Jump to content

Line 5 (Guangzhou Metro): Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
tag with {{Bare URL PDF}}
Line 2: Line 2:
{{Infobox rail line
{{Infobox rail line
| name =
| name =
| other_name = L2 (5 lines plan name)<br>M3 (7 lines plan name)<br>M5 (2000 plan name)<br>Huanshilu line ({{lang|zh-hans|环市路线}})
| other_name = L2 (5 lines plan name)<br />M3 (7 lines plan name)<br />M5 (2000 plan name)<br />Huanshilu line ({{lang|zh-hans|环市路线}})
| logo = GZM_Line_5_icon.svg
| logo = GZM_Line_5_icon.svg
| logo_width = 100px
| logo_width = 100px
Line 13: Line 13:
| system = [[Guangzhou Metro]]
| system = [[Guangzhou Metro]]
| status = Operational
| status = Operational
| locale = [[Huangpu District, Guangzhou|Huangpu]], [[Tianhe District|Tianhe]], [[Yuexiu District|Yuexiu]], and [[Liwan District|Liwan]] districts<br/>[[Guangzhou]], [[Guangdong]]
| locale = [[Huangpu District, Guangzhou|Huangpu]], [[Tianhe District|Tianhe]], [[Yuexiu District|Yuexiu]], and [[Liwan District|Liwan]] districts<br />[[Guangzhou]], [[Guangdong]]
| start = {{GZM stations|Jiaokou}}
| start = {{GZM stations|Jiaokou}}
| end = {{GZM stations|Wenchong}}
| end = {{GZM stations|Wenchong}}
| stations = 24
| stations = 24
| routes = 1
| routes = 1
| daily_ridership = 1.09 million (2017 daily average)<ref>http://www.gzmtr.com/ygwm/gsgk/qynb/201806/P020180627541408016222.pdf</ref><br>1.367 million (2015 Peak)<ref name="31dec15ridership">{{Cite web|url=http://www.gd.xinhuanet.com/newscenter/2016-09/16/c_1119569966.htm |script-title=zh:中秋假期广州地铁日均客流730万人次- 新华网|website=www.gd.xinhuanet.com|access-date=2016-09-17}}</ref>
| daily_ridership = 1.09 million (2017 daily average)<ref>http://www.gzmtr.com/ygwm/gsgk/qynb/201806/P020180627541408016222.pdf {{Bare URL PDF|date=March 2022}}</ref><br />1.367 million (2015 Peak)<ref name="31dec15ridership">{{Cite web|url=http://www.gd.xinhuanet.com/newscenter/2016-09/16/c_1119569966.htm |script-title=zh:中秋假期广州地铁日均客流730万人次- 新华网|website=www.gd.xinhuanet.com|access-date=2016-09-17}}</ref>
| open = {{Start date and age|2009|12|28|df=yes}}
| open = {{Start date and age|2009|12|28|df=yes}}
| close =
| close =
Line 30: Line 30:
| tracks = 2
| tracks = 2
| gauge = {{RailGauge|sg}}
| gauge = {{RailGauge|sg}}
| electrification = [[Third rail]], 1,500&nbsp;V [[Direct current|DC]]<br>([[Overhead lines]] with same voltage installed in depot)
| electrification = [[Third rail]], 1,500&nbsp;V [[Direct current|DC]]<br />([[Overhead lines]] with same voltage installed in depot)
| speed =
| speed =
| elevation =
| elevation =
Line 62: Line 62:
==Stations==
==Stations==
{| class="wikitable"
{| class="wikitable"
! rowspan="2" colspan="2" | Station<br>No.
! rowspan="2" colspan="2" | Station<br />No.
! colspan="2" | Station name
! colspan="2" | Station name
! rowspan="2" | Connections
! rowspan="2" | Connections
! colspan="2" rowspan="2" | Distance<br>{{small|km}}
! colspan="2" rowspan="2" | Distance<br />{{small|km}}
! rowspan="2" | Location
! rowspan="2" | Location
|-
|-
Line 273: Line 273:


