda based WAG9 hauling freight |
||
| powertype = Electric |
| powertype = Electric |
||
| designer = [[ABB Group]] |
| designer = [[ABB Group]] |
Revision as of 01:37, 20 January 2022
WAG-9 | |||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||
|
The Indian locomotive class WAG-9 is a class of 25 kV AC electric locomotives that was developed in 1995 by ABB Group (ABB) for Indian Railways. The model name stands for broad gauge (W), AC Current (A), Goods traffic (G), 9th generation (9) locomotive. They entered service in 1996. A total of 2680 WAG-9 have been built at Chittaranjan Locomotive Works (CLW), with more units being built at Banaras Locomotive Works (BLW), Bharat Heavy Electricals Limited (BHEL) and Diesel-Loco Modernisation Works (DLMW). It was the most powerful freight locomotive of its fleet until the formal induction of the WAG-12.
The WAG-9 is one of the most successful locomotives of Indian Railways serving freight trains for over 25 years. A passenger variant of the WAG-9 was developed namely the WAP-7 locomotive by modifying the gear ratio to pull lighter loads at higher speeds.
Introduction
The WAG-9 locomotive is referred to as the "Heavy Haul" freight locomotive of the Indian Railways (IR). It was conceived in response to the extreme growth in the rail freight transportation sector, which is considered to be of great importance to the growth of the economy of India. The need for more electrification and electric locomotives in India had increased. Around 60-65% of the freight haulage of the IR takes place on the electrified section of the Golden Quadrilateral (Indian Railways) and diagonals (which account for 25% of the route). These are very busy routes, so clearance is a necessity. Electrical powers give it a great sectional clearance ability. Thus, these locomotives are important for the Indian Railways.
These locomotives have entered the Western Railway zone of Mumbai. The first 22 units were imported from ABB. Of these, the first six were fully assembled and rest were in kit form. CLW started producing of WAG-9 traction motors on 1 November 1999. The units built by ABB have pantographs with two end horns while the CLW built units have pantographs with single end horns which are common in India. This class had a capacity to MU several units, but IR restricts them to two, because of dynamic loading restriction on most bridges. Regenerative brakes provide about 260 kN of braking effort.
The WAG-9H also has different application software than the WAG-9. The first WAG-9H was commissioned on 30 June 2000. The #30130 prototype was housed at Gomoh (GMO). This was then converted back to standard WAG-9 in 2002. This unit has a livery of twin white stripes on green, instead of yellow stripe on green, seen on the other WAG-9(x)s.
The WAG-9i was introduced in 2010, and was #31215. It was homed at the GMO shed. With IGBT, even if one traction motor failed, other traction motors can function with a total output of 5500 hp.
Newer WAG-9 units have "CLW Glorious 60 years" marked on their sides. Some WAG-9(x)s are fitted with a solid cowcatcher while others are fitted with grilled cowcatchers. Some have American style flasher lamps while others have Indian style flasher lamps. http://elocos.railnet.gov.in/Study_Material/TSD_3Ph.pdf.
Newer versions of the WAG-9 feature full Insulated-gate bipolar transistor (IGBT) traction control; the debut model was the WAG-9 31248. The class as a whole is denoted by the WAG-9i prefix in its model number, although there is a technical variant of this class named WAG-9H, with the "H" meaning "Heavy".
The WAG-9H/9Hi locomotives are the second heaviest in regular service in India (after the WAG-12), the only freight-dedicated three-phase AC locomotives in the country, and the only electric locomotives in India fitted with IGBT. They are also the freight locomotives with the highest operational speed in India.
It is similar to the WAP-7 class locomotive but features a different gear ratio, which makes it suitable for heavy freight operations. In November 1998, the Chittaranjan Locomotive Works (CLW) started producing these with indigenous components. The first of which, named Navyug (New Era), was produced on 14 November 1998. Like the WAP-5 units, the WAG-9 has GTO thyristor converters and three-phase asynchronous motors.
Operations
WAG-9 has quickly become one of the important locos in the Indian railways. With its higher power, this locomotive has replaced WAG-7 which was the main electric loco before WAG-9's arrival. Applications where twin WAG-7s were required are now handled by a single WAG-9. This includes both leading a long consist and for banking operations. The regenerative braking capabilities of WAG-9 has also helped reduce the electricity consumption. The original WAG-9 had some wheel slippage incidents while hauling heavy load. This was rectified through the introduction of WAG-9H and subsequently using WAG-9i. This has significantly reduced the issue that were associated with the original version.
