Jump to content

West Coast MRT station: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
Added address, coordinates and the relation with Tanglin Sec Sch.
Line 19: Line 19:
| image =
| image =
| image_caption =
| image_caption =
| address =
| address = 301 West Coast Road
| coordinates =
| coordinates = 1.310790, 103.757656
| line = {{rail color box|system=SMRT|line=Cross Island}}
| line = {{rail color box|system=SMRT|line=Cross Island}}
| other =
| other =
Line 53: Line 53:
}}
}}


'''West Coast MRT station''' is a future underground [[Mass Rapid Transit (Singapore)|Mass Rapid Transit]] station on the [[Cross Island MRT line|Cross Island line]] (CRL) located in [[Singapore]]. First announced in September 2022, the station is expected to be completed in 2032 along with the other CRL Phase 2 stations.
'''West Coast MRT station''' is a future underground [[Mass Rapid Transit (Singapore)|Mass Rapid Transit]] station on the [[Cross Island MRT line|Cross Island line]] (CRL) located in [[Singapore]] and will be beside Tanglin Secondary School, which will be demolished to make way for the station. First announced in September 2022, the station is expected to be completed in 2032 along with the other CRL Phase 2 stations.
==History==
==History==



Revision as of 12:17, 20 September 2022

West Coast
 CR18 


西海岸
வெஸ்ட் கோஸ்ட்
Future Mass Rapid Transit (MRT) station
General information
Location301 West Coast Road
Coordinates1.310790, 103.757656
Owned byLand Transport Authority
Line(s)
Construction
Structure typeUnderground
AccessibleYes
History
Opening2032; 7 years' time (2032)
ElectrifiedYes
Services
Preceding station Mass Rapid Transit Following station
Clementi Cross Island Line
Future service
Jurong Lake District
Terminus
Location
Lua error in Module:Location_map at line 411: Malformed coordinates value.

West Coast MRT station is a future underground Mass Rapid Transit station on the Cross Island line (CRL) located in Singapore and will be beside Tanglin Secondary School, which will be demolished to make way for the station. First announced in September 2022, the station is expected to be completed in 2032 along with the other CRL Phase 2 stations.

History

West Coast station was first announced on 20 September 2022 by Transport Minister S Iswaran. The station will be constructed as part of Phase 2 of the Cross Island line (CRL), a 15-kilometre (9.3 mi) segment spanning six stations from Turf City station to Jurong Lake District station.[1][2] The station is expected to be completed in 2032.[3]

References

  1. ^ Chew, Hui Min (20 September 2022). "Six more MRT stations will be built in Phase 2 of Cross Island Line; to open by 2032". CNA. Retrieved 20 September 2022.
  2. ^ Kok, Yufeng (20 September 2022). "Cross Island Line phase 2 to open by 2032 with 6 MRT stations, from Turf City to Jurong Lake District". The Straits Times. Retrieved 20 September 2022.
  3. ^ "Cross Island Line Phase 2". LTA. 20 September 2022. Retrieved 20 September 2022.