== Future Development ==
== Future Development ==
An eastern extension to Huangpu Passenger Port is currently under construction with opening scheduled in 2023. It is 9.76km long and with seven stations.<ref>{{Cite web|title=广州地铁5号线工可报告获批 将向东延至黄埔客运港站|url=http://gd.sina.com.cn/news/2018-01-23/detail-ifyquptv8782549.shtml|access-date=2020-08-22|website=gd.sina.com.cn}}</ref><ref>{{Cite web|date=2018-01-22|title=广州地铁5号线东延段要开工啦!黄埔、开发区往返市区更方便!_网易新闻|url=http://news.163.com/18/0122/17/D8P7GJ2J000187VE.html|access-date=2020-08-22|archive-url=https://web.archive.org/web/20180122235054/http://news.163.com/18/0122/17/D8P7GJ2J000187VE.html|archive-date=2018-01-22}}</ref>
An eastern extension to Huangpu Passenger Port is currently under construction with opening scheduled in 2023. It is 9.76&nbsp;km long and with seven stations.<ref>{{Cite web|title=广州地铁5号线工可报告获批 将向东延至黄埔客运港站|url=http://gd.sina.com.cn/news/2018-01-23/detail-ifyquptv8782549.shtml|access-date=2020-08-22|website=gd.sina.com.cn}}</ref><ref>{{Cite web|date=2018-01-22|title=广州地铁5号线东延段要开工啦!黄埔、开发区往返市区更方便!_网易新闻|url=http://news.163.com/18/0122/17/D8P7GJ2J000187VE.html|access-date=2020-08-22|archive-url=https://web.archive.org/web/20180122235054/http://news.163.com/18/0122/17/D8P7GJ2J000187VE.html|archive-date=2018-01-22}}</ref>
{| class="wikitable"
{| class="wikitable"
! rowspan="2" | Station<br>no.
! rowspan="2" | Station<br />no.
! colspan="2" | Station name
! colspan="2" | Station name
! rowspan="2" | Connections
! rowspan="2" | Connections
! colspan="2" rowspan="2" | Distance<br>{{small|km}}
! colspan="2" rowspan="2" | Distance<br />{{small|km}}
! rowspan="2" | Location
! rowspan="2" | Location
|-
|-
Line 358: Line 358:
{{Northern Guangdong transit}}
{{Northern Guangdong transit}}
{{Guangzhou Metro|line5=yes}}
{{Guangzhou Metro|line5=yes}}

{{DEFAULTSORT:Guangzhou Metro, Line 05}}
{{DEFAULTSORT:Guangzhou Metro, Line 05}}
[[Category:Guangzhou Metro lines|05]]
[[Category:Guangzhou Metro lines|05]]

Revision as of 16:34, 14 March 2022

Line 5
Line 5 train near Template:GZM stations
Overview
Other name(s)L2 (5 lines plan name)
M3 (7 lines plan name)
M5 (2000 plan name)
Huanshilu line (环市路线)
StatusOperational
OwnerCity of Guangzhou
LocaleHuangpu, Tianhe, Yuexiu, and Liwan districts
Guangzhou, Guangdong
Termini
Stations24
Service
TypeRapid transit
SystemGuangzhou Metro
Services1
Operator(s)Guangzhou Metro Corporation
Rolling stockCRRC Qingdao Sifang/Kawasaki Heavy Industries Metro cars[1]
Daily ridership1.09 million (2017 daily average)[2]
1.367 million (2015 Peak)[3]
History
Opened28 December 2009; 15 years ago (2009-12-28)
Technical
Line length31.9 km (19.82 mi)
Number of tracks2
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationThird rail, 1,500 V DC
(Overhead lines with same voltage installed in depot)
Route map

Huangpu New Port
Line reservation
Xiagang
Lujiao Creek
Baoying Dadao
 13  Left arrow to Xinsha
Huangpu New Port branch line
Xiayuan
 13 
Miaotou
Shuangsha Stabling Yard
Shuangsha
Wenchong
Dashadong
 7 
Dashadi
Huangpu Port branch line/  13  Left arrow to Chaoyang
Yuzhu
 13 
Yuzhu Depot/Yuzhu Stabling Yard (Line 13)
Sanxi
Dongpu
connection to Line 4
Chebeinan
 4 
Keyun Lu
Yuancun
 11 
 11 
Left arrow anti-clockwise
clockwise Right arrow
Tancun
Liede Creek
Liede
Zhujiang New Town
 3 
Wuyangcun (OSI to  10  Siyou Xinma Lu)
Yangji Stream
 10  Right arrow to Xilang
Yangji
 1 
 13  Left arrow to Xinsha
Zoo
Ouzhuang
 6 
Taojin (OSI to  12   13  Jianshe Liumalu)
Xiaobei
 11  Left arrow clockwise
Guangzhou Railway Station
 2   11   14   22 
 14  Left arrow to Dongfeng
 22 
Left arrow to Airport North (Terminal 2)
to Panyu Square Right arrow
Xicun
 8 
Xichang
 13 
 13  Left arrow to Chaoyang
Sima Creek
Zhongshanba
 11 
 11  Right arrow anti-clockwise
 6  UpperRight arrow to Xiangxue
Tanwei
 6 
connection to Line 6
 6  Down arrow to Xunfenggang
Jiaokou Bus interchange
Line 5
Simplified Chinese广州地铁5号线
Traditional Chinese廣州地鐵5號線
Transcriptions
Standard Mandarin
Hanyu PinyinGuǎngzhōu Dìtiě Wǔ Hào Xiàn
Yue: Cantonese
Jyutpinggwong2zau1 dei6tit3 ng5 hou6 sin3

Line 5 of the Guangzhou Metro runs from Liwan District to Huangpu District. It starts at Template:GZM stations running 31.9 km (19.8 mi) in a wide "∩" shape and ends at Template:GZM stations. Like line 4 and 6 it's equipped with linear induction motor technology. Line 5's color is red. Huangpu Line began operation on 28 December 2009, from Template:GZM stations to Template:GZM stations. As of May 2017, Line 5 carries an average of 1.05 million passengers per day and is extremely congested throughout the day, operating at over 100% capacity during rush hours.[4][5] The opening of Phase I of Line 13 further increased traffic demand on the west end of Line 5 and pushing congestion to over 130% capacity.[6] Prompting the Guangzhou Metro to limit passenger traffic at a number of subway stations on Line 5.[6] In the future Line 13 Phase II will provide relief for Line 5.