Chittaranjan Locomotive Works (CLW) turned out its first 9,000 hp WAG-9 freight locomotive on 31 March 2019, the last day of the financial year. This 9,000 hp version of the WAG-9H has been classified by IR as WAG-9 HH. The first H stands for higher axle load and the second H stands for the higher power rating. The class has been allocated a block of serial numbers starting with 90001, the number of the first unit. The decision to upgrade the power output of the WAG-9 was taken to partly meet the demands of the upcoming electrified Western Dedicated Freight Corridor (WDFC). The upgraded locomotive class will also augment hauling capacity on the existing network of the Indian Railways.[1]
Locomotive sheds
Zone | Name | Shade Code | Quantity | Introduction | |
---|---|---|---|---|---|
WAG9 | WAG9H | ||||
Central Railway | Bhusaval | BSL | 46 | 10 October 2013 | |
Ajni | AQ | 23 | 147 | 14 January 2000 | |
Kalyan | KYN | 1 | 12 | 23 January 2013 | |
Eastern Railway | Bardhaman | BWN(D) | 30 | 1 March 2020 | |
Asansol | ASN | 30 | 1 November 2020 | ||
East Central Railway | Pt. DD Upadhyaya Junction | DDU | 61 | 1 July 2020 | |
Gomoh | GMO | 69 | 83 | 9 March 1997 | |
Barauni | BJU | 52 | 20 June 2012 | ||
Patratu | PTRU(D) | 6 | 111 | 1 September 2020 | |
East Coast Railway | Visakhapatnam | VSKP | 205 | 22 July 2014 | |
VSKP(D) | 66 | 17 April 2021 | |||
Angul | ANGL | 3 | 13 December 2021 | ||
Northern Railway | Ludhiana | LDH | 184 | 21 December 2015 | |
Saharanpur | SRE | 28 | 1 September 2020 | ||
North Central Railway | Kanpur | CNB | 171 | 27 January 2016 | |
North Eastern Railway | Gonda | GD(D) | 2 | 5 December 2021 | |
Northeast Frontier Railway | Malda Town | MLDT(D) | 3 | 17 September 2021 | |
Southern Railway | Arakkonam | AJJ | 20 | 9 November 2020 | |
South Central Railway | Vijayawada | BZA | 16 | 27 June 2021 | |
Lallaguda | LGD | 73 | 68 | 1 May 2007 | |
Kazipet | KZJ | 100 | 29 August 2013 | ||
Gooty | GY(D) | 30 | 31 August 2019 | ||
South Eastern Railway | Tatanagar | TATA | 2 | 184 | 21 March 2010 |
Bondamunda | BNDM | 130. | 20 August 2016 | ||
Bokaro Steel City | BKSC | 99 | 31 March 2019 | ||
Rourkela | ROU | 134 | 31 January 2019 | ||
South East Central Railway | Bhilai | BIA | 133 | 14 January 2009 | |
Bilaspur | BSP | 85 | 1 September 2020 | ||
South Western Railway | Krishnarajapuram | KJM(D) | 33 | 14 May 2020 | |
Western Railway | Valsad | BL | 19 | 1 July 2020 | |
West Central Railway | Tughlakabad | TKD | 30 | 105 | 1 September 2008 |
New Katni Jn. | NKJ | 40 | 26 September 2017 | ||
Itarsi | ET | 115 | 1 November 2020 | ||
Total | 204 | 2543 | |||
Total Locomotives Active as of 01-01-2022[2] | 2747 |
Performance
Two WAG-9 class units can haul a load of 4,500 tonnes (4,400 long tons; 5,000 short tons) on grades of 1 in 60 (1.67%). The WAG-9H was expected to haul 58 BOXN wagons, i.e.,4,700 tonnes (4,600 long tons; 5,200 short tons), without multiple units on grades of 1 in 150 (0.67%). The locomotive can run even in 100% humidity, or in deserts, where there is high saturation of conductive particles. For shunting up to 15 km/h (9.3 mph), it can haul 7,500 tonnes (7,400 long tons; 8,300 short tons) on grades of 1 in 1000 (0.1%) or less. The atmosphere may be humid and salty. Regenerative braking will provide braking force of no less than 260 kN (58,000 lbf) at 10–62 km/h (6.2–38.5 mph) and closer to 260 kN (58,000 lbf) at higher speeds. Below is the capacity of the WAG-9 while hauling BOX wagons (in tonnes}):[3]
Grade\km/h | Start | 20 | 30 | 40 | 50 | 60 | 70 | 80 | 90 | 100 |
---|---|---|---|---|---|---|---|---|---|---|
Level | 6000+ | 6000+ | 6000+ | 6000+ | 6000+ | 6000+ | 6000+ | 6000+ | 6000+ | 6000+ |
1 in 500 | 6000+ | 6000+ | 6000+ | 6000+ | 6000+ | 6000+ | 6000+ | 4985 | 4150 | 3500 |
1 in 200 | 5060 | 5060 | 5060 | 5060 | 5060 | 4045 | 3325 | 2780 | 2365 | 2040 |
1 in 150 | 4250 | 4250 | 4165 | 4080 | 3985 | 3200 | 2640 | 2220 | 1895 | 1640 |
1 in 100 | 3205 | 2910 | 2870 | 2825 | 2775 | 2240 | 1855 | 1565 | 1345 | 1165 |
1 in 50 | 1820 | 1455 | 1445 | 1435 | 1420 | 1440 | 945 | 795 | 680 | 590 |
See also
References
- ^ "New 9,000 hp WAG-9 HH Locomotive Rolls Out of CLW". RailPost.in - Indian Railways News & Analysis. 2 April 2019. Retrieved 5 April 2019.
- ^ "e-Locos".
- ^ "Trainweb".