Tanjung Malim railway station: Difference between revisions
🥂🥂🥂🥂 Tags: Reverted Mobile edit Mobile web edit |
Undid revision 1096440955 by 103.155.223.42 (talk) |
||
Line 1: | Line 1: | ||
<!-- THIS STATION IS NOW ON |
<!-- THIS STATION IS NOW ON THE PORT KLANG LINE SINCE DECEMBER 2015 REVISION OF THE KTM KOMUTER TIMETABLE FOR THE KLANG VALLEY DOUBLE TRACKING UPGRADING PROJECT. THE PORT KLANG LINE RUNS FROM TANJUNG MALIM TO PORT KLANG, WHILE THE SEREMBAN LINE IS FROM BATU CAVES TO PULAU SEBANG/TAMPIN. KINDLY ENSURE YOUR INFO IS UP TO DATE BEFORE EDITING. A SIMPLE CHECK WITH THE KTM KOMUTER TIMETABLE AT WWW.KTMB.COM.MY WILL SHOW THAT. --> |
||
{{Infobox station |
{{Infobox station |
||
| style = KTM |
| style = KTM |
Revision as of 22:28, 4 July 2022
KA15 Tanjung Malim | ||
---|---|---|
Commuter rail and inter-city rail station | ||
General information | ||
Other names | Chinese: 丹绒马林 Template:Lang-ta | |
Location | Kampung Stesen Tanjong Malim, 35900 Tanjung Malim, Perak, Malaysia | |
Owned by | Keretapi Tanah Melayu | |
Line(s) | West Coast Line | |
Platforms | 1 side platform & 1 island platform | |
Tracks | 3 | |
Construction | ||
Parking | Available, free. | |
Accessible | Yes | |
Other information | ||
Station code | KA15 | |
History | ||
Opened | 1900 | |
Rebuilt | 2007 | |
Electrified | 2007 | |
Services | ||
Lua error in Module:Adjacent_stations at line 237: Unknown line "KL Sentral–Padang Besar". |
The Tanjung Malim railway station is a Malaysian train station stationed at the north eastern side of and named after the town of Tanjung Malim, Perak. The station provides both Komuter and ETS services.
The station was first constructed in 1900 and at the time, served as the halt for the intercity trains. As part of the Rawang-Ipoh double tracking and electrification project, it was rebuilt in 2007 and reopened two years later, on 1 June 2009, as the final stop in the Rawang-Tanjung Malim shuttle service (formerly known as the Rawang-Kuala Kubu Bharu shuttle service). The service has since 2016 been merged with the Port Klang Line, making Tanjung Malim the northern terminus of the line.
The station, unlike the four other stations along the shuttle route, is situated along three railways with three platforms. Its only similarity with the other stations on the shuttle route is that it also contains facilities normally reserved for medium-to-large stations along three or more lines. In addition to ticketing facilities and basic amenities, the station contains spaces for administrative occupants, as well as a kiosk and an additional foot bridge (fused with a foot bridge exclusively for Komuter users) for pedestrians that simply intend to cross the railway lines. The station also includes low-tech support for disabled passengers. The station exits northeast into a branch road that leads west into the town centre of Tanjung Malim.
The Tanjung Malim station's one side platform and one island platform are designated as Platform 1 (adjoining the main station building at the west, intended for northbound trains), Platform 2 (at the east, intended for southbound trains), and Platform 3.
Train services
- ETS Train No. EG9022/EG9032: KL Sentral–Ipoh
- ETS Train No. ES9051/EG9031: Ipoh–KL Sentral
- ETS Train No. EG9420/EG9425: Padang Besar–Gemas
- Port Klang Line services
References
- "KTM Komuter Services For Rawang - Rasa Sector Launched". Official Keretapi Tanah Melayu website. 21 April 2007. Archived from the original on 10 August 2007. Retrieved 3 May 2007.
- "KTM Komuter New Route : Rawang - Kuala Kubu Bharu". Official Keretapi Tanah Melayu website. 2 January 2008. Archived from the original on 23 December 2007. Retrieved 2 January 2008.
- "KTM Komuter service to Tanjung Malim, Perak (Perkhidmatan KTM Komuter Ke Tanjung Malim, Perak)". Official Keretapi Tanah Melayu website. 1 June 2008. Retrieved 3 June 2008.
{{cite web}}
: CS1 maint: url-status (link)
External links