Jump to content

Pingguoyuan station: Difference between revisions

Coordinates: 39°55′36″N 116°10′39″E / 39.926727°N 116.177388°E / 39.926727; 116.177388
From Wikipedia, the free encyclopedia
Content deleted Content added
Heatgaga (talk | contribs)
No edit summary
Heatgaga (talk | contribs)
No edit summary
Line 45: Line 45:
'''Pingguoyuan station'''<ref name=map2021>{{cite web|url=https://www.bjsubway.com/jpg.html|publisher=北京地铁|title=北京地铁线路图|archive-url=https://web.archive.org/web/20211231004642/https://www.bjsubway.com/jpg.html|archive-date=2021-12-31|accessdate=2021-12-31}}</ref> ({{zh|s=苹果园站|t=蘋果園站|p=Píngguǒyuán zhàn}}) is a [[metro station|station]] on [[Line 1 (Beijing Subway)|Line 1]], [[Line 6 (Beijing Subway)|Line 6]] and [[Line S1 (Beijing Subway)|Line S1]] of the [[Beijing Subway]], located in [[:zh:苹果园街道 (北京市)|Pingguoyuan Subdistrict]], [[Shijingshan District]], [[Beijing]].
'''Pingguoyuan station'''<ref name=map2021>{{cite web|url=https://www.bjsubway.com/jpg.html|publisher=北京地铁|title=北京地铁线路图|archive-url=https://web.archive.org/web/20211231004642/https://www.bjsubway.com/jpg.html|archive-date=2021-12-31|accessdate=2021-12-31}}</ref> ({{zh|s=苹果园站|t=蘋果園站|p=Píngguǒyuán zhàn}}) is a [[metro station|station]] on [[Line 1 (Beijing Subway)|Line 1]], [[Line 6 (Beijing Subway)|Line 6]] and [[Line S1 (Beijing Subway)|Line S1]] of the [[Beijing Subway]], located in [[:zh:苹果园街道 (北京市)|Pingguoyuan Subdistrict]], [[Shijingshan District]], [[Beijing]].


The station for Line 1 was opened on April 23, 1973. Pingguoyuan station on Line 1 is closed for renovation from April 18, 2020 to late 2023.<ref name=reopen1>{{cite web|title=地铁1号线福寿岭站、苹果园站何时建成开通?|url=http://liuyan.people.com.cn/threads/content?tid=12639692|quote=且苹果园站是停运不停车,施工过程中还要确保地铁列车运行安全,所以施工进度有延迟。结构施工完成后还将进行机电设备、装修施工,预计在2023年底开通}}</ref> The station for Line 6 and Line S1 was opened on December 31, 2021.
The station for Line 1 was opened on April 23, 1973. Pingguoyuan station on Line 1 is closed for renovation from April 18, 2020 to late 2023.<ref name=reopen1>{{cite web|title=地铁1号线福寿岭站、苹果园站何时建成开通?|url=http://liuyan.people.com.cn/threads/content?tid=12639692|quote=且苹果园站是停运不停车,施工过程中还要确保地铁列车运行安全,所以施工进度有延迟。结构施工完成后还将进行机电设备、装修施工,预计在2023年底开通|archive-url=http://web.archive.org/web/20220319030027/http://liuyan.people.com.cn/threads/content?tid=12639692|archive-date=2022-03-19|accessdate=2022-03-19}}</ref> The station for Line 6 and Line S1 was opened on December 31, 2021.


The Line 1 station and Line 6 station are underground, and the Line S1 station is elevated.
The Line 1 station and Line 6 station are underground, and the Line S1 station is elevated.

Revision as of 03:05, 19 March 2022

Pingguoyuan[1]

苹果园
Beijing Subway
Line 6 platform
General information
LocationPingguoyuan South Road (苹果园南路)
Pingguoyuan Subdistrict, Shijingshan District, Beijing
China
Coordinates39°55′36″N 116°10′39″E / 39.926727°N 116.177388°E / 39.926727; 116.177388
Operated byBeijing Mass Transit Railway Operation Corp., Ltd
Line(s)     Line 1 (Closed until late 2023,[2] for renovation)
     Line 6
     Line S1
Platforms6 (1 island platform and 2 side platforms, 2 side platforms under renovation)
Tracks6
Construction
Structure typeUnderground (Line 1 & Line 6)
Elevated (Line S1)
AccessibleYes
Other information
Station code103 (Line 1)
History
OpenedApril 23, 1973 (Line 1)
December 31, 2021[3] (Lines 6 and S1)
ClosedApril 18, 2020 (Line 1) (for renovation until late 2023[2])
Services
Preceding station   Beijing Subway   Following station
Template:BJS lines
Template:BJS linesTerminus
Location
Pingguoyuan[1] is located in Beijing
Pingguoyuan[1]
Pingguoyuan[1]
Location in Beijing

Pingguoyuan station[1] (simplified Chinese: 苹果园站; traditional Chinese: 蘋果園站; pinyin: Píngguǒyuán zhàn) is a station on Line 1, Line 6 and Line S1 of the Beijing Subway, located in Pingguoyuan Subdistrict, Shijingshan District, Beijing.

The station for Line 1 was opened on April 23, 1973. Pingguoyuan station on Line 1 is closed for renovation from April 18, 2020 to late 2023.[2] The station for Line 6 and Line S1 was opened on December 31, 2021.

The Line 1 station and Line 6 station are underground, and the Line S1 station is elevated.

Station layout

Platform panorama of Line 1 Pingguoyuan station.

The line 1 of Pingguoyuan station has two underground side platforms and both are the only two platforms of Beijing Subway stations that haven't installed platform gates due to the aging of platform devices.

The station for Line 1 is closed for renovation, and the platform gates will be installed after the renovation is finished.[4]

Exits

There are 4 exits, lettered A, B, C, and D. All exits have a stairlift.[5]

Line 1

References

  1. ^ a b "北京地铁线路图". 北京地铁. Archived from the original on 2021-12-31. Retrieved 2021-12-31.
  2. ^ a b c "地铁1号线福寿岭站、苹果园站何时建成开通?". Archived from the original on 2022-03-19. Retrieved 2022-03-19. 且苹果园站是停运不停车,施工过程中还要确保地铁列车运行安全,所以施工进度有延迟。结构施工完成后还将进行机电设备、装修施工,预计在2023年底开通
  3. ^ "市重大项目办到苹果园交通枢纽现场办公". 2019-11-20.
  4. ^ "北京地铁1号线安全门全线投入使用". Beijing Municipal Commission of Transport. 2017-09-11. Archived from the original on 2017-09-12. Retrieved 2017-09-12.
  5. ^ 1号线. Beijing Subway 北京地铁官方网站 (in Chinese). Archived from the original on 2020-04-05. Retrieved 2020-10-21.