Jump to content

Nanning–Pingxiang high-speed railway: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Crtruneer (talk | contribs)
this is place to put actual photo of the railway, not a place to show where the guangxi region is (that should be on guangxi page)
Crtruneer (talk | contribs)
No edit summary
Line 50: Line 50:
The railway is being built in two sections: Nanning to [[Chongzuo]], and Chongzuo to Pingxiang.
The railway is being built in two sections: Nanning to [[Chongzuo]], and Chongzuo to Pingxiang.


Construction on the Chongzuo to Pingxiang section started in 2020.<ref>{{Cite web|title=广西将建左至铁路!新设明东、龙州、凭祥东3-广西新闻网|url=http://www.gxnews.com.cn/staticpages/20200515/newgx5ebde0ec-19534944.shtml|access-date=2020-12-21|website=www.gxnews.com.cn}}</ref>
Construction on the Chongzuo to Pingxiang section started on 28 September 2020.<ref name="news202009">{{cite web |title=崇凭铁路开工,以后南凭祥动车只要1多小时 |url=http://news.gxnews.com.cn/staticpages/20200929/newgx5f720b98-19849444.shtml|date=2020-09-29 |archive-date=2021-09-07 |archive-url=https://web.archive.org/web/20210907074801/http://news.gxnews.com.cn/staticpages/20200929/newgx5f720b98-19849444.shtml }}</ref>


==History==
==History==

Revision as of 19:44, 26 October 2022

Nanning–Pingxiang
high-speed railway
Overview
Native name南凭高速铁路
StatusUnder construction
Termini
Service
Operator(s)China Railway Nanning Group
Technical
Line length119.3 km (74.1 mi) (Nanning–Chongzuo South)[1]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed250 km/h (155 mph)

Nanning–Pingxiang high-speed railway is a high-speed railway between Nanning and Pingxiang in Guangxi, China. Rather than being a central government initiative, this project is largely being coordinated at a regional level, in Guangxi.[2][3]

The railway is being built in two sections: Nanning to Chongzuo, and Chongzuo to Pingxiang.

Construction on the Chongzuo to Pingxiang section started on 28 September 2020.[4]

History

Erection of the overhead wires for the Nanning to Chongzuo section began in December 2020.[5]

Route

Between Fusui South and Pingxiang East, the line runs roughly parallel to the Hunan–Guangxi railway.

Stations

Station Name Chinese Transport connections
Nanning  1   2 
Wuxu Airport Nanning Wuxu Airport
Fusui South
Qujiu South (reserved)
Chongzuo South
Ningming East
Longzhou
Pingxiang East

Future Development

It would connect to railways in northern Vietnam, and this line is seen as the first stage of a high-speed network reaching as far as Singapore,[6][7] however Vietnam does not have near-future plans to continue the line to Hanoi. Cross-border traffic will therefore be limited to using the slow Hanoi–Đồng Đăng railway.[8]

References

  1. ^ "南凭铁路南崇段满图"试跑" 预计11月底正式运营".
  2. ^ "CHINA-SINGAPORE HS". Railways Africa. Retrieved 2011-02-19.
  3. ^ "Guangxi to build Nanning-S'pore high-speed rails via Laos, Thailand & M'sia - Apple Travel". Retrieved 2011-02-19.
  4. ^ "崇凭铁路开工,以后南宁到凭祥动车只要1个多小时!". 2020-09-29. Archived from the original on 2021-09-07.
  5. ^ "南崇铁路又有新进展!预计于2022年建成通车". gx.sina.com.cn. Retrieved 2020-12-21.
  6. ^ "Une ligne TGV va relier la Chine à Singapour". Retrieved 2011-02-19.
  7. ^ "High-speed railway to boost trade". Retrieved 2011-02-19.
  8. ^ "Lạng Sơn muốn làm đường sắt kết nối với Trung Quốc" [Lang Son wants to build a railway connecting to China]. TUOI TRE ONLINE (in Vietnamese). 2016-11-02. Retrieved 2021-04-08.{{cite web}}: CS1 maint: url-status (link)