Jump to content

Nanning–Pingxiang high-speed railway: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Line 76: Line 76:
|-
|-
|[[Wuxu Airport railway station|Wuxu Airport]]
|[[Wuxu Airport railway station|Wuxu Airport]]
|吴圩机场
|吴圩机场
|[[Nanning Wuxu International Airport|Nanning Wuxu Airport]]
|[[Nanning Wuxu International Airport|Nanning Wuxu Airport]]
|-
|-
|[[Fusui South railway station|Fusui South]]
|[[Fusui South railway station|Fusui South]]
|扶绥南
|扶绥南
|
|
|-bgcolor="lightgrey"
|-bgcolor="lightgrey"
|[[Qujiu South railway station|Qujiu South]] (reserved)
|[[Qujiu South railway station|Qujiu South]] (reserved)
|渠旧南
|
|-
|-
|[[Chongzuo South railway station|Chongzuo South]]
|[[Chongzuo South railway station|Chongzuo South]]
|崇左南
|崇左南
|
|
|-bgcolor="lightgrey"
|-bgcolor="lightgrey"
|[[Ningming East railway station|Ningming East]]
|[[Ningming East railway station|Ningming East]]
|宁明东
|
|-bgcolor="lightgrey"
|-bgcolor="lightgrey"
|[[Longzhou railway station|Longzhou]]
|[[Longzhou railway station|Longzhou]]
|龙州
|
|-bgcolor="lightgrey"
|-bgcolor="lightgrey"
|[[Pingxiang East railway station|Pingxiang East]]
|[[Pingxiang East railway station|Pingxiang East]]
|凭祥东
|
|}
|}



Revision as of 12:13, 5 December 2022

Nanning–Pingxiang
high-speed railway
Overview
Native name南凭高速铁路
StatusUnder construction
Termini
Service
Operator(s)China Railway Nanning Group
Technical
Line length119.3 km (74.1 mi) (Nanning–Chongzuo South)[1]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed250 km/h (155 mph)

Nanning–Pingxiang high-speed railway is a high-speed railway between Nanning and Pingxiang in Guangxi, China. Rather than being a central government initiative, this project is largely being coordinated at a regional level, in Guangxi.[2][3]

History

The railway is being built in two sections: Nanning to Chongzuo, and Chongzuo to Pingxiang. Construction on the Nanning to Chongzuo section started on 28 October 2018.[4] Construction on the Chongzuo to Pingxiang section started on 28 September 2020.[5]

Erection of the overhead wires for the Nanning to Chongzuo section began in December 2020.[6]

The Nanning to Chongzuo section is expected to open in November 2022.[1]

Route

Between Fusui South and Pingxiang East, the line runs roughly parallel to the Hunan–Guangxi railway.

Stations

Station Name Chinese Transport connections
Nanning 南宁站  1   2 
Wuxu Airport 吴圩机场 Nanning Wuxu Airport
Fusui South 扶绥南
Qujiu South (reserved) 渠旧南
Chongzuo South 崇左南
Ningming East 宁明东
Longzhou 龙州
Pingxiang East 凭祥东

Future Development

It would connect to railways in northern Vietnam, and this line is seen as the first stage of a high-speed network reaching as far as Singapore,[7][8] however Vietnam does not have near-future plans to continue the line to Hanoi. Cross-border traffic will therefore be limited to using the slow Hanoi–Đồng Đăng railway.[9]

References

  1. ^ a b "南凭铁路南崇段满图"试跑" 预计11月底正式运营".
  2. ^ "CHINA-SINGAPORE HS". Railways Africa. Retrieved 2011-02-19.
  3. ^ "Guangxi to build Nanning-S'pore high-speed rails via Laos, Thailand & M'sia - Apple Travel". Retrieved 2011-02-19.
  4. ^ "铁路建设快马加鞭 2023年广西将实现市市通高铁" (PDF). 2021-07-01. Archived from the original (PDF) on 2021-09-07.
  5. ^ "崇凭铁路开工,以后南宁到凭祥动车只要1个多小时!". 2020-09-29. Archived from the original on 2021-09-07.
  6. ^ "南崇铁路又有新进展!预计于2022年建成通车". gx.sina.com.cn. Retrieved 2020-12-21.
  7. ^ "Une ligne TGV va relier la Chine à Singapour". Retrieved 2011-02-19.
  8. ^ "High-speed railway to boost trade". Retrieved 2011-02-19.
  9. ^ "Lạng Sơn muốn làm đường sắt kết nối với Trung Quốc" [Lang Son wants to build a railway connecting to China]. TUOI TRE ONLINE (in Vietnamese). 2016-11-02. Retrieved 2021-04-08.{{cite web}}: CS1 maint: url-status (link)