Line 17 (Chengdu Metro): Difference between revisions
Line 46: | Line 46: | ||
* On Nov 11 2017, the first [[tunnel boring machine]] started digging section between Jiujiang North and Baifoqiao Stations.<ref>{{cite news| title =串联温江、武侯和双流 成都地铁17号线开始"打洞"|publisher = 四川在线| date = 2017-11-29 |url=http://sichuan.scol.com.cn/fffy/201711/56037269.html| accessdate = 2017-11-29| language = zh }}</ref> |
* On Nov 11 2017, the first [[tunnel boring machine]] started digging section between Jiujiang North and Baifoqiao Stations.<ref>{{cite news| title =串联温江、武侯和双流 成都地铁17号线开始"打洞"|publisher = 四川在线| date = 2017-11-29 |url=http://sichuan.scol.com.cn/fffy/201711/56037269.html| accessdate = 2017-11-29| language = zh }}</ref> |
||
* On March 24, 2019, Line 17 phase 1 elevated section was completed. |
* On March 24, 2019, Line 17 phase 1 elevated section was completed. |
||
* On April 9, 2019, |
* On April 9, 2019, Huangshi-Chengdu Fifth People's Hospital, Mingguang-#1 Vent Tunnel sections are completed. |
||
* On August 5, 2019, main structures of all stations on Line 17 was completed.<ref>{{cite news| title = 成都地铁17号线一期全线车站封顶 |publisher = 成都市温江区人民政府 | date = 2019-08-07 |url= |
* On August 5, 2019, main structures of all stations on Line 17 was completed.<ref>{{cite news| title = 成都地铁17号线一期全线车站封顶 |publisher = 成都市温江区人民政府 | date = 2019-08-07 |url= |
||
http://www.wenjiang.gov.cn/wjzzw/wjxw/2019-08/07/content_e5853693078941c6b98defd90d00625d.shtml |
http://www.wenjiang.gov.cn/wjzzw/wjxw/2019-08/07/content_e5853693078941c6b98defd90d00625d.shtml |
Revision as of 12:52, 17 April 2022
Chengdu Metro Line 17 | |
---|---|
17 | |
Overview | |
Status | Operational |
Owner | City of Chengdu |
Locale | Chengdu, Sichuan |
Termini | |
Service | |
Type | Rapid transit |
System | Chengdu Metro |
Operator(s) | Chengdu Metro Corporation |
Depot(s) | Yongyi Depot (永义车辆段) Wutongmiao Depot (五桐庙停车场) |
History | |
Planned opening | 18 December 2020[1] |
Technical | |
Line length | 26.15 km (16.2 mi) (in operation) |
Number of tracks | 2 |
Character | underground and elevated |
Electrification | overhead lines, 25,000 V AC |
Operating speed | 140km/h[2] |
Line 17 of the Chengdu Metro is an express metro line in Chengdu. The whole line is 50.945 km. The line uses 8-car Type-A trains operating up to 140 km/h speed powered by 25kV AC overhead lines.[3]
Phase 1 runs from Jinxing Station in Wenjiang District to Jitouqiao Station in Wuhou District. Phase 1 is 26.145 km long with 5.5 km running elevated and 20.6 km running underground. There are 9 stations with 2 elevated stations and 7 underground stations.[4][5]
Phase 2 extends the line west across central Chengdu to Gaohongcun Station. It is 24.8 km long, all underground with 18 additional stations.[6]
Progress
- On February 23, 2017, Sichuan Development and Reform Commission approved Line 17 Phase 1.[7]
- On February 27, 2017, Line 17 Phase 1 started construction.[8][9]
- On Nov 11 2017, the first tunnel boring machine started digging section between Jiujiang North and Baifoqiao Stations.[10]
- On March 24, 2019, Line 17 phase 1 elevated section was completed.
- On April 9, 2019, Huangshi-Chengdu Fifth People's Hospital, Mingguang-#1 Vent Tunnel sections are completed.
