Line M101 (Beijing Subway): Difference between revisions
Appearance
Content deleted Content added
JamesBrierl (talk | contribs) |
JamesBrierl (talk | contribs) No edit summary |
||
Line 23: | Line 23: | ||
| operator = |
| operator = |
||
| character = Underground |
| character = Underground |
||
| depot = |
| depot = Fuhaocun |
||
| stock = 3-car Type A |
| stock = 3-car Type A |
||
| linelength = {{Convert|19|km|mi|abbr=on}} |
| linelength = {{Convert|19|km|mi|abbr=on}} |
Revision as of 23:20, 3 May 2022
Line M101 | |
---|---|
Overview | |
Status | Under construction |
Locale | Tongzhou district Beijing |
Termini | |
Stations | 14 |
Service | |
Type | Rapid Transit |
System | Beijing Subway |
Depot(s) | Fuhaocun |
Rolling stock | 3-car Type A |
History | |
Planned opening | 2027 | (planned)
Technical | |
Line length | 19 km (12 mi) |
Character | Underground |
Operating speed | 100 km/h (62 mph) |
Line M101 of the Beijing Subway (Chinese: 北京地铁M101线) is a rapid transit line under planning in Tongzhou District, Beijing, China. It will run from Shangwuyuan station to Zhangjiawan East station. The total length of the line is 19 kilometres (12 mi). It is fully underground. There will be 14 stations. It is scheduled to open in 2027.[1][2]
Stations
station name | Connections | |||||
---|---|---|---|---|---|---|
English | Chinese | |||||
Shangwuyuan | 商务园 | |||||
Tongzhou West Railway Station | 通州西站 | |||||
Tongshun Lu | 通顺路 | |||||
Tongzhou Huiyi Zhongxin | 通州会议中心 | |||||
Longwangzhuang | 龙旺庄 | |||||
Tonghu Dajie | 通胡大街 | |||||
Yudaihe Dajie | 玉带河大街 | |||||
Beijing Sub-Center Railway Station | 城市副中心站 | Pinggu 6 (via Beiyunhedong) | ||||
Xingzheng Bangong Xiqu | 行政办公西区 | |||||
Beijing Dajuyuan | 北京大剧院 | |||||
Tiyu Zhongxin | 体育中心 | |||||
Zhangjiawan West | 张家湾西 | |||||
Zhangjiawan | 张家湾 | |||||
Zhangjiawan East | 张家湾东 | |||||
References
- ^ "北京城市副中心M101线最新线路图公布 计划2027年年底通车". 2022-04-20.
- ^ "北京轨道交通M101线一期工程环境影响报告书(征求意见稿).pdf" (PDF). 2022-04-18.