Opening timeline

Line 5 drawn to scale.
Segment Commencement Length Station(s) Name
Jiaokou — Wenchong 28 December 2009 31.9 km (19.82 mi) 24 (initial phase)

Stations

Station
No.
Station name Connections Distance
km
Location
English Chinese
5 01 Template:GZM stations 滘口 0.00 0.00 Liwan
5 02 Template:GZM stations 坦尾  6  1.75 1.75
5 03 Template:GZM stations 中山八  11  1.54 3.29
5 04 Template:GZM stations 西场  13  1.53 4.82
5 05 Template:GZM stations 西村  8  0.68 5.50
5 06 Template:GZM stations 广州火车站  2   11   14 

 GS  Guangzhou railway station GZQ

1.58 7.08 Yuexiu
5 07 Template:GZM stations 小北 2.40 9.48
5 08 Template:GZM stations 淘金  12   13  (both via Template:GZM stations) 1.10 10.58
5 09 Template:GZM stations 区庄  6  1.03 11.61
5 10 Template:GZM stations 动物园 1.09 12.70
5 11 Template:GZM stations 杨箕  1  1.05 13.75
5 12 Template:GZM stations 五羊邨  10  (Template:GZM stations) 1.06 14.81
5 13 Template:GZM stations 珠江新城  3  0.76 15.57 Tianhe
5 14 Template:GZM stations 猎德 1.15 16.72
5 15 Template:GZM stations 潭村 1.44 18.16
5 16 Template:GZM stations 员村  21  (to be replaced by  11 ) 1.79 19.95
5 17 Template:GZM stations 科韵路 1.55 21.50
5 18 Template:GZM stations 车陂南  4  1.37 22.87
5 19 Template:GZM stations 东圃 1.37 24.24
5 20 Template:GZM stations 三溪 1.55 25.79
5 21 Template:GZM stations 鱼珠  13  1.79 27.58 Huangpu
5 22 Template:GZM stations 大沙地 1.55 29.13
5 23 Template:GZM stations 大沙东  7  1.33 30.46
5 24 Template:GZM stations 文冲 1.19 31.65

Future Development

An eastern extension to Huangpu Passenger Port is currently under construction with opening scheduled in 2023. It is 9.76 km long and with seven stations.[7][8]

Station
no.
Station name Connections Distance
km
Location
English Chinese
5 25 Template:GZM stations 双沙 Huangpu
5 26 Template:GZM stations 庙头路
5 27 Template:GZM stations 夏园  13  Guangzhou Bus Rapid Transit GBRT
5 28 Template:GZM stations 保盈大道
5 29 Template:GZM stations 广州开发区
5 30 Template:GZM stations 黄埔客运港 Dongguan Rail Transit  1  (Planned)

Rolling Stock

Line 5 uses six car linear motor trains. In 2020, Guangzhou Metro started bidding for 14 additional trains to supplement the fleet in preparation for the east extension.[9]

Type Time of manufacturing Series Sets Assembly Notes
Type L 2008–2010 L2 30 Mcp+M+Mp+M+M+Mcp Manufactured by CRRC Qingdao Sifang[10]
Type L 2011–2013 L4 32 Mcp+M+Mp+M+M+Mcp Manufactured by CRRC Qingdao Sifang

References

  1. ^ "Guangzhou Metro - Railway Technology".
  2. ^ http://www.gzmtr.com/ygwm/gsgk/qynb/201806/P020180627541408016222.pdf [bare URL PDF]
  3. ^ 中秋假期广州地铁日均客流730万人次- 新华网. www.gd.xinhuanet.com. Retrieved 2016-09-17.
  4. ^ 广州地铁五号线最小行车间隔压缩至2分06秒_金羊网新闻. news.ycwb.com. Retrieved 2017-07-08.
  5. ^ "广州日报数字报-地铁高峰时段燕塘至广州东最挤". 2018-04-09. Archived from the original on 2018-04-09. Retrieved 2020-05-10.
  6. ^ a b "广州地铁 全程为你--公司新闻". gzmtr.com. Retrieved 2020-05-10.
  7. ^ "广州地铁5号线工可报告获批 将向东延至黄埔客运港站". gd.sina.com.cn. Retrieved 2020-08-22.
  8. ^ "广州地铁5号线东延段要开工啦!黄埔、开发区往返市区更方便!_网易新闻". 2018-01-22. Archived from the original on 2018-01-22. Retrieved 2020-08-22.
  9. ^ "详细页". www.gzggzy.cn. Retrieved 2020-08-22.
  10. ^ "地铁五号线最后一列运到 下月启用27辆新车_广州新闻_大洋网". 2017-01-14. Archived from the original on 2017-01-14. Retrieved 2020-08-22.