- On August 5, 2019, main structures of all stations on Line 17 was completed.[11]
- On Jan 7 2020, Line 17 Phase 2's Beimenqiao Station started excavation, marking the start of station construction for Phase 2.
- On March 25, 2020, Line 17 Phase 1 finished track-laying.[12]
- On June 19, 2020, Chengdu Metro started 3-month trial operation for Line 17.[13]
- On June 24, 2020, Construction finished for Wutongmiao Depot (五桐庙停车场) for Line 17.[14]
- On December 18, 2020, Line 17 from Jinxing station to Jitouqiao station was opened.
Operation
Line 17 Phase 1 and Line 19 Phase 1 will be running in connection as one route.
From 2024[15]
When Line 17 Phase 2 and Line 19 Phase 2 are finished, the operation plan will be:
Line 17 Section:Jiujiang North - Baifoqiao - Jitouqiao
Line 19 Section:Jinxing - Huangshi - Chengdu Fifth People's Hospital- Fengxihe - Wenquan Avenue - Mingguang - Jiujiang North
Stations
Station
№ |
Station name | Transfer | Distance km |
Location | ||
---|---|---|---|---|---|---|
English | Chinese | |||||
17 01 | Jinxing | 金星 | -- | 0.000 | Wenjiang | |
17 02 | Huangshi | 黄石 | 4.280 | 4.280 | ||
17 03 | Chengdu Fifth People's Hospital | 市五医院 | 2.962 | 7.242 | ||
17 04 | Fengxihe | 凤溪河 | 4 | 1.851 | 9.093 | |
17 05 | Wenquan Avenue | 温泉大道 | 2.038 | 11.131 | ||
17 06 | Mingguang | 明光 | 1.974 | 13.105 | ||
17 07 | Jiujiang North | 九江北 | 6.641 | 19.746 | Shuangliu | |
17 08 | Baifoqiao | 白佛桥 | 4.179 | 23.925 | Wuhou | |
17 09 | Jitouqiao | 机投桥 | 9 | 1.468 | 25.393 | |
References
- ^ "12月18日五线齐发,成都轨道交通运营里程突破500公里!".
- ^ "成都轨道交通17号线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川日报. 2017-08-01. Retrieved 2017-08-01.
- ^ "成都轨道交通17号线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川日报. 2017-08-01. Retrieved 2017-08-01.
- ^ "地铁19号线一期" (in Chinese). 成都地铁. 2017-10-16. Retrieved 2017-10-16.
- ^ "轨道交通17号线一期". Retrieved 2018-04-04.
- ^ "成都轨道交通17号线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川日报. 2017-08-01. Retrieved 2017-08-01.
- ^ "成都轨道交通11号线一期、17号线一期工程可研报告获批" (in Chinese). 四川新闻网. 2017-02-23. Retrieved 2017-02-23.
- ^ 成都地铁17号线一期开建 预计2020年通车_网易新闻. news.163.com. Retrieved 2018-08-19.
- ^ "成都地铁17号线一期开建 预计2020年通车" (in Chinese). 网易. 2017-02-28. Archived from the original on 2018-05-08. Retrieved 2017-02-28.
- ^ "串联温江、武侯和双流 成都地铁17号线开始"打洞"" (in Chinese). 四川在线. 2017-11-29. Retrieved 2017-11-29.
- ^ "成都地铁17号线一期全线车站封顶" (in Chinese). 成都市温江区人民政府. 2019-08-07.
- ^ "成都轨道交通17号线一期"长轨通" 温江将迎双地铁时代".
- ^ "即将开启空载调试、空载试运行 成都地铁9号线、17号线离开通也近了!".
- ^ "成都地铁17号线列车有家啦!五桐庙停车场主体工程完工".
- ^ "成都地铁17号线"最难建段"开始掘洞" (in Chinese). 四川在线. 2018-03-29. Retrieved 2018-03-29.