Jump to content

Line 4 (Chongqing Rail Transit): Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Under construction: Added content.
Western Extension: copy-paste, this is source for phase 2 stations
Tag: references removed
Line 328: Line 328:
{| class="wikitable"
{| class="wikitable"
! rowspan="2"| Station<br>No.
! rowspan="2"| Station<br>No.
! colspan="2" | Station name
! colspan="2" | Station name<ref>{{cite web|url=http://cq.people.com.cn/n2/2022/0126/c365401-35114006.html|date=2022-01-26|title=轨道4号线二期通过验收 28日进行不载客试运行}}</ref>
! rowspan="2" | Connections
! rowspan="2" | Connections
! colspan="2" rowspan="2" | Distance<br>{{small|km}}
! colspan="2" rowspan="2" | Distance<br>{{small|km}}

Revision as of 12:11, 17 April 2022

Line 4
Add→{{rail-interchange}}
Toutang Station platform
Overview
Native name重庆轨道交通4号线
StatusOperational
Line number4
LocaleChongqing, China
Termini
Stations8
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
History
Opened28 December 2018; 6 years ago (2018-12-28)
Technical
Line length15.7 km (9.8 miles)[1]
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1500 V DC Overhead line
Route map

Shunshuisi Park
Hongfan depot
Shimahelijiao
Yudaishan
Panxi
Dashiba
Daqingcun
Huahuiyuan
Longxi
Jiazhoulu
Min'an Ave.
Chongqing N. Station
N. Square
Toutang
Baoshuigang
Cuntan
Heishizi
Gangcheng
Taipingchong
Tangjiatuo depot
Tangjiatuo
Tieshanping
Luqi
Guoyuan Logistics Hub
Yuzui
Yanping
Shiheqing
Fusheng
Fusheng railway station
Sanbanxi
Longyi Ave.
Longxing
Gaoshita
Pufu
Tongzilin
Shichuan
Huangling
Shichuan depot

Line 4 of Chongqing Rail Transit is a rapid transit line in Chongqing, China.[2]

Since June 2020, some rapid trains through operate from Line 4 into the Loop line.[3]

Opening timeline

Segment Commencement Length Station(s) Name
N. Square of Chongqing N. Railway Station – Tangjiatuo 28 December 2018 15.7 km[1] 7 Phase I
Min'an Ave. – N. Square of Chongqing N. Railway Station 11 January 2019 1

Stations

Phase I

Phase I is 15.754 km in length (underground section is 11.075 km, elevated section is 4.679 km).[1]

In June 2018, debugging of the first segment of Phase I commenced.[4] Phase 1 of Line 4 began operating on December 28, 2018.

Service
routes
Station
Station name Connections Distance
km
Location
E L English Chinese
through-service to/from Tiaodeng via Loop line
4/01 Min'an Ave. 民安大道 Add→{{rail-interchange}} Yubei
4/02 Chongqing North Station (North Square)[a] 重庆北站北广场 Add→{{rail-interchange}}
4/03 Toutang 头塘 Add→{{rail-interchange}} Jiangbei
4/04 Baoshuigang 保税港 Add→{{rail-interchange}}
4/05 Cuntan 寸滩
4/06 Heishizi 黑石子
4/07 Gangcheng 港城
4/08 Taipingchong 太平冲
4/09 Tangjiatuo 唐家沱

Gangcheng station has not been opened yet.

Under construction

Phase II

Phase II is 32.8 km in length with 15 stations (10 underground stations and 5 elevated stations).[5]

Station
No.
Station name[6] Connections Distance
km
Location
English Chinese
4/10 Tieshanping 铁山坪 Jiangbei
4/11 Luqi 鹿栖
4/12 Guoyuan Logistics Hub 果园物流枢纽
4/13 Yuzui 鱼嘴
4/14 Yanping 雁坪
4/15 Shiheqing 石河清
4/16 Fusheng 复盛 Fusheng Railway Station Fusheng Railway Station
Add→{{rail-interchange}}
4/17 Sanbanxi 三板溪
4/18 Longyi Ave. 龙驿大道 Yubei
4/19 Longxing 龙兴
4/20 Gaoshita 高石塔
4/21 Pufu 普福
4/22 Tongzilin 桐梓林
4/23 Shichuan 石船
4/24 Huangling 黄岭

Western Extension

The Western extension of Line 4 started construction in March 2021. It will add 9 more stations west of Min'an Ave. station. The extension is 11 km in length.[7]

Station
No.
Station name Connections Distance
km
Location
English Chinese
Panguilu 盘桂路 Jiangbei
Shima Flyover 石马立交
Yudaishan 玉带山 Add→{{rail-interchange}}
Panxi 盘溪
Dashiba 大石坝 Add→{{rail-interchange}}
Daqingcun 大庆村 Yubei
Huahuiyuan 花卉园 Add→{{rail-interchange}}
Longxi 龙溪
Jiazhoulu 嘉州路 Add→{{rail-interchange}}

Notes

  1. ^ The former translation is North Square of Chongqingbei Railway Station, which has been changed since the opening of the Line 10's station

References

  1. ^ a b c "重庆轨道交通四号线一期工程".
  2. ^ "轨道交通4号线、5号线、10号线和环线 明年部分线路有望建成通车". May 17, 2016.
  3. ^ "轨道交通将跨线运行 唐家沱到重图不到40分钟-新华网". m.xinhuanet.com. Retrieved August 27, 2020.
  4. ^ "轨道4号线不载客试运行,有望年内投用". June 21, 2018.
  5. ^ "重庆轨道交通4号线进入全面主体结构施工阶段".
  6. ^ "轨道4号线二期通过验收 28日进行不载客试运行". January 26, 2022.
  7. ^ "重庆新开工4条轨道线路 看看这些站有没有经过你家". March 2, 2021.