Content deleted Content added
Yobot (talk | contribs)
m Tagging for WPNZ prelimary stage: Banner normalisation using AWB (10903)
reassessed as start class
Line 1: Line 1:
{{WikiProject Highways|oceania=yes|class=stub|importance=low}}
{{WikiProject Highways|oceania=yes|class=start |importance=low}}
{{WikiProject New Zealand|importance=low|class=stub}}
{{WikiProject New Zealand|importance=low|class=start }}


== Remove material - please provide refs ==
== Remove material - please provide refs ==

Revision as of 22:13, 23 June 2022

WikiProject iconHighways: Oceania Start‑class Low‑importance
WikiProject iconThis article is within the scope of WikiProject Highways, a collaborative effort to improve the coverage of highways on Wikipedia. If you would like to participate, please visit the project page, where you can join the discussion and see a list of open tasks.
StartThis article has been rated as Start-class on the project's quality scale.
LowThis article has been rated as Low-importance on the project's importance scale.
Taskforce icon
This article is supported by the Oceania Highways Task Force.
WikiProject iconNew Zealand Start‑class Low‑importance
WikiProject iconThis article is within the scope of WikiProject New Zealand, a collaborative effort to improve the coverage of New Zealand and New Zealand-related topics on Wikipedia. If you would like to participate, please visit the project page, where you can join the discussion and see a list of open tasks.
StartThis article has been rated as Start-class on Wikipedia's content assessment scale.
LowThis article has been rated as Low-importance on the project's importance scale.

Remove material - please provide refs

==Costs and section length== {| class="wikitable" border="1" |- ! Section ! Length ! Cost ($ million) ! Completion date |- | Upper Harbour Motorway SH18 | 12 Km | 400 | 2012 (Greenhithe section Dec 2007) |- | [[Waterview Connection]] SH20 - 16 connection | 4.5 Km (3.2 Km tunnel) | 2200 | 2015 (possibly later) |- | Mt Roskill extension SH20 | 4 Km | 186 | April 2009 |- | SH20 widening | 4 Km | 230 | Mid 2011 |- | SH20 - 1 connection | 4.5 Km | 210 | August 2010 |} All up the entire route could cost more than $3 billion dollars and may be completed by 2015, with possible tolling of one or more sections. The entire route is either 6 lanes or has the capacity to be expanded to 6 lanes later.